HOSPITAL PENAWAR

DEVELOPMENT AND IMPROVEMENT

2011

Page 2: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

IVF-Development & Improvement

PROGRESS

PROJECT DATELINE STATUS

Gas connection to machine--- Nasir

4 NOV WAITING FOR GAS SUPPLIER

Anaest Machine---Ahmad

19 NOV Brochure & quotation acquired

Page 3: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

IVF- Development & Improvement

ACTIVITIES

PROJECT DATELINE STATUS

IVF TALK OCT 29NOV 2NOV 9

DONE –23 attended2ND BATCH3rd BATCH (namelist with Diana)

FREE AD-FACEBOOK

OCT 28 DONE

LPPKN VISIT(by NOV 9)

Draft letter---NOV 2Call to make appt ---NOV 2

DONE by Bella (see email)

GP VISIT OCT 28---GP @ PG & Masai areaNOV 1---GP @ PG & Masai areaNOV 4---GP @ Tmn U & Skudai areaNOV 15---GP @Kota Tinggi areaNOV 17--GP @ Johor Jaya & Permas areaNOV 23---GP @ JB area

DONERescheduled

Page 4: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

IVF-Development & Improvement

PROJECT DATELINE STATUS

DIGITAL MARKETING BY EMAIL(by NOV 10)

Get data frm kpp & MedilinkNOV 1

Draft email NOV 2

DONE-- Data acquired

PUBLIC BOOTH TESCO SERI ALAMNOV 12

BULK MAILING– NGO(by NOV 16)

Draft letter &IVF leaflet job order NOV 11

DIGITAL MARKETING BY TELEMARKETING (FOLLOW-UP)(by NOV 25)

Get data frm deptNOV 14Data tracking NOV 18

Page 5: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

GP VISIT

• 28 OCT 2011• AIR BIRU PASIR GUDANGPOLIKLINIK PENAWAR---DR SHUKORPOLIKLINIK SEJAHTERA---DR

ZURAIDAHPOLIKLINIK ROZIKIN---DR ZAIDAH

(locum)

Page 6: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FREE AD ---FACEBOOK

Page 7: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

OCT 2011

IMAGING DEVELOPMENT

Page 8: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY• SITE PROGRESS

COMPLETED• # BARIUM PLASTERING • # LEAD GLASS FRAME • # WALL AND FLOOR TILE AT CONTROL

AREA• # LEAD DOOR

Page 9: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY

LEAD DOOR &BARIUM PLASTER LEAD GLASS FRAME

Page 10: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY

WALL & FLOOR TILE@ CONTROL PANEL

FLOOR TRUNKING

Page 11: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY • IN PROGRESS

• # FLOOR TRUNKING• # TOILET DOOR• # ELECTRICAL JOB• # CEILING

Page 12: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY• CONCEPT

# LAMINATE CEILING

# FLOORING – VINYL

# WALL – FANCY PAINTING

COMPLETION DATE : 15 NOV 2011

Page 13: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW GENERAL X-RAY

• LICENSE

STATUS : LULUS BERSYARAT

# 25/10/11 KKM submission

1. APC Dr Nachiappan

2. APC Dr Zukri as Penyelia

3. Floor plan PP Masai as a new place for Old X-Ray

4. Dr Marlina time table

Page 14: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

BIOMED PROGRESS DEVELOPMENT

NOVEMBER 2011

HOSPITAL PENAWAR

Page 15: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW ENT

Page 16: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

CONFIRM TO BUY

• LIGHT SOURCE› U9112 GL 350-5A PRICE RMB 4296› 2 LAMP XENON & HALOGEN

INCASE BREAKDOWN WE CAN SELECT 2ND LAMP

› ILLUMINATION >2000000LX• CAMERA SYSTEM

› U9226 F-168D PRICE RMB 17491› SCANNING STANDARD 600 LINES› CAMERA HEAD 1.3” SONY WATERPROOF› OUTPUT : BNC, Y, C, RGB, DVI, USB

Page 17: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

SUPPLIER

• CONTACT NAME– Colin Zhuang

• ADDRESS– Shanghai Medical Instrument

Impt.&Expt.Co.,LTD Tel: +86-021-65951875 Fax: +86-021-65951876 Mobile:86-13816132537 Email:[email protected],[email protected] Website:www.smicc.com

