Hoh Siew Wai Professional CV

Download Hoh Siew Wai Professional CV

Post on 12-Apr-2017

107 views

Category:

Documents

3 download

TRANSCRIPT

Hoh Siew Wai

Hoh Siew Wai

Resume

Personal ParticularsName

: Hoh Siew Wai

IC Number

: 770215-14-5719 (A 3600914)

Current Address

: 10, Jalan Suria 5,

Taman Suria,

43000, Kajang.

Selangor, D.E.. Malaysia.

Permanent Address

: 10, Jalan Suria 5,

Taman Suria,

43000, Kajang.

Selangor, D.E.. Malaysia.

Contact Number

: +(6) 016 333 1692 (Mobile Phone) +(6) 0 3 8736 1296 (Residence)

E-mail

: hoh_siew_wai@hotmail.com

Age

: 37Date of Birth

: 15th February, 1977.

Race

: Chinese

Gender

: Male

Religion

: BuddhismMarital Status

: Married

Permanent Residence : Malaysian

Health

: Excellent

Language Spoken

: English, Bahasa Malayu, and Mandarin

Dialect Spoken

: Cantonese and Hokkien

Languages Written

: English, Bahasa Malayu, and Chinese

License Possessed

: Car (Class D)

Educational Background

Highest Level

Level

: Bachelor Degree

Grade

: Pass

Field of Study

: Information System Engineering

Major

: System Analysis and Design, Software Engineering

Awarded

: Campbell University, North Carolina, U.S.A.

Graduation Date

: 09th June, 2001Name of Institution

: Tunku Abdul Rahman College

Main Campus of Kuala Lumpur.

Second Highest Level

Level

: Advanced Diploma

Grade

: Merit

Field of Study

: Information System Engineering

Major

: System Analysis and Design, Software Engineering

Awarded

: Tunku Abdul Rahman College,

Main Campus of Kuala LumpurGraduation Date

: 28th March, 2001

Name of Institution

: Tunku Abdul Rahman College,

Main Campus of Kula Lumpur.

Third Highest Level

Level

: Diploma

Grade

: Pass

Field of Study

: Information System Engineering

Major

: System Analysis and Design, Software Engineering

Graduation Date

: 6th May, 1999

Name of Institution

: Tunku Abdul Rahman College,

Main Campus, Kuala Lumpur.

Certification

Certificate: Certificate in Computer Studies (C.C.S.)

Grade

: Pass

Field of Study

: Computer Studies

Major

: System Analysis and Design, Software Engineering

Graduation Date

: 20th March, 1998

Name of Institution

: Tunku Abdul Rahman College,

Main Campus, Kuala Lumpur.

Secondary EducationLevel

: SPM

Field of Study

: Science

Grade

: Grade IIGraduation Date

: 1995

Name of Institution

: S.M.Chong Hwa,

Jalan Gombak, Kuala Lumpur.Other Academy Courses Attended(1).

Course

: Project Management Professional (PMP)

Field of Study

: Project Management

Date

: 08th September, 2011 11th September, 2011Name of Institution

: iKompass Solution (Malaysia) Sdn. Bhd.

Tentative Date to Certified: 1st Quarter, 2013.

Other Courses Attended

(1).

Course

: Asas Payung Terjun (Basic Airborne)

Field of Study

: Military Combat Parachuting

Date

: 20th September, 1999 23rd October, 1999Name of Institution

: Pusat Latihan Peperangan Khusus,

21 Commando, Sungai Udang, Melaka.

(2).

Course

: Kadar Bakal PTTR

Field of Study

: Basic Military Course

Date

: 01st March, 2000 30th March, 2000Name of Institution

: Rejimen 503 (A.W.) Ipoh, Perak.

Job Skills.

IBM Mainframe in Platform OS/390, zOS, Cobol and Cobol CICS programming.

Project Management.

Regional project management

Staff / Team Management and Staff Training. Employment History

1.Company Name :HSBC Electronic Data Processing (Malaysia) Sdn. Bhd. - HDPM

Ground Floor, Wisma Hamzah Kwong Hing,

No.1 Leboh Ampang,

51000 Kuala Lumpur,

West Malaysia.

Position :Project Manager cum Commercial Banking Off Shore Global Transformation Team Manager / Line Manager

Level :Asst. Vice President, reporting to Business Unit Head

Specialization :Business solutioning and project management on Commercial Banking projects and Resourcing Manager

Industry :Financial Institution / Banking

Date : 18th June, 2015 Present

Work Description :1) Line Manager to Commercial Banking Team

(CMB).

2) Manage the Commercial Banking project

3) Provide solutioning for Commercial Banking

Project.

4) Key chair person on the Project Working Group (PWG) and Project Steering Committee (PSC).

5) Team Management and Resourcing

Management.

Completed Projects1) HSBC Sri Lanka Commercial Banking Visa convert to MasterCard.2) HSBC Philippines Commercial Banking Visa convert to MasterCard.

3) Malaysia Commercial Banking Supplier Chain

Solution (SCS-AI).

