© Holcim (Srbija) d.o.o. 2010

Holcim (Srbija) d.o.o.

-

Primena mera BZR

Primeri dobre prakse

Goran VasićAsistent tehničkog direktora

2

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Sadržaj:

• Upoznavanje sa Holcim (Srbija)

d.o.o.

• Sistem BZR u Holcim (Srbija)

d.o.o.

• Primeri dobre prakse

3

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Holcim Grupa

Gradimo temelje za buduće generacije.

Želimo da budemo najcenjenija

i najprivlačnija

kompanija u cementnoj industriji, stvarajući vrednosti za naše zaposlene, poslovne partnere, kupce i lokalnu zajednicu.

Vizija

Misija

4

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Holcim Grupa

Holcim grupa je jedan od najvećih svetskih proizvođača cementa i agregata (drobljenog kamena, šljunka i peska) kao i gotovih betona i asfalta.

Holcim Grupa posluje u oko 70 zemalja na svim kontinentima.

154

fabrika cementa•

Prodaja cementa

131.9

miliona tona•

50.335

zaposlenih

485

fabrika agregata•

Prodaja agregata u nivou

143.4

miliona tona•

6.850

zaposlenih

1.457 fabrika betona•

Prodaja betona

41.8

million m³•

23.725 zaposlenihPodaci za

2009

5

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Holcim (Srbija) d.o.o.

Gde se nalazimo •

Fabrika cementa Popovac•

Fabrika gotovih betona „Beograd-Istok“•

Predstavništvo, Beograd•

Preduzeće za plovne puteve “Kamenko Gagrčin”, Sombor

Kada smo osnovani 1913, kao francusko-srpsko mešovito društvo

Broj zaposlenih ~ 400

Ukupne investicije 2002-2005 Ukupne

investicije

2002 -

200990 miliona dolara (prema SPA)116 miliona

EUR

Ukupan godišnji proizvodni kapacitet ~ 1.3 miliona tona cementa

i veziva

6

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Sadržaj:

• Upoznavanje sa Holcim (Srbija)

d.o.o.

• Sistem BZR u Holcim (Srbija)

d.o.o.

• Primeri dobre prakse

7

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Sistem BZR u Holcim Srbija

• Osnovi modela:

Standard OHSAS 18001Holcimov interni BZR standard – “Zelena piramida”

•Opšti elementi:Zasnovan na smanjenju rizikaSistematski pristupZahtev za kontinualnim poboljšanjima

•Struktura:OH&S PolitikaPlaniranjePrimena i implementacija postupakaProveravanje i korektivne merePreispitivanje od strane rukovodstva

Imati potpunu “Zelenu piramidu”

znači imati uspostavljen sistem menadžmenta

BZR-a

koji je sposoban da ispuni zahteve politike i ciljeva.

8

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Holcimova Kardinalna Pravila

1.

Nemojte da izbegavate ili

ometate sprovodjenje mera bezbednosti i ne dozvolite da to radi neko drugi, bez obzira na nivo hijerarhije u odnosu na Vas

2.

Za obavljanje svakog radnog zadatka obavezno je poštovanje pravila o nošenju lične zaštitne opreme

3.

Procedure za izolaciju i zaključavanje uvek moraju de se poštuju

4.

Najstrože je zabranjen rad pod uticajem alkohola i/ili

droga

5.

Svaka povreda i incidentna situacija moraju da se prijave

Kardinalna

Pravila primenjuju

se bez kompromisa, izuzetaka i tolerancije od 01.01.2007

9

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Holcim (Srbija) d.o.o. –

BZR statistika

1999-2009

20

23

149

133

74

485

700

537

2008

2007

2006

2005

2004

2003

2002

2001 1,455

2000 1,816

1999 1,441

2009

443

75

2045

7877

8291

2008200720062005200420032002200120001999

2009 Broj povreda

Broj izgubljenih dana

Prioritet

Br

1

Smanjenje broja teških povreda

Prioritet

Br

1

Smanjenje broja teških povreda

Prioritet Br

2

Smanjenje broja povreda

Prioritet Br

2

Smanjenje broja povreda

Naša vizija:

NULA povreda

Naša vizija:

NULA povredaNULA povreda

10

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Sadržaj:

• Upoznavanje sa Holcim (Srbija)

d.o.o.

• Sistem BZR u Holcim (Srbija)

d.o.o.

• Primeri dobre prakse

Upravljanje bezbednošću ugovarača u Holcim (Srbija) d.o.o.Zaštitno odelo za radnike u cementnoj industriji

11

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Direktiva za upravljanje bezbednošću ugovarača: SvrhaSvrha

Postavlja minimalne zahteve

u vezi Upravljanja bezbednošću ugovarača koje svaka kompanija u okviru Grupe

mora da poštuje pri njihovom

angažovanju

Navodi zahteve za

obezbeđivanje uslova u smislu kontrolisanja ili svođenja na minimum rizika koji prate aktivnosti izvođača.

Primenjuje se kada se angažuje izvođač radi izvođenja projekta ili vršenja usluga.

Kompanija mora da primenjuje Direktivu bez obzira na to gde izvođač izvodi radove, na terenu ili van njega ili između pogona Holcima

ili mesta obavljanja radova od strane trećih lica (znači -

i pri

transportu

proizvoda, lica ili robe kada kompanija može da

obezbedi

kontrolu).

Zahtevi Direktive odnose se na svaku fazu u okviru ciklusa usluga za koje se izvođač

angažuje.

Direktiva se ne odnosi na dobavljače robe niti na ugovore o snabdevanju.

