Updates on Georgian Railway
JSC GEORGIAN RAILWAY
Lianyungang-Poti 11-14 days
Urumqi-Poti 6-8 days
Kobe-Poti 17-20 days
Subsidiaries
Georgian Railway
Passenger SBU
Freight SBU
Infrastructure
SBU
GR Logistics & Terminals
GR Transit
Tbilisi
第比利斯
Terminal yard area: 5,000 m2
Close to City Center
2 Gantry cranes with lifting capacity of 50t
Max per time keeping capacity of 700 containers
Poti
波季
Terminal yard area: 5,000 m2
Containers owned: 460 20’
Gantry Crane with lifting capacity 40t
Max per time keeping capacity of 700 containers
Batumi
巴统
GR Logistics & Terminals office in Batumi
Port container turnover capacity 100,000 TEU
Ferry turnover capacity 70,000t
Bulk good turnover capacity 200,000,000t
Baku-Tbilisi-Kars (BTK)
Completion Date: 2017
BTK railway length: 826 km
Freight capacity: 6.5M tons
Passengers capacity: 1M
Kars-Kanbaz79km New
Line
Kartsakhi-Akhalkalaki
29km New Line
Historical step of deepening economic relations as Georgia and Turkey connect via railway
BTK is beneficial not
only for the region but
also for Asia-Europe
logistic networks
Railway track modernization project
• Increasing capacity from 27.5M tons to 100M tons
• Speed increase from 60 to 80km/h for freight
Bottleneck Mitigation
• Construction carried out by China Railway 23RD construction Bureau
• Full automatic blocking system
Project details
• 46% completed
• Completion year: 2019Status
Anaklia阿纳克利亚
Completion Year 2020
Throughput capacity: 100M tons
Berth can accommodate Panamax sized container ships
Pre-construction work is already underway
Georgian government already invested ₾100M
Deep Sea Port project
Anaklia Deep
Sea Port
Connection between newly built port and railway network of
Georgia will be constructed
Poti Port
Batumi Port
Georgian government took responsibility for linking Anaklia Port to
the region’ infrastructure. Completion Year: 2020
Georgia
Black Sea
Anaklia and Railway Network
Tsatskhvi
18 km new railway track
Projects across TITR countries
Georgia
• Vale terminal construction
Kazakhstan
• Modernization of Aktau port
• Kuryk ferry port adding 4M tonnes to the TITR
Azerbaijan
• Alyat port construction
• Modernization of Azerbaijan railway - infrastructure and rolling stock
$547M
Trade stats of 2016
Agreement to initiate China-Georgia free trade
$169M
$25B
$2B
$187B*
$429B*
*2015 Year
ExportImport
Anaklia-railway network
Alyat/Kuryk
Railway capacity 100M ton
60 Block-trains expected in 2017
Trade Flow: 600B
Modernization
Anaklia Port
China-Europe
TITR
BTK
Corridors
Ongoing projectsPlanned projects
Volume