hpcl csr social audit report

56
Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban Samapti Guha Susanta Datta Zainab Kakal TISS National CSR Hub School of Management & Labour Studies Tata Institute of Social Sciences Mumbai 2011

Upload: llrkahappa

Post on 02-Dec-2014

196 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Samapti Guha

Susanta Datta

Zainab Kakal

TISS National CSR Hub School of Management & Labour Studies

Tata Institute of Social Sciences Mumbai

2011

Page 2: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 1

Acknowledgement

The social audit report on Swavalamban and Unnati projects would not have been possible without the

support of different stakeholders of these projects who have contributed directly and indirectly during the

audit process. We are grateful to Tata Institute of Social Sciences for giving us the opportunity to work on

this report. We would like to thank Prof. Sharit Bhowmik, Dean, School of Management and Labour

Studies, TISS for his immense support. We are also thankful to all support staff of School of Management

and Labour Studies and the Accounts Department of TISS.

We would like to thank Ms. Sonal Desai, GM, CSR and Mr. S. S. Sharma, Deputy Manager, and other

personnel of HPCL for their support. Without their support it would not have been possible for us to reach

the external stakeholders of these projects.

All Principals, training staff and other supporting staff of the studied ITI in Maharashtra and ITCs in

Bathinda, Punjab helped us to understand the implementation process during fieldwork and provided

relevant data related to the Swavalamban project. We would like to thank all of them.

We would like to thank Mr. Sougata Roy Chowdhury, Director, Skill and Affirmative Action, CII and

other staff of the same division of CII for providing data of Swavalamban project and connecting us to the

ITCs in Bathinda.

Mr. Manish Singh, Operational Head and Mr. Vikas Malhotra, Consultant of CQ Works Skill Pvt. Ltd.

provided relevant information about the implementation process adopted by CII, CQ Works Skill Pvt. Ltd

for Swavalamban project. We are grateful to them.

We are grateful to the Regional heads and Office managers of NIIT at Dehradun in Uttarakhand, Panipat

in Haryana, Rajamundhary in Andhra Pradesh, and Barasat in West Bengal for their extended cooperation

and enduring support. We also thank HPCL employees for their valuable inputs on the Unnati project and

providing data for the same project. We would also extend a warm thanks to the Head Masters, teachers

and students of each school who contributed magnanimously to our study with their comments and

insights.

SG, SD and ZK.

Page 3: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 2

Abbreviation

BIMT Bathinda Institute of Management & Technology

CII Confederation of Indian Industries

CSR Corporate Social Responsibility

DEO District Education Officer

FGD Focused Group Discussion

FY Financial Year

GOI Government of India

GM General Manager

HPCL Hindustan Petroleum Corporation Limited

ITI Industrial Training Institute

ITC Industrial Training Center

MES Modular Employable Schemes

MGNREGA Mahatma Gandhi National Rural Employment Guarantee Act

MOU memorandum of understanding

MS Excel. Microsoft Excel

NGO Non Government Organization

NIIT National Institute of Information Technology

PRES Pravara Rural Educational Society

PSU Public Sector Undertaking

SA Social Audit

SWOT Strength Weakness Opportunity Threats

TISS Tata Institute of Social Sciences

UK United Kingdom

VTP Vocational Training Providers

Page 4: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 3

Contents

Acknowledgement ........................................................................................................................................ 1 Abbreviation ................................................................................................................................................. 2 Chapter 1 ....................................................................................................................................................... 5 Introduction ................................................................................................................................................... 5

1.1 Background: ........................................................................................................................................ 5 1.2 Objectives of Social Audit .................................................................................................................. 6 1.3 Scope of Social Audit ......................................................................................................................... 6 1.4 Methodology ....................................................................................................................................... 7

� Unnati ............................................................................................................................................ 7 � Swavalamban ................................................................................................................................ 7

1.5 Outlines of the chapters/ reports ......................................................................................................... 8 Chapter 2 ....................................................................................................................................................... 9 UNNATI ....................................................................................................................................................... 9

2.1. Introduction ........................................................................................................................................ 9 2.1.1 Unnati ........................................................................................................................................... 9 2.1.2 Project Description ....................................................................................................................... 9 2.1.3 Rationale / Objectives of the project .......................................................................................... 10

2.2 Social Audit ...................................................................................................................................... 10 2.2.1 Governance Statement ............................................................................................................... 10 2.2.2 As-is Analysis ............................................................................................................................ 11

Table 2.1: As-is Analysis ............................................................................................................ 11 Table 2.2: Quality check Matrix for internal stakeholder ........................................................... 13

2.2.3 Stakeholder Mapping ................................................................................................................. 14 2.2.4 Stakeholder Analysis.................................................................................................................. 14

2.2.4.1 NIIT ..................................................................................................................................... 14 2.2.4.2 School Management ............................................................................................................ 15 2.2.4.3 Students ............................................................................................................................... 16 2.2.4.4 NIIT local trainers ............................................................................................................... 16 2.2.4.5 HPCL Officers .................................................................................................................... 17

Table 2.3: Quality check Matrix for external stakeholders ......................................................... 18 2.3. Social Accounting: Key issues ......................................................................................................... 18

Chapter 3 ..................................................................................................................................................... 24 SWAVALAMBAN ..................................................................................................................................... 24

3.1 Introduction ....................................................................................................................................... 24 3.1.1 Swavalamban ............................................................................................................................. 24 3.1.2 Project Description ..................................................................................................................... 24 3.1.3 Rationale .................................................................................................................................... 25 3.1.4 Objectives .................................................................................................................................. 25

Page 5: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 4

3.2. Social Audit ..................................................................................................................................... 26 3.2.1 Governance Statement ............................................................................................................... 26

3.2.1.1 Governance Statement between HPCL and CII .................................................................. 26 3.2.1.2 Governance Statement between Assessment Partner and CII ............................................. 28

3.2.1.2.1 City & Guild (Phase I – III) ......................................................................................... 28 3.2.1.2.2 Sona Skills (Phase IV) ................................................................................................. 29 3.2.1.2.3 CQ Works Skills Services Pvt Ltd (Phase V) .............................................................. 29

3.2.1.3: Governance Statement between Training Partner and CII ................................................. 29 3.2.2 Stakeholder Mapping ................................................................................................................. 30

3.2.2.1Structure of the Team ........................................................................................................... 31 Table 3.1: Stakeholders under Swavalamban ............................................................................. 31

3.2.3 Stakeholder Analysis.................................................................................................................. 31 3.2.3.1 Confederation of Indian Industries (CII) ............................................................................. 31 3.2.3.2 City and Guild ..................................................................................................................... 33 3.2.3.3 CQ Works Skills Services Pvt Ltd ...................................................................................... 33 3.2.3.4 Training Centers .................................................................................................................. 34

3.2.3.4.1 Industrial Training Institute (ITI), Lone ....................................................................... 34 Figure 3.1: Status of Passed out Students of ITI, Lone ........................................................... 35

3.2.3.4.2 Baba Farid ITI, Bathinda Punjab ................................................................................. 36 Figure 3.2: Status of Passed out Students of Baba Farid ITI, Bathinda, Punjab ..................... 36

3.2.3.4.3 Bathinda Institute of Management and Technology (BIMT) ....................................... 37 Figure 3.3: Status of Passed out Students of BIMT, Bathinda, Punjab ................................... 38

3.2.4 As-is Analysis ............................................................................................................................ 40 Table 3.1 As-is Analysis of different stakeholders ..................................................................... 40 Table 3.2: Quality check matrix for all stakeholders .................................................................. 44

3.3. Social Accounting: Key issues ......................................................................................................... 46 Chapter 4 ..................................................................................................................................................... 49 RECOMMENDATIONS ............................................................................................................................ 49

4.1 UNNATI ........................................................................................................................................... 49 4.2 SWAVALAMBAN ........................................................................................................................... 50 4.3 Alternative model for implementation .............................................................................................. 52

4.3.1 UNNATI .................................................................................................................................... 52 Figure 4.1: Alternative model for implementation of “Unnati” .................................................. 52

4.3.2 SWAVALAMBAN .................................................................................................................... 53 Figure 4.2: Alternative model for implementation of “Swavalamban” ...................................... 54

Page 6: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 5

Chapter 1

Introduction

1.1 Background:

Hindustan Petroleum Corporation Limited (HPCL) is a Fortune 500 PSU engaged in exploration,

production and distribution of petroleum products across the country. The Company aspires to take up

leading role in Corporate Social Responsibility (CSR) as this company believes CSR connects

businesses to society and helps them to participate in overall development of the nation. HPCL has

already implemented two projects "Unnati" and "Swavalamban" in different States in India. Tata Institute

of Social Sciences (TISS) strongly believes that implementation of these two projects is not the end of

CSR. To understand the impact of these projects, HPCL has engaged expert like TISS to carry out Social

Audit of these projects. In this context TISS team is submitting the final report on Social Audit of

“Unnati” and “Swavalamban” projects to HPCL.

Corporate Social Responsibility (CSR) activities of Hindustan Petroleum Corporation Limited (HPCL)

have been initiated since 1985. The purpose of HPCL CSR activities, which was taken from its VISION

and MISSION statement, is stated as follows:

a) “Serving the community is the purpose of our business.

b) Ensuring sustainable business process – financially, environmentally and socially, is our effort.

c) Using core competence, expertise and technology of our business to reach the common people,

especially the underprivileged, is our aim.

d) Developing capacity in the community is our strategy.

e) Enhancing human excellence and improving quality of life is our endeavor.” (Source: Bringing

Smiles 2009-10, HPCL)

According to CSR statement of purpose of HPCL, it is clearly stated as “HPCL’s CSR model has been

based on “Creating Shared Value”. The shared value model is based on the concept that corporate success

and social welfare are interdependent. A business needs a healthy, educated workforce, sustainable

resources and adept government to compete effectively. For society to thrive, profitable and be

competitive, businesses must be developed and supported to create income, wealth, tax revenues, and

opportunities for philanthropy and sustainability”

Page 7: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 6

Generally HPCL funded two types of CSR activities: one is project at corporate level, another is project at

field level. While corporate projects follow a top down approach, decided by HPCL top authority and

implemented to the field level with the help of implementing agencies, field level projects follow a

bottom up approach and are based on short term needs. Previously they have followed field level projects

as part of their CSR activities and covered more than hundred field level projects. From 2005-06 onwards,

the plan of CSR programme activities has been initiated at corporate level and HPCL has appointed

“Organization Dynamics”, a consultancy company, to conduct the baseline study. Accordingly, after

completing all the baseline study, as per requirement of HPCL, they have submitted a detailed report to

HPCL. That report is one of the guiding sticks of HPCL’s present CSR programme. On the basis of their

recommendations, HPCL has initiated seven full-fledged corporate projects. Two of these projects are

Swavalamban, and Unnati.

1.2 Objectives of Social Audit

Social Audit (SA) enables organizations to explore and generate their own values. SA provides a

coherent and clear image of HPCL and helps this organization to plan and execute their CSR

activities in a transparent and fair way.

It helps the organization to understand how each of the stakeholders of these projects has met the

assigned responsibilities.

