how to deliver a project with a 150% advance

26
How to Deliver a Project with a 150% Advance. Moises Narvaez

Upload: koombea

Post on 13-Jan-2017

140 views

Category:

Software


0 download

TRANSCRIPT

Page 1: How To Deliver a Project With a 150% Advance

How to Deliver a Project with a 150% Advance.

Moises Narvaez

Page 2: How To Deliver a Project With a 150% Advance

- System Engineer- Passionate Bckn Developer- Project Manager- 5 years at Koombea

About me

Page 3: How To Deliver a Project With a 150% Advance

But…. I’m not a Project Manager

Page 4: How To Deliver a Project With a 150% Advance

TAKE CHARGE OF THE PROJECT:

¡FALL IN LOVE!

Page 5: How To Deliver a Project With a 150% Advance

Get all the information you need

This is a critical point for a project’s success:The basis for the whole project depend on it, as it is necessary to have the right tools to work with.

Any and all information you can get can be valuable:

◦ Technical Proposal◦ Requirements◦ Budget◦ Deadlines

Page 6: How To Deliver a Project With a 150% Advance

Read

AnalyzeAsk

Page 7: How To Deliver a Project With a 150% Advance

Share all the information with your team and listen to their opinions.

Get them involved and excited about the project, so they feel it is theirs too.

If changes are required, discuss it with everyone involved and find the right solution together.

Get the whole team involved in the process

Page 8: How To Deliver a Project With a 150% Advance
Page 9: How To Deliver a Project With a 150% Advance

The Master Plan

◦ Risks

◦ Reach

◦ Technical Details

Think about the big picture:Having a global vision of the project, without forgetting the smaller details, will help you

get more clarity to define:

Page 10: How To Deliver a Project With a 150% Advance

Plan the Sprint Meetings

Source: www.ScrumTrainingSeries.com

Page 11: How To Deliver a Project With a 150% Advance

¡ DIVIDE AND CONQUER!

Page 12: How To Deliver a Project With a 150% Advance

One Rock at a Time

Divide the project into Rocks or Big Features,

and focus on one at a time.

These Rocks will then become epics.

All the cards in your board should belong to a

specific epic, with only a few exceptions.

Page 13: How To Deliver a Project With a 150% Advance

Divide each “Rock” into pieces

Think of them as lego pieces that will help build

your project.

Make sure each piece is: Independent, Estimable and Simple.

Each piece will become a story or card on your board. (Trello / Jira / Pivotal).

Page 14: How To Deliver a Project With a 150% Advance

ADD VALUE TO YOUR PRODUCT EVERY DAY

Page 15: How To Deliver a Project With a 150% Advance

Focus On Your Mission

Plan out what you wish to accomplish at the end of

the day, and stick to your main mission.

Constantly show progress to your client: Remember that they are as in love with the project as you are, and want to be part of building it.

Page 16: How To Deliver a Project With a 150% Advance

Moises Narvaez

If you don’t accomplish your mission at the end of the day, you’ve wasted a day.

Page 17: How To Deliver a Project With a 150% Advance

PREPARE FOR THE UNEXPECTED

Page 18: How To Deliver a Project With a 150% Advance

Only 60% of a sprint’s tasks are identified at the Planning stage.

Source: Agile Project Management Scrum (Schwaber 2004)

Page 19: How To Deliver a Project With a 150% Advance

Sprint BacklogIf a setback occurs that will make it impossible to complete the current sprint, it should be placed in this category and be regarded as a priority.

Project BacklogIf a feature/task was not identified during the planning meeting, but is not related to the current sprint, it should be placed in this category.

Icebox

These features are out of

the product’s scope. No

matter how easy or exciting

they are, they most be

placed in this category.

New pieces can (and will) emerge

For each iteration, new requirements can (and will) emerge: It is our task to identify where to place them:

Page 20: How To Deliver a Project With a 150% Advance

Never say “No”

Manage client’s expectations.

Create a card, document it and send it to the icebox.

Evaluate the effort required to complete this new requirement and put it in writing.

Page 21: How To Deliver a Project With a 150% Advance

When necessary: Work Harder!

Page 22: How To Deliver a Project With a 150% Advance

KEEP YOUR TEAM MOTIVATED

Page 23: How To Deliver a Project With a 150% Advance

Be a Role Model

Page 24: How To Deliver a Project With a 150% Advance

We all want to be better at what we do

Make sure that every member of your team is giving his/her best.

Take time to answer questions.

Congratulate them when things are getting done, and push them when they could be better.

Challenge them: Everyone wants to learn new things. All the time.

Page 25: How To Deliver a Project With a 150% Advance

KOOMBEA, YOU’RE AWESOME!

Page 26: How To Deliver a Project With a 150% Advance

Questions?

[email protected]

@ingnarvaez

moisesnarvaez

¡ THANK YOU !