Region Scores East District County Item # Primary Route Project Type Cost Estimate Project Description SHIFT Regional Score 2020 Max 100 9 Mason 98908 KY 9 3.781 7.56 MAJOR WIDENING $40,350,000 WIDEN THE AA HIGHWAY TO 4 LANES FROM KY 1449 TO KY 11. (16CCN) 80.4 9 Greenup 98509 KY 207 10.932 15.88 NEW ROUTE $52,230,000 IMPROVE KY207 FROM THE INDUSTRIAL PARKWAY TO THE KY693 INTERSECTION IN FLATWOODS.(08CCN)(16CCR) 79.9 9 Boyd IP20080512 KY 168 5.804 7.458 MINOR WIDENING $43,936,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ON SEGMENT 2 OF KY168 FROM FROM US60 (MP 5.8) TO HOOD CREEK ROAD (MP 7.4) IN ASHLAND. 79.0 12 Knott IP20080662 KY 160 8.198 9.42 RECONSTRUCTION $31,719,000 IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS WITH A NEW FACILITY THAT MEETS CURRENT STANDARDS FROM KY 899 TO KY 3391. 77.1 12 Letcher 12199.10 US 119 15.772 17.805 RECONSTRUCTION $13,250,000 IMPROVE US119 FROM NORTH OF KY15 TO BRASS DRIVE (SOUTH).(16CCN)(18CCR) 76.9 9 Mason IP20170079 KY 9 10.256 10.398 SAFETYHAZELM $2,680,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF THE INTERSECTION OF KY 9 (AA) AND US 62 LOCATED IN MAYSVILLE. 76.3 9 Carter 98311 KY 1 9.824 10.242 SAFETY $3,050,000 IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR) 75.6 Wednesday, September 18, 2019 Page 1 of 24 Note: Projects may extend beyond county shown.

Upload: others

Post on 12-Jun-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

Region ScoresEast

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Mason 9‐8908 KY 9

3.781 ‐ 7.56

MAJOR WIDENING $40,350,000 WIDEN THE AA HIGHWAY TO 4 LANES FROM KY 1449 TO KY 11. (16CCN) 80.4

9Greenup 9‐8509 KY 207

10.932 ‐ 15.88

NEW ROUTE $52,230,000 IMPROVE KY‐207 FROM THE INDUSTRIAL PARKWAY TO THE KY‐693 INTERSECTION IN FLATWOODS.(08CCN)(16CCR)

79.9

9Boyd IP20080512 KY 168

5.804 ‐ 7.458

MINOR WIDENING $43,936,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ON SEGMENT 2 OF KY‐168 FROM FROM US‐60 (MP 5.8) TO HOOD CREEK ROAD (MP 7.4) IN ASHLAND.

79.0

12Knott IP20080662 KY 160

8.198 ‐ 9.42

RECONSTRUCTION $31,719,000 IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS WITH A NEW FACILITY THAT MEETS CURRENT STANDARDS FROM KY 899 TO KY 3391.

77.1

12Letcher 12‐199.10 US 119

15.772 ‐ 17.805

RECONSTRUCTION $13,250,000 IMPROVE US‐119 FROM NORTH OF KY‐15 TO BRASS DRIVE (SOUTH).(16CCN)(18CCR) 76.9

9Mason IP20170079 KY 9

10.256 ‐ 10.398

SAFETY‐HAZ‐ELM $2,680,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF THE INTERSECTION OF KY 9 (AA) AND US 62 LOCATED IN MAYSVILLE.

76.3

9Carter 9‐8311 KY 1

9.824 ‐ 10.242

SAFETY $3,050,000 IMPROVE SAFETY AT THE EAST CARTER HIGH SCHOOL. (06CCN)(08CCR)(12CCR) 75.6

Wednesday, September 18, 2019 Page 1 of 24Note: Projects may extend beyond county shown.

Page 2: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Nicholas IP20080555 KY 36

0 ‐ 3.075

RECONSTRUCTION $28,281,000 CORRECT HORIZONTAL AND VERTICAL ALIGNMENT AND WIDTH DEFICIENCIES TO IMPROVE OPERATIONAL EFFICIENCY AND SYSTEMS CONNECTIVITY OF KY 36 FROM US 68 NW OF CARLISLE (0.00) TO KY 13 SW OF CARLISLE (3.075)

74.9

12Floyd 12‐195 KY 979

12.389 ‐ 13.95

SPOT IMPROVEMENTS

$13,910,000 SPOT IMPROVEMENTS FROM BRANHAM'S CREEK TO JOHN M. STUMBO SCHOOL. (12CCR)(16CCR) 74.2

9Rowan 9‐8915 KY 801

15.85 ‐ 17.011

MAJOR WIDENING $20,300,000 WIDEN KY 801 FROM NEAR MMRC REGIONAL PARK TO KY 158 IN FLEMING CO. (16CCN)(18CCN) 72.7

12Johnson IP20190076 KY 40

9.15 ‐ 9.8

RECONSTRUCTION $9,253,000 IMPROVE ROADWAY GEOMETRICS AND CAPACITY ON KY‐40 FROM KY‐321 TO GARBAGE HOLLOW.

72.7

12Martin 12‐154.11 KY 40

13.004 ‐ 16.007

RELOCATION $43,430,000 INEZ TO WARFIELD (SECTION 2‐1): FROM LITTLE BLACKLOG TO BOOTH FORK. [STA. 190+00 TO STA. 298+00 (ENGLISH)] (2002BOP)(12CCR)(AR/W)(16CCR)

72.4

9Boyd IP20130096 KY 716

0 ‐ 0.56

RECONSTRUCTION $14,313,000 RECONSTRUCT KY‐716 FROM MP 0.0 (US 60) TO MP .560 (KY 3293)TO IMPROVE SAFETY AND DECREASE CONGESTION.

72.1

9Rowan 9‐8406 KY 377

0 ‐ 8.2

RECONSTRUCTION $61,850,000 IMPROVE SAFETY AND CONNECTIVITY AND REDUCE CONGESTION ON KY‐377 FROM KY‐32 TO NORTH OF KY‐799. (08CCN)(10CCR)(16CCR)(18CCR)

72.1

9Rowan 9‐204 KY 32

2.235 ‐ 4.157

RECONSTRUCTION $31,800,000 IMPROVE KY‐32 FROM PARK HILLS DRIVE TO VIKING DRIVE NORTH. (12CCR)(18CCR) 70.4

Wednesday, September 18, 2019 Page 2 of 24

Page 3: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Johnson IP20190077 KY 40

9.8 ‐ 10.7

RECONSTRUCTION $15,323,000 IMPROVE ROADWAY GEOMETRICS AND CAPACITY FROM GARBAGE HOLLOW TO EAST OF MILL STREET.

70.0

12Pike 12‐8705 / 12‐8705

PF 9999

NEW ROUTE $10,320,000 IMPROVE CONNECTIVITY BETWEEN THOMPSON ROAD AND US‐23 AT STONECOAL.(12CCN)(14CCR)(16CCR)

68.8

9Nicholas 9‐205 KY 36

3.1 ‐ 3.283

SAFETY $8,200,000 IMPROVE THE KY‐36/KY‐32 INTERSECTION NEAR THE NICHOLAS COUNTY SCHOOL PROPERTY. (12CCR)(16CCR)

68.3

9Lewis 9‐8807 KY 57

0 ‐ 4.557

RECONSTRUCTION $48,810,000 RECONSTRUCT KY‐57 FROM KY‐9 TO FLEMING/LEWIS COUNTY LINE. (14CCN)(16CCR)(18CCN)

67.8

12Lawrence IP20080666 KY 3

17.1 ‐ 19.627

MINOR WIDENING $21,050,000 RECONSTRUCT TO ACCOMMODATE RECREATIONAL VEHICLES IN THIS REGION OF RURAL KENTUCKY AT MOUNTAIN CROSSING BETWEEN US 23 AND KY 1185.