Page 18: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

ACTIVITY PROGRESS• PROFORMA INVOICE NEEDED

– 31/10/2011– USD 6575.00

• PURCHASE ORDER – DONE 1/11/2011

• TT PROGRESS– PASS OVER TO ERIN– 1/11/2011

• TARGET TT COMPLETE– 21 NOVEMBER 2011 ( WAITING EN AZIZAN )

Page 19: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

CCTV DEVELOPMENT

Page 20: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

CCTV DEVELOPMENT

• Purchase of material:

Avtech Dome Camera (RM95.00 x 10 unit) = RM950.00

CCTV cable (2 box)+ Cable Power (2 box) = RM390.00

BNC Connector & other equipment = RM226.50

H/disk 500gb+Connecter DC 30pcs = RM345.00

DVR = RM0.00

Monitor + Bracket = RM405.00

Power DB 5AMP (3 unit) = RM540.00

TOTAL = RM2,856.50

APPROVED BUDGET = RM3,100.00

Page 21: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MATERIAL PURCHASED

Page 22: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MATERIAL PURCHASED

Page 23: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

SCHEDULE PROGRESS

Work done 24-30 Oct 31-6 Nov 7-13 Nov-Planning Done- Drilling In progress Done- Cable installation: *Lift A *Lift B

Not started yet In progressIn progress

-Camera installation: *Lift A *Lift B

**

- Camera replacement (2 unit) *

- System test *

Page 24: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Drilling

LIFT A

Page 25: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Drilling

LIFT B

Page 26: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

PARADE IMPROVEMENT

Page 27: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

CURRENT LOCATION

Page 28: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEW LOCATION

Page 29: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

THIS WEEK TARGET

• Start on 4 November 2011:- P.A. system ready to use.- new location (Directors’ parking lot)- parade commander on stage- record by CCTV – David to change CCTV view

- QC will in-charge for the parade until further notice

• Content:- Pemeriksaan perbarisan (attendance/uniform)- Takhlim- Current issues

Page 30: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

HP NOVEMBER 2011DEVELOPMENT &

IMPROVEMENTLADY O&G

2nd ENT CLINIC1 November 2011

Gee / CS Team

Page 31: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G# Target October ~ 150 outpatient / 30 inpatient

# Achievement for October

1.Dr.Norlela ~ 25 outpatient / 1 inpatient

2.Dr.Geetha ~ 10 outpatient / 0 inpatient

# Failure to achieve target:

3.Attendance & commitment lady O&G doctor.

4.Night clinic & Sunday clinic by resident doctor ( Dr.Suhaimi ) close.

Page 32: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&GDr.Norlela

4 Oct 9 o/p

6 Oct 5 o/p

11 Oct 9 o/p ~ 1 i/p

13 Oct 2 o/p

18 Oct On leave

20 Oct On leave

25 Oct – 30 Nov On leave

Page 33: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&GDr.Geetha

1 Oct 1 o/p

2 Oct 0 o/p

8 Oct On leave

9 Oct On leave

15 Oct 2 o/p

16 Oct 3 o/p

22 Oct Emergency leave

23 Oct Emergency leave

29 Oct 4 o/p

30 Oct ( Dr. Han Sok Kit ) 0 o/p

Page 34: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G# Target November ~ 150 outpatient / 30

inpatient

# Target performance measures:

1. Full commitment from lady O&G

~ Night clinic open 6-10pm @ by Dr.Geetha

~ Sat/Sun clinic open 9-1pm @ by Dr.Geetha

2. Replacement lady doctor if Dr.Geetha emergency leave;

@ Dr.Han Sok Kit (010-7171151) or MO under Dr.Geetha

Page 35: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G

3 . Activities by CS DepartmentProject Dateline Status

1. Banner installation 1 Nov Done

2. Roster by Medical Unit 31 Oct Done

3. Digital Marketing by SMS 4 Nov - sorting data from Kpp- HP data - done

4. Digital Telemarketing “Delivery” 11 Nov - sorting data from Kpp- HP data - done

5. Website Update “ Delivery Package & Lady O&G”

2 Nov - Draft done

6. Visit GP Clinic 1 Nov 8 Nov 15 Nov17 Nov23 Nov

- PG & Masai area- Taman U & Skudai area- Kota Tinggi area- Johor Jaya & Permas area- JB area

Page 36: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G • Comparison Total Patient O&G

