hodoscope replacement for e906
DESCRIPTION
Hodoscope Replacement for E906. By Rusty Towell December 8, 2006. Outline. Why Hodoscopes Detector description Scintillator material Photomultiplier tubes Schedule The hodoscope group. Hodoscopes. Used for triggering like in E866. Upgrades in design Additional planes - PowerPoint PPT PresentationTRANSCRIPT
Hodoscope Replacement for E906
By
Rusty Towell
December 8, 2006
December 11, 2006 Review of FNAL E906
Outline
• Why Hodoscopes• Detector description• Scintillator material• Photomultiplier tubes• Schedule• The hodoscope group
December 11, 2006 Review of FNAL E906
Hodoscopes
• Used for triggering like in E866.
• Upgrades in design• Additional planes
• More selective trigger • efficiency monitoring• redundancy
• New material (higher efficiency)• Double ended read-out (better timing needed
due to the higher rates)
December 11, 2006 Review of FNAL E906
Hodoscope Planes(approximately the same sizes, changes highlighted)
E866 E906Statio
nX (in) Y(in)
1 48 40
12x2 2x16
2 66 51
2x16
3 106 96
12x2 2x13
4 117 120
16x2 2x14
Station
X (in) Y(in)
1 48 40
16x2 2x16
2 66 51
16x2 2x16
3 106 96
none 2x16
4 117 120Two @ 16x2 2x16
December 11, 2006 Review of FNAL E906
Typical y Hodoscope Plane St 1 and 2
16 channels
x
y
2 half planes
December 11, 2006 Review of FNAL E906
Double-ended y Hodoscope Plane St 3&4
Half planes at slightly different z positions to allow for double-ended readout.
x
y
December 11, 2006 Review of FNAL E906
Scintillator Material
• Old material is:• Too small (station 1)• Too thin (station 2)• Too old/crazing
• station 2 (1989)• station 3 & 4 (1982)
• Decreased efficiencies were observed in E866.• Therefore ‘new’ scintillator material and light
guides will be used.• Material for stations 1 and 2 will come from HERMES.• New material will be purchased for stations 3 and 4.
December 11, 2006 Review of FNAL E906
Photomultiplier Tubes
• Total number of PMTs needed for E906 is 384 plus spares.
• Reuse all good PMTs from E866. Total number of tubes was 198.
• An additional 250 tubes have been committed from ZEUS when DESY is decommissioned in fall 2007.
• All tubes will be tested.
December 11, 2006 Review of FNAL E906
Hodoscope Budget
• Scintillator and light guide material: • Scintillator: EJ-200 (same as Bicron BC-408)• estimated at $120 k plus contingency and inflation
based on a 2002 quote. • Updated quote received late last week came in slightly
lower.• Total budgeted is $153 k from DOE and $ 16 k from NSF.
• Photomultiplier tubes• All pmt’s will be reused from previous experiments.• The only costs will be in shipping and testing the tubes.• Total budgeted is 2k $.
December 11, 2006 Review of FNAL E906
Schedule
• Most of the labor intensive work on the hodoscopes (especially on station 3 and 4) will be done during the summer break from classes.
• PMTs testing, design work, purchases, etc. can be done during the school year.
• There should be no problem in completing the hodoscopes on time.
• The hodoscopes could be completed earlier if the funding profile allowed for materials to be purchased sooner.
December 11, 2006 Review of FNAL E906
Hodoscope TeamUIUC & ACU
• UIUC will rebuilt stations 1 and 2.• ACU will rebuilt stations 3 and 4.• ACU rebuilt and commissioned the
hodoscopes for E789 and E866.• Testing of the PMTs will be shared.• This team can construct the
hodoscopes needed for E906.