1 Name of the Project (Stretch)
2 NH No.
3 Name of the concessionaire (SPV)
4 Names of the partners of SPV
5 Length of the stretch
6
Nature of project (2 lane widening, 2
lane to 4 lane, Expressway)
7
Toll collected by (Concessionaire/NHAI
appointed agency)
8
Nature of contract
(BOT/DBFOT/Annuity/OMT/EPC)
9 Major structures
10
Length start at (name of nearby town
and Chainage)
11
Length ends at (name of nearby town
and Chainage)
12 Project Cost
13
Project IRR (As per submitted
cashflow)
14 Concession Period
15
Status of the project (under
bidding/LoA/Financial Clouser/Under
construction /Under operation Under
some issues (Specify the same)
16
Project start date (Appointed date)
17 Construction Period (Yrs)
18 COD
19 No. of years under operations
20 Concession ends on (date)
21 Name of the lead banker
22 Other banks in cosortium
23 Equity component (Crs.)
24 Debt Component (Crs.)
25 VGF (If any) Crs.
26 Premium quoted (If any) Crs.
27
Toll Location (Chianage and nearby
village)
28 No of toll lanes
29 Routine maintenance estimates
30 Major maintenance estimates
29
Traffic Data (Pl provide annual avg
daily traffic)
Traffic Toll Rate Traffic Toll Rate Avg. Traffic Toll Rate Traffic Toll Rate
29a Car/Jeep/Van or LMV (Tollable) 2718
29b
Light Commercial vehicle, Light goods
vehicle, Mini bus (Tollable) 917
29c Bus or Truck (2 Axles) (Tollable) 1145
29 d
Heavy contruction machinery (HCM),
Earth moving equipment (EME) or
Multi axle vhicle (MAV) 3 to 6 Axles
(Tollable) 1513
29e
Oversized vehicle (7 or more axles)
(Tollabel) 9
No
4-Laning of Kaithal-Rajasthan Border Section of NH–152/65 from km 33+250 (Design km
0.000) to km 241+580 (Design Km 165.759) in the State of Haryana
Traffic Data analysis on the National Highway stretches
NH–152/65
M/s. IRB Infrastructure Developers Ltd. Mumbai (Bidder)
Kaithal (33.250 Km-stone of NH-152 present at site)
2013-14 2012-13 2011-12
Bid date (1st
operational year)
Not Required
PWD is maintaining the road to deposite amount of NHAI. The maintenacne amount
released for Rs. 76.6 lacs for the year 2014-15
Haryana-Rajasthan Border [Km 241.580 of NH-65 (new NH-52)]
Rs. 1146.57 Crores year 2012-13 civil construction cost
May be filled at NHAI HQ
do
do
do
27 Years including construction period
LOA issued on 06.05.2014
After Submission of Performance BG and Financial Closure, appointed date will be decided
166.259 Km.
2 lane to 4 lane
Concessionaire
BOT (Toll)
4 nos. of ROB, 5 nos. Flyovers, 13 nos. Minor Bridge & 23 nos. of Underpasses (5 nos. VUP
and 18 nos. of PUP/CUP)
5 lane in each side.
Not Applicable
234 Cr. Grant
Km 125.795 (Design km 36+776) Near Narwana, Km 171.580 (Design km 87+000) Near
Barwala & Km 212.400 (Design km 135+900) Near Barwa
2.5 Years (30 months)
COD will be after completion of construction
24.5 Years
After 27 years From Appointed Date
Will be given By Concessionaire, financial closure yet to be achieved.