Month 2011

Dr.Suhaimi

Dr.Norlela Dr.Geetha Total

July 493 493

August 382 8 23 413

September

387 24 31 442

October 456 26 10 492

Page 37: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G – Colposcopy (3 Oct 2011)

Page 38: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G - clinic

Page 39: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LADY O&G - ultrasound

Page 40: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

2nd ENT CLINIC • Waiting for new light source & camera set

@ incharge by Ahmad

~ 31 October 2011 @ no progress

Page 41: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

2nd ENT CLINIC (3 Oct 2011)

Page 42: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

2nd ENT CLINIC – work station (3 Oct)

Page 43: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

DIALYSIS : KKM LICENSE SUBMISSION

Page 44: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Try to contact and visit Dialysis Center to find out SRN with Dialysis Certificate.

• Progress:- Already approach SRN Rohana (ex- staff

HP) but she demand for salary up to RM3K.

- Interviewed SRN done on 15th October 2011with Matron Marziah.

- Candidate experience at Kulai Rotary Dialysis Centre – 6 month

STAFFING

Page 45: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NO DIALYSIS CENTRE VISITING/ CALL

STAFFING REMARK

1 BP RENAL CARE (RENGIT) SDN BHD

Visit 3 SRN, 2 AIDE 1 – Post Basic Renal-For licensing

2 Johor Quarries Association Dialysis,Johor Jaya

Visit 8 SRN 2 – post Basic Renal – 1 for licensing

3 Prima Dialysis Centre, Masai

Visit 4 SRN- 1in charge for license

1 – Post Basic Renal – 1 for licensing

4 Nefro Utama Sdn Bhd,Bandar Baru Uda

Call 10 SRN 2 – Post Basic renal – 1 for licensing

5 Pusat rawatan dialisis yayasan pembangunan keluarga,permas jaya

Call 10 SRN 4 AIDE 3 – post Basic renal - 1 license,2 (bond)

PROGRESS

Page 46: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NO DIALYSIS CENTER VISIT/CALL STAFFING REMARKS

6 JB- Lions Medical Charity, Taman Sri tebrau

Call 5 SRN , 2 Aide

1 – SRN Post Basic

7 JJ Lion Dialysis centre,Taman Johor Jaya

Call 3 SRN, 1 Aide

No Post Basic

Page 47: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Requirement from NKF• Fees

RM 4,500.00•

DurationPeriod of training is 6 months

•Entry RequirementsMust be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit

• Must have full secondment and a form of endorsement from their relevant authority

• Hepatitis Status – must be negative

* Intake on January and August every year

PROGRESS

Page 48: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• MOH Requirement• Fees

RM 3,500.00

• DurationPeriod of training is 6 months

• Entry RequirementsMust be a registered staff nurse/medical assistant, preferably with 6 months working experience in a haemodialysis unit

• Hepatitis Status – must be negative

• Closing date for course intake January’12 - September

• * Intake on January and July every year

Page 49: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NEUROSURGERY

Page 50: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

PROGRESS• Letter to Director of Hospital Sultanah

Aminah ready and prepared by Pn Hjh Norizan.

• Will send the letter to Director on Thursday 01st November 2011

Page 51: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

PROGRESS• Letter already send and pass it to Ms

Hafilna PA, of Director, Hospital Sultanah Aminah by Tuesday -01st November 2011.

• Will follow up with her to get approval for attachment.

Page 52: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MAINTENANCE RESOLVE 90%

SEPTEMBER

Page 53: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Reference from M.O.D September report• Sekeliling bangunan• No. Report date Report Status• 1 16/9/2011 Air sinki café berlimpah ok

• 2 16/9/2011 Sampah banyak di kaki lima The Shoppe

• 3 16/9/2011 Mentol lampu pintu masuk hadapan tiada ok

• 4 16/9/2011 Lampu taman depan The Shoppe terbakar

• 5 16/9/2011 Lampu taman main entrance tak hidup ok

• 6 16/9/2011 Sebahagian Galery terlindung dengan bahan projek ok

• 7 20/9/2011 5 bulb lampu tiang terbakar ok

• 8 20/9/2011 A&E bulb terbakar ok

• 9 20/9/2011 Bumbung laluan kaki dari kafe tanggal ok

• 10 21/9/2011 Puntung rokok bertaburan dari The Shoppe ke A&E

Page 54: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• 11 21/9/2011 Longkang tepi Genset kotor

• 12 21/9/2011 Puntung rokok di gazebo bertaburan

• 13 21/9/2011 Tandas A ground floor kotor

• 14 22/9/2011 Habuk di perabot dan bingkai tingkap

• 15 22/9/2011 Aircond not function well in ground floor ok

• 16 24/9/2011 Barang-barang Hari Raya Open House belum dikemaskan.