67.8

9Lewis 9‐8806 / 9‐8806.10

KY 8

24.016 ‐ 28.95

RECONSTRUCTION $54,440,000 RECONSTRUCT KY‐8 FROM KY‐8C IN GARRISON TO SCAFFOLD LICK ROAD.(14CCN)(16CCR) 67.7

12Letcher 12‐199.50 PF 9999

RECONSTRUCTION $22,350,000 RECONSTRUCT US‐119 BY WIDENING TO 4‐LANES ALONG A NEW ALIGNMENT (ORANGE) THROUGH THE GATEWAY INDUSTRIAL PARK TO US‐23, INCLUDING US‐23 FLYOVER RAMP.(16CCN)

66.9

9Fleming 9‐8901 KY 11

13.038 ‐ 13.6

SAFETY $1,930,000 CONSTRUCT LEFT TURN LANES ON KY 11 AT ROSS DRIVE, TAYLOR MILL AND THE INDUSTRIAL PARK ROAD. (16CCN)

66.6

9Fleming 9‐8815 KY 165

0 ‐ 6.243

MINOR WIDENING $8,740,000 UPGRADE, WIDEN, AND PROVIDE SPOT IMPROVEMENTS ON KY‐165 TO IMPROVE SAFETY FROM KY‐32 TO US‐68. (14CCN)

66.0

Wednesday, September 18, 2019 Page 3 of 24

Page 4: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Fleming 9‐8903 KY 32

10.165 ‐ 10.615

SAFETY $15,640,000 SAFETY IMPROVEMENTS AND PAVEMENT REHAB EAST OF FLEMINGSBURG BYPASS TO KY 156. (16CCN)

65.9

9Bath IP20150068 KY 36

13.4 ‐ 17.2

RECONSTRUCTION $45,382,000 IMPROVE SAFETY ON KY 36 FROM THE INTERSECTION WITH 1‐64 TO THE INTERSECTION OF KY 965 (HART PIKE) INCLUDING THE CURVES KNOWN AS CLEAR CREEK FURNACE AND THOMAS HILL.

64.9

12Pike 12‐346 US 460

2.57 ‐ 2.77

MINOR WIDENING $2,270,000 IMPROVE SAFETY AND REDUCE CONGESTION AT THE US‐460 AND KY‐1460 INTERSECTION. 63.3

9Greenup 9‐132 KY 2

13.165 ‐ 17.188

PE & ENVIRONMENTAL

$55,960,000 RECONSTRUCT KY‐2 FROM MP 13.2 TO US‐23 (MP 17.2)(08CCN)(14CCR)(16CCR)(18CCN) 62.3

9Carter 9‐8401 US 60

16 ‐ 17.112

SAFETY $16,650,000 RECONSTRUCT US‐60 FROM WEST OF GLENWOOD HOLLOW ROAD TO EAST OF KY‐3296. THE PROJECT SHALL INCLUDE 12' LANES, WIDE PAVED SHOULDERS, UNOBSTRUCTED CLEAR ZONES, FLATTER VERTICAL GRADES, AND GENTLY HORIZONTAL CURVES. (08CCN)(12CCR)(14CCR)(18CCN)

62.1

10Breathitt 10‐376 KY 15

16.75 ‐ 17.9

MAJOR WIDENING $24,860,000 IMPROVE KY‐15 FROM THE INTERSECTION OF NEW KY‐15/30 TO INTERSECTION OF KY‐1812. 59.5

12Pike IP20080720 KY 1426

7.528 ‐ 9.638

RECONSTRUCTION $23,024,000 MITIGATE OR ELIMINATE ROCKFALL HAZARDS AND IMPROVE ROADWAY FOR BETTER FLOW AND EFFICIENCY IN ORDER TO HANDLE THE EXPECTED CONGESTION ARISING FROM EVENTS AT THE EXPO CENTER. IDENTIFIED IN THE 1999 PIKEVILLE URBAN STUDY,  FROM BILL KING RD. TO US 119.

58.4

Wednesday, September 18, 2019 Page 4 of 24

Page 5: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Lewis IP20110101 KY 8

31 ‐ 32.36

RECONSTRUCTION $19,446,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 8. 58.1

9Lewis 9‐231 KY 59

18.1 ‐ 23.19

RECONSTRUCTION $104,660,000 RECONSTRUCT KY‐59 FROM KY‐9 (AA) IN VANCEBURG TO JUNCTION OF KY‐344 MP 18.1 TO MP 23.19.(16CCN)(18CCN)

57.5

9Bath IP20170051 KY 36

12.3 ‐ 13

MAJOR WIDENING $2,940,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ON KY 36 FROM NORTH OF MARIELLA DRIVE (MP 12.3) TO THE INTERSECTION OF OLD KY 36 (MP 13.0).

56.7

12Johnson IP20080654 KY 321

7.07 ‐ 8.791

CONGESTION MANAGEMENT

$38,176,000 ADDRESS CONGESTION AND CRASH ISSUES ON KY 321, FROM 6TH STREET TO THE JUNCTION OF KY 321 AND KY 40.

55.8

12Letcher IP20120023 KY 15

3.621 ‐ 4.018

RECONSTRUCTION $2,332,000 RECONSTRUCT INTERCHANGE AND ROADWAY. 55.3

12Pike 12‐198 / 12‐198.01

KY 194

17.951 ‐ 21

RECONSTRUCTION $21,340,000 IMPROVE KY 194 FROM US 119 RAMP NEAR SMITH FARMS BOTTOM (CR 1458) TO NEAR DESKINS BRANCH CULVERT. (18CCR)

54.7

12Knott IP20080660 KY 15

3.8 ‐ 4.1

SAFETY‐HAZ‐ELM $2,530,000 SAFETY IMPROVEMENTS WHILE MAINTAINING OR IMPROVING TRAFFIC FLOW ON KY 15 AT THE INTERSECTION OF KY 160 NEAR CARR FORK LAKE.

53.9

12Pike IP20080731 KY 3495

0 ‐ 0.3

SAFETY‐HAZ‐ELM $2,802,000 REDUCE CONGESTION, IMPROVE CONDITION AND INCREASE MOTORIST SAFETY ON THIS SEGMENT OF KY 3495, FROM THE TEMINATION OF THE US 23/KY 3495 EXIT RAMP NORTH 0.3 MILES ON KY 3495 TO JUST PAST PIKEVILLE HIGH SCHOOL.

53.7

Wednesday, September 18, 2019 Page 5 of 24

Page 6: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

10Owsley 10‐292.10 KY 11

14.343 ‐ 17.494

RECONSTRUCTION $22,100,000 I‐75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY‐11 FROM KY‐30 AT LEVI IN OWSLEY COUNTY TO 0.5 MILE SOUTH OF KY‐587 IN LEE COUNTY. START AT KY‐30 AT LEVI IN OWSLEY MOVING NORTH. (06CCR)(10CCR)(14CCR)(18CCN)

52.9

9Elliott 9‐192.01 KY 32

2 ‐ 8.656

RECONSTRUCTION $57,270,000 IMPROVE KY‐32 FROM WEST OF STEGALL COLD SPRING ROAD TO KY‐7 NEAR NEWFOUNDLAND. (PRIORITY SECTION I)(06CCR) (08CCR) (10CCR)(12CCR)(14CCR)(16CCR)(18CCR)

52.3

10Lee 10‐292.40 KY 11

1.8 ‐ 4.798

RECONSTRUCTION $51,660,000 I‐75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY‐11 FROM 0.5 MILE SOUTH OF KY‐587 TO 0.65 MILE NORTH OF KY‐52 IN BEATTYVILLE AND CONSTRUCT BRIDGE OVER KENTUCKY RIVER.