SA helps HPCL to assess the capabilities of the implementing agencies and accordingly, the

organization can identify the plan its future CSR projects.

SA creates a new level of participative democracy focused on values and long term visions and in the

process makes HPCL transparent to stakeholders and supporters.

1.3 Scope of Social Audit

The social audit is a transparent process and documentation conducted to measure and manages the social

objectives of both Unnati and Swavalamban programme. It is geared to provide better governance

systems for any organization. The social audit is expected to deliver mechanisms by which HPCL can

identify inconsistencies between its aims and the final implementation of both Unnati and Swavalamban

programme. Using the audit report, HPCL can develop high levels of detailing in what they wish to

measure and verify and which will be appropriate to the needs of the organization as well as other

stakeholders. The audit will also aid HPCL to understand the current impact and limitations to impact. In

addition, it will provide HPCL a multi-stakeholder perception of its programme and help in formulation

of future CSR policies. Post the audit, HPCL can ensure greater verifiability of data and accountability

for the programme internally.

Page 8: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 7

1.4 Methodology

Unnati

Participative methods have been employed to engage stakeholders. The nature of the data is qualitative.

As it is a multi-stakeholder study, multiple research tools have been adopted. For the data collection

multistage sampling technique has been adopted. In the first stage, data has been collected from HPCL

through interview and focus group discussion. In the second stage stratified sampling technique has been

adopted to select the NIIT branch offices from four states for data collection regarding implementation of

Unnati. In the last stage, schools have been selected to collect the data from school students and teachers

through interview and focus group discussion. For interviews, semi-structured questionnaire has been

designed. The questions are based on the background, development, current conditions, and overall

implementation of the project. Even the environmental interactions of one or more individuals, groups,

communities, businesses or institutions involved in the projects have been studied.

Swavalamban

For the data collection, multistage sampling technique has been adopted. In the first stage, data has been

collected from HPCL, CII through structured interview and focus group discussion. In the second stage,

three training centers, Industrial Training Institute (ITI), Lone, Maharashtra; Baba Farid ITI, Bathinda,

Punjab and Bathinda Institute of Management & Technology (BIMT) have been selected on the basis of

their actual coverage in terms of number of passed out students over the last five phases. During the field

visit, we have conducted interviews with the principal of the training centers, organized Focused Group

Discussion (FGD) among the teachers about their perception about the programme, challenges they faced

and their suggestions to improve the programme. In the third stage, random sampling technique has been

adopted to select student beneficiaries to conduct the social audit. We have also collected data from both

the current students and passed out students by using semi structured questionnaire. We asked the

students about their perception of the programme, expectation after completion of training, future interest,

their problems and challenges during training and their suggestions for improvement of the programme.

In case of passed out students, the emphasis is given on their perception about the benefit of the

programme in terms of employment and increase in income.

Page 9: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 8

1.5 Outlines of the chapters/ reports

This report consists of four chapters. First chapter gives an overall idea about the scope of social audit for

HPCL CSR projects. The objective of this social audit is to judge whether a balance has been maintained

between the stated targets and achievements of Corporate Social Responsibility (CSR) activities of

HPCL. To do this, we need to check whether there exists any gap in the implementation processes with

reference to governance statement and also check the level of inconsistency exists in the delivery process.

The second and third chapters provide a proper social audit framework for project Unnati and

Swavalamban respectively. In both chapters, we provide governance statement of each stakeholder,

stakeholder’s mappings, stakeholder’s analysis with the help of inconsistency checking and quality check

matrix analysis. We discuss all key issues emerge from social accounting framework for both the projects

Unnati and Swavalamban. Finally chapter four provides recommendations and suggests alternative

models for implementation of Unnati and Swavalamban separately with a notion of running both projects

for long term sustenance basis.

Page 10: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 9

Chapter 2

UNNATI

2.1. Introduction

2.1.1 Unnati

The Unnati programme has been one of the flagship programmes of HPCL’s Corporate Social

Responsibility vision. While it began as a regional project, it grew to a national scale and has been

executed so since 2009. This year, HPCL along with NIIT, trained 4000 students across India’s urban,

rural and semi-urban centers where HPCL operates. While the pilot project was conceived and conducted

in Andhra Pradesh, in 2010, the Unnati programme spread to the northern regions covering 10 states, 12

towns and 14 schools. HPCL has developed a partnership with NIIT for the implementation of the

programme. While NIIT is in charge of the courseware and the training, HPCL funds and supports the

programme.

2.1.2 Project Description

Unnati is a joint execution of HPCL and NIIT and it has specific roles and responsibilities for both the

stakeholders. While NIIT chooses the schools, HPCL makes the final selection. The schools are chosen

based on three criteria:

- The school should not have had any prior access to or training for computers.

- The school must serve the poorest of the poor.

- The school should be in a location decided by HPCL.

Once, the school is chosen and agrees to participate, the training is carried out by NIIT staff. The

courseware is distributed, regular tests are carried out and classes are organized in coordination with the

school principal and the school timings. HPCL local officers are appointed by the HPCL head office to

monitor the programme. These officers are required to make surprise visits and examine the progress on a

regular basis. The important measure is that the students should be learning. At the end of the programme,

a final examination is carried out by the NIIT staff in presence of HPCL officers and based on the results,

students are awarded with certificates. HPCL donates a number of computers to each school for the

further use and practice.

Page 11: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 10

2.1.3 Rationale / Objectives of the project

The programme was formulated to fill the existing gap created by the lack of access to computer

education in schools for students in high school moving to college education. The Unnati programme

aims to provide basic computer skills and education to school children from selected schools. The

programme aims to result in increased employability and raised self esteem among students.

2.2 Social Audit

2.2.1 Governance Statement

HPCL is a Fortune 500 company, with an annual turnover of Rs. 1,08,599 Crores and sales/income from

operations of Rs 1,14,889 Crores (US$ 25,306 Millions) during FY 2009-10, having about 20%

Marketing share in India and a strong market infrastructure.

The Unnati programme was conceived in order to develop knowledge about computers for students of

economically backward schools so that they are at par with other mainstream school students when they

reach high school. The schools were chosen by HPCL in areas where they had their centers so that the

monitoring of the programme would be easier and the local environment in which HPCL existed would

profit from the initiative.

HPCL currently has not articulated the vision or mission of the Unnati programme.

This lack of mission and vision for Unnati programme has led to the ultimate absence of strategic

planning for the coming years and focus on solely medium-term and short-term objectives. This approach

has deterred the overall potential impact of the programme. Recognized problems and issues have also

unfortunately not been solved and hence, an incremental slope that should have ideally been observed in

the programme is missing. However, it has clearly expressed the internal rules guiding how the project

will be executed. Many of those rules are considered to be functional guidelines and have led to the

programme execution to be vague and inconsistent with the prescribed regulations.

The MOU also lists many potential problem areas. It calls for detail and feedback mechanisms to ensure

that the programme is effectively executed. However, the same MOU also mentions that none of the

statements are binding on the parties.

Page 12: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 11

Additionally, there is a lack of motivation and passion from the HPCL employees. Their approach to their

duties towards Unnati displays their minimal comprehension of the programme and its ultimate aims.

This is also due to the lack of the articulation and marketing of HPCL’s CSR vision and mission

internally within the organization. The overall mission and vision of HPCL as an organization does not

mention stakeholders other than the employees and customers and hence does not aid their social aims.

Most importantly, there exists a requirement of a social value base across the organization regarding the

social purpose of HPCL - i.e. the social objectives of HPCL have a top-down approach resulting in lack of

participation of employees and other stakeholders and lack of further innovation. This top-down approach

also weakens the programme due to lack of adequate and appropriate feedback from HPCL personnel

who is based on the field. In one case the local HPCL office was completely unaware of their required

participation in the project. In other cases, the offices interpreted their participation on their own means.

On the positive side, HPCL has a strong hold on accountability. It lays great emphasis on documentation

and monitoring. However, the efficacy and efficiency of the monitoring process suffers due to the innate

lack of consensus orientation and participation from the employees and other stakeholders. It also leads to

compromising on transparency and accountability issues which HPCL and NIIT both uphold.

2.2.2 As-is Analysis

Table 2.1: As-is Analysis

No. Objective/ Rule Inconsistency Comments 1. NIIT will chose schools

locations as decided by HPCL

- Personal connections of NIIT and HPCL employees play an important role in influencing the final decision

- Urban schools may be chosen by NIIT/HPCL for ensuring easy success

NIIT’s competence is not in choosing schools and hence, this aspect has greatly suffered

2. The training will be minimum 40 hours duration for each student with 6-days classes per week, at least once per week for each student in each standard

This has not been implemented due to the available school hours, lack of school infrastructure, the structure of the school curriculum and problems with intermittent electricity

As per NIIT, In some areas, there was no electricity available all day and hence, it was absolutely impossible to implement the programme successfully.

3. During the training period, minimum 3 tests will be conducted in order to gauge the effectiveness of the training

Tests have not been conducted at various centers due to the lack of adequate hours and urgency to finish the programme

In many cases, test answers were provided to students by NIIT.

Page 13: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 12

No. Objective/ Rule Inconsistency Comments 4. During the duration of the

training, the adequate number of computers (approximately 10 computers for every 200 students) will be installed in each school so that the students can continue to practice in their leisure time

The number of computers installed was much less than the students due to the lack of infrastructure in the schools. On an average 2-5 students would use the computer at any time

The computers were not made available without a trainer during leisure time and the school did not want to provide the computers to the students in the absence of the trainer

5. After the computer training is over, a test will be conducted in the presence of a HPCL officer to ascertain the effectiveness of the training/learning

HPCL officers did not make their presence at the school during the tests due to the long hours of the tests and the unplanned nature of the same

Some HPCL officers were not even aware of this requirement.

6. Certificates will be given to only those students whose attendance is minimum 60% and who have passed in at-least two written tests

All tests were not conducted. In some schools, no test other than the final examination was conducted. Certificates were given to all students in most cases.

7. Entire course curriculum should be prepared in English/Hindi as per the suitability

The final exam was conducted on software in English even for Hindi speaking students. In areas like Rajmundhary and Barasat, courseware in Hindi could not be read by students.

8. Course content includes usage of Internet and Email

Neither was taught in both the schools visited

In some cases, NIIT said that it was not within their agreement to have taught Internet and Email.

9. Each student will be given his respective courseware

Students did not receive courseware till the end of the course

Due to the inability to find a suitable school, it was decided to teach the 10th standard students of the school. Books for these students could not be arranged for till the last minute.

10. HPCL had to arrange to enablement of internet connectivity at the training locations

There was no internet connectivity available such that the internet module that was to be taught to the students was completely ignored

In some cases, interested local NIIT officers used their phones to show what internet was and could do

11. All students of the class will be trained

Selected students were trained in schools to ensure they did not cross the pre-determined number

These numbers were often chosen by the school. Often the brightest students would be picked.

12. School had to be in charge of infrastructure and electricity

Most schools selected did not have access to suitable infrastructure and did not want to pay for a generator

HPCL in Rajmundhary claimed to have paid the electricity costs.

Page 14: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 13

Based on the above inconsistencies, the following quality check matrix has been created. This matrix

highlights the degree of inconsistency and provides pointers for further deliberation.

