  • 8/10/2019 Hoa-Toa Flush Reviewer

    1/61

    History of Architecture

    Theory of Architecture

    Professional Practice

  • 8/10/2019 Hoa-Toa Flush Reviewer

    2/61

    Defining open space in residential

    subdivision

    PD 957

    PD 1296

    BP 220

    PD 579

  • 8/10/2019 Hoa-Toa Flush Reviewer

    3/61

    The Greek council house which is

    covered meeting place for the

    democratically-elected council is called:

    Bouleuterion

    Thersihon

    Prytaneion

    Diathyros

  • 8/10/2019 Hoa-Toa Flush Reviewer

    4/61

    A key house agency that assist private

    developers to undertake low and middle

    income mass housing production

    National Home Mortgage & Finance

    Corporation (NHMFC)

    Home Insurance & Guarantee Corporation(HIGC)

    Housing & Land Use Regulatory Board

    (HLURB)

    National Housing Authority

  • 8/10/2019 Hoa-Toa Flush Reviewer

    5/61

    The Grandest Temple of all Egyptian

    temples, it was not built by upon one

    complete plan but owes its size,disposition and magnificence to the work

    of many Kings. Built from the 12th

    Dynasty to the Ptolemaic period. Great Temple of Ammon, Karnak

    The Great temple of Abu-Simbel

    Temple of Queen HATSHEPSUT Temple of Ramsesseum, Thebes

  • 8/10/2019 Hoa-Toa Flush Reviewer

    6/61

    A ____________ is a ___________which extends vertically from lowest

    portion of the wall which adjoins two livingunits up to a minimum height of 0.30meters above the highest portion of theroof and extends horizontally 0.30 metersbeyond the outermost edge of theabutting living units?

    Partywall; block

    Firewall; lotline wall Firewall; fireblock

    Blotline wall; block

  • 8/10/2019 Hoa-Toa Flush Reviewer

    7/61

    The value of extra work or change in

    construction plans by the owner.

    Unit prices provided credit does not exceed

    10 percent of original contract

    Actual direct cost plus 10 percent for profit,

    overhead and tax Value included in contingencies

    Estimate and acceptance in lump sum

  • 8/10/2019 Hoa-Toa Flush Reviewer

    8/61

    Refers to the most reasonable price of

    land and shelter based on the needs and

    financial capability of programbeneficiaries and appropriate financial

    schemes (RA 7279).

    Financial rangeAffordable cost

    House rental wage range

    Lower housing rate

  • 8/10/2019 Hoa-Toa Flush Reviewer

    9/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    10/61

    In a PERT CPM. ____________is a

    starting node to two or more activities

    Concurrent node

    Merge node

    Simultaneous nodes

    Burst node

  • 8/10/2019 Hoa-Toa Flush Reviewer

    11/61

    It refers to contracts or arrangements

    involving the transfer of systematic

    knowledge for the manufacture if aproduct

    Technology transfer

    Transfer of Record

    Contract Documents

    Technical Transfer

  • 8/10/2019 Hoa-Toa Flush Reviewer

    12/61

    The father of modern picture books of

    Architecture

    Andrea Palladio

    Leon Battista Alberti

    Philibert De Lorme

    Giacomo Barozzi da Vignola

  • 8/10/2019 Hoa-Toa Flush Reviewer

    13/61

    The man of learning can fearlesslylook down upon the troublesome

    accidents of fortune. But he who thinkshimself entrenched in defense not oflearning but of luck, moves one slipperypath, struggling though life unsteadily and

    insecurely. a New Architecture

    Ten books of Architecture by Marcus Vitruvius

    Space, Time and Architecture by SigfriedGideon

    The Poetry of Architecture by John Ruskin

  • 8/10/2019 Hoa-Toa Flush Reviewer

    14/61

    It was the first law passed by the national

    assembly in 1921 where the maestros de

    obra or the master builders are requiredto register as architects?

