hotel furdown framing

1
Lbl Qty Member Length C0 3 362S125-18 11 3/8" T0 2 362T100-18 4' - 0 5/8" 11 1/4" C0 C0 C0 T0 T0 0" 2' - 0" 4' - 0 1/8" 0" 2 1/4" 2' - 2 5/8" 4' - 3" 11 1/4" C0 C0 C0 T0 C0 T0 11 1/4" 0" 4 1/2" 2' - 4 1/2" 4' - 5 3/8" C0 C0 C0 T0 C0 T0 0" 1' - 6 3/4" 3' - 6 7/8" 11 1/4" C0 C0 C0 T0 T0 0" 1' - 11 3/8" 2' - 7 3/8" 2' - 7 3/8" 11 1/2" C0 C0 C0 T0 T0 0" 1' - 11 3/8" 2' - 10 1/2" 2' - 10 1/2" 11 1/2" C0 C0 C0 T0 T0 Lbl Qty Member Length C0 4 362S125-18 11 3/8" T0 2 362T100-18 4' - 2 7/8" Lbl Qty Member Length C0 3 362S125-18 11 3/8" T0 2 362T100-18 2' - 7 3/8" Lbl Qty Member Length C0 4 362S125-18 11 3/8" T0 2 362T100-18 4' - 5 1/4" Lbl Qty Member Length C0 3 362S125-18 11 3/8" T0 2 362T100-18 3' - 7 1/8" Lbl Qty Member Length C0 3 362S125-18 11 3/8" T0 2 362T100-18 2' - 10 1/2" 2' - 7 3/8" 3' - 10 5/8" 3' - 10 3/8" 2' - 10 1/2" 2 6.07 ° 2 6.11 ° 2 6.14 ° 26. 78° 3' - 11 1/8" 4 ' - 1 " 362S125-18 6' Scale Project number Date Drawn by Size A STEEL Drawing number Review TRANSCON THE DRAWINGS HEREIN ARE MANUFACTURING DRAWINGS ONLY. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING ALL DIMENSIONS, SITE CONDITIONS, AND THAT ALL STATE AND LOCAL CODE REQUIREMENTS ARE MET. PLEASE CONTACT TRANSCON STEEL FOR ANY ADDITIONAL CLARITY IN NEEDED PRIOR TO INSTALLATION. FRAMING THE FUTURE As indicated 2.13 Panel29-34 12-105 Marriott Courtyard Sailisbury , NC 07/12/12 3/8" = 1'-0" 1 Bill of Material 1/2" = 1'-0" 3 Panel 29 1/2" = 1'-0" 4 Panel 30 1/2" = 1'-0" 5 Panel 32 1/2" = 1'-0" 6 Panel 33 1/2" = 1'-0" 7 Panel 31 1/2" = 1'-0" 8 Panel 34 3/8" = 1'-0" 9 Bill of Material 3/8" = 1'-0" 10 Bill of Material 3/8" = 1'-0" 11 Bill of Material 3/8" = 1'-0" 12 Bill of Material 3/8" = 1'-0" 13 Bill of Material

Upload: geoffrey-jennings

Post on 07-Aug-2015

12 views

Category:

Software


0 download

TRANSCRIPT

Page 1: Hotel Furdown Framing

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 4' - 0 5/8"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 4' - 0 5/8"

11 1

/4"

C0 C0 C0

T0

T0

0" 2' - 0

"

4' - 0

1/8"

0"

2 1/4"

2' - 2

5/8"

4' - 3

"

11 1

/4"

C0 C0 C0

T0

C0

T0

11 1

/4"

0"

4 1/2"

2' - 4

1/2"

4' - 5

3/8"

C0 C0 C0

T0

C0

T0

0"

1' - 6

3/4"

3' - 6

7/8"

11 1

/4"

C0 C0 C0

T0

T0

0"

1' - 1

1 3/8"

2' - 7

3/8"

2' - 7 3/8"

11 1

/2"

C0 C0 C0

T0

T0

0"

1' - 1

1 3/8"

2' - 1

0 1/2"

2' - 10 1/2"

11 1

/2"

C0 C0 C0

T0

T0

Lbl Qty Member LengthC0 4 362S125-18 11 3/8"T0 2 362T100-18 4' - 2 7/8"

Lbl Qty Member LengthC0 4 362S125-18 11 3/8"T0 2 362T100-18 4' - 2 7/8"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 2' - 7 3/8"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 2' - 7 3/8"

Lbl Qty Member LengthC0 4 362S125-18 11 3/8"T0 2 362T100-18 4' - 5 1/4"

Lbl Qty Member LengthC0 4 362S125-18 11 3/8"T0 2 362T100-18 4' - 5 1/4"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 3' - 7 1/8"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 3' - 7 1/8"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 2' - 10 1/2"

Lbl Qty Member LengthC0 3 362S125-18 11 3/8"T0 2 362T100-18 2' - 10 1/2"

2' - 7 3/8" 3' - 10 5/8" 3' - 10 3/8" 2' - 10 1/2"

26.07°

26.11°

26.14°

26.78°

3' - 11 1/8" 4' - 1"

362S125-18 6'

Scale Project numberDateDrawn by Size

ASTEEL Drawing number

ReviewTRANSCON THE DRAWINGS HEREIN ARE MANUFACTURING DRAWINGS ONLY.CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING ALLDIMENSIONS, SITE CONDITIONS, AND THAT ALL STATE AND LOCALCODE REQUIREMENTS ARE MET. PLEASE CONTACT TRANSCON STEELFOR ANY ADDITIONAL CLARITY IN NEEDED PRIOR TO INSTALLATION.

FRAMING THE FUTURE As indicated 2.13

Panel29-34

12-105

Marriott Courtyard Sailisbury , NC

07/12/12

3/8" = 1'-0"1 Bill of Material

1/2" = 1'-0"3 Panel 29 1/2" = 1'-0"4 Panel 30

1/2" = 1'-0"5 Panel 32 1/2" = 1'-0"6 Panel 33

1/2" = 1'-0"7 Panel 31

1/2" = 1'-0"8 Panel 34

3/8" = 1'-0"9 Bill of Material 3/8" = 1'-0"10 Bill of Material

3/8" = 1'-0"11 Bill of Material 3/8" = 1'-0"12 Bill of Material

3/8" = 1'-0"13 Bill of Material