Page 1: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

1

®

HotShingleLOKTM

Page 2: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

2

® DATA SHEETfor HotShingleLOKTM

HotShingleLOK is a patent pending one-piece roof edge ice melt system engineered to lock onto existing asphalt composite shingle without penetrating roof deck. A specially designed three sided angulated raceway securely holds a secure a single commercial grade self regulating heat trace cable in place for a direct heat transfer. The benefit of a direct heat transfer is less heat trace cable is needed to prevent ice dam and icicles formations on all roof edges. Less heat trace cable means lower energy costs. Easily installs around gutters and downspouts. And since no modifications are required to existing roof structure, overall project costs remain a fraction of all other market alternatives. HotShingleLOK2X and 3X are engineered to hold two and three heat trace cable runs for extreme applications when a minimum of 20+ inches of melt back from roof edge is needed.

SECURE: An engineered channel was developed to receive existing composite asphalt shingles

SIMPLE & FAST INSTALLATION: Simple design installs easily on all EXISTING asphalt composite shingle roofs

NEC Compliant: The engineered open raceway design conforms to the NEC (National Electrical Code) Article 426 and provides access for insertion, inspection and replacement

NO MODIFICATIONS: This one piece design requires no shingle cutting or removal. Avoids damaging or modifying existing roof shingles which saves time on installations to reduce overall cost of project LESS HEAT TRACE CABLE NEEDED: The benefit of a direct heat transfer is less heat trace cable is needed to prevent ice dam and icicles formations on all roof edges

A “GREEN” SOLUTION: Less heat trace cable means lower energy costs. In fact, all HotEdge roof edge melt systems use at least 50% less heat trace cable than all other alternatives, i.e. zig zag and aluminum metal tracks

WARRANTY: Industry leading 10-year limited warranty against heat cable failures and manufacture defects assures a long service. Heat trace cable is protected from UV light and snow/ice shifts and slides

COLOR MATCH: Our expansive inventory and nationwide network allows HotEdge to best match existing roof or trim color

EXCLUSIVE FEATURES

Page 3: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

3

®

DIMENSIONS:5’ lengths and commercial grade adhesive included

ELECTRICAL REQUIREMENTS:120VAC, or 208-277VAC. NEC Article 426.28 requires 30mA ground fault circuit protection for roof ice melting systems

HEATING SYSTEM:Commercial-grade 12-watt/ft self-regulating heat cable, UL-approved for roof and gutter deicing

COLOR:Our expansive inventory and nationwide network allows HotEdge to best match existing roof or trim color

MATERIAL SELECTION:.021” Copper, 24 gauge Kynar 500 Steel or .032 Aluminum Kynar 500

COMPONENTS:HotShingleLOK, commercial-grade 12W self-regulating UL-approved for roof and gutter deicing heat cable, commercial grade adhesive, and transition panel

DATA SHEETfor HotShingleLOKTM

SPECIFICATIONS

Page 4: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

4

® DESIGN GUIDEfor HotShingleLOKTM

24 GAUGE KYNAR 500 .032 ALUMINUM KYNAR 500 .021 COPPER

HEAT CABLE

----- ·----24 GAUGE KYNAR 500 ·- 13" _.032 ALUMINUM KYNAR 500 -----_ .021 COPPER

[SHINGLE I [FLASHING]

. [FASCIA BOARD I I HEAT CABLE l

I

Page 5: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

5

® DESIGN GUIDEfor HotShingleLOKTM

Transition Panel Scale 2:14” wide Transition panel fits over 1/8-1/4” gap

between HotShingleLOK panels to cover seams

≈ 13.5” 24 GUAGE KYNAR 500.032 ALUMINUM KYNAR 500.021 COPPER

≈0.30” Inside radius

The revolutionary one-piece HotShingleLOK™ panels are design engineered for secure and simple installation on composite asphalt shingle, wood shake, cedar shake, and concrete tile applications with or without gutter systems.

The objective is to heat a roof edge on a continuous basis by transferring heat directly from a commercial grade self-regulating heat cable to the HotShingleLOK™. Heating a roof edge on a continuous basis is critical towards preventing icicles and ice dams from forming. Once installed, snow melt water does not have the chance to re-freeze on the roof edge. Gutters and downspouts must always be taken into careful consideration as part of a complete system as they represent the pathway necessary for snow melt water to travel and reach the ground before it can re-freeze.

The heated HotShingleLOK™ panels slide between the second and third rows of shingles with the heated ice melt cable three-sided raceway laid just above the gutter hangers and tight to the edge.

If needed, the 4” wide HotShingleLOK Transition Panel fits over the 1/8-1/4” gap between the HotShingleLOK™ Panels to cover the seams.

Page 6: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

6

® DESIGN GUIDEfor HotShingleLOKTM

Overview1. The overall objective is to keep the snow melt water in a liquid state until it reaches the ground and is drained

away from the structure’s foundation. A heated gutter and downspout system is required for most applications.

2. The HotShingleLOK Panels are normally ten feet wide and installed with a 1/8”-1/4” gap between the panels for expansion/contraction and drainage between the panels. The HotShingleLOK panels may be cut to width at the job site. If needed, the job site cut is covered by the Transition Panels (below) that have a clean cut factory edge.

3. The four inch wide Transition Panel has a slightly larger inside cavity fold-back at the bottom and fits over the gap between the LOK Panels.

4. This patent pending open raceway design conforms to the NEC (National Electrical Code) Article 426 and provides access for insertion, maintenance and replacement.

5. The heat generated by the single run of commercial-grade self-regulating heat cable is directly conducted to the HotShingleLOK Panels. The raceway was designed to tightly wrap the heat cable on 3 sides for retention and maximum heat transference.

6. Due to the extended up-roof melt back distance, only a 12 watt/ft ice melt cable should be used. Consult with a licensed electrician for layout, junction box locations, EPD electrical feeds and NEC compliance.

Page 7: HotShingleLOK - HotEdge Roof Ice Melt · 2020. 11. 30. · 800.411.3296 6 ® DESIGN GUIDE for HotShingleLOKTM Overview 1. The overall objective is to keep the snow melt water in a

www.hotedge.com 800.411.3296

7

® DESIGN GUIDEfor HotShingleLOKTM

HotShingleLOK™ Panel – Harmonized Part Number Nomenclature

HotShingleLOK™ Panel

HSLOK

HotShingleLOK™ Transition Panel

HSLOKP(Note: Transition Panels may be required between each LOKPanel and at each end of each horizontal run.

Roof Clips

(50/package)

XX – No Options

BTP= Build to Print (Special Order Only)

60 = 60"MaterialC= Copper, 0.021”, 16oz., ½ Hard

S = Painted Kynar 500 Steel, 0.019”

A = Kynar Painted Aluminum, 0.032”

ColorNATC = Natural Copper(For copper material)

STD. ColorsALMD= AlmondCLRD = Colonial RedHMGR = Hemlock GreenSLBL = Slate BlueBNWH = Bone WhiteCOPE = Copper PennyMNBN = Mansard BrownSLGR = Slate GrayMABL = Matte BlackDKBZ = Dark BronzeMDBZ = Medium BronzeCLGR = Classic GreenHAGR = Hartford GreenSRTN = Sierra Tan

HSLOK — S - HAGR — 120 — XX — Rev12

HotShingle™ Extension Panel – Design Guide 9-27-2011 Rev13 ©2011 Hot Edge, LLC Page 5 of 6

HotShingleLOK Products Material & Color Length Options

004 = 4"Transition panel