51.8

12Floyd IP20110161 KY 80

8.725 ‐ 9.489

LANDSLIDE REPAIR $7,080,000 ELIMINATE ROCKFALL HAZARD AT VARIOUS LOCATIONS ADJACENT CHURCH AND MARTIN INTERSECTIONS.

51.3

12Floyd IP20080637 KY 1427

4.58 ‐ 9.082

RECONSTRUCTION $19,636,000 IMPROVE SITE DISTANCE/LANE WIDTH/SHOULDER WIDTH ISSUES.  IMPROVE ENTRANCES ONTO ROADWAY.

51.3

10Magoffin IP20190122 KY 40

0 ‐ 0.7

MINOR WIDENING $10,650,000 MODERNIZE ROADWAY TO INCLUDE BETTER DRAINAGE AND PROPER BIKE/PED FACILITIES. 50.9

9Carter IP20080519 US 60

12.1 ‐ 13.3

RECONSTRUCTION $19,073,000 IMPROVE US 60 GEOMETRY BEGINNING AT THE TERMINI OF NEW CONSTRUCTION AT OLIVE HILL (MP 12.4) (ITEM NO. 9‐159.00) EXTENDING 1.1 MILES TO THE I‐64 EXIT 161 TO IMPROVE SYSTEMS CONNECTIVITY AND INCREASE OPERATIONAL EFFICIENCY OF THE ROUTE.

50.6

Wednesday, September 18, 2019 Page 6 of 24

Page 7: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Mason IP20190115 KY 9

5.6 ‐ 7.56

MAJOR WIDENING $16,625,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ALONG KY 9 FROM 0.3 MILES SOUTH OF KNOWESHAW ROAD TO THE KY 11 INTERSECTION IN MAYSVILLE.

50.4

12Martin 12‐154.16 KY 40

16 ‐ 18

RELOCATION $56,280,000 INEZ TO WARFIELD (SECTION 2‐2): FROM BOOTH FORK TO KY‐2031 [STA. 298+00 TO STA. 382+00 (ENGLISH)] (2002BOP)(16CCR)

50.0

9Boyd 9‐8400 US 60

0.2 ‐ 4.023

CONGESTION MITIGTN

$22,600,000 IMPROVE US‐60 FROM I‐64 AT INTERCHANGE 181 TO THE KY‐180 INTERSECTION AT CANNONSBURG. (08CCN) (10CCR)(12CCR)

50.0

10Breathitt 10‐375 KY 205

7.804 ‐ 9.954

MINOR WIDENING $17,320,000 IMPROVE KY‐205 FROM NORTH OF KY‐1812 TO SOUTH OF PEGGS FORK RD. 49.9

10Menifee IP20000075 KY 713

6.6 ‐ 7.25

SPOT IMPROVEMENT

$3,492,000 COMPLETE SPOT IMPROVEMENT TO MODERNIZE THE ROADWAY ON KY 713 IN THE FAGAN AREA FROM APPROXIMATELY MILEPOINT 6.6 TO APPROXIMATELY MILEPOINT 7.25.

49.6

10Morgan IP20060266 US 460

16.623 ‐ 17.127

RECONSTRUCTION $10,098,000 ENHANCE THE OPERATIONAL EFFICIENCY AND IMPROVE CONGESTION ON US 460 FROM THE INTERSECTION OF KY 2498 TO THE INTERSECTION OF COURT STREET IN WEST LIBERTY.

49.0

10Estill IP20080569 KY 89

14.3 ‐ 17.473

RECONSTRUCTION $26,636,000 IMPROVE SAFETY AND LEVEL OF SERVICE FROM 1500 FEET NORTH OF LANDFILL ROAD (ACROSS FROM ESTILL COUNTY HIGH SCHOOL) TO 1250 FEET NORTH OF RAILROAD BRIDGE B00001.

49.0

10Wolfe IP20150475 KY 15

9.515 ‐ 10.03

MINOR WIDENING $3,658,000 INSTALL CURB AND GUTTER WITH SIDEWALKS ALONG KY 15 FROM KY 15S/KY 191 TO CAMPTON SQUARE APARTMENTS.

48.6

Wednesday, September 18, 2019 Page 7 of 24

Page 8: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

10Lee IP20110008 KY 11

4.8 ‐ 5.5

MINOR WIDENING $806,000 EXTEND TWO WAY LEFT TURNING LANE (TWLTL) FROM 0.047 MILES NORTH OF LEE COUNTY SENIOR CITIZENS CTR TO 0.103 MILES SOUTH OF GRAND AVE.

48.3

10Powell IP20080581 KY 11

14 ‐ 16.7

RECONSTRUCTION $17,706,000 IMPROVE LEVEL OF SERVICE FROM BROWN ST. TO STONEGATE DR. IN STANTON. 48.3

10Lee IP20160010 KY 399

5.75 ‐ 6.2

RECONSTRUCTION $1,995,000 RECONSTRUCTION ALONG KY 399 IN LEE COUNTY.  THIS PROJECT ALSO INCLUDES A SECTION THAT IS A REOCCURRING MAINTENANCE ISSUE.

48.0

10Powell 10‐163.20 KY 213

9.3 ‐ 11.2

SAFETY $12,020,000 IMPROVE SAFETY, UPGRADE GEOMETRICS, AND ADDRESS CAPACITY ISSUES FOR KY 213 FROM KY 615 TO BOTTOM OF MOUNTAIN. (PRIORITY SECTION 2)(2018BOP)

47.8

12Lawrence IP20080672 KY 1185

0 ‐ 2.232

MINOR WIDENING $19,197,000 TO UPGRADE THE ACCESS TO THE MARINA FROM KY 3 IN ORDER TO BETTER ACCOMMODATE RECREATIONAL TRAFFIC USING THE ROAD.  KY 1185 MP 0.00 TO 2.232 AT YATESVILLE LAKE

47.2

10Magoffin 10‐8901 US 460

10 ‐ 10.7

RECONSTRUCTION $9,550,000 IMPROVE US‐460 IN MAGOFFIN COUNTY AT IVY POINT HILL WEST OF SALYERSVILLE. (16CCN) 46.8

10Perry 10‐269.20 KY 15

16.9 ‐ 21.2

MAJOR WIDENING $79,630,000 RECONSTRUCTION OF KY 15 FROM BONNYMAN TO NEAR KY 28. (14CCN) 46.4

12Letcher 12‐199.15 US 119

16.731 ‐ 17.805

RECONSTRUCTION $16,780,000 IMPROVE US‐119 FROM KY 2034/COUGAR DRIVE TO BRASS DRIVE (SOUTH).(16CCN)(SEE 12‐199.10 FOR D, R, U)(18CCR)

46.0

Wednesday, September 18, 2019 Page 8 of 24

Page 9: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

10Estill 10‐206 KY 89

11.652 ‐ 11.903

SPOT IMPROVEMENTS

$3,800,000 IMPROVE SAFETY ON KY‐2459 (CARHARTT AVE.) FROM  KY‐89 TO THE RAILROAD BRIDGE. (18CCR) 45.8

9Rowan 9‐301.10 PF 9999

NEW ROUTE $72,400,000 NEW ROUTE FROM US‐60/KY‐32 EAST OF MOREHEAD TO I‐64 INCLUDING A NEW INTERCHANGE. (98CCN)(08CCR)(14CCR)

45.4

10Wolfe 10‐212 KY 191

4.765 ‐ 4.965

RECONSTRUCTION $1,390,000 IMPROVE THE KY‐191 AND KY‐1812 INTERSECTION. 44.8

10Perry IP20110133 PF 9999

NEW ROUTE $16,921,000 NEW AND BETTER ACCESS TO WENDELL FORD AIRPORT 44.6

10Menifee IP20060263 US 460

0.101 ‐ 4.8

RECONSTRUCTION $37,427,000 IMPROVE SAFETY, CORRECT GEOMETRICS, AND ENHANCE REGIONAL CONNECTIVITY ON US 460 FROM THE INTERSECTION OF KY 713 TO ROTHWELL (MP 4.8).