Table 2.2: Quality check Matrix for internal stakeholder

Quality criteria Scoring Categories Not

Applicable Fully Fairly Hardly Not at all

Is there a relevant governance statement that describes the CSR programme of HPCL?

x x X x √

Are the programme rules clearly listed?

x x √ x X

Are the programme rules covering every aspect of the planning?

x x X √ X

Did stakeholders participate in creating the governance statement?

X x X x √

Are problems or lack of information identified as one of the objectives?

X x X √ x

Are the values of the programme clearly stated?

x x X √ x

The Quality matrix check clearly highlights some critical issues. The programme is in dire need of a

vision and mission statement. A governance statement can emerge out of the same. A well developed

plan is extremely essential to ensure systematic implementation of the programme at the nationwide scale.

For any socially-oriented programme, it is pertinent that the stakeholders are continually engaged and

involved in the planning process. There is absolutely minimal stakeholder involvement in the planning

and execution. The next section on stakeholder mapping will better define the current stakeholder

engagement.

Page 15: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 14

2.2.3 Stakeholder Mapping

Stakeholders form an important component of every social audit and it is important to identify and

understand the level of interest and power of each stakeholder. For the Unnati programme, there exists

multiple stakeholders – primary as well as secondary.

The primary stakeholders include:

- HPCL

- NIIT

- School Management

- Students

The secondary stakeholders include:

- District Education Officer

- NIIT local trainers

- HPCL local officers

2.2.4 Stakeholder Analysis

While it is clear that there exists a serious lack of communication within HPCL, this section will focus

mostly on external stakeholders. Stakeholders play an important and significant role in the success of any

programme. A positive stakeholder relationship also signifies a higher value base for the programme and

increases overall integrity of the programme.

2.2.4.1 NIIT

- Perception

While NIIT is a joint partner and is in charge of the execution of the programme, it views HPCL critically

and skeptically. NIIT is the sole executioner of the programme while it is HPCL that makes all key

decisions. This equation has strained their relationship and NIIT views HPCL as a demanding yet not

collaborative partner. For example, the NIIT offices reported that the local HPCL office only connects

with the local NIIT office when issues regarding the project come up and demand accountability for the

same. NIIT feels they are at the receiving end of every problem and do not get their due. Also, there is a

common feeling that the local HPCL office is only the monitoring and funding agency that steps in at

their terms and is not fully corporative and supportive during the implementation. NIIT finds it difficult to

deal with operational problems of which they are many and requires HPCL’s support in solving some

critical problems which are beyond their control. NIIT feels that they are at HPCL’s disposal and behave

like an agency employed by HPCL more than a collaborator.

Page 16: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 15

- Implementation

NIIT believes that HPCL needs to be more sensitive of the needs of the programme and alter it so as to

systemize it and ensure effective implementation and overall success. NIIT has had difficulties in trying

to find the most fitting school. Once, the school is found and agrees on the implementation of the

programme, it often lacks suitable infrastructure and this often results in bad management of computers.

E.g. Dripping ceiling during rains and recurring power failures have destroyed computing devices. This

could also possibly be due to use of old equipment by NIIT.

- Achievement

NIIT is not convinced that the programme is achieving much. According to them, because the students

belong to lower sections of the society, they do not have the ability to grasp concepts easily and the

training is wasted on most of the students. Also in the current environment and the method in which it is

being implemented, it cannot have many in-depth effects. NIIT believes that even if the programme does

not satisfy any other stakeholders, it definitely gratifies the students.

2.2.4.2 School Management

- Perception

The school views the Unnati programme as either an additional responsibility or a productive opportunity

depending on the School Management. While most public schools do not have much incentive to take up

the programme because of the lack of infrastructure and support available, some proactive schools use

Unnati to gain the support of HPCL and give their school students leverage. Schools are aware of the

importance of such training and encourage students and NIIT/HPCL to continue the classes at a higher

level and include more students so that the students can maximize their learning and every student in the

school has the opportunity to learn.

- Implementation

Once the infrastructure is provided, the school needs to communicate with NIIT for the proper execution.

If the school leadership is active, it results in the monitoring of the programme internally such that the

monitoring by HPCL is completely rendered useless and unnecessary. The school plays an extremely

important role in order to ensure the success of the programme. Schools where Unnati has been a massive

success had to modify their regular time-tables and school hours and continually connect with NIIT on a

daily basis. In case of inactive leadership, the programme happened on its own pace often stretching to 5-

6 months and classes being irregular and ill-equipped.

Page 17: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 16

- Achievement

Though the school management is appreciative of the programme, it feels that the programme needs to

continue for the next batch of students in addition to a higher level of computer training for the current

students. While some forward looking schools have considered options for using the donated computer

efficiently, for other schools, they are just another accessory and they have no plans for using them or

maintaining them.

2.2.4.3 Students

- Perception

The students view the programme very positively. They are happy with NIIT and its trainers. They view it

as an important achievement for themselves. They do not realize the overall implication of learning or the

necessity of the same. They were just interested in the more glamorous programmes like Paint and did not

see much need of studying MS Excel.

- Implementation

Though the students were satisfied with the training in spite of its gaps, they were deeply frustrated with

the computers which did not function or continued to get spoilt repeatedly. They were unhappy that at

most times, the equipment was broken. At all times, either one of the parts of the computer was not

functioning which rendered it useless during class.

- Achievement

The students believe that they learnt a lot and are always awaiting a chance to practice. They know that

the knowledge of the computers is essential for them. They are thankful that they had the opportunity to

learn the computer. However, they are not aware of the importance of what they are learning. Some also

feel that they are not getting the best of the programme and training because they are poor.

2.2.4.4 NIIT local trainers

- Perception

NIIT local trainers were either NIIT students who were in higher training or regular trainers. This would

depend on location of the school. They viewed the classes as another chore or responsibility.

- Implementation

The trainers found it immensely difficult to train students. They had to modify the modules often to make

the students understand better. In many cases, when the infrastructure did not allow it, the trainers used

Page 18: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 17

available equipment resourcefully to teach the students. Also, because the students belonged to poor

households, they believed that the students used the equipment in a rougher fashion which resulted in

breaking down of equipment on a much more regular basis and sooner than otherwise.

- Achievement

The trainers do not view the programme to be or become a successful one. It has too many lose gaps

which they take care of on their own and it cannot be possibly a sustainable effort from their side. They

also retort that though the students are learning, they shall soon forget if they do not practice. Also, in the

absence of maintenance for the computers, they are sure to get spoilt very soon. The programme is

viewed to be a token effort without far-reaching impacts.

2.2.4.5 HPCL Officers

- Perception

The HPCL officers view the programme as another official deliverable. They are willing to do what is

necessary and conveyed to them from the Head Office but have not involved themselves completely even

if they are aware of some drawbacks and issues.

- Implementation

The HPCL officers made weekly/fortnightly trips to the schools to monitor the programme. Often, more

than one officer was involved in the monitoring. Monitoring involved asking the students questions about

what they learned and checking with them and the school management ensuring the smooth function of

the programme. There is no standard monitoring or reporting process and each officer does it in his own

way. When the Head Office insists, emails about the progress and current status are sent accordingly.

- Achievement

The HPCL officers view the programme as something good that HPCL is doing at the side. They see

themselves as benevolent do-gooders. They believe that considering the social and economic situation of

the students, the programme is a huge advancement for them.

Page 19: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 18

Table 2.3: Quality check Matrix for external stakeholders

Quality criteria Scoring Categories Not

Applicable Fully Fairly Hardly Not at all

Do the stakeholders know about the organization?

X √ X x X

Are the stakeholders clearly defined?

X √ X x X

Is there effective dialogue among stakeholders?

X X X √ X

Did stakeholders participate in creation of the programme?

X X X x √

Are stakeholders satisfied with the programme?

X X √ x x

Are stakeholders appropriately involved in the execution of the programme?

X X √ x x

2.3. Social Accounting: Key issues

- Top down Approach of programme planning and execution

The programme seems to be based on a variety of assumptions. They range from - schools need the

programme and will easily consent for the realization of the programme to the very belief that schools

will maintain these computers so high school students can actually practice and remember these skills

when they move to college. As per the programme, the selected school must not have any computer

access at all. In most states, government’s education programme allows for computer distribution and

access to schools. In this circumstance, it becomes close to impossible to find a school where there are no

computers resulting in forged data for school selection.

While this is one example, due to inept inadequacies in the planning, an element of deception has entered

the project which was completely avoidable.

Page 20: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 19

- Lack of infrastructure in schools

This has been a common issue for most schools as schools do not have the current capacity required to set

up a lab of 10 computers for students. This requires electrical components as well as space. In some cases,

where space was provided, walls and ceilings would drip during monsoons harming the computers. The

computers would often not work due to either provision of bad computers by NIIT or bad maintenance by

the schools. According to NIIT, another reason was that the poor students could not use them properly

and rendered them spoilt. In the case of Rajmundhary, there was a security problem as the area where the

school was located for perceptible to robbery and there was always a threat that the computers could get

stolen or destroyed by vandals. In Panipat, the space provided for the computer class was extremely small

hardly fitting 6-7 computers. This resulted in 5-6 students sitting together and working. This also gave

each student 5 minutes of working time on the computer which is not enough time to practice what they

have learnt.

- Changing methodology used by NIIT

NIIT changed its teaching methodology at various centers. At Barasat, few students, chosen by the school

authority, were trained and they taught the other students. At Dehradun, two trainers divided the class in

groups and taught each groups of students individually. While this difference in methodology was due to

the location constraints on occasion, in general this difference was avoidable. The change in methodology

has also caused changes in overall impact and monitoring.

- Use of computers during extra time

Though the lab was intended to be available for students for additional practice, in most cases it was not

utilized. Many of the students stayed away from the school and would leave immediately. In one case, the

lab could not be kept open for the students till later because of security issues. In most cases, due to

infrastructure problems, the labs were used for most of the day and there was no time for extra practice.

- Lack of electricity

Many chosen locations had electricity problems and due to the lack of generators, the machines would

often get spoilt and classes were difficult to conduct. As mentioned before, in this situation, it was

difficult to understand which stakeholder would bear the cost of the generator or any other equipment

required to be used for conducting the class. This was especially so, since, HPCL chose the locations and

the schools and NIIT was the implementing partner. Putting in a backup system on computers was also

expensive for NIIT. Data would often be lost due to intermittent electricity and the computers will also be

rendered useless at many times after too many electrical cuts.

Page 21: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 20

- Lack of incentives for School Management

School managements who play the primary role in ensuring the success of the programme currently have

no incentives to play an effective role in the implementation of Unnati. There exists no motivation

towards devoting time or effort for the successful execution of the programme. It is falsely assumed that

the School management will be eager to take up this programme because it helps the students and is

conducted as charity. In many cases, NIIT has reported that schools have not shown interest in

implementing the programme as it does not fall under the purview of their work. In addition, most of the

schools have lack of staff and infrastructure and do not want to get an added workload that will come

from implementing the programme. If Unnati aims to be a sustainable programme, it needs to motivate

the school management and its HPCL officers and provide adequate incentives for the schools which are

participating in the programme.

