Installation Guide of Hybrid power solution-Indoor Air-Condition site
40pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial
40pt
: R153 G0 B0
黑体
30pt
30pt
黑色
:
FrutigerNext LT Regular
: Arial
30pt
30pt
黑色
细黑体
Contents
• Installation preparative
Prepare the tools
Get familiar with system composition
• Installation process
• Installing equipments
Installing Inverter
Installing SAU
Installing temperature sensor
Remove Original battery
Installing Deep Cycle Battery
• Connecting the system cables
Connecting cables of battery
Connecting cables of SAU
Connecting cables of PCS1000
Check-up
• Conducting a Power-on Test
Setting SAU parameters
Conducting an Operation Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 3
Installation preparativePrepare the tools :
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 4
Get familiar with system composition with indoor battery
Installation preparative
Air-condition (A/C3) Installation is by air-condition supplier
NOTE: AMF maybe locate in the ATS box actually
When there are 2
battery strings, 2
current sensor
need be installed.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 5
Installation preparativeGet familiar with system composition with outdoor battery cabinet
Air-condition (A/C3) Installation is by air-condition supplier
Note: AMF maybe located in ATS box actually.
When there are 2 battery
strings, 2 current sensors need
be installed
(a3)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 6
1 Installing SAU
1) Install floating nuts to rack in the shelter.
2) Fix the SAU on the rack with bolts.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 7
2 Installing Indoor temperature sensorInstalling the temperature sensor on the battery rack by bundling tapes as shown in Figure 1
If the battery is installation outside, the temperature sensor should install at the inlet of BTS. As shown in
Figure 2
Figure 1 Figure 2
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 8
3 Remove original battery and installing Deep Cycle Battery
1).At least two persons are required in the transport of batteries. Otherwise,
batteries may fall and cause injuries.
2). Place batteries according to the diagram so that battery cables are
connected properly and short-circuits should be prevented.
3). Before connecting the cables to batteries, wear a pair of gloves and
wrap the handle of the socket wrench with PVC insulating tapes.
Tighten the bolts of batteries after connecting the cables .
4). Remove the protection caps for battery terminals when connecting
cables. After the cables are connected, Install the protection caps on the
battery terminals.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 9
Remove original battery and installing Deep Cycle Battery
3.1 Keep D.G running during the installing process to prevent the site out of power
Set the D.G in Manual mode, and start the D.G manually(Eg: ComAp InteliLite AMF25)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 10
Remove original battery and installing Deep Cycle Battery
3.2 Turn OFF the breaker in Power System which connected to the
battery. If it is the Fuse , remove it as below figure .
3.3 Remove the cables of original batteries
3.4 Remove the original battery.
3.5 Remove the battery rack.
FUSE
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 11
Removing original battery and installing Deep Cycle Battery-Battery inside shelter 4. Installing Deep Cycle Battery
Note1. Place batteries according to the diagram so that battery cables are connected properly
and short-circuits are prevented.
Note 2. Before connecting the cables to batteries, wear a pair of gloves and wrap the handle of
the wrench with black PVC insulating tapes. Tighten the bolts of batteries after connecting the
cables
Note 3. Remove the caps on battery terminals as connecting the cables. After connecting the
cables , install the caps on the battery terminals.
Note 4. Before battery installation, make sure the original circuit-breaker or fuse in power
supply system suit to the new installation total battery capacity . Replace the circuit breaker or
fuse which not suit exceeding charging current. Maybe use short bus bar to extend capacity.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 12
Removing original battery and installing Deep Cycle Battery-Battery inside shelter
Bearing mount
item:1Back barrier pole
Item:3
Floor stand
Item:4
front barrier pole
Item:2
fixer
item:17
insulated support
Item:22
bus bar
item:23
mutual inductor
installation-board
item:28
Output cover
item:25
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 13
1)Installing bottom bearing mount with 2
floor stands
3) Installing 8 barrier poles with 2 floor stands 4) Installing 2 diagonal poles with 2 floor
stands
Remove original battery and installing Deep Cycle Battery
2)Installing upper bearing mount with 2
floor stands
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 14
Remove original battery and installing Deep Cycle Battery
5)Mark out the direction of
batteries as follows
6)Install the 12 cells battery
of bottom layer
7)Install the 12 cells
battery of upper layer
8)Install the barrier poles
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 15
Remove original battery and installingDeep Cycle Battery
9)Install the cables between
batteries in the same layer
10) Install the cables between
batteries of different layers
11)After install insulated supporter and
bus bar (Connected method: 8 sets of M8
bolts, washers), install the connection
lines of output terminal.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 16
Remove original battery and installingDeep Cycle Battery
12) Install output protection
cover (item :25)
13) Install the caps (4 in total) 14)Output voltage between positive and
negative is more than 48 V.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 17
Remove original battery and installingDeep Cycle Battery
15) Install mutual inductor
installation-board(Connected
method: 2sets of M8 bolts,
gaskets) item :28
16) Install mutual inductor
Note: Arrow direction on the
mutual inductor suit to
charging current direction.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 18
Remove original battery and installingDeep Cycle Battery
17-1) Connect cables between
batteries and power system
17-2) Make sure there is no short
circuit and connect the switch or
fuse of the charging branch circuit
of batteries in the power supply
system.