44.4

10Morgan IP20190185 KY 172

20.4 ‐ 21.169

RECONSTRUCTION $8,736,000 GEOMETRIC IMPROVEMENTS AND ROADWAY RECONSTRUCTION ON KY 172 FROM WEST OF KY 1614 TO 0.3 MILES INTO JOHNSON COUNTY.

43.4

9Elliott 9‐228 KY 7

0 ‐ 6.956

RECONSTRUCTION $87,130,000 IMPROVE KY‐7 FROM SOUTH CITY LIMITS OF SANDY HOOK TOWARD WRIGLEY. (12CCR)(16CCR)(18CCR)

42.4

10Powell IP20190108 CR 1316

0.075 ‐ 0.575

RECONSTRUCTION $3,909,000 RECONSTRUCT ROADWAY OUT OF FLOODWAY/FLOODWAY IN ORDER TO ELIMINATE MOUNTAIN PARKWAY ACCESS.

42.3

10Lee IP20190180 KY 11

1.8 ‐ 3.3

RECONSTRUCTION $17,359,000 I‐75 TO MOUNTAIN PARKWAY; RECONSTRUCT KY‐11 FROM 0.3 MILE NORTH OF KY‐587 TO WEST RIDGE ROAD.

42.0

Wednesday, September 18, 2019 Page 9 of 24

Page 10: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Floyd IP20110160 US 23

8.662 ‐ 8.859

SAFETY‐HAZ‐ELM $3,059,000 RECONSTRUCT TO IMPROVE SIGHT DISTANCE AT US 23/DANIELS CREEK ROAD INTERSECTION. 41.3

12Johnson IP20080652 KY 172

11.8 ‐ 12.1

MINOR WIDENING $3,384,000 ADDRESS SAFETY, BRIDGE AND APPROACH CONDITION ISSUES, AND CORRECT ROCK‐FALL SAFETY HAZARD AT MUD LICK CREEK BRIDGE

40.7

10Morgan 10‐8804 PF 9999

RECONSTRUCTION $9,790,000 IMPROVE KY‐2498 FROM US‐460 TO THE ARH HOSPITAL. (14CCN)(16CCN) 40.6

10Estill 10‐205 KY 82

0 ‐ 4.1

RECONSTRUCTION $32,460,000 IMPROVE LEVEL OF SERVICE, SAFETY, AND CONNECTIVITY ON KY‐82 FROM KY‐89 IN ESTILL CO. TO NEW CONSTRUCTION LOCATED NORTH OF HUDSON MILL ROAD IN ESTILL COUNTY.

40.4

9Mason IP20150186 KY 9

4.6 ‐ 4.9

SAFETY‐HAZ‐ELM $395,000 CONSTRUCT RIGHT TURN LANE (SB) INTO CLARKSON SHERMAN ROAD (LANDFILL, 4.740) TO PROVIDE SAFETY FOR MOTORISTS TRAVELING ALONG THE AA HIGHWAY. (MP 4.6 TO MP 4.9)(14CCN)  REPLACES 09 081 D0009 1.50

40.0

12Johnson IP20190074 PF 9999

NEW ROUTE $7,851,000 NEW ROUTE. CONSTRUCT NEW CONNECTIVITY FROM KY‐321 AT MP 8.18 TO KY‐40 AT MP 9.75 AT THE MOUTH OF GARBAGE HOLLOW.

39.9

10Perry 10‐209 KY 476

0 ‐ 0.9

RECONSTRUCTION $8,380,000 IMPROVE KY‐476 FROM KY‐15X IN WALKERTOWN TO NORTH OF WALKER CORNETT ROAD IN WABACO.

39.7

9Lewis IP20110034 KY 8

24.016 ‐ 25.4

MINOR WIDENING $17,493,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 8 THROUGH QUINCY. 39.2

Wednesday, September 18, 2019 Page 10 of 24

Page 11: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

10Lee IP20110009 KY 11

9.323 ‐ 9.523

SPOT IMPROVEMENT

$471,000 ADD TURN LANE AT THE INTERSECTION OF KY 11 AND KY 498. 38.8

12Martin IP20080686 KY 40

18.8 ‐ 19

SPOT IMPROVEMENT

$2,493,000 CURVE REVISION NEAR WARFIELD 37.8

9Boyd IP20080513 KY 168

7.458 ‐ 8.179

MINOR WIDENING $16,616,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY ON SEGMENT 3 OF KY‐168 FROM HOODS CREEK ROAD (MP 7.458) TO US‐23 (MP 8.179).

37.2

12Pike IP20150005 KY 632

11.5 ‐ 12

SPOT IMPROVEMENT

$4,258,000 MAKE SAFETY SPOT IMPROVEMENTS AT THIS HIGH CRASH LOCATION.  PRIORITY 3 OF 8 OF RECOMMENDED SPOT IMPROVEMENT IN REFERENCED STUDY.  SPOT 10, SECTION 5.

36.5

10Morgan IP20190028 KY 172

13 ‐ 16.4

RECONSTRUCTION $18,778,000 GEOMETRIC IMPROVEMENTS AND ROADWAY RECONSTRUCTION ON KY 172 FROM CROCKETT TO JUST SOUTH OF KY 1715 AT MOON.

36.1

9Greenup IP20080545 KY 750

0.37 ‐ 1.595

RECONSTRUCTION $24,932,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 750 FROM POND RUN (MP 0.37) TO KY‐207 (MP 1.595) .

35.8

9Nicholas IP20110097 KY 36

5.726 ‐ 7.2

RECONSTRUCTION $17,074,000 RECONSTRUCT KY 36, BEGINNING 1 MILE WEST OF WHETSTONE ROAD AND ENDING JUST WEST OF LOCUST GROVE ROAD. CORRECT HORIZONTAL, VERTICAL AND WIDTH DEFICIENCIES TO IMPROVE OPERATIONAL EFFICIENCY AND SYSTEMS CONNECTIVITY OF KY 36.

35.8

9Fleming 9‐80051 KY 32

27.893 ‐ 28.293

SAFETY $11,420,000 IMPROVE SAFETY AND SIGHT DISTANCE ON KY‐32 BEGINNING AT 0.4 MILES WEST OF FLEMING/ROWAN CO LINE AND ENDING 0.3 MILES EAST OF THE LINE.(18CCN)

35.7

Wednesday, September 18, 2019 Page 11 of 24

Page 12: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Boyd IP20130098 KY 5

8.9 ‐ 9.3

SAFETY‐HAZ‐ELM $8,170,000 RECONSTRUCT INTERSECTION AT KY‐5 AND KY‐1458 TO IMPROVE SAFETY AND MOBILITY AND TO ADDRESS GEOMETRICS.

35.2

9Nicholas IP20120057 KY 32

6.132 ‐ 8.313

RECONSTRUCTION $24,100,000 RECONSTRUCT KY 32 BEGINNING AT THE KY 32 / KY 36 INTERSECTION AND ENDING AT NEW US 68 IN NICHOLAS COUNTY

35.0

9Carter IP20160294 PF 9999

NEW ROUTE $12,557,000 NEW ROUTE FROM CW STEVENS BLVD. TO KY 3297 (PHASE II OF PROPOSED BYPASS PROJECT) TO IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF NORTH‐SOUTH TRAFFIC IN GRAYSON.

35.0

10Powell 10‐210 KY 213

6.371 ‐ 6.897

SAFETY‐HAZARD ELIM

$3,500,000 IMPROVE SAFETY AND LEVEL OF SERVICE ON KY‐213 IN POWELL COUNTY FROM SONS ROAD TO REED COURT.