- Success criteria not clear

After the programme was envisioned, there have been no clear evaluation criteria for the social impact.

Key indicators to monitor the impact were developed but the overall social impact was not taken into

consideration. This has resulted in the limited reach and accomplishment of the programme. The NIIT

staff considered the programme successful because the students were happy with learning computers. The

school considered it a success if all students attended and received certificated and the school received the

donated computers. While it is obvious that each stakeholder has his own internet and motivations, the

lack of an overall criteria or indicator system has deflated the expected impact. For example, NIIT’s

measure of their success based on fulfilling the student’s expectation, very often was a way for them, to

move away from their original responsibility which is to teach the students effectively. Especially because

they became lax on effective training by assuming the students came from an impoverished background

and hence, could only learn a bit and were incapable of understanding and grasping everything. Also,

because the students were very often using the computers for the first time, they were satisfied with little

they learnt and were happy just operating on ‘Paint’. In general, the programme has been poorly

developed and hence has generated several implementation issues and delivered little impact.

- Review of roles and responsibilities of stakeholders

There is asymmetry of information and expectations within stakeholders. While there is wide consensus

of the inputs the school is supposed to bring to the programme, there are also exceptions. For example,

the school is expected to provide the infrastructure but cannot ensure the electricity. NIIT expects the

school or HPCL to get a generator. The school accepts HPCL or NIIT to arrange for it. This causes much

Page 22: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 21

confusion and is potentially damaging for long-term alliances. The current roles and duties need to be

reinterpreted and enforced for better implementation and understanding of Unnati.

- Lack of NIIT Faculty

In remote locations, NIIT has faced problems of securing faculty. In particular areas where the schools

were far away from the NIIT centers, continued faculty engagement was difficult as the trainers would

not be willing to travel to the school on a daily basis. It is also difficult to manage this faculty as they are

expected to work with a rural group that they are not previously acquainted with. In some cases, for

example, at the Rajamundhry office, the faculty was contracted solely for this project. At the Dehradun

office, young trainees studying at NIIT were working as trainers at the schools.

- Lack of rural/semi-rural perspective on education and training

None of the main stakeholders NIIT or HPCL have any expertise in understanding the current landscape

of education and training in the rural and semi-rural areas of India. This lack of competence is clearly

reflected in the current functioning of the programme. HPCL or NIIT need to spend suitable time training

themselves on the methodology required to make such a programme successful and implement the same

for optimum success.

- Lack of vision and mission statement

Unnati is in dire need of a strategic vision around which it can develop into a wholesome programme with

far-reaching impact. The lack on a long term vision is also hampering the success of this programme

which has tremendous potential for far-reaching impact. A well planned project as such could result in a

wide scale employment for youth, a higher degree of self esteem and an aspiration status for other

students. While the Rajmundhary project claimed that students in the 10th grade trained through the

programme were qualified enough for data entry jobs and they would help the students find the same,

none of the other offices could claim to be doing the same.

- Lack of risk management assessment

The programme did not undertake a thorough risk management assessment and hence, the parties had to

deal with various risks on their own means making the functioning efficient. The Dehradun NIIT Office

claimed to have put extra hours when electricity failed while the Barasat office did not put in the same.

Regarding the internet module, while the Dehradun office showed the use of Internet on their phones, the

Rajamundhry and Panipat office claimed to be completely unaware that Internet was included as a

requisite in the module. Such instances can be accounted for simply when a risk management assessment

Page 23: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 22

is done which covers the mitigation policy in case of failed electricity and failed internet connectivity,

hence, improves accountability.

- Not equal opportunity for students

While the programme appears to have an equal opportunity angle for all poor students, in many schools,

in order to stick to the necessary numbers, some students were selected. For example, in the Panipat

office, the school chose the deserving students for the computer education programme. This by default

goes against the idea of the programme which is to give all poor school students the chance to learn

computers.

- Quality and context for computer education

While the programme was developed to provide basic computer education to poor students, it did not

consistently reflect in the attitude of NIIT and HPCL. While in some cases like the Dehradun and Barasat

office, the instructors had accepted that the students of 6th standard could not learn as well, in the Panipat

office there was a consensus that poor students could only learn at their level and not as good as the other

students that NIIT trains. This appears as paternalism and classism on the part of NIIT. However, NIIT

does not have the expertise or experience to deal with rural markets. This attitude is also a reflection on

the environmental context in which these schools exist and the complete absence of training and

sensitivity to rural and semi-rural concepts.

Also, at the end of the programme, it was observed that the students were only interested in Paint as a

programme and could not recollect much about any other programme. This is a bigger question for NIIT

to enquire into their methodology and improve it to serve other markets so that the use and

implementation of the other programmes in equally engrossing.

- Lack of effective partnerships

The programme was developed solely by HPCL and NIIT while both did not have the experience to work

in the rural markets. This has not only compromised the quality of the executed programme but also

created multiple operational issues. For example, for the Dehradun NIIT office, in order to find a school

for the programme, they had to approach the District Education Officer who in turn recommended the

school. In other cases, as such, a local partnership with a reliable local NGO working on education issues

would have been very helpful.

Page 24: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 23

- Absence of sustainability of the project

The programme in its current state in not sustainable as it is. The programme is currently in its

compromised version and does not completely fulfill what it set out to do. For sustained impact, HPCL

needs to carve a better, improved programme which provides a better package which ensures better

impact. For instance, the programme focused on 4000 students across India which is a very small number.

Hence, in each school, it in turn neglects a large student population which could also be potentially

trained and fits the necessary criteria. Also, once the programme is over, there is no feedback mechanism

or continuous engagement which allows for the students to remember and reaffirm their computer skills.

The donated computers act as a token for sustainability as many of the computers are used for official

proposes by the school and become non-operative as they do not get the required maintenance and

environment to perform optimally.

Page 25: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 24

Chapter 3

SWAVALAMBAN

3.1 Introduction

3.1.1 Swavalamban

Project “Swavalamban” is HPCL’s one of the flagship projects on long term sustenance basis among all

CSR activities. The idea of ‘Swavalamban’, as suggested by Organization Dynamics’, is to provide

specific skill training to school drop outs which have potential of earning either through employment or

self employment. During that time, Confederation of Indian Industries (CII) in collaboration with “City

and Guild”, a UK based NGO and one of the largest assessment and certification body for Vocational

skill at International level, were taken initiative to plan out a nationwide programme to train large number

of young people in different States and cities. But the coverage of the programme was so large in India

that required lots of supporting hands to enhance the number of beneficiaries. That is also one of the

reasons why “Organization Dynamics” recommended HPCL to become a partner in this programme and

help unemployed to earn livelihood and save them from anti-social activism.

3.1.2 Project Description

The Swavalamban program was conceived to provide training and capacity building or skill development

to the needy potential candidates in order to enable them to earn livelihood for themselves and their

family and also as a part of this programme, supply the good quality professional in various trades and

services. They have used following guidelines as criteria to identify candidates for the programme under

this project:

a) The candidate belongs to the household which has income less than Rs. 10,000 per month,

b) Preferences will be given to children without parents,

c) Minimum age of the candidate should be 18 years,

d) The candidate should undergo a basic aptitude and attitude evaluation prior to selection, to assess

suitability and reliability for the respective programme.

While project ‘Swavalamban’ was conceived, it was thought that there existed sufficient infrastructural

set up to run this programme and training would be provided in specific skill development under the

expertise of “City & Guild” for four month duration basis. It was not a specific gender oriented

programme and hence, training was applicable to both boys and girls. The fee per person would be Rs.

6,000 for the entire course. To maintain quality standard, rigorous test (both in written/oral and practical)

Page 26: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 25

to be conducted for final assessment to qualify them for a certificate and successful candidates get a card

in shape of driving license which will enable them to take up jobs (either self employment or

employment).

Project Swavalamban is a multi-stakeholders programme which includes funding partner, implementation

partner, assessment partner and training centers. HPCL has already executed five phases of

implementation in cooperation with CII as its implementing partner. To run the implementation process

smoothly, CII has also appointed training partners and assessment partner separately. The roles and

responsibility of HPCL and CII were clearly stated in five consecutive MOUs. While HPCL’s

responsibility was to provide fund support and overall supervision, CII’s responsibility was overall

execution and periodic monitoring of the project.

3.1.3 Rationale

“One of the biggest problems faced by the country and its youth is unemployment. Also most of the

youth in rural areas lack the requisite skills for the available jobs. For the rural youth to be employed and

preferably within their area, there is a need for them to be trained in different skills. There is also a need

to make them capable of being self employed that will give them the means of earning, while at the same

time, it helps to create job opportunities for others. Having understood the needs of the youth, HPCL

took up the challenge of training youth in different vocational skills like plumbing, automobile

repairing, welding, fabrication and electrical installation”.

[Source: Bringing Smiles, 2009-10, HPCL]

3.1.4 Objectives

The aim of project ‘Swavalamban’ is to provide training and capacity building/ skill development to the

needy potential candidates to enable them to earn livelihood for themselves and their family. To achieve

this objective, multi stakeholders approach has been followed and specific target has been set up for each

stakeholder at each implementation stage. Broadly two specific objectives are given as follows:

1) “to provide training and capacity building/skill development to the needy potential candidates to

enable them to earn livelihood for themselves and their family, or alternatively, in brief, to provide

self employment for sustainable basis by imparting skill.

2) to supply good quality professionals in various trades and services”.

[Source: Several MOUs between HPCL AND CII]

Page 27: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 26

3.2. Social Audit

3.2.1 Governance Statement

The project, Swavalamban is implemented by multi stakeholders like HPCL, CII, assessment agency and

different training centers. There are several governance statements between different stakeholders at

different stages of implementation. Here, each of the statement is discussed.

3.2.1.1 Governance Statement between HPCL and CII

Governance statement ensures that the training centers would be chosen by CII in co-ordination with

HPCL in areas where CII had their centers so that the monitoring of the program would be easier.

Training should be monitored by CII through their training partner and quality assessment should be done

by their assessment business partner. The roles and responsibilities of CII as mentioned in several MOUs

between HPCL and CII are stated as follows:

- “Identification of suitable locations by CII for organizing training.

- Selection of candidates for training on fair and transparent basis.

- Identify potential of employment/ self employment in nearby locations.

- Conduct tests for quality training.

- Issue of certificate/card with name of HPCL on it.

- Provide a follow up document about the beneficiaries and their contact details which will be used to

conduct impact assessment post-training, based on which a report will be submitted by CII within three

months of the completion of training, in a way that the report can be used for communication on impact of

investment.

- The average duration of training will be 200 hrs. This would be contingent upon the skill trade being

chosen and average uptake of the enrolled candidates in the local areas.

- The prime responsibility of CII is to ensure that training and certification are provided to the candidates

in trades that enhance employability.” (Source: Several MOUs between HPCL and CII).