On Going Projects1) Global Project Manager to Global Standard

Payment Transparency

Other Management Role1) Managing Commercial Banking Team, including daily management and responsible on

Recruitment.

2) Member of the management team of HSBC

Global Transformation Center Malaysia.

2.Company Name :Bank Of China (Malaysia) Berhad

2nd Floor, Plaza OSK,

25 Jalan Ampang,

50450 Kuala Lumpur, Malaysia.

Position :Personal Banking Department Manager / Card Centre Manager / Project manager

Level :Manager, report to Director of Personal Banking Department

Specialization :Business solutioning and project management on Personal Banking key projects

Industry :Business user Project Solutioning / Project Management

Date : 06th July, 2012 17th June, 2015

Work Description :1) Propose / Design new product features to the Bank which applicable in Malaysia market.

2) Main liaison to Head Office in Beijing and

Hong Kong. 3) Main liaison to Information Technology

Department, Risk Management Department,

Internal and External Auditors, Bank Negara

Malaysia (BNM), relevant authorities such as ABM, various card brand office, including

MasterCard, Visa, Union Pay and MEPS.

4) Liaison to other Head Of Departments (HOD).

5) Responsible the designed products is comply with local regulatory and industry compliance

and practices.

6) Manager in-charged on Bank Of China (Malaysia) Berhad Great Wall Prepaid Card (

GWPPC) operation

Projects4) Bank Of China (Malaysia) Berhad Great WallInternational Credit Card (GWICC) Issuing.

Responsible to obtain approval from Bank Negara Malaysia (BNM).

Responsible to obtain approval from UnionPay International.

Incharge of the entire Project Management.

5) MasterCard Debit Issuing

6) MasterCard Credit Issuing

7) Union Pay Debit Card8) Interbank Giro (IBG).9) Merchant Acquiring System.

10) ATM.

11) UnionPay Online Payment (UPOP).

12) Malaysia Chip & PIN Projects.

13) MyClear e-Debit.

14) Fine tune and enhancement of the existing UnionPay Prepaid Card.

3.Company Name :E2Power Sdn. Bhd - OCBC bank (M) Berhad

Level 9, Menara OCBC,

18, Jalan Tun Perak,

50050, Kuala Lumpur, Malaysia.

Position :Assistant Vice President

Level :24th August, 2010 30th April, 2011Team Leader / Project Manager01st May, 2011 05th July, 2012

Solutioning Manager / Project Manager

Specialization :Information Technology (Software) / Solutioning /

Project Management in all Consumer Banking projects (Major in Credit Card, ATM MEPS and self service banking machines)

Industry :Information Technology (Software) / Solutioning /

Project Management

Date : 24th August, 2010 05th July, 2012

Work Description :24th August, 2010 30th April, 2011(Team Leader / Project Manager)

1) As the Team Leader to in-charge Capabilities

Building (CB) team.

2) Project Manager for the organization Mega

Projects / Key Projects.

3) Present technical design to organization top

top management.

4) Project budget estimation.

5) Periodically update project / financial status to

Project Steering Committee.

6) Working closely and ensure goals alignment

with OCBC Headquarter (SG).

7) Drive and motivate the project team to accomplish the projects.

8) Liaise with external parties such as gouvernement and semi-gouvernent, vendors, consultants and multi-level user on the projects scopes and draft for projects plan.9) Conceptualize the project and ensure the Project team understanding the scopes of the project.

10) Ensure the satisfactions of Customers and the interest of the bank.

01st May, 2011 05th July, 201

(Solutioning Manager / Project Manager)1) Manage key / mega projects for MY & SG Consumer Banking (Credit Card, ATM, Card Application origination, Internet Banking, Channels and Branch Transformation).

2) Provide and evaluate solutions for the projects.

3) Primary liaison to technical team, vendor and business users.

4) Project budget estimation / and execute the project within budget control.

5) Periodically update project / financial status to

Project Steering Committee and top management.

6) Working closely and ensure goals alignment

with OCBC Headquarter (SG).

7) Drive and motivate the project team to accomplish the projects.

Major projects Accomplished24th August, 2010 30th April, 2011(Team Leader / Project Manager)

1) IT Project Manager for the Malaysia Electronic

Payment System (MEPS) Shared ATM Network (SAN) Roll out on time with value added features, i.e. Cross Border transactions allowed and multi-tier service charge.

2) Current as the IT Project Manager for OCBC

Malaysia Single Platform Credit Card Application System Upgrade Project.

3) Evaluator on the vendor system for the OCBC

Malaysia / Singapore Single Platform Credit Card Application System Upgrade Project.

01st May, 2011 05th July, 201

(Solutioning Manager / Project Manager)1) Solutioning Manager / IT Project Manager for

OCBC MY on Credit Card application upgrade

project for both MY and SG.

2) Solutioning Manager / Project Manager for Payment Card Industry Data Security Standard (PCI DSS) exercise, successfully identifies all risks, non-compliances, take actions to suggest, monitor and close the risks.