12

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Direktiva za upravljanje bezbednošću ugovarača: FazeFaze

Key IssuesDefine Scope ofWork

Risk assessment of critical tasks

Identify contractors capability based on type of work approval

Contract Definition including General and Specific OH&S Requirements

Award Contract

Key IssuesEvaluate Contractors OH&S Performance determine if they would be used again retain as an “Approved Contractor“

Key IssuesPre-Commencement Meeting define requirements and expectations

Pre-Commencement Risk Controls i.e. permit to work where required, inspection and verification skills and equipment

Key IssuesManagement of contracted work:

• Regular Meetings

• Instruction Training

Task Analysis:

• Method and Statements

• Determine Level of Potential Risk

Monitoring & Inspection

Auditing

Periodic Performance Reviews

Key IssuesInspection and acceptance of work

Receive all relevant documents or information

Confirm no new hazards are created

Phase 2ContractDefinition& Award

Phase 3Pre-

Commencement

Phase 4Contract

Implementation& Control

Phase 5Hand Over &Acceptance

Phase 6Close Out &

Review

Key IssuesWork Experience

Health & Safety Program / Policy Documentation

Safety Statistics

Training Documentation

Legal and Financial Information

Insurance - Limits and Endorsements

History of Citation and Fines

Phase 1Pre-Qualification

ApprovedContractor

Contractor Safety ManagementUpravljanje bezbednošću izvođača

Faza 1

Pretkvalifiko-vanje

Odobrenog Izvođača

Faza 2

Definisanje i dodela ugovora

Faza 6

Završetak i Revizija

Faza 3

Pred početak

Faza 4

Izvođenje i kontrola ugovora

Faza 5

Primopredaja i prijem

Ključna PitanjaRadno iskustvo

Dokumentovanje programa / politike BZR

Statistika o bezbednosti

Dokumentacija o obukama

Pravne i finansijske informacije

Osiguranje –

limiti

i podrška

Podaci o prethodnim kaznama

Ključna PitanjaProvera i prijem radova

Prijem svih relevantnih dokumenata ili informacija

Potvrda da nisu stvorene nikakve nove opasnosti

Ključna PitanjaProcena Izvođačevih performansi u pogledu OHS da se utvrdi da li da se oni ponovo angažuju i zadrže kao “Odobreni Izvođači”

Ključna PitanjaDefinisanje obima poslova

Procena rizika za kritične zadatke

Utvrđivanje sposobnosti Izvođača na osnovu vrste odobrenja za radove

Definisanje Ugovora, uključujući i osnovne i specifične OHS zahteve

Dodela Ugovora

Ključna PitanjaUpravljanje poslovima iz ugovora:

•Redovni sastanci

•Obuka uz uputstva

Analiza zadataka

Metod i Izjave

Utvrđivanje nivoa potencijalnih rizika

Praćenje i Kontrola

Revizije

Periodične provere performansi

Ključna PitanjaSastanak pre početka radi definisanja zahteva i očekivanja

Kontrola rizika pre početka radova, tj. Dozvole za rad tamo gde treba, provera i verifikovanjesposobnosti i opreme

13

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Direktiva za upravljanje bezbednošću ugovarača: U praksiU praksi

Dobavljač

na tržištu

BZR direktive i propisiProces pred-kvalifikacije

Koncept IT Alati

Pred-kvalifikovani

potencijalni dobavljač

Proces izbora

dobavljača

Izvršavanje usluge odstrane odabranog

dobavljačaOcena dobavljača

Rad na razvoju

dobavljača

Koncept IT Alati Koncept IT Alati

14

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Sadržaj:

Upoznavanje sa Holcim (Srbija)

d.o.o.

Sistem BZR u Holcim (Srbija)

d.o.o.

Primeri dobre prakse

Upravljanje bezbednošću ugovarača u Holcim (Srbija) d.o.o.Zaštitno odelo za radnike u cementnoj industriji

15

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Zaštitno odelo za radnike u cementnoj industriji: ProblemProblem

Pojedine radne aktivnosti –

izloženost toploti → povišen nivo rizika

Zaštitna oprema otporna na toplotu → neophodna tokom pojedinih radnih aktivnosti

Temperatura sirovinskog

brašna: 50°C

Temperatura sirovinskog

brašna: 850°C

16

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Zaštitno odelo za radnike u cementnoj industriji: ZahteviZahtevi

Zahtevane karakteristike zaštitnog odela otpornog na toplotu:

Sertifikovano zaštitno odelo sa odgovarajućim nivoom zaštiteDeklarisane karakteristike potvrđene internim testom Odgovara potrebama radnika pri izvođenju radnih aktivnosti

Standardna zaštitna odela otporna na toplotu:

Livničarska odelaVatrogasna odela

17

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Zaštitno odelo za radnike u cementnoj industriji: RazvojRazvoj•

Serija uporednih testova izvršena na:Vatrogasnom odelu (bazirano na materijalu NOMEX®)Zaštitnom odelu za radnike u cementnoj industriji kompanije TEMPEX –Austrija

Test 1:Test 1: Test 2:Test 2:

18

© Holcim (Srbija) d.o.o. 2010 22/04/2010Primena mera BZR – primeri dobre prakse

Zaštitno odelo za radnike u cementnoj industriji: StatusStatus

Pozitivni rezultati testa potvrđeni su sertifikacijom

razvijenog odela prema najnovijem referentnom standardu:

EN ISO 11612:2008 A1+B1+C1EN ISO 11612:2008 A1+B1+C1•

Zaštitno odelo otporno na toplotu razvijeno u Srbiji postalo je interni standard u regionu istointerni standard u regionu istoččne Evrope ne Evrope

Sledeći korak

→→

Nastavak razvojaNastavak razvoja

Cilj:Cilj:

NULA POVREDANULA POVREDA

19