Governance statement about financial terms and conditions clearly points out that Rs. 6000 per candidate

including operational and administrative expenses will be provided by HPCL. Operational and

administrative expenses include expenses for initial study to identify skill trades, gathering feedback from

the local area, centre identification and approval, advertising and communication expenses related to

selection of candidates, delivery of training and assessment, costs of raw materials used for training,

verification of delivery and assessment through visits of visiting verifiers and quality inspectors, cost for

usage of facilities and equipment, certification and quality assurance and smart card. In addition to agreed

Page 28: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 27

upon fund, HPCL would facilitate the project whenever possible through its dealer network and offices of

purposes such as generation and communication to potential candidates, provision of space etc. Payment

should be made 50% on advance basis and 50% should be disbursed after completion of the training

programme.

According to the Governance statement about Records and reporting, it is mandatory to CII to maintain:

(a) “Report on skill gap analysis to ensure income generation after training,

(b) Records and evidence of candidate performance and training. The record of assessment related

activities would be made available to HPCL. Records should include methods used to enroll candidates,

final list of candidates on commencement of training, record of dropouts and final list of successful

candidates,

(c) A monthly report of activities undertaken under the project along with photographs with HPCL logo

and outcomes of the same would be forwarded by CII to HPCL, to indicate progress of the project and

(d) Within 3 months of the training, CII will submit evidence of income generation of the beneficiaries in

suitable format to be decided in consultation with the project leader”. (Source: MOU between HPCL and

CII).

Apart from this, Governance statement also pointed out Branding activities, criteria of success and

ensures employability. But as per as employability part is concerned two critical statements have been

made…

• Through this MOU the parties involved agree to explore options for and facilitate

employment for successful candidates. This would be done through the available network

of HPCL outlets in the area and other options available in nearby areas.

• The selection of skill trades and the subsequent training and certification while does not

guarantee employment from either of the parties involved in this MOU, it is agreed that

this has to enhance employability.

It is important to note that the motto of project Swavalamban is to impart training to the rural and semi-

urban youth so that they can be enable to generate income to support their livelihood. But the underlined

portion mentioned above directly contradicts the motto of this programme and raise the legal validity as

well as acceptance of the certificate of this programme. This contradiction ultimately also leads to

question about the future sustenance of this programme in terms of employment generation.

Page 29: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 28

3.2.1.2 Governance Statement between Assessment Partner and CII

3.2.1.2.1 City & Guild (Phase I – III)

‘City & Guild’ was a UK based NGO; one of the largest assessment and certification body for works skill

at International level. From 1st December 2004 a Joint initiative has been taken by Pravara Rural

Education Society with Confederation of Indian Industries (CII), New Delhi and City & Guilds, England,

for providing opportunity to dropout students to undergo vocational training. In order to do that, with

joint efforts of Pravara Rural Education Society, CII and City & Guilds, England 16 courses like Motor

Vehicle Engineering and Fabrication, Welding and Pipe works, Refrigeration & Air Conditioning etc.,

have been started from 1st December 2004 at ITI, Loni in Maharashtra. During this time, a base line study

was conducted by ‘Organization Dynamics’ on behalf of HPCL for their Corporate Social Responsibility

(CSR) and on the basis of their recommendations, HPCL became the partner of this programme. The

existing programme was redefined and came out as ‘Swavalamban’ project in the year 2006 vide first

MOU between CII and HPCL on 9th February, 2006.

In the nascent stage, CII central office directly implemented the project through City & Guilds as its

Principal Implementation partner vide MOU signed on 15th May, 2006. After that, they have not signed

any MOU but CII has followed the terms and conditions mentioned in the earlier MOU to implement the

project.

The roles and responsibilities of “City & Guild”, as given in the governance statement, are exactly same

as given in the MOU between CII and HPCL. They were trying to provide entry level skills and they were

not engaged in making them proficient workers. As an Assessor, their role was defined to provide

guidelines and syllabus, up-gradation of trainer’s skills, periodic verification in terms of progress of the

programme, conduct interim verification. Accordingly, ‘City & Guild’ prepared the training syllabus

which includes training schedule and the whole execution process such as guidelines to centers to execute

the projects, how to enroll candidates, what documentation to do during training, evidence to maintain

what level of training they have given, what training methodologies have been used, whether by

visualization of machines, or, hands on training guidance etc. It had conducted 3-4 days industry level

training programme (conducted twice in last 4 years) and one soft skill level training for the trainers. The

idea was to send trainers for industry training so that they can equipped with latest knowledge. Soft skill

training programme to the trainers were also arranged to make them understand the latest techniques of

imparting practical training, as well to enhance their capability.

Page 30: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 29

As per financial terms as mentioned in governance statement, after deducting 10 % of professional fees,

CII has given the remaining part to City & Guild of Rs. 5400 per candidate per certification towards the

assessment and certification fee which includes the cost of trainers’, assessors’, administrators’ fee,

certification costs and taxes (and it does not include the cost of Facilities, Equipments, Consumables and

general Advertising and Marketing related expenses). 50% of fee was paid before commencement of each

phase, and remaining 50% of the fee was paid on completion of training.

Out of Rs. 5400 received from CII, City & Guild allocated Rs. 2000 (inclusive of tax) as a cost to the

training centre. During the City and Guild phase, both midterm assessment and end term assessment were

done. Visiting verifier and quality inspector visited to the training centers accordingly. “City & Guild”

were associated with Swavalamban project upto phase III and suspended its India operation in 2009.

3.2.1.2.2 Sona Skills (Phase IV)

After “City & Guild” suspended its India operation, CII faced problem of monitoring due to disparity of

locations. During that time, few employees of “City & Guild” formed ‘Sona Skills’ which became an

external assessor of CII. But no governance statement was found between CII and ‘Sona Skills’ because it

was not a registered entity. During phase IV, assessment was done by “Sona Skills” and certification was

done by them and CII jointly.

3.2.1.2.3 CQ Works Skills Services Pvt Ltd (Phase V)

It is a private limited company and its head office is located at Gurgaon. It has conducted vocational

training programmes in India. CQ Works Skills Services Pvt Ltd was engaged in the project

“Swavalamban” after the suspension of ‘City & Guild’ India operation, i.e. from phase IV onwards. In the

phase IV, Sona Skills had taken only end term assessment part of ‘Swavalamban” project. They also did

certification jointly with CII during phase IV. In phase V, their role was limited to conduct end term

assessment only.

3.2.1.3: Governance Statement between Training Partner and CII

The training centers played pivotal role in the project ‘Swavalamban’ in terms of activities involved

including mobilization of candidates, registration of candidates for the programme, delivery of theoretical

lectures and practical training, periodic evaluation, prepared candidates for end term assessment. Their

defined role was to provide training as per defined syllabus and guidelines. Apart from this, they also

dealt with the grassroots level problems.

Page 31: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 30

In governance statement, it is clearly defined that training centre should be: (a) ensuring that the project is

run in accordance to terms laid down in this MOU, (b) registering the required numbers of candidates, (c)

doing execution and administration of the courses, (d) conducting training in accordance with the

standards as provided by CII and its partners, and (e) preparing compliances to administrative and quality

requirements laid down by CII. Moreover, the roles and responsibility of CII and its partner would be : (a)

providing the standards/syllabi for training and assessment, (b) making payment to the charges for the

external assessors/ verifiers being used in this programme, (c) maintaining quality assurance for

consistent delivery in line with set standards including train the trainer, train the assessor, administrative

inputs, verification of training delivery and assessment through visiting verifier visits, quality audits, etc.,

(d)ensuring proper assessment and certification, and (e) disbursing payment of funds for training in

accordance with terms mentioned in the MOUs.

As per financial terms mentioned in the governance statement of training centers, fund was allocated Rs.

2000 (inclusive of taxes) per candidate towards all expenses. Expenditures include consumables, utilities,

salary of trainers and internal assessor costs, any costs incurred in relation to usage of facilities,

administrative costs, communication costs, registration costs of candidates etc. Payment would be made

on the basis of three installments: (a) initial 25% fund would be provided on the basis of per candidate

registration, (b) subsequently in the next step, 37.5% fund would be disbursed during the midterm

assessment only after completion of 50% of training as certified by visiting verifier, and (c) finally, the

remaining 37.5% fund per candidate would be released after completion of training subject to number of

candidates appearing for final assessment, with a minimum of 80% attendance.

3.2.2 Stakeholder Mapping

Stakeholders form an important component of every social audit and it is important to identify and

understand the level of interest and power of each stakeholder. The stakeholders include:

- HPCL CSR Dept

- CII Skill Division

- Assessment Body

o City & Guild (Phase I-III)

o Sona Skills (Phase IV)

o CQ Works Skills Pvt. Ltd (Phase V)

- Training Center (consider 3 training centre for this study)

o Industrial Training Institute, Lone, Maharashtra

o Baba Farid ITI , Bathinda, Punjab

Page 32: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 31

o Bathinda Institute of Management & Technology (BIMT), Bathinda, Punjab

- Student Beneficiaries

o Current Students

o Passed out students

3.2.2.1Structure of the Team

In this project, the stakeholders are HPCL, CII, City& Gild, Sona Skills, CQ Works skill, training

centers and students. The assigned responsibility of the stakeholders during different phases is

depicted in the following table.

Table 3.1: Stakeholders under Swavalamban

Stakeholders Phase I (2006-07)

Phase II (2007-08)

Phase III (2008-09)

Phase IV (2009-10)

Phase V (2010-11)

Funding Agency HPCL HPCL HPCL HPCL HPCL Implementation Partner CII CII CII CII CII

Principal Implementation partner of CII

City & Guild City & Guild City & Guild CII CII

Assessment Agency City & Guild City & Guild City & Guild Sona Skills CQ works skills

Certification Agency City & Guild City & Guild City & Guild Sona Skills CII Monitoring Training Centre

City & Guild City & Guild City & Guild CII CII

Training Centers 8 centers 4 centers 3 centers 12 centers 8 centers

3.2.3 Stakeholder Analysis

As we already discussed about the HPCL as internal stakeholder, hence in this section we specifically

focus on the external stakeholders. It is well known that stakeholders involve crucial role in terms of

coordination and its networking with the other agencies to achieve a target within a stipulated timeframe.

3.2.3.1 Confederation of Indian Industries (CII)

- Perception

CII is a composite of member industries. Member industries have a requirement of skill manpower and as

a result, there is a demand for vocational education. CII have been working with different industries of

National repute and along with this experience, their involvement with the project ‘Swavalamban’ helps

them to implement their learning at the grassroots level for the welfare of the society. CII is the principal

implementation partner for the project ‘Swavalamban’ since 2006. As a part of this collaboration, five

Page 33: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 32

consecutive MOUs were already signed between CII and HPCL with specific terms of references.

Previously this project was handled by CII- Skill Development, CSR, IR/HR and Affirmative Division.

Currently it is monitored under CII-Skill Development Division. Skill Division is the custodian for

Swavalamban Project and it is monitored by the central office of Skill division which is located in

Gurgaon. It has undertaken broadly four type of activities: - Policy Advocacy, working with members,

working with Government and on-ground initiatives. Under on ground initiatives, “Swavalamban”

belongs into central level project category and it was fully funded by HPCL and monitored by CII with its

different partner training centers and partner Assessment agencies.

- Role and Responsibilities of CII in Swavalamban

1. Identifying the location in connection with HPCL.

2. Creating and mobilization of candidates.

3. Selection of candidates as per guidelines.

4. Final selection of candidates as per aptitude.

5. Training of candidates.

6. Assessment of trained candidates.

7. Industry linkages for employability.

8. Mobility of Candidates.

- Implementation Process

1) Firstly, the area for implementation was selected mutually by CII and HPCL.

