how to become a pacificorp supplier two transmission lines between its naughton power plant near...

11
How to become a PacifiCorp Supplier Instructions for suppliers

Upload: ngohanh

Post on 05-Apr-2018

221 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

How to become a PacifiCorp Supplier

Instructions for suppliers

Page 2: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Visit www.pacificorp.com

Page 3: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Click on “Suppliers”

Page 4: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Click on “Get details on how to become a supplier”

Page 5: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Click on “Complete the vendor registration form”

Page 6: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

The below window will appear, click on “open”

Page 7: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Fill out the vendor registration form

Page 8: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Vendor registration form tips

• You may fill out the form by placing your cursor in the form and filling in the blanks.

• You may also print off the form and hand write the information

When complete, click on “Print”

Page 9: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Submitting the registration form Make sure your registration form is complete and all required forms (W-9’s, certificates, etc.) are included in your submittal. You may submit your application package to:

PacifiCorp Procurement Attention: Vendor Administration Coordinator 825 NE Multnomah Street, Suite 400 Portland, Oregon 97232

OR Via email to: [email protected]

Page 10: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

What happens next?

• You can expect an email acknowledgment that your registration form was received within two weeks of submittal.

• As long as all required information has been submitted, a final decision on your vendor registration can be expected within 90 days of submittal.

Page 11: How to become a PacifiCorp Supplier two transmission lines between its Naughton power plant near Kemmerer, Wyoming, and the Ben Lomond substation near North Ogden, Utah

Thank you!

Question? Please contact: [email protected]