3) Deployment Manager for Cheque Scan Deposit Machine (CSDM).

4) Solutioning Manager / Project Manager for Employee Provident Fund (EPF) Kiosks at OCBC branches.

5) Solutioning Manager / Project Manager for Bank Negara Malaysia (BNM) new notes Recalibrate all eLobby machines and Teller Assist Unit (TAU) to deposit and dispense new issued notes.

6) Solutioning Manager / Project Manager for ATM Card Forced PIN Change.

4.

Company Name :CIMB Bank Berhad

Level 4, Menara Southern Bank, 83 Medan Setia 1, Plaza Damansara, Bukit Damansara, P.O. Box 12281, 50772 Kuala Lumpur, Malaysia.

Position :Assistant Vice President cum Senior System Analyst

Level :Team Leader

Specialization :Credit Card Management System

Industry :Information Technology (Software)

Date : 04th August, 2008 23rd August, 2010

Work Description :1) As the Team Leader to in-charge a Project Development Team.2) Drive and motivate the project team to accomplish the projects.3) Liaise with Vendors, Consultatants and multilevel user on the projects scopes and draft for projects plan.4) Conceptualize the project and ensure the Project team understanding the scopes of the project. 5) Cost estimation and prepare for project progress

milestone.6) Perform technical design and review source code of Programmers, Analyst Programmers and System Analyst.7) Coordinate for all channels through out the entire SDLC.8) Ensure the satisfactions of Customers and the interest of the bank.

Major projects Accomplished1) As Technical Manager and Deputy IT Project Manager for CIMB Bank Credit Card Expansion for Singapore Region (Bank Management key project for year 2008 & year 2009).2) As the Technical Manager and IT Project Manager for 2008s Visa Collection Only Compliance Project.3) IT Project Manager for CIMB Bank Singapore region in acquiring business.

4) Involved in Credit Card Application System upgrade.5) Management level / IT decision maker for weekly

Production System Support (Route basis).

5.Company Name :Scope International (M) Sdn. Bhd. Level 1 Crystal Plaza, Lot 4, Jalan 51A/223, 46100 Petaling Jaya, Selangor, Malaysia.

Position :System Analyst

Level :Team Leader

Specialization :Credit Card Management System

Industry :Information Technology (Software)

Date : 01st August, 2006 03rd August, 2008

Work Description:1) Handle Project especially in CardLinK / In- house Customization.

2) Perform SDLC.

3) Liaise with vendors, consultants and user on

requirement, projects scopes and draft for

projects plan.

4) Conceptualize the project and prepare functional specification, system design.

5) Cost estimation and prepare for project progress

milestone.

6) Work with Application programmers/programmers on coding, debugging and unit testing.

7) Conduct for User Acceptance Testing (U.A.T.) and convince user to accept IT solution.

8) Plan for project implementation/ Cutover.

9) Post Implementation Evaluation.10) Production Problem Resolution

Major projects Accomplished1) As key team member for October 2006 Compliance for Hong Kong, Malaysia, India, Singapore, Indonesia, Thailand, India, Taiwan & Manhattan Bank in Hong Kong.2) Modify in-house Cash Advance MasterCard Outgoing file to be sent to MasterCard on Global Brand Compliance project.3) As the Team Leader for Production System Support for Hong Kong region on all Credit Card / Merchant / Application.4) As IS Driver for Visa / MasterCard / Amex Annual Compliance.

5) Project Managers / Trainers / Technical examination designer / Interviewer for Asia Region Credit Card Application Production System Support Hubbing project.

6.

Company Name :Southern Bank Berhad

Level 4, Menara Southern Bank, 83 Medan Setia 1, Plaza Damansara, Bukit Damansara, P.O. Box 12281, 50772 Kuala Lumpur , Malaysia.

Position :System Analyst (S.A)

Level :Senior Executive

Specialization :CardLink (Credit Card)

Industry :Information Technology (Software)

Date : 12th February 2001 31st July, 2006

Management Role :1) Supervising two (02) staffs : -

Analyst Programmer & Programmer

Work Description:2) Handle Project especially in CardLink.

3) Perform SDLC.

4) Liaise/Vendors/Consultatants with user on

requirement, projects scopes and draft for

projects plan.

5) Conceptualize the project and prepare functional

specification, system design.

6) Cost estimation and prepare for project progress

milestone.

7) Work with Application Programmers/programmers

on coding, debugging and unit testing.

8) Conduct for User Acceptance Testing (U.A.T.) and

convince user to accept IT solution.

9) Plan for project implementation/ Cutover.

10) Post Implementation Evaluation.

11) Staff Training.12) Production Problem Resolution.

Major projects Accomplished1) Multiple Application (Centralized) Rates System.

2) Falcon Fraud Monitoring System.

3) EMV Chip Based Credit Card.

4) Yearly Compliances.

5) Redesign and layout of new cardholder statement.

6) CardLink Security.

7) CardLink Extended Payment Plan (C.E.P.P.).

8) MasterCard BankNet TCP/IP Protocol.

9) Interbank Giro.

34