2) CII chose the training institutes and vocational training providers (VTPs).

3) Trades were selected as per local industry requirements.

4) Candidates were mobilized through advertisement/leaflets etc.

5) Beneficiaries were selected as per set parameters and trade was chosen according to the grasping

ability of the candidates. The two parameters of selection were (a) Beneficiary had family income

level below Rs. 10,000/- and (b) The age of the beneficiary should be less than 18 years.

6) Candidates were trained at the VTP institute and monitored.

7) On completion of training, the candidates were assessed by external assessors sent by CII.

8) If the beneficiary passed the Assessment they would be issued the CII-HPCL joint certificate.

9) On completion, they would be linked to industries for placement.

10) Beneficiaries were monitored for positive impact in their livelihood.

11) CII would send detailed report to HPCL.

Page 34: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 33

- Challenges:

During the process of implementation, several issues were observed. When the project was first

taken up by CII, central office directly implemented the project through City & Guilds. Phase IV

onwards, CII has faced difficulties in monitoring the activities of the training centers.

After 2009, assessment has been done once on completion of training, as the cost of monitoring

has increased with the current inflationary trend and HPCL has not increased the fund for the

task.

Training centers also faced problem in mobilization of students due to Mahatma Gandhi National

Rural Employment Guarantee Act (MGNREGA), as potential candidates did not want to take

vocational training to migrate for better job.

3.2.3.2 City and Guild

Initially “City & Guild” played a proactive role in implementation and execution of the project. This

organization was involved in forming vocational education framework/ modules. Even, the modules

under the government schemes of Modular Employable Schemes (MES) have been taken from them. CII

has been working with “City & Guild” in a number of projects and initiatives. City & Guild suspended its

Indian operation in the year 2009. Accordingly, no governance statement of ‘City and Guild’ was found

during our field visit and CII did not provide any report on the performance of City and Guilds. But all

the training centers participated in this study were very happy to work with City & Guild. They

replied that City and Guild implemented as per their responsibilities and funds were disbursed at

the scheduled time. During Phase I-III, they have made periodic visit and closely associated with

the training center. After City and Guild suspended its operation, the training centers were not

getting funds in time and received less support from both implementing partner as well as

assessment partner.

3.2.3.3 CQ Works Skills Services Pvt Ltd

- Perception

CQ Works Skills Services Pvt Ltd has considered that project Swavalamban has a noble vision of

improving grass-root employability. The staff of this organization has perceived that the original idea

behind Swavalamban was to create employment opportunity among the underprivileged youth by

providing vocational training. In the present era of economic transition, they thought that it was not easy

to serve the beneficiaries and they wanted to focus on the positives and continue improvements of the

project.

Page 35: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 34

- Implementation

CQ started as an external assessor of candidates and monitor of the project. From phase IV onwards, their

role was to conduct end term assessment. They have done joint certification with CII only in Phase IV.

They have recruited external assessor to conduct final assessment. They have given four or five options to

the students for their practical examination. In case of vernacular language problem, oral exam was taken.

- Challenges

Broadly there are four types of challenges faced during implementation process: (a) Co-ordination with

different stakeholders, (b) time availability of the different stakeholders, (c) fund delayed, and, (d)

problem of placement ( in this case, industry orientation is strongly required). The funding pattern has not

changed since the beginning of the project over 5 years now. It is increasingly difficult to manage quality

especially with high inflationary Impact. It should be considered to improve scales of funding.

3.2.3.4 Training Centers

3.2.3.4.1 Industrial Training Institute (ITI), Lone

- Perception

ITI Lone is the only one of the pioneering institute which has started skill development programme in

association with “City and Guild”, a UK based NGO, one of the largest assessment and certification body

for works skills at international level since 2004. “Swavalamban” was started in 2008 and ITI Lone has

provided training in the following trades: Basic Motor Vehicle Engineering, Basic Plant maintenance,

Basic Electronic Installations, Basic Painting Skill, Basic Garment Making, Basic plumber, Basic Two

Wheeler Mechanic, Basic IT for Office application, Basic Fabrication Welding & Pipe Works, Basic AC

& Refrigeration etc. Principal and teaching staffs have opined that there is a need for such initiative and

they are happy to be a part of it.

- Implementation

Total 725 beneficiaries completed training and got certificates, 330 beneficiaries completed training and

waiting for result and 125 beneficiaries are currently pursuing the programme. While we interacted with

the current students, we focused on their interest, expectation after completing the programme and what

support is required to improve the programme. On the other hand, social impact analysis has been done

on the passed out student and it was checked whether this programme really helped them to get any job or

not.

Page 36: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 35

Status of Current Students

Current batch consists of 125 students with a high expectation that after completing the course, they will

get employment or become self employed. The whole batch is divided into five groups, each consisting of

25 students. Three trades -Basic Electronic Installations, Basic Electronics and Basic Plumber- have one

group each where as ‘Basic Motor Vehicle Engineering’ has two groups.

Status of Passed out Students

Figure 3.1: Status of Passed out Students of ITI, Lone

In the primary survey, we have excluded 330 candidates those who have completed their training in

January 2011 in the phase V but waiting for certificates till April 2011. Out of 307 passed out candidates

who participated in the survey, only 263 candidates got jobs and 250 of employed candidates mentioned

that their average income has raised compared to their earlier income. It was found that the rise in average

income over the years remained the same. However, they have not faced any problem for placement

without certificates because ITI Lone is connected with the local industry through Pravara Rural

Educational Society (PRES).

- Challenges

Apart from daily activities the staff of the ITI Lone has to maintain huge documentation related to

Swavalamban project which they consider an extra burden for them.

Time is major constraint as they have to implement the project within 3-4 months with a short

notice.

They are also facing financial hardship as there is no change in training cost allocation over five

year’s period. However, the cost of training has increased substantially.

Page 37: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 36

The current syllabus has not accommodated the present needs of the industry which affect the

employability of the beneficiaries.

3.2.3.4.2 Baba Farid ITI, Bathinda Punjab

- Perception

Baba Farid ITI accepted this project because of three reasons: firstly, through this project they could

provide free training and education to poor needy students; secondly, there was a scope for better

reputation (as they can work jointly with HPCL, CII and City & Guild) and finally it was a new challenge

to them as well as inspiration to do a noble job.

- Implementation

They have provided training on Basic Electrical Installation, basic Fabrication welding and pipe work,

Basic Plumbing, basic IT for computer application. They have offered a course on basic beauty therapy

(level I) only once. They have already completed training of 1228 candidates during Phase II-V and 60

candidates are currently attending the training programme.

Status of Current Students

Current batch consists of 60 students with a high expectation that after completing the course, they will

start their own work and they can contribute their income to their family. The whole students were

divided into following three trades: Basic electric Installation (20), Basic IT for Office Applications (20),

and Basic Plumbing (20).

Status of Passed out Students

Figure 3.2: Status of Passed out Students of Baba Farid ITI, Bathinda, Punjab

Page 38: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 37

The above result depicts that out of 301 passed out candidates, only 65 candidates’ got employment and

out of them, the average income of 60 candidates has increased compared to their previous income. The

situation is very worse in case of phase V where most of the fresh passed out candidates were not getting

their jobs. It was also noticed that waiting period of getting employment after completion of training was

more than 2 - 3 months. It is very surprised to note that none of the passed out candidates (Batch Nov-Jan

2011) received their certificates during the survey in the month of April 2011. So it is important to note

that delayed in the process of certificate distribution also affected the process of getting employment.

Challenges

Delay in the process of getting certificate created problems in terms of getting job.

With one month prior notice, it was hard for the training centre to start the training programme

and it affected the regular routine work of the institution.

The training staff focused more on how to finish the course rather than on smooth delivery of

training. Due to lack of time, the staff of this ITI was forced to provide training in the weekends

and the holidays.

Without any travel support, students found it difficult to attend the class regularly.

Finally, the pedagogy of computer course was found incomprehensive and insufficient. Material

needs to be supplied in local language as the educational qualification of the beneficiaries were

poor.

3.2.3.4.3 Bathinda Institute of Management and Technology (BIMT)

- Perception

City & Guild approached BIMT in 2006-07 for ‘Swavalamban’ project, and accordingly BIMT

management accepted it because this project objective was matched with the NGO’s1 objective. The main

aim was to develop technical skills in those beneficiaries who were not financially independent or

belonged to the weaker section of the society so that they would be self dependent for their livelihood.

According to the BIMT Director’s opinion, the course was highly successful and has been appreciated by

many philanthropic personalities of the town as it covered vast information about Information

Technology which contained both theoretical and practical knowledge.

- Implementation 1 Bathinda Institute of Management & Technology (BIMT) is operated under the aegis of Help-Educational Society (regd.), an NGO which is approved by ITC (4153) from DGE&T, NCVT, Ministry of Labour & Employment, New Delhi.

Page 39: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 38

BIMT has provided training in Information Technology and they have taken only ‘Basic IT Application

for Office Use’ under project Swavalamban. The duration of this course was 120 hours as per the

guidelines provided by the CII and HPCL. The curriculum of the course contained basic use of

Computers & MS Office so that candidate would get opportunities to work in the different sectors of the

commercial society. They followed the earlier guidelines provided by City & Guilds for implementation

which includes daily assignments, regular tests and visits from the subject experts from Sona Skills,

Gurgaon.

Status of Current Students

It was found that students were very positive and realized the need of computer learning. They joined the

courses due to two reasons: firstly, it was a free course and secondly, it would provide employment after

completion of the training. It was found that the current batch consisted of 85 students. They wanted to

continue their study along with computer education which might create a scope for their income

generation. They shared their satisfaction about their teachers who worked hard and followed an easy

method of teaching.

Status of Passed out Students

They have completed training of 800 beneficiaries and certificates were already distributed. Out of these

passed out, 400 candidates participated in the primary survey. The summary of the survey was given as

follows:

Figure 3.3: Status of Passed out Students of BIMT, Bathinda, Punjab

Page 40: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 39

It is important to note that out of 193 employed candidates; average income of 146 was increased

compared to their previous income. It was observed that over the phases, the level of average increased

income was declining. A wide difference was found between increased in the averaged income of male

beneficiaries and that of female beneficiaries.

- Challenges

Most of the students came from BPL families and they were not well versed in English language

and computer. Students found difficulties in understanding the course materials as these were

written in English. Course material in Punjabi language might be helpful to them.

Certification was not completed within a stipulated time after the assessment. Without

certificates, students were not able to get any job and they also confused about their future

planning.

It was observed that phase IV onwards, payments were made after final assessment which

violated first two norms mentioned in the last MOU which was signed on 15.07.2008. After 2008,

no MOU has been signed.

Page 41: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 40

3.2.4 As-is Analysis

Table 3.1 As-is Analysis of different stakeholders

No. Activities/ Roles/ Responsibilities Actual Observation Comments 1 Identify suitable locations for

organizing training. Location was decided according to the demand of HPCL to run the programme in its nearby refinery areas.

Should be based on baseline study and need assessment survey.