    Engineers and Architects Law Act no. 2986

    Engineers and Architects Law Act no. 2896 Engineers and Architects Law Act no. 9286

    Engineers and Architects Law Act no. 8296

  • 8/10/2019 Hoa-Toa Flush Reviewer

    15/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    16/61

    The memorial column built in the form of

    tall Doric order and made entirely f

    marble is; Column of Antoninus Pius

    Trajans Column

    Column of Marcus Aurelius

    Column of Dioelectian

  • 8/10/2019 Hoa-Toa Flush Reviewer

    17/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    18/61

    It is the eclectic style of domesticarchitecture of the 1870s and the 1880s

    in England and the USA and actuallybased on country house and cottageElizabeth architecture which wascharacterized by a blending of Tudor

    Gothic, English Renaissance and colonialelements in the USA:

    Mannerist Phase

    Queen Anne style Jacobean Architecture

    Stuart Architecture

  • 8/10/2019 Hoa-Toa Flush Reviewer

    19/61

    Le Corbusier planned a high density

    building that was a super building that

    contained 337 dwellings in only acres ofland. What is the structure that supposed

    to be located in Marseilles?

    Unite d Habitation Brasilia

    The mile High tower

    Ecumenopolis

  • 8/10/2019 Hoa-Toa Flush Reviewer

    20/61

    When the owner hires an Architect of a

    firm to coordinate the whole range of

    Comprehensive Architectural Services, itshall constitute?

    Design-Build

    Labor Supervision Project Management

    Construction Service

  • 8/10/2019 Hoa-Toa Flush Reviewer

    21/61

    Which article is NOT included in the

    Building Contract?

    Time of Completion and Liquidated Damages

    Performance & Payment Bonds

    Cost Records

    Payments

  • 8/10/2019 Hoa-Toa Flush Reviewer

    22/61

    He is a registered & licensed architect,

    who is academically and professionally

    qualified, & with exceptional orrecognized expertise or specialization in

    any branch of architecture;

    Architect-of-record Consulting Architect

    Architect

    Architect-in-charge of the construction

  • 8/10/2019 Hoa-Toa Flush Reviewer

    23/61

    BA full time construction inspector hired

    by owner assisting in the supervision of

    the work. Project Representative

    Engineer

    Contractor

    Architect

  • 8/10/2019 Hoa-Toa Flush Reviewer

    24/61

    ??? or coerce an architect toperform/undertake any service under the

    general practice of ??? upon convictionbe sentence to a fine of not less than

    ____________ of suffer imprisonment fora ____________ of not exceeding

    _________ years . (Handbook on RA9266 See p.66)

    250,000/2

    200,000/6 200,000/5

    250,000/5

  • 8/10/2019 Hoa-Toa Flush Reviewer

    25/61

    After ___________ substantial

    completion of contract work, the architect

    shall inspect the project & issue certificateof completion after certification, the

    contractor will finish outstanding work

    during period of making good of all knowndefect of 60 days.

    85%

    98%

    95%

    90%

  • 8/10/2019 Hoa-Toa Flush Reviewer

    26/61

    Which of the following is NOT the architectsresponsibility in relation to the contractor? The Architect shall immediately upon his personal

    knowledge and inspection, reject or condemn materials,equipment or workmanship which are not in conformitywith the Contract Documents in order not to causeUnnecessary delay and additional expense to theContractor,

    The Architect shall not knowingly call upon the Contractor

    to correct or remedy oversights or errors in the ContractDocuments to the Contractors financial advantage.

    The Architect shall give the contractor every reasonableaid to enable him to fully understand the contents of theContract Documents by furnishing clear, definite andconsistent information in all pertinent contract documents

    to avoid unnecessary mistakes that may involve extracosts to the Contractor.

    The Architect shall consider the needs and stipulation ofthe Contractor and the effect of his work upon the life andwell-being of the public and community as a whole

  • 8/10/2019 Hoa-Toa Flush Reviewer

    27/61

    In methods of compensation, if the

    Architect as Project Manager performs

    regular architectural services for thesame project, he is compensated

    separately for these services as

    stipulated in what UAP Documents? UAP Doc 201

    UAP Doc 202

    UAP Doc 203 UAP Doc 204

  • 8/10/2019 Hoa-Toa Flush Reviewer

    28/61

    The Contractor shall submit the followingbefore Final Payment is to be released

    except for: 3 copies of directory of Panel boards with list

    of circuits, instructions and Manuals forOperating and Maintenance of Fixture and

    Equipment and Keying Schedule Guarantee Bond equivalent to 40% of the

    Contract Price covering a period of one yearafter the Final Acceptance of the Work.

