hogan residence bathroom remodel valued repeat customer kitchen remodel (see other presentation)...
TRANSCRIPT
Hogan ResidenceBathroom Remodel
Valued Repeat CustomerKitchen Remodel (see other presentation)Basement Bathroom Addition (see other presentation)Upstairs Bathroom Remodel
Upstairs Bathroom Remodel Original bathroom
for house Metal window Carpet floor covering Cast Iron Tub Ceramic Tile Walls Wallpaper previously
removed and adhesive painted over
Vanity deteriorating
Demolition and repair Sub-floor repaired
in areas Drywall repaired
around vanity Plumbing drain
line replaced
Improvements… Glass Block Window
replaced metal framed window
Hardi-backer installed prior to ceramic tile flooring and tub-surround
Fiberglass Tub replaced cast iron tub