Hitachi Power Europe Service
7th German-African Energy ForumApril 7th – 10th, 2013Hamburg, 9th April 2013
“Value addition through lifetime service“
Hitachi Power Europe Service, a new player in HPE-Group and its abilities for providing rehabilitation and refurbishment services to the energy market
7th German-African Energy ForumHamburg, 9th April 2013
Value addition through lifetime serviceHans-Josef SandkaulManaging Director
Hitachi Power Europe Service GmbH / Company presentation 2013 3
Hitachi Power EuropeGroup of companies
Various businessdivisions around
the world
Babcock FertigungszentrumOberhausen GmbH
BGR Boilers Private Ltd.India
HITACHI Ltd., JapanTurnover: 90 Bn € / 330,000 Employees
Meeraner DampfkesselbauGmbH
Hitachi Power Africa (Pty) Ltd.
Donges SteelTecGmbH
Hitachi Power Europe GmbH
Duisburg / Germany
Hitachi Power Europe Service GmbH
Hitachi Power Europe Service GmbH / Company presentation 2013 4
Hitachi Power SystemsCompetence in fossil-fired power plants
FGD
ESP
DeNOx
Boiler
Turbine/Generator
More than 65% of a high efficient power station can be supplied by group members
BoilerTurbine/GeneratorDeNOxFGDEngineeringBOPI & C System
Civil worksInfrastructureBOP others
Hitachi Power Europe Service GmbH / Company presentation 2013 5
Hitachi Power EuropeNeurath F&G (BoA II), Germany
2 x 1,100 MWel / 2 x 2,959 t/h
Once-through steam generator, Benson®
Lignite
Design parameters:SH: 600 °C / 292 barRH: 605 °C / 80 bar
Plant in operation: 2012
Hitachi Power Europe Service GmbH / Company presentation 2013 6
Global primary energy supplyfrom fossil fuels
Source: International Energy Agency
Hitachi Power Europe Selection of projects / products (as of June 2012)
Project Customer Product Fuel CapacityKusileSouth Africa ESKOM Utility steam generator Bituminous coal 6 x 800 MW
MedupiSouth Africa ESKOM Utility steam generator Bituminous coal 6 x 800 MW
EemshavenNetherlands RWE Flue gas cleaning Bituminous coal 2 x 800 MW
RotterdamNetherlands Electrabel / GDF Suez Power Train ** Bituminous coal 1 x 790 MW
WilhelmshavenGermany Electrabel / GDF Suez Power Train ** Bituminous coal 1 x 790 MW
MaasvlakteNetherlands E.ON Utility steam generator Bituminous coal 1 x 1.100 MW
MoorburgGermany Vattenfall Utility steam generator Bituminous coal 2 x 820 MW
WestfalenGermany RWE Flue gas cleaning Bituminous coal 2 x 800 MW
DattelnGermany E.ON Utility steam generator Bituminous coal 1 x 1,100 MW
Neurath F & GGermany RWE Utility steam generator Lignite 2 x 1,100 MW
BoxbergGermany Vattenfall Utility steam generator Lignite 1 x 670 MW
WalsumGermany Evonik / EVN Turnkey power plant * Bituminous coal 1 x 750 MW
GentBelgium Electrabel Utility steam generator Blast furnace gas 1 x 305 MWel
MalmöSweden E.ON Sverige Combined-cycle power plant Gas 440 Mwel + 250 MWth
* Supply of utility steam generator, flue gas cleaning equipment, steam turbine/ generator, civil engineering including cooling tower; overall plant layout
** Power Train = utility steam generator, flue gas cleaning equipment, steam turbine/ generator including balance-of-plant equipment (excluding construction work, electrical engineering, instrumentation & control, external coal feeding etc.)