34.9

12Pike 12‐281 KY 194

21.3 ‐ 22

SAFETY $9,980,000 CURVE REVISION AND PASSING LANES ON KY‐194 NEAR DESKINS BRANCH (08CCR)(12CCR) 34.7

12Pike IP20080708 KY 319

0.35 ‐ 2.35

RECONSTRUCTION $13,554,000 IMPROVE COMMUTER SAFETY ON THIS PORTION OF ROADWAY OVER HARDY MOUNTAIN, FROM BLACKBERRY CREEK TO TURKEYTOE BRANCH.

34.6

12Johnson IP20080651 KY 172

0 ‐ 12.37

SPOT IMPROVEMENT

$8,115,000 PERFORM SPOT IMPROVEMENTS AT VARIOUS LOCATIONS AND SEGMENTS OF KY 172 TO BETTER ACCOMMODATE TRUCKS AND FARM VEHICLES.

34.3

9Bath IP20080510 KY 36

6.97 ‐ 11.847

RECONSTRUCTION $49,901,000 IMPROVE SAFETY AND CORRECT GEOMETRIC AND CAPACITY DEFICIENCIES ON KY 36 FROM THE INTERSECTION OF KY1325 (MP 7.0) TO THE INTERSECTION OF US 60 IN OWINGSVILLE (MP 11.847).

33.6

Wednesday, September 18, 2019 Page 12 of 24

Page 13: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Floyd 12‐8703 KY 80

1.527 ‐ 1.827

CONGESTION MITIGTN

$4,770,000 IMPROVE ACCESS TO KY 80 AT GARRETT EASTBOUND AND ELIMINATE NECESSITY FOR CROSSING WESTBOUND LANES TO MERGE INTO EASTBOUND LANES. MP 1.527 TO MP 1.827 (12CCN)(18CCN)

33.5

9Fleming IP20110044 KY 32

7.3 ‐ 9.935

RECONSTRUCTION $26,562,000 RECONSTRUCT KY 32 BEGINNING (MP 7.3) NEAR THE ELIZAVILLE CITY LIMITS AND ENDING AT (MP 9.935) WEST OF THE FC HIGH SCHOOL.

32.5

9Greenup IP20150105 KY 7

13.03 ‐ 20.052

RECONSTRUCTION $78,772,000 RECONSTRUCT KY 7 FROM ITS INTERSECTION WITH RAKES MILL ROAD TO ITS INTERSECTION WITH US 23 IN SOUTH SHORE.

32.2

12Knott IP20110151 KY 80

14.69 ‐ 16

SAFETY‐HAZ‐ELM $7,260,000 ELIMINATE ROCKFALL HAZARDS FROM KY 2029 TO ROCK FORK ROAD. 32.1

12Knott IP20080663 KY 899

3.7 ‐ 4.2

SAFETY‐HAZ‐ELM $6,388,000 PROVIDE A BETTER TRANSITION AT THIS CURVE, FROM THE NEW SECTION TO THE OLD SECTION AT THE BOTTOM OF THE HILL AT SHORT BRANCH NEAR PIPPA PASSES.

31.9

9Mason IP20160298 KY 9

10.6 ‐ 10.9

SAFETY‐HAZ‐ELM $1,566,000 CONSTRUCT RIGHT TURN LANE ON NB KY 9 (AA) AT INTERSECTION OF KENTON STATION DRIVE (ONE OF THE HOSPITAL ENTRANCES) TO IMPROVE SAFETY

31.8

9Mason IP20080552 KY 8

9.2 ‐ 11.04

RECONSTRUCTION $20,025,000 CORRECT GEOMETRIC DEFICIENCIES AND IMPROVE LONG‐TERM STABILITY OF KY 8 FROM KY 3056 (MP 9.20) TO THE NEW MAYSVILLE BRIDGE (MP 11.04).     FOUNDATION STABILIZATION AND ROADWAY REHAB TO PROVIDE A SAFER MORE STABLE ROADWAY INTO MAYSVILLE.

31.7

Wednesday, September 18, 2019 Page 13 of 24

Page 14: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Martin IP20080682 KY 3

11.8 ‐ 12.1

SPOT IMPROVEMENT

$3,484,000 CURVE REVISION W OF THE KY 40 INTERSECTION 31.1

10Morgan IP20190035 PF 9999

BYPASS $27,949,000 CREATE A NEW EASTERN BYPASS OF WEST LIBERTY. 31.1

9Rowan IP20160013 KY 32

3.9 ‐ 6.4

TRANSPORTATION STUDY

$132,000 COMPLETE PLANNING/CONGESTION MITIGATION STUDY ON KY 32 AT THE I 64 INTERCHANGE.

31.1

9Carter IP20160293 KY 3297

0.325 ‐ 0.45

CONGESTION MANAGEMENT

$309,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 3297 NEAR EAST CARTER MIDDLE SCHOOL. 30.6

9Greenup IP20150377 KY 67

1.4 ‐ 13.039

MAJOR WIDENING $76,439,000 COMPLETE CONSTRUCTION TO ULTIMATE 4‐LANE FACILITY OF KY 67 FROM JUNCTION WITH TECHNOLOGY DRIVE (MP 1.4) TO US 23 IN WURTLAND (MP 13.039), A TOTAL OF 11.639 MILES.

30.2

12Letcher IP20110062 KY 463

0.537 ‐ 0.737

SAFETY‐HAZ‐ELM $1,548,000 RECONSTRUCT SECTION WITH SHARP CURVE AT KY 463 INTERSECTION WITH KY 510. 30.2

9Lewis IP20110025 KY 9

18.2 ‐ 18.8

SAFETY‐HAZ‐ELM $1,798,000 CONSTRUCT RIGHT AND LEFT TURN LANES AT THE INTERSECTION OF KY 989 (MP 18.553) TO IMPROVE SAFETY AND DECREASE COLLISIONS.    THIS INTERSECTION HAS A HIGH VOLUME OF TURNING MOVEMENTS AND IS LOCATED IN A LONG SWEEPING CURVE.    A PARK AND RIDE IS LOCATED AT

30.2

10Magoffin IP20040032 KY 7

22.5 ‐ 23.8

RECONSTRUCTION $12,103,000 RECONSTRUCT FROM WILL BAILEY BRANCH ROAD TO KY 1090. 30.1

Wednesday, September 18, 2019 Page 14 of 24

Page 15: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Lawrence IP20190045 PF 9999

NEW ROUTE $913,958,000 NEW ROUTE KY 645 FROM EXISTING US 23, KY 645 AT ULYSSES TO THE INDUSTRIAL PARK ROAD EAST OF GRAYSON USING KY 201 AND KY 1. 33 MILES

30.0

10Lee IP20110010 KY 52

18.7 ‐ 19.5

SAFETY‐HAZ‐ELM $6,170,000 CURVE REVISION ON KY 52 AT HORSESHOE BEND ENDING 0.297 MILES WEST OF HAWES RD. 30.0

12Martin IP20080684 KY 40

6.9 ‐ 7.1

SAFETY‐HAZ‐ELM $2,317,000 SPOT IMPROVEMENTS TO CURVE GEOMETRICS NEAR INTERSECTION WITH KY 1884. REPLACES 12 080 D0040 938.00

29.9

12Floyd IP20110156 KY 321

3.1 ‐ 4.182

LANDSLIDE REPAIR $4,915,000 ELIMINATE ROCKFALL HAZARDS FROM KY 3 SOUTH APPROX. 1 MILE. 29.7

9Boyd IP20110167 KY 766

1.004 ‐ 1.261

SAFETY‐HAZ‐ELM $4,997,000 IMPROVE GEOMETRICS AND SAFETY BY RECONSTRUCTION OF ALIGNMENT FOR KY‐766 TO INTERSECTION WITH KY‐1134.

