h.j. heinz distribution center

35
River Avenue Pittsburgh, Pennsylvania Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth Distribution Center

Upload: oriel

Post on 05-Feb-2016

128 views

Category:

Documents


0 download

DESCRIPTION

H.J. Heinz Distribution Center. River Avenue Pittsburgh, Pennsylvania. Michael J. Carroll Mechanical Option Primary Advisor: Dr. Bahnfleth. Presentation Outline. Building Synopsis Client Concerns Goals of Project Mechanical Systems Mechanical System Selection Daylight Addition - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: H.J. Heinz Distribution Center

River AvenuePittsburgh, Pennsylvania

Michael J. CarrollMechanical OptionPrimary Advisor: Dr. Bahnfleth

H.J. Heinz Distribution

Center

Page 2: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Presentation Outline Building Synopsis Client Concerns Goals of Project Mechanical Systems Mechanical System Selection Daylight Addition Roof Framing Redesign Conclusions Questions

Page 3: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Building Synopsis Total 150,000 ft2

140,000 ft2 Warehouse 3 Offices, 2 Break Rooms,

2 Sets of Rest Rooms Built 8/2000 11/2001 $14 million cost Addition to Prior Warehouse Adjacent to Allegheny River

Page 4: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

H.J. Heinz Distribution Center

Page 5: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

H.J. Heinz Distribution Center

Page 6: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

H.J. Heinz Distribution Center

Page 7: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Client Concerns Open Floor Space Storage for Canned

Food Temperate Climate Freezing of Cans Near

Intake Louvers

Page 8: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Client Concerns

Freezing Cans

Page 9: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Goals of Project Provide Economical and

Efficient Working Environment

Supply Zonal Air Conditioning

Impart Daylight into Warehouse

Design Roof Framing for Daylighting Clerestories

Page 10: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Existing Mechanical: 3 Duct Heaters 12 Intake Air Louvers 13 Exhaust Fans Air-to-Air Packaged

Heat Pumps

Page 11: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Existing Cooling:

Page 12: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Existing Heating:

Page 13: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical SystemsProposed Mechanical: Geothermal Heat

Exchanger Ground Water Heat

Pump System Surface Water Heat

Pump System Zonal Heating and

Cooling Control

Page 14: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Zonal Heat Pump Sizes and Quantities

Zone Rooms Design Load Unit Size Quantity of Units

Zone 1 East Office Area 1 Ton 1 Ton 1

Zone 2 West Office Area 2 Tons 2 Tons 1

Zone 3 Conveyor Hallway 20 Tons 10 Tons 2

Zone 4 Warehouse 336 Tons 25 Tons 14

Mechanical Systems

Proposed Heat Pump Locations:

Page 15: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Geothermal Exchanger Heat Pump:

Page 16: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Geothermal Heat Pump Equipment Pricing

Unit Quantity Material Installation Unit Total Total

25 Ton Heat Pump 14$14,500.0

0 $6,425.00$20,925.0

0$292,950.

00

1 Ton Heat Pump 1 $1,325.00 $1,100.00 $2,425.00 $2,425.00

2 Ton Heat Pump 1 $1,925.00 $1,350.00 $3,275.00 $3,275.00

10 Ton Heat Pump 2 $9,200.00 $2,800.00$12,000.0

0$24,000.0

0

1-1/4" Polyethylene HX Pipe (in Linear Feet) 39,219 $0.61 $2.03 $2.64

$103,538.16

1" Copper H2O Pipe (in Linear Feet) 1,875 $2.37 $4.03 $6.40$12,000.0

0

1-1/2" Fiberglass with Jacket Insulation (LF) 1,875 $1.04 $1.94 $2.98 $5,587.50

         $443,775.

66

Mechanical Systems

Geothermal Exchanger Heat Pump:

Page 17: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Ground Water Heat Pump

Page 18: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Ground Water Heat Pump Equipment Pricing

Unit Quantity Material Installation Unit Total Total

25 Ton Heat Pump 14$14,500.0

0 $6,425.00$20,925.0

0$292,950.

00

1 Ton Heat Pump 1 $1,325.00 $1,100.00 $2,425.00 $2,425.00

2 Ton Heat Pump 1 $1,925.00 $1,350.00 $3,275.00 $3,275.00

10 Ton Heat Pump 2 $9,200.00 $2,800.00$12,000.0

0$24,000.0

0

110 GPM Plate & Frame Heat Exchanger 1 $7,360.00 $590.00 $7,950.00 $7,950.00

3 HP - 150 GPM End-Suction Pump (each) 2 $4,340.54 $2,336.88 $6,677.42

$13,354.84

2-1/2" Sch. 40 Steel Pipe (LF) 360 $5.05 $9.60 $14.65 $5,274.00

1" Copper H2O Pipe (in Linear Feet) 1,875 $2.37 $4.03 $6.40$12,000.0

0

1-1/2" Fiberglass with Jacket Insulation (LF) 1,875 $1.04 $1.94 $2.98 $5,587.50

         $366,816.