Hitachi Power Europe Service GmbH / Company presentation 2013 8
Hitachi Power Europe ServiceProducts / Services
Engineering / Technologies Construction / Commissioning
■Engineering (N,S)
■Utility Boiler (S)■ Industrial Boiler
(N,S)■HRSG (N,S)■Special Boiler
(N,S)■Modernisation
(S)■Efficiency Im-
provement (S)■Flue Gas Dust
Precipitator (N,S)
■Catalyst (T)
BoilerTechnology/
Flue GasCleaning
■Engineering (N,S)
■Burner Systems (N,S)
■Combustion chamber (N,S)
■Grates Systems for Waste, RDF and Biomass (N,S)
■Enviromental Protection Measures (N,S)
■Hard Coal (S)■Lignite (S)
FiringTechnology
■Warranty Service for HPE (S)
Warranty Service
■Planning (N,S)■Boiler and Firing
Systems (N,S)■Plant Optimisation
(N,S)■Emission
Measurements (N,S)
■Efficiency and Operational Measurements (N,S)
■Acceptance Tests (N,S)
■Plant Management (N,S)
■Personnel Training (N,S)
Commissioning
■Gas Turbine (T,S)
■Steam Turbine (S)
TurbineService
■Grinding Systems (N,S)
■De-AshingSystems (N,S)
■Coal Feeder (N,S)
Mills & Components
■Planning of Construction (N,S)
■Construction of Boiler (N,S)
■Construction of Firing Systems (N,S)
■Modification, Retrofit, Repair (S)
■Contract work (N,S)
■Supervision (N,S)
■24 h Service (S)
Construction
Spare PartsExplanations: N = New build (activities before PAC)
S = Service (activities after PAC)T = Trading (activities for affiliated companies)
Hitachi Power Europe Service GmbH / Company presentation 2013 9
Hitachi Power Europe ServiceService Organisation of Hitachi Power Europe
Intelligent Service
HPE Service offers all kinds of service activities concerning fossil fueled power plants
Services and supplies based on the individual requirements
A clear focus on engineering driven solutions
A large availability of own staff and partner companies with trustful relationships
Tailor made scope
Hitachi Power Europe Service GmbH / Company presentation 2013 10
Responsibility and interfaces between the service company and the design units is clearly defined.
Hitachi Power Europe ServiceService for New Built Plants
Erection ofnew plants
The Service Company will selectively take care of new plant erection jobs as a key to the aftersales
business
Integration of Service Company
within proposal preparation
Design unitsNew plant business
Service company Operations
Guarantee
After Sales business• Revamp and Retrofit• Spare parts• Operation + Maintenance
Implementation operating units HPE
Implementation Service Company HPES
EngineeringProjectacquisition
Responsibility
Hitachi Power Europe Service GmbH / Company presentation 2013 11
Full ServiceMaintenance Contract +
Material/Personnelmanagementincluding O&M
Inspection ContractPlant Status appraisal/Inspections during Shut-down/ Planning and budgeting of checksInstallation
& Revamping of various maintenance
elements
Ext
ende
d S
ervi
ces
Extended Guarantee
Repair ContractInspection contract +
implementation ofchecks
Maintenance ContractRepair contract +
unscheduled repair work
Hitachi Power Europe ServiceFull Service Provider
Hitachi Power Europe Service GmbH / Company presentation 2013 12
Measures of Maintenance
harm-basedmaintenance
preventive maintenance
measures for plant life-time
extension
maintenance based on inspection
maintenance based on condition
maintenancebased on intervall
Hitachi Power Europe ServiceDifferent Maintenance Models
Hitachi Power Europe Service GmbH / Company presentation 2013 13
Hitachi Power Europe ServiceMeasures of Maintenance
Decision criteria for various maintenance models
Consequently: Operators who are active in the utility business and who are not able to revert on
short-term alternatives or back-up units is recommended:
preventive maintenance
high availability (cost advantage) execution during planned shutdowns high reliability in plant operation
preventive maintenance
harm-basedmaintenance
limited availability negative effect on operation costs limited or no security given for staff, plant and
environment.