• 17 26/9/2011 Kucing berkeliaran di kafe

• 18 26/9/2011 Hos getah tidak digulung kemas di kaki lima

• 19 27/9/2011 Lampu depan Imaging department rosak ok

• 20 28/9.2011 Lampu di kafe tak berfungsi ok

Page 55: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Reference from M.O.D report september

• Ground floor • 21 16/9/2011 Penutup pam tandas A tiada in progres • 22 16/9/2011 Lift B - lantai kotor • 23 22/9/2011 Habuk di kebanyakan tempat • 24 24/9/2011 Lampu A&E tak hidup ok

• 1st floor • 25 20/9/2011 Candle light di tangga Classic Clinic not fctn ok • 26 20/9/2011 Women & Child toilet - pipe leaking ok • 27 20/9/2011 Downlite Women & Child - not function

ok • 28 20/9/2011 Candle light at Women & Child not function ok • 29 20/9/2011 Frame spotlite - not function ok • 30 22/9/2011 habuk di kebanyakan tempat

Page 56: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Reference from M.O.D report september• 2nd Floor • 31 16/9/2011 Toilet transit ward - besi atas pada pintu • 32 17/9/2011 Tandas transit ward 2 banyak sampah • 33 17/9/2011 Room 205 close due to leaking ok • 34 20/9/2011 Wallpaper tanggal in progres • 35 20/9/2011 Access door to wards 2 broken ok • 36 22/9/2011 Pantry messy because do not have rack for

plate ok • 37 23/9/2011 Banyak tandas kotor kerana tiada

Housekeeping • 38 23/9/2011 Perabot di transit ward 2 terkopak kulit

• 3rd Floor • 39 16/9/2011 Room 306 - tv plug tiada, no bed tiada,, bau cat

ok • 40 17/9/2011 Room 311 - siling bocor, paip tak ketat ok • 41 18/9/2011 Aircond at ward 3 counter not function ok • 42 23/9/2011 Bed di ward 305 tidak memuaskan

Page 57: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Project - New x-ray

Pintu telah dipasang

Pemasangan siling

Kerja – kerja pengorekan lantai untuk elektrikal

Layout pemasangan elektrikal

Page 58: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

New transit ward

Pemasangan vinyl selesai

Aircond dalam progress

Compressor aircond telah dipasang

Page 59: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

HEALTH & PHYSICAL ASSESMENT

Page 60: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• BY AGE- < 40 years

* Female -38 person

* Male – 11 person

> 40 years

* Female – 10 person

* Male – 5 person

CRITERIA

Page 61: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Year of service

- Propose staff more than 5 years of service

Page 62: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• MALE- LAB TEST – Full Blood Count, Renal Test,

Liver Test, Lipid Profile And UFEME- Fasting Blood Sugar test (Diabetic)- Cancer Marker – Prostate (PSA)- Ecg Test - Stress Test- Physical Fitness

• * For staff more than 3 years of service ONLY

PROPOSAL STAFF 40 YEARS AND ABOVE

Page 63: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Female- LAB TEST – Full Blood Count, Renal Test, Liver Test,

Lipid Profile And UFEME- Fasting Blood Sugar test (Diabetic)- Cancer Marker – Ovary (CA-125)- Pap Smear- Ecg Test - Stress Test- Mammogram- Physical Fitness

• * For staff more than 3 years of service ONLY

Page 64: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• MALE- LAB TEST – HB1C and UFEME- Stress Test- Physical Fitness

PROPOSAL STAFF < 40 YEARS

Page 65: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Female- LAB TEST –HB1C and UFEME- Pap Smear- Physical Fitness

Page 66: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FITNESS TEST

1. FLEXIBILITY.

2. MUSCULAR ENDURANCE.

3. AEROBIC ENDURANCE.

Page 67: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FLEXIBILTY TEST.(SIT AND REACH)

• 1. SIMPLE 3 TIMES TEST TO DO.• 2. GET AVERAGE SCORE.• 3. TO MEASURE CORE MUSCLE

FLEXIBILTY.