29.7

9Mason 9‐8907 KY 9

17.343 ‐ 19.541

MAJOR WIDENING $70,600,000 WIDEN KY 9/AA HIGHWAY TO 4 LANES FROM KY 435 TO KY 2370 IN BRACKEN CO. (16CCN) 29.5

9Carter IP20190048 KY 182

10.7 ‐ 11.8

SPOT IMPROVEMENT

$11,762,000 IMPROVE GEOMETRY OF KY 182 FROM MILEPOINT 10.7 TO 11.8, WHICH IS NEAR THE CARTER CAVES STATE RESORT PARK MAIN ENTRANCE.

29.5

12Lawrence IP20080674 KY 3398

0 ‐ 2.289

MINOR WIDENING $16,982,000 IMPROVE/WIDEN KY‐3398 FROM KY‐3 @ FALLSBURG TO US‐23 @ FULLERS TO IMPROVE SAFETY AND TO ACCOMMODATE RESIDENTIAL GROWTH AND RECREATIONAL VEHICLES IN THIS AREA.

29.4

Wednesday, September 18, 2019 Page 15 of 24

Page 16: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Floyd IP20080633 KY 122

25.2 ‐ 25.5

SPOT IMPROVEMENT

$4,922,000 ADDRESS SIGHT DISTANCE ISSUES  AND SUBSTANDARD GEOMETRICS OF THIS CURVE, FROM .3 MILES BEFORE NANCY ROAD TO .5 MILES PAST CREEKSIDE DRIVE.

29.4

9Greenup IP20130104 KY 1

12.4 ‐ 13.2

SAFETY‐HAZ‐ELM $8,291,000 RECONSTRUCT KY‐1 TO IMPROVE HORIZONTAL AND VERTICAL ALIGNMENT DEFICIENCIES, ADD SHOULDERS AND IMPROVE CLEAR ZONES. TURN LANES MAY BE CONSIDERED AT LOCATION OF ARGILLITE ELEMENTARY SCHOOL AND KY‐207 INTERSECTION.

29.3

9Boyd IP20110175 KY 3

5.075 ‐ 7.802

SAFETY‐HAZ‐ELM $36,649,000 CORRECT HORIZONTAL, VERTICAL AND WIDTH DEFICIENCIES TO IMPROVE OPERATIONAL EFFICIENCY AND SYSTEMS CONNECTIVITY OF KY‐3, BEGINNING AT MILEPOINT 5.075 (PV 1215) TO MILEPOINT 7.802 (INTERSECTION WITH KY‐180).

29.2

9Bath 9‐8404 KY 965

7.147 ‐ 7.247

RECONSTRUCTION $1,674,000 RECONSTRUCT CURVE AT .8 MILE SOUTH OF KY‐36.  (08CCN)(12CCR) 28.6

12Letcher IP20110153 KY 931

14.5 ‐ 16

SAFETY‐HAZ‐ELM $4,351,000 CURVE REVISIONS AT THREE LOCATIONS BETWEEN EAGLE ROAD AND COOKVILLE ROAD. 28.1

9Bath IP20190182 KY 965

6.3 ‐ 7

RECONSTRUCTION $7,213,000 CORRECT GEOMETRIC DEFICIENCIES ON KY 965 FROM BLEVINS VALLEY ROAD (MP 6.3) TO MILL CREEK BRIDGE (MP 7.0).

27.8

10Menifee 10‐8805 US 460

15.233 ‐ 19.003

MAJOR WIDENING $50,230,000 WIDEN EXISTING ROADWAY AND IMPROVE VERTICAL AND HORIZONTAL CURVES. NEW CONSTRUCTION. COMPLETES US 460 UPGRADES IN MENIFEE COUNTY FROM MP 14.35 TO 19.39 AND IN MORGAN COUNTY FROM MP 0 TO MP 0.8. (14CCN)(16CCR)

27.3

Wednesday, September 18, 2019 Page 16 of 24

Page 17: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

12Pike IP20080724 KY 1469

4.9 ‐ 5.199

SAFETY‐HAZ‐ELM $1,622,000 IMPROVE SUBSTANDARD GEOMETRICS IN THE CURVE NEAR MARSHALL BRANCH. 27.2

10Breathitt IP20110007 KY 30

7.481 ‐ 8.876

RECONSTRUCTION $9,183,000 IMPROVE SAFETY AND SUBSTANDARD GEOMETRICS FOR KY 30 IN BREATHITT COUNTY ACROSS SHOULDERBLADE HILL.     TO IMPROVE ROADWAY GEOMETRICS TO ENHANCE SAFETY AND LOCAL MOBILITY BETWEEN JACKSON AND BOONEVILLE AND REGIONAL CONNECTIVITY BETWEEN THE HAL ROGERS PARKW

27.1

9Elliott 9‐8802 KY 32

9.2 ‐ 10.2

MAJOR WIDENING $11,710,000 KY‐32 FROM 9.2 MILE MARKER TO 10.2 MILE MARKER WIDENING.  (14CCN)(16CCR)(18CCN) 26.8

12Knott IP20110150 KY 80

11.62 ‐ 11.74

SAFETY‐HAZ‐ELM $1,278,000 ELIMINATE ROCKFALL HAZARDS 0.2 MILE WEST OF INTERSECTION OF KY 1087 & KY 80. 26.4

10Wolfe 10‐8102 KY 191

10.256 ‐ 14.298

SAFETY $3,800,000 HILL AND CURVE CORRECTION ON KY‐191 BETWEEN HAZEL GREEN AND KY‐205. (02CCN)(08CCR)(10CCR)

26.1

9Lewis 9‐8808 KY 9

12.709 ‐ 12.789

RECONSTRUCTION $1,700,000 RECONSTRUCT INTERSECTION AT KY‐9 AND KY‐2523.  (14CCN) 26.1

12Floyd 12‐80000 US 23

3.1 ‐ 3.2

SAFETY $250,000 CONSTRUCT NEW INTERSECTION ON  US‐23 AT THE ENTRANCE TO BETSY LANE HIGH SCHOOL(18CCN)

26.0

12Johnson 12‐8903 KY 1428

0.805 ‐ 2.897

SAFETY $33,540,000 IMPROVE SAFETY AND GEOMETRICS FROM KY 321 RAMP TO PAINTSVILLE, AT THE BROADWAY INTERSECTION. (16CCN)

25.9

Wednesday, September 18, 2019 Page 17 of 24

Page 18: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Bath IP20080508 US 60

11.1 ‐ 11.2

SPOT IMPROVEMENT

$1,066,000 IMPROVE SAFETY AND SIGHT‐DISTANCE ON US 60 BETWEEN MILEPOINTS 11.1 AND 11.2, WEST OF KY 965.

25.7

9Bath IP20190176 KY 36

18.6 ‐ 18.9

SPOT IMPROVEMENT

$4,567,000 GEOMETRICALLY IMPROVE ROADWAY AT ELK LICK CURVE ON KY 36 (AT SWARTZ MOWING MAINTENANCE FACILITY).

25.7

12Letcher 12‐8909 KY 160

0 ‐ 21.843

RECONSTRUCTION $5,050,000 UPGRADE KY‐160 (ROXANA‐VAN ROAD) WITH SHOULDER/BREAK REPAIRS, CULVERT EXTENSIONS, AND DRAINAGE UPGRADES. (16CCN)

25.4

10Estill 10‐207 KY 89

19.806 ‐ 22.428

MAJOR WIDENING $20,170,000 IMPROVE GEOMETRICS ON KY‐89 IN ESTILL COUNTY FROM KY‐1886 TO THE ESTILL/CLARK COUNTY LINE.

25.3

9Fleming IP20110005 KY 57

5.282 ‐ 9.183

RECONSTRUCTION $45,328,000 CORRECT GEOMETRIC AND WIDTH DEFICIENCIES ON THIS SEGMENT OF KY 57 BEGINNING AT MINEER ROAD (MP 5.282) EXTENDING TO 0.5 MILE SOUTH OF LEWIS COUNTY LINE (MP 9.183) TO IMPROVE OPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS AND OVERALL FLOW OF TRAFFIC.

