hoffeco en
DESCRIPTION
HoffeCo PresentationTRANSCRIPT
© 2011 Hoffeco S.L.www.hoffeco.com
who we are
HoffeCo is a
European firm with
extensive
experience in
procurement
management in the
hotel and
hypermarket
sectors, with a
portfolio of more
than 500 suppliers
from around the
world to meet office
and space
requirements.
Turnkey
HoffeCo was founded with a philosophy of the integral
management of all aspects of hypermarket projects,
ranging from procurement management and coordination
of execution to the installation of their various components.
Turnkey Interactive and dinamic work
We are an external procurement department with a single
interlocutor who is part of the team throughout the project.
Our objective is to optimise time and cost, thanks to an
interactive and dynamic working system.
Flexibility
If the client facilitates the interior design project, we will
execute it. If they do not, our technical team or staff will
develop it.
© 2011 Hoffeco S.L.www.hoffeco.com
our mission
Executive Member
Sales
Procurement
Human Resources
Projects
Furniture and Fittings
Quality
Works
Interior Design
Andalucía
Morocco
© 2011 Hoffeco S.L.www.hoffeco.com
team
- planning and negotiation phase
- procurement manager
- financial follow-up
- logistic management
- works management
© 2011 Hoffeco S.L.www.hoffeco.com
services
HoffeCo’s policy is to revitalise the project in order
to minimise unnecessary costs. To do this, in this
first phase all technical specifications will be
inspected with the client to ensure their correct
execution. The objective is to detect problems,
define responsibilities, develop a realistic work
plan and find the suppliers that best meet the
needs of the project and the initial budget.
- planning and negotiation phase
- procurement management
- financial follow-up
- logistics management
- works management
© 2011 Hoffeco S.L.www.hoffeco.com
services
HoffeCo handles negotiations with
suppliers and generates procurement
orders based on the budget approved
beforehand by the client, in
accordance with the specifications of
the decoration project.
- planning and negotiation phase
- procurement management
- financial follow-up
- logistics management
- works management
© 2011 Hoffeco S.L.www.hoffeco.com
services
HoffeCo will work directly with the
accounts department of the client to
set dates for payment and minimise
deposits. Each month, a cash flow
report will be submitted so that the
client can take payments to be made
during this period into account.
- planning and negotiation phase
- procurement management
- financial follow-up
- logistics management
- works management
© 2011 Hoffeco S.L.www.hoffeco.com
services
HoffeCo will follow up on delivery dates
for materials in coordination with the
client and their technical team on site.
In turn, it will coordinate the installation
of materials and fittings purchased,
which, depending on each
manufacturer, will be installed with
personnel of the vendor or client.
- planning and negotiation phase
- procurement management
- financial follow-up
- logistics management
- works management
© 2011 Hoffeco S.L.www.hoffeco.com
services
The key to a job well done lies in the
smallest details. This being the case, our
work includes coordinating the project,
ensuring the correct use of the
equipment and leaving the facilities
ready for use, in perfect condition.
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Nikki Beach Hoteles
Beyrouth, Lebanon.
International Hotel
Hotel Catedral Barcelona
Barcelona, Spain
82 rooms
Urban Hotel
Hotel Mº Jimena
Toledo, Spain
34 habitations
Urban Hotel
Hotel Barceló Fez
Fez, Marocco
97 rooms
International Hotel
Hotel Ciudad de
Calatravos
Teruel, Spain
104 rooms
Resort Hotel
Hotel Azata las Rozas
Madrid, Spain
150 rooms
Urban Hotel
Hotel Europa
Zaragoza, Spain
77 rooms
Urban Hotel
47th Park Street
London, England
49 rooms
International Hotel
Hotel Carlton
Tel Aviv, Israel
268 rooms
International Hotel
Hotel Club Marítimo
Sotogrande
Cádiz, Spain
45 rooms
Resort Hotel
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Hotel Don Carlos
Marbella, Spain
150 rooms
Resort Hotel
Nikki Beach Hoteles
Beirut, Líbano.
Hotel Internacional
NH Arganda Madrid
Madrid, Spain
101 rooms
Urban Hotel
NH Pacífico
Madrid, Spain
97 rooms
Urban Hotel
NH Central Convenciones
Sevilla, Spain
156 rooms
Urban Hotel
Hotel Vapor Gran
Tarragona, Spain
79 rooms
Urban Hotel
NH Alcorcón
Madrid, Spain
102 rooms
Urban Hotel
NH Mercader
Madrid, Spain
153 rooms
Urban Hotel
NH San Sebastián de los
Reyes
Madrid, Spain
120 rooms
Urban Hotel
Hotel Tryp Zaragoza
Zaragoza, Spain
162 rooms
Urban Hotel
Hotel Vinci Málaga
Málaga, Spain
Urban Hotel
Hotel Sheraton Real de
Faula
Benidorm, Spain
238 rooms
Resort Hotel
ZT Barcelona
Barcelona, Spain
150 rooms
Urban Hotel
Marriott’s Village
Paris, France
228 rooms
International Hotel
Hotel Palais Medina Fez
Fez, Morocco
142 rooms
International Hotel
Marriott’s Playa Andaluza
Málaga, Spain
315 rooms
Resort Hotel
Hotel Prestige Lucena
Córdoba, Spain
170 rooms
Resort Hotel
Hotel Hyatt Kiev
Kiev, Ucrania
234 rooms
International Hotel
Hotel Movenpik
Beirut, Lebanon
293 rooms
International Hotel
Hotel Souani
Al Haceima, Morocco
91 rooms
International Hotel
Marriott’s Club Son Antem
Mallorca, Spain
185 rooms
Resort Hotel
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Hotel Westing Real de
Faula
Benidorm, Spain
221 rooms
Resort Hotel
Nikki Beach Hoteles
Beirut, Líbano.