34

Mechanical Systems

Ground Water Heat Pump

Page 19: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical Systems

Surface Water Heat Pump

Page 20: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Surface Water Heat Pump Equipment Pricing

Unit Quantity Material Installation Unit Total Total

25 Ton Heat Pump 14$14,500.0

0 $6,425.00$20,925.

00$292,950.0

0

1 Ton Heat Pump 1 $1,325.00 $1,100.00$2,425.0

0 $2,425.00

2 Ton Heat Pump 1 $1,925.00 $1,350.00$3,275.0

0 $3,275.00

10 Ton Heat Pump 2 $9,200.00 $2,800.00$12,000.

00 $24,000.00

1-1/4" Polyethylene HX Pipe (in Linear Feet) 109,885 $2.37 $4.03 $6.40

$703,264.00

1" Copper H2O Pipe (in Linear Feet) 1,875 $2.37 $4.03 $6.40 $12,000.00

1-1/2" Fiberglass with Jacket Insulation (LF) 1,875 $1.04 $1.94 $2.98 $5,587.50

         $1,043,501

.50

Mechanical Systems

Surface Water Heat Pump:

Page 21: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical System Selection

Which is the Best Heat Pump

Solution???

Page 22: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Mechanical System Selection

Ground Water Heat Pump

Advantages: Less Drilling for Wells than

Geothermal Piping Less Piping required than

Surface Water or Geothermal $76,960 savings over

Geothermal $676,685 savings over Water

Source

Page 23: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

DaylightingExisting Warehouse Lighting: 190 - 400 Watt Metal Halide

Fixtures 140 - 180 Watt Fluorescent T8’s = Total 101,750 Watts Installed Warehouse Daylighting: 3 Sets of 3’ high windows length

of Warehouse Visible Transmittance of 0.50 Window-to-wall Ratio = 0.36

Page 24: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Daylighting

Page 25: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Daylighting

Summer / Clear Sky Illuminance

275 Fc on Floor 130 Fc on

Can Sides

Page 26: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Daylighting

Winter / Overcast Sky Illuminance

30 Fc on Floor 22 Fc on

Can Sides

Page 27: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Daylighting

    Luminaire    

   

F01(metal

halide)

F02(fluoresce

nt)

F10(fluoresce

nt)

F01(metal

halide)

F01(metal

halide)

 Luminair

es 190 50 90 126 30

 Lumens

= 36,000 5,950 9,200 36,000 36,000

  CU = 0.87 0.87 0.80 0.87 0.87

RSDD = 0.96          

LLD =   0.85 0.91 0.91 0.85 0.85

BF =   0.90 0.98 0.98 0.90 0.90

LDD = 0.82          

LFF =   0.60 0.70 0.70 0.60 0.60

Illuminance (fc) =   25.60 1.30 3.32 16.98 4.04

             

Total Illuminance (fc) =   30.22     21.59 8.66

Page 28: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Daylighting

Summer Month Peak Savings:

64 kilowatts $186Winter Month Peak

Savings: 25.6 kilowatts $75

Page 29: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Structural Redesign

Existing Roof Structure: Pre-fabricated Wide-

Flange Steel Beams Redesigned Structural Members: New Joist-Girders 3 sets of 3’ high windows required

(= 2 clerestories) 10’ opening for clerestory for length

of warehouse (737’)

Page 30: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Structural Redesign

Joist Size Location

24K7 North and South Exterior Walls

32LH06 Roof Framing Throughout (excluding Clerestories)

36LH13 Roof Framing Supporting Clerestories

60G12N13.4K  Joist Girder on Interior with No Clerestories

60G12N6.7K Joist Girder on West/East Exterior Walls with No

Clerestories

Modified 60G12N13.4K  Joist Girder on Interior with Clerestories

Modified 60G12N6.7K  Joist Girder on West/East Exterior with Clerestories

Page 31: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Structural Redesign

Modified Joist Girders

Page 32: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Conclusions Ground Water Heat Pumps are

Economical for the Pittsburgh Environment

Heating and Cooling provided in all spaces

Daylight reduces Power Demand, and Provide Natural Sunlight

Joist Girders supply needed strength and span Warehouse requires

Page 33: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

AccoladesThe AE Department

Dr. William Bahnfleth Dr. Jim Freihaut Moses Ling M. Kevin Parfit Jonathan Dougherty

LLI Technologies James White, PE Marjorie Conrad Chuck Boyle

Mosities Construction Tom Edwards

Star Electric Bob Kalan

AE Colleagues

Page 34: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

?Questions

Page 35: H.J. Heinz Distribution Center

Michael J. Carroll

Mechanical OptionH.J. Heinz Distribution

Center

Thank You!