measures for plant life-time
extension
detailed analyze of the operation method and current condition of the plant
finding and examination of material samples calculation of critical components preparation of "tailor-made" and cost-effective
package of measures for life-time extension
Hitachi Power Europe Service GmbH / Company presentation 2013 14
-5
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Maintenance Grade
Cos
ts &
Fol
low
up
Cos
ts
“Time Based” Costs
Damage causedFollow-Up Costs
“Condition Based” Costs
Total Maintenance Costs
Under maintained Over maintained“Best Practice”
Hitachi Power Europe ServiceTotal Costs vs. Maintenance Grade
Best Practice Maintenance: A clever, component-wise mix of different maintenance strategies
Hitachi Power Europe Service GmbH / Company presentation 2013 15
Hitachi Power Europe ServicePreventive Maintenance
Extend the functionality through preventive maintenance
100 %functional
ability
timeextension of the functionality
preventive maintenance
measures
critical point
significant increase of availability safety for staff, equipment and
environment long life expectancy simultaneous optimization / reduction of
maintenance costs reduced operating costs lead directly to
profit
Hitachi Power Europe Service GmbH / Company presentation 2013 16
Flexible and mobile safety equipment for large working spaces
Complete coverage of the cross section area
Hitachi Power Europe ServiceShield for Accelerated Boiler Service SABS®
Increases safety for personnel doing maintenance or inspection work
Canvas is most tearproof and heat-resistant
Hitachi Power Europe Service GmbH / Company presentation 2013 17
Hitachi Power Europe ServiceShield for Accelerated Boiler Service SABS®
Assembly Total Duration
SABS® canvasassembly, insert, fixate
SABS® canvas, 76 mlift, pre-assemble, tension
Conventional safety equipmentscaffolding, lagging, safety net, etc.
4 h
6 h
Disassembly Total Duration
SABS® canvas, 76 mclean, release, lower
SABS® canvas, 0 mlay down, joggle, recover
Conventional safety equipmentscaffolding, lagging, safety net, etc.
3 h
3 h
* Data of Vattenfall Europe Generation
Parallel work during the fine cleaning: additional 72 h*
Potential savings at planned outage: 70 h*
48 h*
38 h*
Hitachi Power Europe Service GmbH / Company presentation 2013 18
Major Overhaul & RehabilitationTarget: to increase availability from less than 50% to about 90%
Fuel: LigniteUnit capacity: 305 MWelBoiler capacity: 920 t/hSH outlet press: 183 barSH outlet temperature: 543 °C
Hitachi Power Europe Service Lignite fired Power Plant, Obrenovac, Serbia
Contracting party: European Agency for Reconstruction (EAR)
Owner: Electric Power Industry of Serbia (EPS)
Plant: Lignite Fired Power Plant (6 Units)Nicola Tesla A, Unit 3Obrenovac, Serbia
Scope: Pressure partsFiring systems E-C&ITurbine, generatorAir and flue gas ductsWater treatmentFD and ID fansSoot blower, rotary air heater, Ash removal systemElectrostatic precipitator Pumps and fittingsLive steam pipingInsulation and brick liningsAuxiliaries
Start-up: 2003
Hitachi Power Europe Service GmbH / Company presentation 2013 19
Emergency Repair of a Steam Generator in Kuwait
Fuel: Heavy fuel oil/natural gasUnit capacity: 300 MWelBoiler capacity: 975 t/hSH outlet press: 146 barSH outlet temperature: 540 °C
Hitachi Power Europe ServiceHeavy fuel oil/natural gas fired Boiler, Kuwait
Owner: MEW (Ministry of Electricity & Water) Kuwait
Plant: Sabiya Power PlantUnit 1
Boiler manufacturer: Mitsubishi Heavy Industry (MHI, Japan)
Scope: Dismantling of damaged pressure partsInstallation of Boiler pressure partsSuperheaterMembrane wallsSteam-water pipes and headerBurner systemSteel structure and platformsInsulation and brick liningsExpansion jointsHangersAuxiliaries
Start-up: 08/2010 (Repair period: 5 month)
Hitachi Power Europe Service GmbH / Company presentation 2013 20
Hitachi Power Europe ServiceHeavy fuel oil/natural gas fired Boiler
Heavy fuel oil/natural gas fired Boiler, KuwaitEmergency Repair of a Steam Generator in Kuwait
Hitachi Power Europe Service GmbH / Company presentation 2013 21
Repair / Rehabilitation / Modernization of facilities of all sizes and types of fossil fuel power plants
Emergency Repair 24/7
Performance enhancement through optimization
Improvement in efficiency
Modularized plant optimization
Know-how based on OEM
Summary of Hitachi Power Europe Service
Hitachi Power Europe Service GmbH / Company presentation 2013 22
Conclusion
Customized, flexible service solutions based on our
expertise are the strength of the Hitachi group!
Hitachi Power Europe Service GmbH / Company presentation 2013 23
Thank you for your attention!