2 Mobilizations of candidates This was fully done by the training centers through posters, leaflets, TV scrolling, Newspaper advertisement, words of mouth. It was really become a problem for the training centre to follow all procedure within a short notice.

CII should provide a programme calendar at the outset of the phase of action. This would help training centre to implement their assigned activities smoothly without interrupting their other regular activities.

3 Criterion was used to identify candidates for the Skill development programme; a) Household income is less than Rs. 10,000/- per month. b) Preference given to children without parents. c) Minimum age is 18 years. d) The candidates should undergo a basic aptitude and attitude evaluation prior to selection, to assess suitability and reliability for the respective programmes. e) For trades like drivers, electricians etc. where there is a statutory requirement of a Government license – only those candidates having a valid license at the time of commencement of training, will be short listed for up skilling programme.

More or less candidate came from low income family. Income certificates from the local concerned authority were collected as supporting documents. In most of the cases, the age of the candidates exceeded 18 years. Preference was given to those candidates belonging into the BLP family and drop out students Initially, screening tests were conducted to know about candidate’s interest. Later on, students submitted their trade preference during the admission and discussed with the concern teacher whether they were suitable for that programme or not. It is impossible to get a government license below 18 years. Hence, we have not found any candidate who has any trade license.

Most of the cases, selection was done by the training centre on need basis as selection of candidates according to the criteria suggested by CII and HPCL would take at least 2-3 months. Short notification of initiation of new training batch would become a problem for all training centers. A yearly target would be helpful to the training centers. Selection criteria should slightly be modified because criteria c, d, e were not properly followed and some of the cases, candidates age was relaxed to achieve the number of targeted beneficiaries.

Page 42: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 41

No. Activities/ Roles/ Responsibilities Actual Observation Comments 4 Select candidates for training

through on fair and transparent basis. Training centers have taken age proof of the candidate, family income certificate from the concerned authority during enrollment. Teachers orient the students and try to find out the suitable trade for each of the students. This might reduce the probability of drop out. They have properly maintained all records like attendance register, internal assessment, certificate register etc.

5 Identify potential of employment in nearby locations by CII.

- No skill gap analysis has been done by CII to identify opportunity of employment/self employment in nearby locations. They thought that their other programme report was helpful to do that exercise. No placement support was provided by CII. According to CII officials, they have chosen courses according to the demand of HPCL where it has refineries. It was expected that those courses would help to generate local employment.

Skill gap analysis should be conducted. If HPCL wish to conduct the programme in refinery areas, then base line study is required before initiation of the programme. Placement support should be provided.

6 Organize proper training of 200 hours on an average by the training centers.

Each group consisted of 25 students. All courses had practical component along with theory. Timing of classes was different according to the courses. Normally ratio of theoretical and practical class is 1:2. Only 120 hours of training was conducted on “Basic IT Applications for office use”.

7 Ensure quality assurance of training delivery, assessment and Certification. Conduct tests for quality training.

All these phases were strictly followed by City and Guild during phase I-III. From phase IV onwards, only end term assessment was conducted. Quality assurance was totally stopped due to lack of fund as suggested by CII.

To see the success, midterm assessment and quality checking are required. Also CII should develop some criteria to chose assessment agency and minimize the number of intermediary in the assessment exercise.

Page 43: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 42

No. Activities/ Roles/ Responsibilities Actual Observation Comments 8 Issue of certification/card with name

of HPCL on it. Delivery of the certificates was delayed in the phase V. In some cases, name of the candidates was incorrect. Only in phase IV, certification was done by CII and Sona Skills, where HPCL name and logo were missing.

Certification should be done as early as possible, because without certificate, it is tough to search a job.

9 The prime responsibility of CII is to ensure that training and certification are provided to the candidates in trades that enhance employability.

No placement support was provided by CII as mentioned by the training centers. It is clearly mentioned in the MOU that neither CII nor HPCL is responsible for final placement rather it is expected that this training programme would enhance employability.

Both CII and HPCL can consider this issue for the next phases of operation. The candidates will require the support of CII and HPCL in getting the employment or self employment.

10 Payment Mechanism between HPCL and CII: 50% is paid before commencing the work and 50% balance will be paid after completion of the training programmes

CII has not properly maintained documents regarding its expenditure and channelization of fund to the training centers and their assessment partners. Out of allocated training cost of Rs 6000 per student, utilization of Rs. 4000 was not properly documented.

It should be compulsory to maintain all the fund utilization documentation. It will be helpful to CII to measure cost effectiveness of the programme.

11 Report on Skill Gap analysis is required to ensure income generation after training.

No skill gap analysis has been done separately for Swavalamban. CII has conducted several other studies which have helped them for skill gap analysis.

Baseline study and scientific cost assessment survey will be required for long term CSR plan.

12 Records and evidence of candidate performance and training and assessment related activities would be made available to HPCL

CII have not maintained all this records properly. Even both the training centres and CII were not able to show the number of candidates got employment after completing their training.

CII should improve its MIS system and documented information regarding project implementation at the training centre level.

13 A monthly report of activities is undertaken under the project to indicate its progress. Within 3 months of the training CII will submit evidence of income generation of the beneficiaries.

Quarterly report was submitted by CII to HPCL according to the structure mentioned in their MOU. Report was available, but inconsistency was found between the information provided by training centres and CII.

Reporting system should be comprehensive so that it can be cross checked and verified at each level of operation.

Page 44: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 43

No. Activities/ Roles/ Responsibilities Actual Observation Comments 14 Payment mechanism to the training

centre: 25% on the basis of per candidate registration, 37.5% during the midterm assessment payable after completion of 50% of training as certified by visiting verifier, and 37.5% per candidate payable upon completion of training subject to number of candidates appearing for final assessment, with a minimum of 80% attendance.

That payment mechanism was followed by City & Guild during phase I – III. CII also continued the same MOU and same terms and conditions except the financial terms. From phase IV onwards, CII changed funding mechanism without changing its governance statement. In the new mechanism, CII followed the same mechanism used by HPCL to them. It was found in training centers that CII delayed the disbursement of fund from phase IV.

Smooth payment mechanism should be required to run any project and it will give each stakeholder an incentive to successfully run the project.

Page 45: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 44

3.2.4.1 Quality Check Matrix:

On the basis of the above observation, it is required to check the quality of the programme whether each stage of proposed operation was properly

followed or not. To do this, we have prepared the quality check matrix to know about the inconsistency existed between the stated governance

statement and actual plan of action. It will also help us to locate the source of instability in the process of implementation. It will also help the

funding agency, HPCL to understand about the lacuna in the process of overall supervion and would help them to revise their future plan of action.

Table 3.2: Quality check matrix for all stakeholders

Quality criteria Scoring Categories Fully Partly Fairly Hardly Not at all

Is there a relevant governance statement that describes the CSR programme of HPCL? * Did stakeholders participate in creating the governance statement? * Are the values of the programme clearly stated? * Are the programme rules clearly listed? * Are the programme rules covering every aspect of the planning? * Are the programme rules following strictly by each of the stake holders? * Is the implementing agency co-ordinate with all the stakeholders properly? * Is there any lack of co-ordinations found among different stakeholders in the phases of operation?

*

Whether proper timeline/ calendar were followed at the outset of the financial year/ phase of operation?

*

Whether Training centre was informed their yearly target at the outset of the financial year/ phase of operation?

*

Are all criteria followed during the selection process of the candidates? * Whether course materials were supplied during the training? * Whether vernacular language faced problem during training? * Are all steps of assessment strictly followed by the assessment agency? * Has training centre delivered training within the scheduled time? * Has training centre recorded all documents properly?

*

Page 46: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 45

Quality criteria Scoring Categories Fully Partly Fairly Hardly Not at all

Did training centre maintain all information regarding student enrollment, attendance sheet, and distribution of certificate?

*

Did assessment agency strictly document all the steps of their operation? * Did Implementing agency CII document related records of training properly? * Are financial terms and conditions and payment mechanism clearly mentioned in the governance statement?

*

Is HPCL consistently providing fund for conducting training? * Did CII record all breaking up of cost documentation/fund utilization records properly? * Did assessment agency record all cost documentation/fund utilization records properly? * Has training centre recorded all cost documentation/fund utilization records properly? * Is there any payment delay observed between CII and training centre? * Is there any mismatch observed regarding reported number of beneficiaries by CII and Training centre?

*

Is there any delay related to distribution of certification? * Is there any less co-ordination between CII and training centre? * Is there any problem created for the success criteria set by CII and assessment agency? * Is there any support provided by CII for placement of the students? * Is there any problem about the non recognition of the certificate? * Is there any selection criterion followed to select assessment partner? * Was any govt. recognized NGO chosen as a partner of CII at each phases of operation? * Is there any incidence of delayed payment made by CII to the training centre? * Was HPCL supervising the programme properly at each phases of operation? * Did CII monitor the programme properly at each phases of operation? * Was certificate ceremony cost borne by the training centre? * Was payment mechanism changed by CII as mentioned in the governance statement of the training centers?

*

Page 47: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 46

3.3. Social Accounting: Key issues

- Weak supervision on Implementation agency

HPCL has fully depended on its implementing agency CII. They have chosen CII on the basis of

general perception of CII’s reputation, specific areas of expertise they looking for, good track record

etc. Less number of supervision, surprise visit also reflected its overall dependency on its implementing

partner. It was mutually decided that, in any case, if required, only GOI empanelled NGOs should be

considered to become partner of the CII. But after work suspension of City & Guild, CII recruited an

unregistered farm “Sona Skills” as their assessment partner and also on the certificate the logo of CII and

Sona Skills were kept.

- Lack of plan implementation by CII from Phase IV onwards

During the first three phases, CII outsourced the whole implementing process to the City and Guilds.

According to the responses received from training centers, their feedback on City and Guild was really

good. But after City and Guild suspended their activities, CII has faced difficulties in monitoring the

implementation in different locations due to regional disparities. Their monitoring difficulties were also

reflected as non-cooperation to the training centers.

- Delayed in payments by CII from Phase IV onwards

As per MOU signed between CII and training centers, payment mechanism was such that 25% would be

delivered on the basis of per candidate registration, 37.5% during the midterm assessment payable after

completion of 50% of training certified by visiting verifier, and 37.5% per candidate payable upon

completion of training subject to number of candidates appearing for final assessment, with a minimum of

80% attendance. Up to Phase III, they were getting funds into three installment as per agreed in the MOU.

From Phase IV onwards, funds were not distributed on a regular basis. There was a delay in fund

disbursement from CII to the training institutes which have affected the implementation of Swavalamban.

- Cost documentation was not maintained by CII

As HPCL is a public sector enterprise, it is very clear that their allocated money for corporate Social

Responsibility activities should be properly utilized. To check this, social auditor should always emphasis

to study the mechanism used for channelization of fund to the all stakeholders. As a well-known industry

body like CII, it is expected that they should properly document all these records for future reference. But

it is found that CII has not properly maintained the cost documents whereas the training centers have

properly recorded all the documents. For an example, HPCL allocated budget of Rs. 6000 per candidate.