25.1

12Martin IP20080690 KY 2032

3.3 ‐ 3.8

SAFETY‐HAZ‐ELM $4,386,000 CURVE REVISIONS AT TWO LOCATIONS NEAR KY 40. 24.8

9Lewis IP20110165 KY 344

13.843 ‐ 18.5

RECONSTRUCTION $56,906,000 RECONSTRUCT KY 344 FROM JUNCTION OF KY 377 TO JUNCTION OF KY 59 AT KINNICONNICK. 24.8

9Bath 9‐193 KY 111

1 ‐ 1.5

RECONSTRUCTION $7,050,000 RECONSTRUCT KY‐111 IN THE VICINITY OF THE "S‐CURVE" EAST OF OWINGSVILLE.(14CCR) 24.8

Wednesday, September 18, 2019 Page 18 of 24

Page 19: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Carter IP20110212 KY 2

3.8 ‐ 4.9

RECONSTRUCTION $9,413,000 RECONSTRUCT KY 2 TO CORRECT HORIZONTAL AND VERTICAL DEFICIENCIES FROM 0.02 MI W OF DEAN LOOP ROAD (MP 3.80) TO APPROXIMATELY 0.20 MI W OF SMOKEY VALLEY ROAD (MP 4.90).

24.6

9Carter IP20110214 US 60

6.75 ‐ 6.9

SAFETY‐HAZ‐ELM $3,005,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY BETWEEN ROCK CUTS ON US 60 WEST OF OLIVE HILL.

24.5

9Nicholas 9‐8811 KY 36

8 ‐ 8.23

RECONSTRUCTION $820,000 RECONSTRUCT KY 36/KY 928 INTERSECTION. (14CCN)(16CCR)(18CCN) 24.1

9Nicholas IP20110099 KY 36

9.7 ‐ 11

RECONSTRUCTION $15,653,000 RECONSTRUCT KY 36 BEGINNING AT MOOREFIELD ROAD(EAST) AND ENDING 1/2 EAST OF KY 57 INTERSECTIONS. RECONSTRUCT KY 57 APPROACHES (1/2 MILES N AND S). CORRECT HORIZONTAL, VERTICAL AND WIDTH DEFICIENCIES TO IMPROVE OPERATIONAL EFFICIENCY AND SYSTEMS CONNECTIVI

23.8

12Johnson 12‐5008 KY 321

1.8 ‐ 3.05

ROCKFALL MITIGTN

$13,810,000 CORRECT ROCKFALL HAZARD @ MP 1.80 TO 3.05. (04CCR)(10CCR)(12CCR) 23.8

9Bath IP20100057 US 60

8.2 ‐ 9.4

RECONSTRUCTION $11,172,000 REALIGN ROADWAY ON US 60 NEAR OWINGSVILLE BEGINNING IN THE VICINITY OF ROSE BUSH LN AND ENDING AT WELLS ROAD NEAR I 64 EXIT 123

23.7

9Carter IP20160291 PF 9999

NEW ROUTE $3,941,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF CW STEVENS BLVD (CS 1110) IN GRAYSON. 23.6

Wednesday, September 18, 2019 Page 19 of 24

Page 20: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Fleming 9‐8817 KY 57

2.108 ‐ 8.812

DESIGN ENGINEERING

$76,590,000 CORRECT GEOMETRIC AND WIDTH DEFICIENCIES BEGINNING AT SLEEPY RUN BRIDGE EXTENDING TO 0.5 MILES SOUTH OF LEWIS COUNTY LINE TO IMPROVE OPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS AND OVERALL FLOW OF TRAFFIC. (14CCN)

23.3

9Carter IP20130100 CR 1080

0 ‐ 0.148

RECONSTRUCTION $2,868,000 RECONSTRUCT HARVEY BRANCH ROAD (CR 1080) TO IMPROVE SAFETY AND TO FACILITATE HEAVY TRUCK TRAFFIC BETWEEN KY 7 AND KY 9.

23.1

9Greenup IP20040035 CS 5009

0 ‐ 1.318

RECONSTRUCTION $44,027,000 IMPROVE RIVERSIDE DRIVE (CS‐5009) TO PROVIDE ACCESS TO AIRPORT AND TO PREVENT FLOODING BETWEEN THE CITIES OF WURTLAND AND WORTHINGTON.

22.9

9Mason IP20110046 KY 11

6.19 ‐ 6.287

SAFETY‐HAZ‐ELM $921,000 ADD RIGHT‐TURN ON KY 11 SB INTO KY 419 TO REDUCE RISK OF REAR‐END CRASHES AND IMPROVE OPERATIONAL EFFICIENCY.

22.9

9Carter IP20080534 KY 1025

0 ‐ 0.3

SAFETY‐HAZ‐ELM $4,561,000 GEOMETRIC IMPROVEMENTS ON KY 1025 FROM US 60 (MP 0.0),EAST OF OLIVE HILL EXTENDING NORTH 0.30 MILES PROVIDING ACCESS TO WEST CARTER MIDDLE AND HIGH SCHOOLS AND FACILITIES.  PROJECT WILL INCLUDE BIKE/PED FACILITIES.

22.8

9Fleming IP20110004 KY 57

2.3 ‐ 5.282

RECONSTRUCTION $28,000,000 CORRECT GEOMETRIC AND WIDTH DEFICIENCIES OB THIS SEGMENT OF KY 57 BEGINNING AT SLEEPY RUN BRIDGE (MP 2.300) EXTENDING TO MINEER ROAD (MP 5.282) TO IMPROVE OPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS AND OVERALL FLOW OF TRAFFIC.      PROJECT IS IN

22.5

Wednesday, September 18, 2019 Page 20 of 24

Page 21: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Mason 9‐8809 PF 9999

NEW INTERCHANGE

$11,490,000 ADDITION OF AN INTERCHANGE ON HEATHER FRENCH HENRY SOUTHERN LOOP (US 62 AND US 68). (14CCN)(16CCR)

22.3

12Martin IP20190147 KY 908

6.7 ‐ 8.2

SPOT IMPROVEMENT

$1,338,000 ADDRESS SAFETY CONCERNS, SUBSTANDARD ROADWAY GEOMETRICS, AND PAVEMENT CONDITIONS ON KY‐908 FROM RESERVOIR ROAD TO HELEN MILLS ROAD. 1.5 MILES

22.2

9Bath IP20110090 PF 9999

TRANSPORTATION STUDY

$135,000 PLANNING STUDY TO DETERMINE THE FEASIBILITY OF THE ORIGINAL PROJECT DESCRIBED BELOW:    PROVIDE A SECOND ACCESS FOR BATH COUNTY HIGH SCHOOL AND RECREATIONAL FACILITIES TO IMPROVE TRAFFIC FLOW AND CONGESTION ON US 60 THROUGH OWINGSVILLE AS WELL AS TO INCRE

22.0

9Elliott IP20110069 KY 32

11.5 ‐ 13.5

RECONSTRUCTION $21,972,000 CORRECT HORIZONTAL, VERTICAL AND WIDTH DEFICIENCIES ON KY 32 FROM (MP 11.5) TO (MP 13.5)  TO IMPROVE OPERATIONAL EFFICIENCY, SIGHT DISTANCE RESTRICTIONS, AND TRAVEL TIME FOR THE RESIDENTS OF ELLIOTT AND LAWRENCE COUNTIES.

21.7

12Martin IP20080689 KY 2032

1.9 ‐ 3

MINOR WIDENING $10,656,000 ADDRESS SUBSTANDARD ROADWAY GEOMETRICS AND PAVEMENT CONDITION ON THIS SEGMENT OF KY 2032, FROM .5 MILES PAST RALPH MOORE LANE TO 1.3 MILES PAST THICKETY FORK ROAD.