17-3)Check on the PMU of power
system is there charge current of
battery .If yes, the battery is
installed successfully, or else
check the connections
Refer to “power system guide” as
setting the parameter of power
system
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 19
Note :Battery outside the shelter ,the following step should be
done before removing the original battery.
4.2 Installing MBBS battery cabinet
1.)Installing MBBS battery cabinet
Place MBBS on the base . Take horizontal adjustment
and fix it with expanding bolt
Note :At least 4 persons are required in the MBBS
moving
Removing original battery and installing Deep Cycle Battery (Battery outside shelter)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 20
2.)Remove the original DC
cable inside battery cabinet
Removing original battery and installing Deep Cycle Battery (Battery outside shelter)
Remove these two
DC cables
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 21
Removing original battery and installing Deep Cycle Battery(Battery outside shelter)
4.2 Installing Deep cycle battery
1. At least two persons are required in the transport of batteries. Otherwise, batteries
may fall and cause injuries .
2. Install batteries according to the diagram so that connect battery cables properly
and prevent short-circuits of battery.
3. Before connecting the cables to batteries, wear a pair of gloves and wrap the handle
of the wrench with black PVC insulating tapes. Tighten the bolts of batteries after
connecting the cables
4. Remove the protection caps for battery terminals when connecting cables. After the
cables are connected, Install the protection caps on the battery terminals.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 22
4.2.1. Set battery circuit breaker to “OFF”.
4.2.2.Instal Deep Cycle battery to rack as figure right.
Removing original battery and installing Deep Cycle Battery(Battery outside shelter)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 23
4.2.3. Installing mutual inductor
Note : The arrow direction on the
mutual inductor suit to charging
current direction.
4.2.4.Connect cables between batteries and between
battery and bar bus as below figure
Removing original battery and installing Deep Cycle Battery(Battery outside shelter)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 24
4.2.5 Connect cables (d4) between battery and power system as below figure .
Note : The arrow direction on the mutual inductor suit to charge current direction
Check and make sure that the connected cables are reliable and tight and the voltage of battery strings is
in (48~52.5VDC)and there is no short circuit of battery . Then insert the fuse of battery branch circuit
back.
BATT1
BATT2
Refer to “power system guide” as setting the
parameter of power system
Removing original battery and installing Deep Cycle Battery(Battery outside shelter)
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 25
Connecting the system cables
4.2 Connecting power cable (a3) of AC air-conditioner between ACDB and MBBS1/MBBS2 cabinet door.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 26
Connecting the system cables Connecting the system cables d1:Power cable between battery and
power system
d2: DC Power cable of inverter
d3:-48V sample cable of battery
a1: AC Power cable of inverter
a2: Power cable between inverter and
A/C3
s1: Signal cable (starting diesel
generator)
s2: Signal cable (starting diesel
generator)
s3: Mains input sample cable
s4:ATS output sample cable
s5:Signal cable of temp sensor
s6:Signal cable of current sensor
g1:SAU earthing cable
Safety Notes:
1.Turn off Mains/D.G before connect s3,s4 to be safety.
2.During cable connecting, make sure there is no short circuit between AC and DC
3.Follow the steps of this guide.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 27
Connecting the system cables1. Connecting cables of battery
d1:power cable between battery and power system has already done in step 17 between page 14 and 15
2. Connecting cables of SAU
Note:Turn SAU switch OFF before connecting cables of SAU
① Connecting earthing cable of SAU g1 to the shelter earth bar
② Connecting current sensor signal cable s6 ( if there are 2 battery strings,there are 2 pcs of cable s6)
③ Connecting -48V battery sampling cable d3 ( if there are 2 battery strings,there are 2 pcs of cable d3)
④ Connecting Temp sensor signal cable s5
SAU
g1
d3s5
s6
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 28
Connecting the system cables
⑤ Confirm again that power system is correctly connected to Deep Cycle battery ,and power system
can detect battery and there is charge current. If yes, stop the D.G, and turn OFF the output breaker
of DG .The system is powered by Deep Cycle battery. At this time , connect the cables between D.G ,
ATS and SAU (This step is very important to keep the worker out of danger and system OK)
⑥ According to the user manual of D.G ,disconnect the D.G 12V battery power cable and find the DG remote
on/off port to connect cable s1,s2 with SAU
SAU
s1
s2
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 29
Connecting the system cables
⑦ According to the user manual of ATS ,find the MAIN input of ATS and output of ATS to connect s3,s4 with
SAU on the correspond port on SAU panel.
SAU Side
ATS Side
s3
s4
s3s4
SAU
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 30
Connecting the system cables
⑧ Connect the D.G 12V battery power cable back
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 31
Connecting the system cables
4. Check-up
1)Check from the beginning of this guide if there is any cable that not connected .If yes, connect it or go on.
2)Use multimeter to check and insure that there is no any short circuit between any two cables of -48V ,
ground , L1 , L2 , L3 , N .