Page 48: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 47

All three training centers were getting Rs. 2000 per candidate and it was well documented. But the

remaining amount of Rs. 4000 per candidate for which no records were maintained in a proper way. It is

also surprising to note that this Rs. 4000 was utilized only for end assessment and certification, although

the certification ceremony cost was borne by the training centers. From this background, it is clear that

the utilization of two-third portion of actual money has not been properly documented. On the other

hands, training centers were struggling for funds to meet the increasing part of the training cost. It is also

proved that proper verification of cost will be required at HPCL level before designing the grant structure.

- Mismatch between data provided by CII and training centre

It is noteworthy that there is a severe mismatch between the data on certified beneficiaries provided by

the CII and respective training centers. The number of certified students is greater according to the data

provided by CII than the training centre’s data. It reflects low connectivity of CII with the training centers

at the grass root level and also indicates lack of co-ordination.

Another important issue to be noted that in the Phase I, targeted beneficiaries was 1100 and the estimated

cost was Rs. 66 lakhs where as from the data collected from HPCL it was obtained that Rs 34 lakhs was

disbursed actually. It implies that number of beneficiaries should be much lower than 1100, but actually

1082 beneficiaries were covered by CII which is quite larger with respect to the actual disbursed fund.

This issue is not clarified.

- Transportation cost of students to attend the training programme

Most of the student participated in this programme lived in villages. In Maharashtra, the villages are

located within 5-10km within the periphery of ITI Lone. But situation is very severe in Bathinda, Punjab

where candidate came from 20-25 km away from the training centre. Most of the training center raised the

issue.

- Success criteria based only end term basis

Initially success rate was based on mid-term assessment, report provided by quality inspector and visiting

verifier and finally end term assessment. Two different views towards midterm assessment were found.

On one hand, assessors started interim assessment to know how the training was progressing for two

batches during phase I. Then they realized that the students were not ready for interim assessment. During

the process of mid-term assessment a lot of complex issues have been raised such as students who did not

perform well, demotivated which resulted increase in drop outs after midterm evaluation. Rather than

midterm evaluation, it is important to verify the process of delivery, to know whether trainers were facing

Page 49: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 48

any problem or whether they used proper methodology so that drop out/ low – educated background

student can understand.

On the other hands, staff of the training centre expressed their views that midterm assessment should be

conducted because it gives candidates some idea about the end term assessment. But staff of CII have a

different justification about midterm assessment. They have mentioned that they have limited fund

allocated for assessment and they have already placed their demand to raise the cost of training. However,

according to HPCL CSR team, implementing agency should increase the horizontal2 outreach without

increasing the vertical outreach of the programme.

- Lack of effective partnerships

It was found that there was lack of coordination among the different stakeholders of this project. For

example, training centers have not received any communication from CII in advance regarding the

project. So due to lack of time it became difficult to implement the project in a systematic manner. Most

of the beneficiaries did not know the involvement of HPCL as very few staff of HPCL seldom visited the

training centers. All of the training centers suffered due to delay in fund disbursement.

Miscommunication between CII and training centers were found regarding reporting, documenting and

channelization of fund.

- Lack of selection criteria / process in choosing Assessment partner

Most of the times, students were assessed by experienced persons who were engaged earlier with City &

Guild operation. During the phase IV and V, assessment partner were selected on ad hoc basis. These

assessors only assessed students at the end of the programme. It did not help the students to improve their

performance. Without their support regarding conducting midterm evaluation, feedback on this

evaluation, quality checks etc., it was found difficult to achieve the success of the programme.

2 Here increase in Horizontal outreach means increase in number of beneficiaries. Increase in vertical outreach means improve in quality of training by increasing cost / facilities.

Page 50: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 49

Chapter 4

RECOMMENDATIONS

In this section the social audit team has provided suggestions to improve the project delivery of these two

CSR projects of HPCL. The team has found that these two projects, Unnati and Swavalamban have

enormous development potentials and proper implementation of these projects would help the

beneficiaries to achieve the success. Here audit team has proposed alternative models of implementation

for these two projects.

4.1 UNNATI

Clarify contradictions

HPCL needs to have a multi-stakeholders meeting to evaluate the inconsistencies and consider possible

steps that could be taken to clarify the existing contradictions and set a new bar of comprehension of

common thinking about Unnati before the start of the project in a new set of schools.

Dissatisfaction amongst internal and external stakeholders

There is a need for proactive participation from HPCL to bring stakeholders together and deliberate on

issues or areas which can cause potential issues. The nature of their guidelines and rules which has been

fairly vague so far needs to be revaluated in the light of the current areas of disagreement regarding

Unnati.

Work on perception issues

HPCL’s CSR strategy should immediately translate into better percept of the company internally and

externally. Unnati unfortunately has not reached that zenith. Also, as mentioned before, within Unnati,

there are perception issues which require to be taken care of.

Develop solutions to recognized problems with stakeholder consultation

The problems that have emerged out of the social audit need to be immediately addressed. A multi-

stakeholders consultation is always a good way to develop a sustainable solution because it sets the base

for greater accountability and transparency and ensures a higher degree of cooperation and satisfaction

amongst stakeholders.

Page 51: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 50

Improve project planning and overall functioning

Project planning is that element of Unnati which if changed can make an exceptional difference to the

execution and overall success of the programme. The project needs to be studied from the operation’s

perceptive to guarantee smooth functioning.

Develop governance statement and review missed objectives

HPCL also needs to develop a governance statement for the entire programme. Once the governance

statement is developed, the objectives, rules and guidelines and the planning can smoothly flow out of the

same. This also ensures there is a smooth progression of values and information within the programme.

4.2 SWAVALAMBAN

Strengthen CSR department

Presently CSR Department of HPCL consists of one General Manager (GM) and one Deputy Manager;

both of them jointly monitor all projects. It is expected that HPCL should strengthen its CSR department

so that overall supervision becomes easy. Recruitment of specialized expert will also help them to draw

the plan of action and its periodic implementation. Periodic monitoring, surprise visit will also help the

CSR team to build rapport at the grassroots level.

Revision of Governance Statement

Governance statement between any two stakeholders should be clearly stated and it should be revised in

every financial year. It will help all the stakeholders to understand their responsibilities. Whether the

stated responsibilities have been undertaken or not, HPCL should monitor time to time basis.

Improve the Employment Opportunity

The success of Swavalamban lies on creating employment opportunity for the unemployed and unskilled

youth. HPCL along with CII should develop support system to create wage employment as well as self

employment for the beneficiaries through networking with industries.

Provision of toolkits for beneficiaries

To take self employment as well as wage employment, beneficiaries need toolkits. After midterm

evaluation, beneficiaries should be provided required toolkits based on their performance.

Page 52: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 51

Recognition of training certificate

It is found that industries have doubted Swavalamban as a valid skill training programme. It affected the

acceptability of these students as skilled labourers. Involving local industries in this programme will help

HPCL and training centers to sort out this problem. Even, some jobs could be created at the HPCL outlets

for these beneficiaries.

Proper Channelization of fund

It was found that under Swavalamban, fund was not channelized in time which affected the programme

delivery. HPCL and CII should develop proper criteria for fund channelization and monitor the process

frequently.

Set yearly target in the first quarter of the financial year

To smoothen the implementation at the grassroots level, a yearly target should be set for the training

centers in the first quarter of the financial year and before the starting day of academic session. It will

help these centers to implement the project in a better manner.

Revision of course curriculum and training supports

The course curriculum for Swavalamban needs to be revised according to the industrial needs. Otherwise

it will not help the beneficiaries to get the wage employment as well as self employment. Other supports

like provision of toolkits, provision of travel support, provision of industry-visit, provision of placement

at the end of the certification should be considered. Pedagogy of computer course needs to be designed in

such a way that students can earn mo0re income. For example, computer language like C, C++, Java as

well as account package software like Tally could be incorporated in the syllabus.

Page 53: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 52

4.3 Alternative model for implementation

In this section, the audit team has recommended two alternative models of implementation for Unnati and

Swavalamban Projects.

4.3.1 UNNATI

Figure 4.1: Alternative model for implementation of “Unnati”

Firstly, HPCL has to begin with commissioning a baseline study (conducted along with a multi-

stakeholders consultation) in the regions that it wants to work in. Once the study is ready, based on the

findings, HPCL should develop a CSR programme with a core governance statement which emerges from

the main aims of the organization, its value base, organizational rules and policies and the operational

objectives. Using this as a foundation, goals and objectives for Unnati on an annual or biannual process

must be set. It is important to follow an open process and documentation for the same as it helps multiple

stakeholders be abreast with the programme and increases HPCL and Unnati’s credibility. The

programme plan must emerge from the needs of the community and other stakeholders which will be

revealed through an external SWOT analysis, mapping and profiling of key stakeholders. Once the

programme is formulated, a performance management system should be brought into place so that

Develop Governance Statement for Unnati programme

Baseline study + Multi-stakeholder consultation

Set goals and objectives of Unnati

Develop programme plan

Open process and documentation

Planned actions and measurement

Internal stakeholder consultation

Internal SWOT AnalysisRoles, Tasks, Responsibilities Internal Position Analysis Set Objectives

External stakeholder consultation External SWOT AnalysisStakeholder Record Stakeholder Dialogue Position Analysis Set Objectives

Monitoring and reporting framework

Main Aim Subsidiary Aims Operational Objectives: Policies: Organizational Rules: Value Base:

E

q

u

i

t

y

Responsiveness

Participation

Consensus based

Transparency

Accountability

Page 54: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 53

monitoring and reporting of the programme becomes easy and the social impact assessment becomes

measurable.

Another key to the success of Unnati will be an internal stakeholder analysis and consultation so that the

internal motivation and understanding of the employees is evaluated and correctly incentivized for their

proactive participation. For a successful and sustainable CSR initiative, HPCL will have to inculcate the

values of transparency, accountability, equity, consensus orientation, participation and responsiveness

within the programme.

4.3.2 SWAVALAMBAN

Previously, audit team mentioned that City and Guild implemented Swavalamban project well during the

first three phases. Taking cues from their experience, HPCL can slightly modify its existing

implementation plan. Here we have developed an alternative model (given below in figure 2) which is

nothing but simple modifications of the existing model through which HPCL can remove the existing

lacuna of implementation model. The model can incorporate certain processes like specific structure of

stakeholders’ selection, preparation of timeline for project implementation and budget allocation at the

outset of the respective financial year, multi-stakeholders consultation and their SWOT analysis during

the process of implementation, proper assessment and provide back up support for placement.

Page 55: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 54

Figure 4.2: Alternative model for implementation of “Swavalamban”

Step XII Placement

support

Step XI Impart training

& Ensure quality Assessment

Step X Multi-stakeholder Consultation and SWOT analysis

Step IX Execution &

Monitoring the project

Step VIII MOU between stakeholders

Step VII Invite Tender for

stakeholder selection

Step V Allocation of

Budget

Step IV Project

Development / Timeframe

Step III Criteria for stakeholder

selection

Step II Scientific Cost

Assessment of the project

Step I Need Assessment

Survey

HPCL (Funding and

Overall Supervision)

Page 56: HPCL CSR Social Audit Report

Report on Social Audit of HPCL-CSR Activities: Unnati and Swavalamban

Page | 55