Page 68: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MUSCULAR ENDURANCE TEST(SIT-UP)+(PUSH-UP)

• SIT-UP TO ASSESS LOWER BODY.• PUSH-UP TO ASSESS UPPER BODY.• TWO MINUTE EACH TEST.

Page 69: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MEN PUSH-UP ( TWO MINUTE)

FITNESSLEVEL

AGE

20>29 30>39 40>49 50+

LEVEL 4 >71 >64 >57 >49

LEVEL 3 61-70 54-63 46-56 39-49

LEVEL 2 37-60 31-53 24-45 20-38

LEVEL 1 27-36 21-30 14-23 9-19

Page 70: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

WOMEN PUSH-UP (TWO MINUTE TEST)

FITNESSLEVEL

AGE

20>29 30>39 40>49 50+

LEVEL 4 >34 >31 >27 >23

LEVEL 3 29-33 25-30 22-26 18-22

LEVEL 2 11-28 7-24 2-21 1-17

LEVEL 1 1-10 1-6 1-5 1-4

Page 71: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MEN SIT-UP TEST (TWO MINUTE )FITNESSLEVEL

AGE

20>29 30>39 40>49 50+

LEVEL 4 >88 >82 >75 >68

LEVEL 3 77-87 71-81 66-74 61-67

LEVEL 2 48-76 41-60 31-65 27-60

LEVEL 1 36-47 20-30 25-33 19-26

Page 72: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

WOMEN SIT-UP TEST (TWO MINUTE)

FITNESSLEVEL

AGE

20>29 30>39 40>49 50+

LEVEL 4 >78 >72 >65 >58

LEVEL 3 67-77 61-71 56-64 51-57

LEVEL 2 38-66 31-60 24-55 17-50

LEVEL 1 26-37 20-30 15-23 9-16

Page 73: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

AEROBIC ENDURANCE TEST(10 MINUTE)

• TO DETERMINE STAMINA OF HEART BY CALCULATE THE RECOVERY H.R .

• 10 MINUTE ACT.• REST HR, PEAK HR, RECOVERY HR.

Page 74: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

RCR =PEAK HR – RECOVERY HR AFTER 1 MINUTE/10

RECOVERY RATE NO. CONDITION

< THAN 2.0 POOR

2 – 2.9 FAIR

3 – 3.9 GOOD

4 – 5.9 EXCELLENT

> THAN 6.0 OUTSTANDING

Page 75: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

• Based on Criteria

* Age

* Gender

Type of assessment:

* Blood Pressure

* Glucose

* BMI

* Stamina

ASSESSMENT

Page 76: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

POST PARASOL

COMPANY NAME : RK MARKETING SDN BHD

ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK, 47100 PUCHONG, SELANGOR DARUL EHSAN

TELEPHONE : 03 – 8060 2984

PRICE : WAITING QUOTATION FROM SUPPLIER

DETAILS PRODUCT :

CLASSIC SIDE POST PARASOLS Provides shade & More Utilization Beneath It - Open & Close in less than 5 minutes (Heavy Duty)

CLASSIC SIDE POST PARASOLS Provides shade & More Utilizations Beneath It - Open & Close in less than 5 minutes (Heavy Duty)

• Side post allows unobstructured movement below parasols• Enhance Separate Raised air vent allows better air circulation, more stability • Powder-coated white structural aluminum alloy frame • Stainless Steel Fasteners • Minimal visibility of bolts & nuts • Bigger frames • Customize shapes & sizes to fit your location (up to 4m)

Page 77: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

TENSILE PARASOL

COMPANY NAME : RK MARKETING SDN BHD

ADDRESS :NO 13, JALAN MERANTI JAYA 10, TAMAN MERANTI JAYA INDUSTRIAL PARK,

47100 PUCHONG, SELANGOR DARUL EHSAN

TELEPHONE : 03 – 8060 2984

PRICE : WAITING QUOTATION FROM SUPPLIER

DETAILS PRODUCT :

TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty)

TENSILE PARASOLS Futuristic Solutions (Super Heavy Duty)

• Innovative, stylish effects • Enhances your outdoor shade with a new & exciting look • Powder coated Galvanized frame • 659g/m2 PVC roof cover

Page 78: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

TENSION UMBRELLA HEXAGON (3 M X 3 M)

COMPANY NAME : TK KANVAS SDN BHD

ADDRESS : 4054 JALAN PERMATANG PAUH, 13400 BUTTERWORTH, PENANG,

COUNTRY : MALAYSIA

TELEPHONE NO : 012-5168 505 / 04-3235505

PRICE : WAITING QUOTATION FROM SUPPLIER

DETAILS

Engineered to stand wind speed above 120km/h Size - 3m Diameter Material - PVC coated polyester

- PVC Tarpaulin Frame - Mild Steel Frame

- Galvanized Mild Steel Frame - Aluminium Alloy Frame

Color  - White, Blu.e, Red, Green, Yellow, Grey etc.

