Zone Outage Control™Will reduce cost and schedule by 10% for
three outage cycles.
908 770 4955
www.theoutageexpert.com
__________
________________________
For example:
An outage cost of$3,000,000
An outage duration of
21 Days
An down day cost of
$50,000
908 770 4955
www.theoutageexpert.com
__________
________________________
Zone Outage Control™ will save you
10% on cost or$300,000
10% on schedule or2.1 days at $50,000 a
dayor $105,000
For a total savings of
$405,000
908 770 4955
www.theoutageexpert.com
__________
________________________
Zone Outage Control™ will
give you cost to date and cost to
finish 4 hours after the end of each shift with minimal effort.
908 770 4955
www.theoutageexpert.com
__________
________________________
Zone Outage Control™ will reduce and eventually eliminate downtime due to poor outage close out. (100% availability for 18
months post outage)
908 770 4955
www.theoutageexpert.com
__________
________________________
Boiler BookOrganization of
information (remember the
waltz)
All the information in
one place
Inspection documents
creation
Material and spares
ordering
908 770 4955
www.theoutageexpert.com
__________
________________________
Working ScheduleFirst schedule the
shutdown/open and ready for work hour by hour• Get ops / maintenance /
engineering to give you their schedules
Then schedule the zones• Get the contractors and
lead man to develop a shift by shift task list and manpower loading then review
Then schedule unit testing• Get ops to give you
their timing
Then the start up• Get ops to give you
their timing
908 770 4955
www.theoutageexpert.com
__________
________________________
Get everyone to buy in after the schedule is roughed in.
908 770 4955
www.theoutageexpert.com
__________
________________________
Get commitment from everyone.
Upper Management
Management
Operations Maintenance
Engineering Safety All Contractors
All Lead Men
908 770 4955
www.theoutageexpert.com
__________
________________________
Cost Control Dashboard
Take the working schedule and monazite it shift by shift and contractor by contractor in excel
908 770 4955
www.theoutageexpert.com
__________
________________________
Follow the outage calendar.
908 770 4955
www.theoutageexpert.com
__________
________________________
Get all the mental soak time you can
Constantly mentally rehearse
everyone’s part.
908 770 4955
www.theoutageexpert.com
__________
________________________
Build a team out of different departments and companies.
908 770 4955
www.theoutageexpert.com
__________
________________________
Have as many lead men and contractor meetings and lunches before the outage.
908 770 4955
www.theoutageexpert.com
__________
________________________
Everyone needs to know their part.
908 770 4955
www.theoutageexpert.com
__________
________________________
Choose an Outage Manager.
The Outage Manager chooses a night manager.
908 770 4955
www.theoutageexpert.com
__________
________________________
Once the bell rings
In shutdown / LOTO / open and ready for work, the
outage manager needs to be there for each hand off
of work.
908 770 4955
www.theoutageexpert.com
__________
________________________
Daily outage meetings.Twice a day (morning and night)
With leadmen and contractor foreman.
908 770 4955
www.theoutageexpert.com
__________
________________________
SAFETY FIRSTNear
misses written
Near misses closed
General concerns
Site conditions
Upcoming dangerous
tasks
Contractor coordinatio
n
908 770 4955
www.theoutageexpert.com
__________
________________________
Have a zone chart.Only talk about what will be done in next 12
hoursNever accept “That should be done by shift
change”
908 770 4955
www.theoutageexpert.com
__________
________________________
Make everyone aware that they
need to answer the question you asked
or else
908 770 4955
www.theoutageexpert.com
__________
________________________
Collect timesheets at every meeting.
908 770 4955
www.theoutageexpert.com
__________
________________________
Buy donuts and coffee.
908 770 4955
www.theoutageexpert.com
__________
________________________
Outage meeting
should only be 15
minutes to half an hour.
908 770 4955
www.theoutageexpert.com
__________
________________________
Create a team of
all involved.
908 770 4955
www.theoutageexpert.com
__________
________________________
Call the ball when it’s time to shift
between assess
and elbows
and close outs.
908 770 4955
www.theoutageexpert.com
__________
________________________
PRINT OUT ENDING
MILESTONES IN LARGE PRINT AND
HANG THEM EVERYWHERE.
908 770 4955
www.theoutageexpert.com
__________
________________________
Inspections and Outage
ReportReview all as found sheets
Create work scopes from as
found inspection documents
Get all close out/as left documents
Keep all the originals in a three
ring binder and that’s your outage
report
908 770 4955
www.theoutageexpert.com
__________
________________________
As outage manager, keep
these basic principles in
mind:Keep everyone
focused on what’s next and the end of
the outage
Declare when the outage is over (date and time) loudly as
possible days before your appointed date
and time
If a job site looks like a mess it is, stop and get it right or you will
fight it all outage