21.3

12Knott 12‐8200 KY 1231

6.982 ‐ 7.982

RESURFACING $7,100,000 NEW CONSTRUCTION OF ONE MILE STRETCH OF KY‐1231 BEGINNING AT BRIDGE AFTER LEAVING KY‐550. (04CCN)(06CCR)(08CCR)(10CCR)(12CCR)

20.5

9Mason IP20160297 KY 2515

1.391 ‐ 1.7

SAFETY‐HAZ‐ELM $1,789,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 2515 T FROM THE INTERMEDIATE SCHOOL TO US 62.

20.3

Wednesday, September 18, 2019 Page 21 of 24

Page 22: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Fleming IP20190121 PF 9999

TRANSPORTATION STUDY

$260,000 KY 801 PLANNING STUDY TO DETERMINE PURPOSE AND NEED FOR ANY IMPROVEMENTS NEEDED TO ADEQUATELY SERVE INDUSTRY AND SCHOOL TRAFFIC. SCOPE WILL INCLUDE EVALUATING FEASIBILITY AND POTENTIAL BENEFIT OF EXTENDING, BY NEW ROUTE, KY 801 FROM THE KY 158 INTERSECTIO

20.0

12Lawrence IP20080667 KY 32

0 ‐ 23.586

SPOT IMPROVEMENT

$17,153,000 IMPROVE KY‐32 FROM ELLIOTT C/L TO YATESVILLE LAKE RECONSTRUCTION SECTION FOR BETTER ACCESS TO YATESVILLE LAKE AND TO IMPROVE SAFETY.  SEE ELLIOTT COUNTY LISTING FOR CONTINUATION OF PROJECT TO KY‐7 @ SANDY HOOK.

19.9

12Knott IP20110152 KY 1087

5.05 ‐ 5.25

SAFETY‐HAZ‐ELM $1,670,000 CURVE REVISION 3.654 MILES EAST OF INTERSECTION OF KY 3209 & KY 1087. 19.7

12Pike 12‐8704 CS 1215

0 ‐ 1.654

RECONSTRUCTION $8,910,000 IMPROVEMENTS TO CASSIDY BLVD. AND THOMPSON RD TO ADDRESS SAFETY CONCERNS AND CONGESTION ISSUES.(12CCN)(14CCR)(16CCR)

19.7

9Lewis IP20050016 KY 377

0 ‐ 8.555

RECONSTRUCTION $144,058,000 IMPROVE SAFETY AND OPERATIONAL EFFICIENCY OF KY 377 FROM ROWAN COUNTY LINE (MP 0.000) TO JUNCTION OF KY 344 (MP 8.555) NEAR STRICKLETT.

19.5

9Boyd IP20190112 KY 757

5.3 ‐ 5.7

SPOT IMPROVEMENT

$3,569,000 KY 757 CURVE CORRECTION NEAR CALDWELL PARK. 19.1

12Lawrence IP20190046 PF 9999

NEW ROUTE $18,522,000 CONSTRUCT EXTENSION OF KY 1185 FROM BOY SCOUT ROAD AT YATESVILLE LAKE TO AROUND THE HEADWATERS OF THE LAKE TO KY 3215. 4.23 MILES

18.4

Wednesday, September 18, 2019 Page 22 of 24

Page 23: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Elliott IP20110067 KY 504

1.6 ‐ 2.6

SAFETY‐HAZ‐ELM $8,662,000 IMPROVE SAFETY AND GEOMETRY OF KY 504 FROM MILEPOINT 1.6 TO MILEPOINT 2.6, INCLUDING KY 549 INTERSECTION.

18.4

10Owsley IP20110013 KY 11

3.8 ‐ 4.2

SAFETY‐HAZ‐ELM $2,340,000 RECONSTRUCT THE INTERSECTION OF KY 11 AND KY 846. 18.3

10Owsley 10‐366 KY 11

0 ‐ 1

RECONSTRUCTION $17,580,000 RECONSTRUCTION OF KY 11 IN OWSLEY COUNTY BEGINNING AT THE CLAY COUNTY LINE AND EXTENDING 1 MILE NORTH ALONG KY 11 (MP 0 TO MP 1.0). (2014BOP)

17.4

12Lawrence IP20080671 KY 707

8.16 ‐ 9.69

MINOR WIDENING $10,800,000 RECONSTRUCT THE ACCESS INTO THIS AREA ALONG EXISTING KY 707 IN ORDER TO UPGRADE THIS ROAD FACILITY TO CURRENT STANDARDS.  KY707 MP 8.16 TO 9.69 FROM KY 1937 TO US 23 AT BUCHANAN.

16.4

12Lawrence 12‐3 PF 9999

NEW ROUTE $26,070,000 CONSTRUCT A NEW ROADWAY TO CONNECT BETWEEN KY 3215 TO KY 1185 AT YATESVILLE LAKE. (12CCR)(14CCR)

15.3

12Letcher 12‐311.80 / 12‐311.81

US 119

7.526 ‐ 8.967

RECONSTRUCTION $48,730,000 RECONSTRUCTION OF US‐119 FROM 0.15 MILE WEST OF KY‐806 TO KY‐932. 2012BOP 15.2

12Pike 12‐8905 PF 9999

RECONSTRUCTION $30,450,000 IMPROVE CONNECTIVITY BETWEEN KY 881 AND US 119. (16CCN) 13.4

Wednesday, September 18, 2019 Page 23 of 24

Page 24: Home | KYTC - All Regional projects Report · 2019-09-23 · knott ip20080660 ky12 safety15 3.8 ‐ 4.1 ‐haz elm $2,530,000 safety improvements while maintaining or improving traffic

DistrictCounty Item # Primary Route Project Type Cost Estimate Project Description

SHIFT Regional Score

2020Max 100

9Fleming IP20140003 KY 1325

9.7 ‐ 10.6

SAFETY‐HAZ‐ELM $8,207,000 TO IMPROVE SAFETY BY REALIGNING THE INTERSECTION OF KY 1325 AT MARTHA MILLS ROAD AND IMPROVING THE HORIZONTAL AND VERTICAL CURVES. REALIGNING THE INTERSECTION WOULD CORRECT/ELIMINATE EXTREMELY LIMITED SITE DISTANCE LOOKING SOUTH KY 1325. SCHOOL BUSES MAKE

12.9

12Letcher IP20080678 KY 160

15.3 ‐ 15.6

RECONSTRUCTION $2,003,000 CORRECT INSUFFICIENT TURNING RADIUS AT INTERSECTION KY 160 AND KY‐588 FOR CONTINUOUS FLOW OF TRAFFIC AND FREIGHT MOVEMENT.

12.9

9Rowan 9‐192.03 KY 32

16.619 ‐ 21.636

RECONSTRUCTION $83,090,000 RECONSTRUCT KY‐32 FROM 0.408 MILES WEST OF STEGALL COLD SPRING ROAD TO KY‐7 NEAR NEWFOUNDLAND.(PRIORITY SECTION I). (10CCR)(16CCN)(18CCN)

12.8

12Pike IP20170010 PF 9999

NEW ROUTE $1,321,000 EXTEND THE INDUSTRIAL PARK ACCESS ROAD ON CR‐1268.(14CCN)(16CCN)    ROADWAY WILL ACCESS INDIVIDUAL SITES IN THE INDUSTRIAL PARK.

10.9

12Lawrence IP20190039 PF 9999

NEW ROUTE $1,332,000 NEW ROUTE TO EXTEND CHAPMAN STREET (CR 1112) AT YORK HOLLOW ROAD TO WALBRIDGE ROAD (CR 1110). 1.52 MILES

10.6

Wednesday, September 18, 2019 Page 24 of 24