Hodoscope Replacement for E906 By Rusty Towell December 8, 2006

Upload: vernon-kidd

Post on 02-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Hodoscope Replacement for E906. By Rusty Towell December 8, 2006. Outline. Why Hodoscopes Detector description Scintillator material Photomultiplier tubes Schedule The hodoscope group. Hodoscopes. Used for triggering like in E866. Upgrades in design Additional planes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Hodoscope Replacement for E906

Hodoscope Replacement for E906

By

Rusty Towell

December 8, 2006

Page 2: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Outline

• Why Hodoscopes• Detector description• Scintillator material• Photomultiplier tubes• Schedule• The hodoscope group

Page 3: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Hodoscopes

• Used for triggering like in E866.

• Upgrades in design• Additional planes

• More selective trigger • efficiency monitoring• redundancy

• New material (higher efficiency)• Double ended read-out (better timing needed

due to the higher rates)

Page 4: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Hodoscope Planes(approximately the same sizes, changes highlighted)

E866 E906Statio

nX (in) Y(in)

1 48 40

12x2 2x16

2 66 51

2x16

3 106 96

12x2 2x13

4 117 120

16x2 2x14

Station

X (in) Y(in)

1 48 40

16x2 2x16

2 66 51

16x2 2x16

3 106 96

none 2x16

4 117 120Two @ 16x2 2x16

Page 5: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Typical y Hodoscope Plane St 1 and 2

16 channels

x

y

2 half planes

Page 6: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Double-ended y Hodoscope Plane St 3&4

Half planes at slightly different z positions to allow for double-ended readout.

x

y

Page 7: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Scintillator Material

• Old material is:• Too small (station 1)• Too thin (station 2)• Too old/crazing

• station 2 (1989)• station 3 & 4 (1982)

• Decreased efficiencies were observed in E866.• Therefore ‘new’ scintillator material and light

guides will be used.• Material for stations 1 and 2 will come from HERMES.• New material will be purchased for stations 3 and 4.

Page 8: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Photomultiplier Tubes

• Total number of PMTs needed for E906 is 384 plus spares.

• Reuse all good PMTs from E866. Total number of tubes was 198.

• An additional 250 tubes have been committed from ZEUS when DESY is decommissioned in fall 2007.

• All tubes will be tested.

Page 9: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Hodoscope Budget

• Scintillator and light guide material: • Scintillator: EJ-200 (same as Bicron BC-408)• estimated at $120 k plus contingency and inflation

based on a 2002 quote. • Updated quote received late last week came in slightly

lower.• Total budgeted is $153 k from DOE and $ 16 k from NSF.

• Photomultiplier tubes• All pmt’s will be reused from previous experiments.• The only costs will be in shipping and testing the tubes.• Total budgeted is 2k $.

Page 10: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Schedule

• Most of the labor intensive work on the hodoscopes (especially on station 3 and 4) will be done during the summer break from classes.

• PMTs testing, design work, purchases, etc. can be done during the school year.

• There should be no problem in completing the hodoscopes on time.

• The hodoscopes could be completed earlier if the funding profile allowed for materials to be purchased sooner.

Page 11: Hodoscope Replacement for E906

December 11, 2006 Review of FNAL E906

Hodoscope TeamUIUC & ACU

• UIUC will rebuilt stations 1 and 2.• ACU will rebuilt stations 3 and 4.• ACU rebuilt and commissioned the

hodoscopes for E789 and E866.• Testing of the PMTs will be shared.• This team can construct the

hodoscopes needed for E906.