Hotel Internacional
ZT Peñiscola
Castellón, Spain
350 rooms
Resort Hotel
La Cala de Finestrat
Benidorm, Spain
74 rooms
Residential Apartments
Pierre & Vacances Bon Mont
Tarragona, Spain
215 rooms
Residential Apartments
ZT Hotel Aquasol
Castellón, Spain
89 rooms
Residential Apartments
ZT Hotel Cabo Gata
Plaza Suites
Almería, Spain
149 rooms
Resort Hotel
Hotel Monrooe Beirut
Beirut, Lebanon
49 rooms
Resort Hotel
Pierre & Vacances Terrazas
Costa del Sol
Málaga, Spain
328 rooms
Residential Apartments
Villas D’Eole
Casablanca, Morocco
85 rooms
Residential Apartments
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Nikki Beach Hoteles
Beirut, Líbano.
Hotel Internacional
Al Dente
Marbella, Spain
Restaurant
Arte 14
Madrid, Spain
Restaurant
Chic
Marbella, Spain
Restaurant
Lone Star
Marbella, Spain
Restaurant
Maxin
Marbella, Spain
Restaurant
Aqui Brazil
Marbella, Spain
Restaurant
Chez Michel
Marbella, Spain
Restaurant
Lime & Co
Marbella, Spain
Restaurant
Mango
Málaga, Spain
Restaurant
Piccolo Mondo
Málaga, Spain
Restaurant
Taipan
Marbella, Spain
Restaurant
Tango
Madrid, Spain
Restaurant
Tahi Gallery
Marbella, Spain
Restaurant
Waterloo Brasserie
London, England
Restaurant
Suchotai
Marbella, Spain
Restaurant
Taipan
Madrid, Spain
Restaurant
Tango
Marbella, Spain
Restaurant
Visconti
Marbella, Spain
Restaurant
CT (China Town)
London, England
Restaurant
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Still
Marbella, Spain
Restaurant
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
La Farfalla
Marbella, Spain
Restaurant
Nikki Beach Hoteles
Beirut, Líbano.
Hotel Internacional
La Piazetta
Marbella, Spain
Restaurant
Champagner Bar
Marbella, Spain
Restaurant
Café Gilberto
Marbella, Spain
Restaurant
Saxo
Marbella, Spain
Restaurant
Pizza Piu
Marbella, Spain
Restaurant
Mille Fruti
Marbella, Spain
Restaurant
Café Gaughin
Marbella, Spain
Restaurant
Carpe Diem
Málaga, Spain
Restaurant
Club de Juegos
Marbella, Spain
Restaurant
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Bussines Center
Varsovia, Poland
Other
Club Social Sto.Domingo
Madrid
Other
Oficinas Key Capital
Madrid
Other
Torre Espacio
Madrid
Other
Oficinas Traco
Madrid
Other
Chateau St. Tropez
Francia
Other
Oficinas Gaia
Madrid,
Other
La Tertulia
Madrid
Other
Tienda Paddle Lob, Cocha
Espina
Madrid
Other
Oficinas Falcon Seguridad
Varsovia , Poland
Other
© 2011 Hoffeco S.L.www.hoffeco.com
portfolio
Nikki Beach Hoteles
Beirut, Líbano.
Hotel Internacional
Tienda de ropa KRISTO
Marbella
Other
Tienda de ropa METAL
Marbella
Other
Tienda sde ropa FACCIARO
Puerto Banús, ,Marbella
Other
Tienda de ropa NOIR
D’IVOIRE
Puerto Banús, Marbella
Other
© 2011 Hoffeco S.L.www.hoffeco.com
clients
Alliances
Azata
Atlas Hospitality Morocco
Barcelo
CGI
Grupo Rayet
Hyatt
Husa Hoteles
Izaka
NH
Nikkibeach
Marriott
Mövenpick
Pierre & Vacances
Sheraton
Somed
SR Hoteles
Tryp
Vincci
Westin
W Hoteles
ZT Hoteles
hoffeco´s draft is based on the project
magnitude, its duration and total estimate.
These honoraria include: profit on clients
savings.
► Interior design team if necessary
► Equipment head during all duration of
the project.
► Administration team, transacting the
purchase commands, the check-in revision
of the suppliers and the elaboration of the
control book that will be absorbed in the
termination of the project.
► On site installation and logistic team.
© 2011 Hoffeco S.L.www.hoffeco.com
fees
Madrid
Head Office, Procurement
and Administration
Avda Fuente Nueva 8,
Nave 60 San Sebastián de
los Reyes
28700 Madrid
tel. (+34) 91 659 13 53
fax (+34) 91 652 45 82
Contact person:
Susana Tomás
Andalucía
Design and Architecture
Casa Q local 107
Puerto Banus,
29600 Marbella
Contact person:
Graciela Leanza
Portugal
Logistic and Technical
Installation
Rua San Martinho, 397
apartado 1, 4415-758 Olival,
Vila Nova de Gaia, Portugal
Contact person:
Jesus Castellanos
Rabat Marruecos
North Africa Projects.
tel: + 212 06 61 44 07 77
fax: + 212 05 37 73 75 36
Contact person:
Mme. Asmae Lahlimi Alami
© 2011 Hoffeco S.L.www.hoffeco.com
www.hoffeco.com
© 2011 Hoffeco S.L.www.hoffeco.com