3)Check according to the System connection diagram to insure the each cable connection is correct , firm
and reliable.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 32
Connecting the system cables4) Check from the beginning of this guide if there is any cable that not connected .If yes, connect it or
else go on.
5) Use multimeter to check and insure that there is no any short circuit between any two cables of -48V ,
ground , L , N
6)Check according to the System connection diagram to insure the each cable connection is correct ,
firm and reliable.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 33
Conducting a Power-on TestConducting a Power-on Test
1. Setting SAU parameters
Set the switch of SAU ON to set the parameters of ”Battery capacity , Time etc ”
Item Value
Range
Default
Value
Configured value
Battery
Capacity 1
0~5000Ah 490Ah Set the values according to the actual requirements:
490 AH,600 AH,840AH,980AH,1200AH.
Battery
Capacity 2
0~5000Ah 490Ah Set the values according to the actual requirements:
490 AH,600 AH,840AH,980AH,1200AH.(Normally not used)
Time、Date Set the values according to the actual requirements.
D.G time OFF Schedule enable and set D.G OFF time 20:00
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 34
Conducting a Power-on Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 35
Conducting a Power-on Test
2.1 Conducting a Power-on Test system with Mains
1)Check whether the configuration displayed in the System management list is consistent with
the actual requirements. If it is not consistent, check the cables to ensure that they are
connected properly, and check the number and dimension of the devices.
2) Check the cables between battery and power system to ensure that they are connected
properly.
3). First turn on the inverter ,then turn the circuit breaker connected to the inverter ON in power
system. Check whether the inverter indicator LED is normal. If it is consistent, continue next
step .
4). Turn the circuit breaker connected to the inverter ON in ACDB. Check weather the inverter
indicator LED is normal. If it is consistent ,set the DG to AUTO mode.
Note: In normal case, the indicator LED “INV” on the inverter panel should ON and the indicator
LED “FAULT” is OFF . IF both the indicator LED “INV” and “FAULT” are OFF, check
weather there is voltage on the circuit-breaker in power supply system. If both the LED
“INV”and “FAULT” are ON, check and repair the inverter according to “Inverter user manual”
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 36
Conducting a Power-on Test
5) Turn the Mains knife switch OFF to cut the input of Mains.
6) Keep the switch of SAU ON and set the D.G on Auto mode ,then turn ON the MCB of
D.G output.
7)Select Test Mode of SAU, and press Enter. Then, select Yes or No through the
buttons ▲ and ▼. If you select Yes, the system enters the test mode. Select DG1
Control by pressing Enter. The up/down arrow keys enable you to select ON or OFF.
Select the button by pressing Enter. Set the dry contact of the D.G. to ON or OFF.
The D.G. will start or stop working after the setting. Two minutes later, the system
automatically exits from the test mode and operates in automatic mode. The dry
contact signals are restored to the original status. The D.G. power supply is restored
automatically.
8) Turn the Mains knife switch ON to connect the input of Mains .ATS will switch Mains to supply
power to the system. After about 5 minutes delay , D.G will stop. If D.G not stop, check the
connection of “Mains input sample cable”
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 37
Conducting a Power-on Test
9)Check the indicators of the SAU. In a normal working state, and there is voltage and current information
on the screen of SAU. If there is a fault alarm, perform troubleshooting operations according to the
Maintenance Guide.
10)If there is no default alarm after the system is run for some time, the test is complete.
11)Put the cover of battery shelf back and clear the site before leave.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 38
Conducting a Power-on Test2. 2 Conducting a Power-on Test System without Mains
1)Check whether the configuration displayed in the System management list is
consistent with the actual requirements. If it is not consistent, check the cables to
ensure that they are connected properly, and check the number and dimension
of the devices.
2). First turn on the inverter , then turn the circuit breaker connected to the inverter ON in
power system. Check whether the inverter indicator LED is normal. If it is consistent,
continue next step .
3). Turn the circuit breaker connected to the inverter ON in ACDB. Check weather
the inverter indicator LED is normal. If it is consistent ,set the DG to AUTO mode
4) Keep the switch of SAU ON and set the D.G on Auto mode ,then turn ON the
MCB of D.G output.
.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
35pt
32pt
) :18pt
Page 39
Conducting a Power-on Test
5)Select Test Mode of SAU, and press Enter. Then, select Yes or No through the
buttons ▲ and ▼. If you select Yes, the system enters the test mode. Select DG1
Control by pressing Enter. The up/down arrow keys enable you to select ON or OFF.
Select the button by pressing Enter. Set the dry contact of the D.G. to ON or OFF.
The D.G. will start or stop working after the setting. Two minutes later, the system
automatically exits from the test mode and operates in automatic mode. The dry
contact signals are restored to the original status. The D.G. power supply is restored
automatically
6)Check the indicators of the SAU. In a normal working state, and there is voltage and
current information on the screen of SAU there is no default alarm,. If there is a fault
alarm, perform troubleshooting operations according to the Maintenance Guide.
7)If there is no default alarm after the system is run for some time, the test is complete.
8)Put the cover of battery shelf back and clear the site before leave.