Hotel Leela Project: Hotel Leela, Chennai Details: A 15 meter deep pit had to be excavated to locate a parking lot and a service basement on 2 levels. Challenge: The side walls were to be protected from collapsing. Solution: The side walls were stabilized by constructing secant piles in the sandy strata. The piles were anchored to the surrounding land by providing prestressed anchors with a capacity of 150 tonne. Freyssinet 10K15 tendons of varying length (35 to 45 meter) were used. The job of anchoring about 350 tendons was completed in 4 months flat!

Upload: others

Post on 03-Apr-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hotel Leela - freyssinet-India · 2011-10-18 · Hotel Leela Project: Hotel Leela, Chennai Details: A 15 meter deep pit had to be excavated to locate a parking lot and a service basement

Hotel Leela

Project: Hotel Leela, Chennai

Details: A 15 meter deep pit had to be excavated to locate a parking

lot and a service basement on 2 levels.

Challenge: The side walls were to be protected from collapsing.

Solution: The side walls were stabilized by constructing secant piles

in the sandy strata. The piles were anchored to the

surrounding land by providing prestressed anchors with a

capacity of 150 tonne. Freyssinet 10K15 tendons of varying

length (35 to 45 meter) were used.

The job of anchoring about 350 tendons was completed in 4

months flat!