    Certificate of final Building occupancy. Original and 3 sets of prints of As-Built

    Drawings of the finished project.

  • 8/10/2019 Hoa-Toa Flush Reviewer

    29/61

    Within how many months shall be the

    release of Retention from date of Final

    Payment? 3 months

    4 months

    5 months 2 months

  • 8/10/2019 Hoa-Toa Flush Reviewer

    30/61

    It is the first Development Garden City

    where it is a combination of landscaping,

    informal street layouts, and main axisfocusing on town center.

    Savannah

    Welwyn Letchworth

    Hampstead Garden Suburbs

  • 8/10/2019 Hoa-Toa Flush Reviewer

    31/61

    A British pioneered in regional Planning

    for the Doncaster area (1920-1922) and

    East Kent; Involved in greater LondonPlan; Use of open space as structuring

    element.

    Clarence Perry Leslie Patrick Abercrombie

    Henry Wright

    Andres Duany

  • 8/10/2019 Hoa-Toa Flush Reviewer

    32/61

    He is remembered for his Ideal Cities

    star shaped plans with street radiating

    from central point, usually proposed for achurch, palace or castle.

    Leonardo Da Vinci

    Leon Battista Alberti Pierre Charles L Enfant

    Sir Christopher Wren

  • 8/10/2019 Hoa-Toa Flush Reviewer

    33/61

    Whose theory is the explanation of

    residential land uses in terms of wedge-

    shaped sectors radial to the city centeralong established lines of transportation.

    Homer Hoyt

    Kevin Lynch Ernest Burgess

    None of these

  • 8/10/2019 Hoa-Toa Flush Reviewer

    34/61

    Published the book called Fields,

    Factories and Workshops; or Industry

    Combined with Agriculture with manualwork.

    Antonio Santelia

    Don Soria y Mata Eugene Henard

    Peter Kropotkin

  • 8/10/2019 Hoa-Toa Flush Reviewer

    35/61

    This services giver full meaning to what

    the professional calls comprehensive

    Architectural Service. It wraps-up thewhole range of architectural services.

    Pre-Design Services

    Design- Build Services Post-Construction Services

    Comprehensive Architectural Services

  • 8/10/2019 Hoa-Toa Flush Reviewer

    36/61

    Condominium & Subdivision, Bridges

    Protective Law.

    PD 1185

    PD 1185

    PD 957

    RA 545

  • 8/10/2019 Hoa-Toa Flush Reviewer

    37/61

    The approved form of security furnished

    by the Contractor as a guarantee of good

    faith on the part of the contractor toexecute the work in accordance with

    terms of the Contract.

    Guarantee Bond Contract

    Performance Bond

    Payment Bond

  • 8/10/2019 Hoa-Toa Flush Reviewer

    38/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    39/61

    The sacred enclosure fond in the highest

    part of a Greek city is called:

    Peribolas

    Pteroma

    Temenos

    Corps de Logis

  • 8/10/2019 Hoa-Toa Flush Reviewer

    40/61

    The architect who claimed that: The

    ultimate goal of the new architecture was

    the composite but inseparable work of anart, in which the old diving line between

    monumental and decorative elements will

    have disappeared forever. Frank Lloyd Wright

    Le Corbusier

    Walter Gropius

    Mies Van de Rohe

  • 8/10/2019 Hoa-Toa Flush Reviewer

    41/61

    The architect who said that the exterior of

    the building is the result of the interior.

    Mies Van de Rohe

    Le Corbusier

    Frank Lloyd Wright

    William Ruskin

  • 8/10/2019 Hoa-Toa Flush Reviewer

    42/61

    This means, an entities, agencies,organization & the like that have been

    accredited/registered with the Board ofArchitecture of the Professional RegulationCommission to deliver seminars, lectures, &other continuing Professional Education

    Modules for Architects, other than theIAPOA which is automatically accredited bythe Board of Architecture? United Architects of the Philippines

    CPD Provider Integrated Accredited Professional Organization

    of Architects

    PIA

  • 8/10/2019 Hoa-Toa Flush Reviewer

    43/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    44/61

    The building that serve as a senate house

    for the chief dignitaries of the city and as

    a palace where distinguished visitors andcitizens might be entertained.