Tension Umbrella - Hexagon Tent is suitable for:-- Suitable for Garden

  - Cafe  - Food Outlet   - Food Court

Page 79: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

SUN UMBRELLA

COMPANY NAME : FOSHAN DSIN OUTDOOR FURNITURE FACTORY

Tel. :+86-757-23871076/79/73      

Mobile :+86-13702618798

Fax :+86-757-23871078

E-mail :[email protected] (MSN)

AddRESS .:Shibu Changlu Road,LongJiang Town,Foshan City,Guangdong province,China

PRODUCT INFO : That umbrella material is iron frame and polyester, base is injecting water 100kg. 

PRICE : US $ 95

Page 80: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

PARASOL

COMPANY NAME : BEYOND SUPPLY SDN BHD

ADDRESS : 17, Jalan PMS1, 75400 Plaza Melaka Sentral, MELAKA

TELEPHONE : 06- 2825772

FAX : 06 – 2826772

DESIGN & STRUCTURE :

General Use : OUTDOOR FURNITUREBRAND NAME : SUNLESSPANEL MATERIAL : POLYSTERBASE MATERIAL : ALUMINIUMPOLE MATERIAL : ALUMINIUM

QUOTATION

• DIMENSION: 2.0 M X 2.0 M (6 FT X 6 FT) : RM 800.00• DIMENSION: 2.5 M X 2.5 M (8 FT X 8 FT) : RM 1200.00• DIMENSION : 3.0 M X 3.0 M (10 FT X 10 DFT) : RM 1500.00

Page 81: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011
Page 82: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NURSING SYSTEM

2ND NOVEMBER 2011

Page 83: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Phase 1 – RECORD TRANSACTION

• Training – In Progress (Base On List Name)• User Name & Password – (David) Done • Hardware :

• Mini PDA – Awaiting Quotation From Supplier– (Target – End Of This Week Settle)

• Workstation Trolley – In Progress– (Target – PO & Money Order End Of This Week Settle)

PHASE 2 – PHYSIO REQUEST ONLINE

• STATUS SYSTEM – In Progress (David)

Page 84: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

RECORD TRANSACTIONPRINT PREVIEW

SCREEN PREVIEW

Page 85: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

OT REGISTRATION SYSTEM - WARD

Page 86: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FLOW CHART ORS

PT’S WITH REGISTRATION SLIP

(PROCEED FOR OPERATION)

OT STAFF(CHECK

REGISTRATION SLIP)

FROM WARD(REGISTER PT’S

FOR OP)PRINT

(EVIDANCE)

PT’S WITHOUT REGISTRATION SLIP(DELAY CASE)

DO NOT ACCEPT PT’S

RETURN PT’S TO WARD

Page 87: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

CONT,

ADALAH MENJADI KESALAHAN PROSIDUR JIKA OT MENERIMA

PESAKIT TANPA :‘PRINTED OT REGISTRATION SLIP’

Page 88: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011
Page 89: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

SCREEN PREVIEW

PRINT PREVIEW

Ors system

Page 90: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Penawar Nursing Services

Page 91: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011
Page 92: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Nursing ListNO NAME RECORD PHYSIO OT SYS

