hiradmat safety preparation
DESCRIPTION
HiRadMat safety preparation. Follow-up meeting 24 /06/2011. Processes. See Marion’s talk. Alarms. Instruction meeting f or CCC operators on Monday June 20th https:// edms.cern.ch/document/1149524/1 List of alarms consolidated Lot of them not yet operational - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/1.jpg)
HiRadMat safety preparation
Follow-up meeting24/06/2011
![Page 2: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/2.jpg)
Processes
• See Marion’s talk
![Page 3: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/3.jpg)
Alarms• Instruction meeting for CCC operators on Monday June 20th• https://edms.cern.ch/document/1149524/1• List of alarms consolidated • Lot of them not yet operational• Operational procedure in being written
![Page 4: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/4.jpg)
Beam commissioning low intensity
• Operational procedure approved• https://edms.cern.ch/document/1149525/2• Dry run outcome• https://edms.cern.ch/document/1149523/1• Additional DSO tests on Tuesday• First shot hit the dump !
![Page 5: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/5.jpg)
First protons through TT60-TT66
![Page 6: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/6.jpg)
DSO tests
![Page 7: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/7.jpg)
B.846 works during next TS
• Met L. Colly• 2 x 2 lifting points• Load specification by FB• Will be installed during next TS
![Page 8: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/8.jpg)
Evacuation hardware
• Met GS-ASE• Cable extension during next TS• Evacuation buttons and sirens will be installed
during the August TS.
![Page 9: HiRadMat safety preparation](https://reader036.vdocuments.mx/reader036/viewer/2022062410/5681642b550346895dd5edbc/html5/thumbnails/9.jpg)
Safety file descriptive part
• Still in work.