    Bouleuterion

    Thersihon Prytaneion

    Diathyros

  • 8/10/2019 Hoa-Toa Flush Reviewer

    45/61

    It is a traditional house that was called

    binangiyan. It was a single room dwelling

    elevated at 1.50 meters from the ground;the floor were made of hard wood like

    narra which rested on 3 floor joist which

    in turn were supported by transversegirders.

    Kankanay

    Badjao Bontoc

    Kalinga

  • 8/10/2019 Hoa-Toa Flush Reviewer

    46/61

    Often enclosed and secluded the street,

    whose high density and variety of

    planning conveys a garden image. Itsometimes includes flower planters and a

    water feature and usually supplies a

    variety of seating possibilities. City plaza

    Garden Oasis

    City square

    Street plaza

  • 8/10/2019 Hoa-Toa Flush Reviewer

    47/61

    ??? on natural rocks in a Greek theater

    is called:

    Cavaea

    Exedrae

    Logeion

    Skene

  • 8/10/2019 Hoa-Toa Flush Reviewer

    48/61

    It is the third phase of English-Gothic

    Architecture where elaborated

    ornamental vaulting, and refinement ofstonecutting techniques.

    Perpendicular style

    Rayonnant style Decorated style

    None of these

  • 8/10/2019 Hoa-Toa Flush Reviewer

    49/61

    Enclosure formed by huge stones planted

    on the ground in circular form.

    Menhir

    Cromlech

    Dolmen

    Tumulus

  • 8/10/2019 Hoa-Toa Flush Reviewer

    50/61

    PD 957: In Design Standards for

    Residential Condominium Projects, offsite

    parking is allowed but must NOT be morehow may meters away from the building it

    serves?

    31 meters 50 meters

    100 meters

    110 meters

  • 8/10/2019 Hoa-Toa Flush Reviewer

    51/61

    The architect of a housing project was

    give Php 300,000.00 for the first unit he

    designed. How much will he receive forthe tenth housing unit?

    Php 300,000.00

    Php 420,000.00 Php 480,000.00

    Php 500,000.00

  • 8/10/2019 Hoa-Toa Flush Reviewer

    52/61

    Under PD 1096 the executive officer of

    OBO appointed by the secretary to

    enforce the provision of the code in thefield as well as the enforcement or orders

    and decisions made pursuant thereto.

    Architect Urban Planner

    Building official

    City Engineer

  • 8/10/2019 Hoa-Toa Flush Reviewer

    53/61

    Which of the following situation would

    trigger the owner to suspend work?

    Bankruptcy-Declared by BIR

    Insubordination

    Non-payment of contactors debt/non

    superintendence of contractorAll of the above

  • 8/10/2019 Hoa-Toa Flush Reviewer

    54/61

    Contract Documents shall be the property

    of the

    Architect

    Owner

    Contractor

    Both a & b

  • 8/10/2019 Hoa-Toa Flush Reviewer

    55/61

    PD 1185: Which of the following denotes

    a fire involving flammable liquids and

    gasses? Class A Fire

    Class B Fire

    Class C Fire Class D Fire

  • 8/10/2019 Hoa-Toa Flush Reviewer

    56/61

    It is instructions that supplement or

    modify drawings, specs, & general

    conditions of the contract. Special Provisions

    Supplementary Specs

    Written Notice Instruction to Bidders

  • 8/10/2019 Hoa-Toa Flush Reviewer

    57/61

    Boiler Plate is essential to the production

    of good construction documents as are

    the drawings or the specifications. All areincluded forms except

    Invitation to Bid

    Wage Scales Bond Form

    Building Permit

  • 8/10/2019 Hoa-Toa Flush Reviewer

    58/61

  • 8/10/2019 Hoa-Toa Flush Reviewer

    59/61

    A style in the architecture Italy I the

    second half of the 16thcentury and to a

    lesser extent elsewhere in Europe. It usesclassical elements in an unconventional

    manner.

    Illusionism Mannerism

    Palladianism

    Abstract

  • 8/10/2019 Hoa-Toa Flush Reviewer

    60/61

    A revival style based on the buildings and

    publications of the 6thcentury architect

    marked by ancient Roman Architecturalforms.

    National Romanticism

    Mannerism Palladianism

    Purism

  • 8/10/2019 Hoa-Toa Flush Reviewer

    61/61

    END