1 EN. MOHD ALI      

2 HA ANANDHI      

3 HA MANIMEGALAI      

4 HA MUNIYAMA UPL UPL UPL

5 HA NORSALHA      

6 HA SITI AISHAH      

7 JM SHUHADA      

8 MA MOHD AFFENDY      

9 SEN ARNIDA TRAINED    

10 SEN NORAINI TRAINED    

11 SEN RUZAINEE TRAINED    

12 SEN SUTIMAH      

13 SRN AMIRA      

14 SRN AZMIRA TRAINED    

15 SRN CHE MOHD HAFFIZUDIN      

16 SRN ELLYUSNITA TRAINED    

17 SRN EMY SHAFIQ      

18 SRN FAIZAH TRAINED    

19 SRN MOHD MUKHLIS      

20 SRN NOOR AZIMAH      

Page 93: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

21 SRN NOR ASIKIN TRAINED    

22 SRN NOREEN TRAINED    

23 SRN NORFARHANA TRAINED    

24 SRN NORHAZIMAH TRAINED    

25 SRN NORIDA      

26 SRN NORIDA ERA      

27 SRN NORMALA TRAINED    

28SRN NUR AINI KHADIJAH TRAINED    

29 SRN NUR SITI HANISAH TRAINED    

30 SRN NURSUHAILA      

31 SRN NURUL ASYIKIN TRAINED    

32 SRN RAJA NAZATUL SL SL SL

33 SRN ROGAYAH AKMAR TRAINED    

34 SRN ROSMAWATI      

35 SRN ROSZILA TRAINED    

36 SRN ROZZANA TRAINED    

37 SRN SARUNI      

38 SRN SERI      

39 SRN SHAIRULSAIFUDIN      

40 SRN SITI FATIMAH      

41 SRN YATIMAH      

42        

SL = STUDY LEAVE UPL = UNPAID LEAVE

Page 94: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

THE FLOWERS CAFEDEVELOPMENT & IMPROVEMENT

TARGET 4 NOVEMBER 2011

FLOWER CAFE

Page 95: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Menu

Display

Propose Hawkers Area1. Peti Sejuk 2. Tambah 1 dapur (2

dapur)3. Microwave4. Cabinet (Pingan &

Makanan)5. Stainless Table

FLOWER CAFE

Page 96: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FROOZEN & CHILLER

Budget prize

1. 430 L RM 1580

2. 350 L RM 1350

FLOWER CAFE

Page 98: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

MICROWAVE

Budget prize

1. RM 1500

FLOWER CAFE

CARBINET

MICROWAVE & CARBINET PINGGAN/MAKANAN

Budget prize

1. RM ?

Page 99: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FLOWER CAFE

NEW WORKING HOURS CHEFF

1. CHEFF YUSOF 7 AM – 4 PM

2. CHEFF SITI 9 AM – 6 PM

BREAKFAST PROVIDE BY OUTSOURCE

LUNCH PROVIDED AS USUAL BY CHEFF

Page 100: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

NASI ANEKA MEE

• Nasi Goreng Cina• Nasi Goreng Kampung

• Burger

• Mee Goreng Mamak• Mee Hoon Goreng• Kuew Tiaw Goreng• Kuew Tiaw Kerang

PROPOSE MENU - HAWKER

Menu di atas dicadangkan untuk permulaan dan akan ditambah dari masa ke semasa

PAGI

• Roti Canai• Omelet• Telur ½ masak

• Mee rebus• Mee Sup• Mee Kari• Mee Soto

FLOWER CAFE

Page 101: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

FLOWER CAFE

Promotion

• Promotion Flyers on new Hawker offerings / launching- Distribution at neighboring companies & shops- In hospital building- In Cafe

• Mini Signboard – To publish Menu offerings

• Menu Card – for customer to refer

• Poster & Banner Display

NEED APPROVAL: To give special offering – buy 2 plates of hawker fare and get 1 additional free plate (To attract crowd) from 3.00 pm – 7.00 pm

Page 102: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

Activities

Project Dateline Status

Menu publish 1/11/11 Roti canai,Roti Bakar, Nasi Lemak, Mee Kari, Mee Sup,Nasi/Mee/Bihun/Kew Tiau Goreng

Menu by light box 11/11/11 4 light box/RM 600 (Changeable)(Get approval by doctor)

Menu atas meja 11/11/11 1 set menu / RM 15(Get approval by doctor)

Signboard Café Flowers (Gazebo)

11/11/11 Get quotation from MP

Gazebo 11/11/11 Propose new design gazebo

Flyers 5/11/11 Order by 1/11/11

FLOWER CAFE

Page 104: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

LAUNCHING

Launching target on 3 Nov 2011

• Mini Menu distribute • Special offer by group - Dessert

FLOWER CAFE

Page 105: HOSPITAL PENAWAR DEVELOPMENT AND IMPROVEMENT 2011

TRAINING TEBAR ROTI CANAI

TRAINER: CHEF YUSOFF / WAHIDTIME : GROUP 1 – 2 PM – 3PM, GROUP 2 – 3 PM – 4 PM

DATE : 2 WEEK (1 – 14/11/11)

PESERTA : STAFF CAFÉ

FLOWER CAFE