HiQ Solar, Inc. www.hiqsolar.com Page 1 of 7 20 Common Mistakes Installing PV Systems 21 December 2015, v1.1 Introduction Even the most experienced professionals make mistakes, and PV systems present many opportunities for errors. In this paper we list some of the more common issues we’ve seen or heard about often enough to be worth mentioning. Our intention is to be brand agnostic but where we couldn’t resist the urge to put in our own propaganda its in italics. Enjoy! Contents Inverter Physical Mounting............................................................................................................. 2 1. Not Leaving Enough Room Around Inverters ...................................................................... 2 2. Mounting in Direct Sunlight ................................................................................................ 2 DC-Side Electrical ............................................................................................................................ 2 3. Strings Aren’t Connected .................................................................................................... 2 4. String Wires Reversed ......................................................................................................... 3 5. Swapped Strings .................................................................................................................. 3 6. Poor Quality Crimping ......................................................................................................... 4 7. Connectors Not Latched ...................................................................................................... 4 8. Connectors Exposed to Moisture While Open .................................................................... 4 9. Excessively High Resistance on DC Side............................................................................... 4 10. Not Accounting for Differential Thermal Expansion.......................................................... 4 11. Wires Not Long Enough ..................................................................................................... 5 12. Insulation Cold Flow .......................................................................................................... 5 AC-Side Electrical ............................................................................................................................ 5 13. Problems with Grounding ................................................................................................. 5 14. Phase Wiring Issues ........................................................................................................... 5 15. Phase Power Imbalance .................................................................................................... 6 16. Issues with External Voltage Translation Transformers .................................................... 6 17. High Resistance ................................................................................................................. 6 18. Breaker Issues ................................................................................................................... 6 19. Problems with Terminations ............................................................................................. 7 Communications ............................................................................................................................. 7 20. Customer Internet Connections ........................................................................................ 7 Acknowledgements ........................................................................................................................ 7

Upload: others

Post on 04-Jul-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

HiQSolar,Inc. www.hiqsolar.com Page1of7

20CommonMistakesInstallingPVSystems21December2015,v1.1IntroductionEventhemostexperiencedprofessionalsmakemistakes,andPVsystemspresentmanyopportunitiesforerrors.Inthispaperwelistsomeofthemorecommonissueswe’veseenorheardaboutoftenenoughtobeworthmentioning.Ourintentionistobebrandagnosticbutwherewecouldn’tresisttheurgetoputinourownpropagandaitsinitalics.Enjoy!

ContentsInverterPhysicalMounting.............................................................................................................2

1. NotLeavingEnoughRoomAroundInverters......................................................................22. MountinginDirectSunlight................................................................................................2

DC-SideElectrical............................................................................................................................23. StringsAren’tConnected....................................................................................................24. StringWiresReversed.........................................................................................................35. SwappedStrings..................................................................................................................36. PoorQualityCrimping.........................................................................................................47. ConnectorsNotLatched......................................................................................................48. ConnectorsExposedtoMoistureWhileOpen....................................................................49. ExcessivelyHighResistanceonDCSide...............................................................................410. NotAccountingforDifferentialThermalExpansion..........................................................411. WiresNotLongEnough.....................................................................................................512. InsulationColdFlow..........................................................................................................5

AC-SideElectrical............................................................................................................................513. ProblemswithGrounding.................................................................................................514. PhaseWiringIssues...........................................................................................................515. PhasePowerImbalance....................................................................................................616. IssueswithExternalVoltageTranslationTransformers....................................................617. HighResistance.................................................................................................................618. BreakerIssues...................................................................................................................619. ProblemswithTerminations.............................................................................................7

Communications.............................................................................................................................720. CustomerInternetConnections........................................................................................7

Acknowledgements........................................................................................................................7

Page 2: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page2of7

InverterPhysicalMounting

1. NotLeavingEnoughRoomAroundInvertersTheenemyherecanbethedesiretohaveeverythinglookingneatinsuchawaythatthereisnotenoughroomaroundtheinvertertoallowittobeaccessedorremovedbyaservicetech.Alternativelyitcanbenotbeingawareofminimumspacingofinvertersthatneedaircirculationoraccesstochangeairfilters.Ifthereareminimumspacingsforaparticularinvertertheywillbespecifiedintheinstallationmanual.

2. MountinginDirectSunlightMostinvertersareratedforoutdooruse.However,mountingstringinvertersonasouth-facingorwestfacingwallisacommonpracticewithpossiblenegativeconsequences.Mostinvertershaveawideoperatingtemperaturerange,butwillde-rateastheyexceedaparticulartemperature–sotheimpactislikelytobeonenergyharvest.Inaddition,manyhavefans,displaysetc.thatwilldegradeovertimewithtemperatureand/orUVexposure,requiringvisitsforrepairorreplacement.Overallit’srecommendedtomountinvertersinashadedlocationifpossible.TrueString™invertersaresealed,havenodisplays,nofansorairfiltersandcanbemountedunderthearray.Otherthanthenormalpowerde-ratingathightemperatureourinverterscanbemountedanywhere.

DC-SideElectrical

3. StringsAren’tConnectedThiscanbeverydifficulttodetectanddiagnosewithlargestringandcentralinverters,butthiserrorisverycommon.EasytoseewiththeTrueStringinverters.Forexample,Figure1showsagraphcomparinginverteroutputsforanarray(a);thelowestperformer(#2766)iseasytoidentify(b).Lookingattheperformancesummaryforthatspecificinverteritisobviousthatonestring(String1)istheculprit(c).

Figure1:Identifyingthelowestperforminginverterinanarray

(a)#

(b)#

(c)#

Page 3: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page3of7

4. StringWiresReversedVerycommonwherecustomjumpersareused,canevenhavesamegenderconnectorsoneachend.Inadditiontothestringnotproducingpower,itispossiblethatthiscandamagetheinverter.Errorslikethisarelesslikelyifwiringisclearlyidentified,suchasintheinstallationofFigure2below.

Figure2:Clearlyidentifiedstringpolaritiesmakemiswiringharder

5. SwappedStringsThisislesscommon,butwehaveseenit–plusandminuswiresofunrelatedstringsconnectedtoeachinput.Forlargestringinverterswithmanystringsbundledtogetheritcanevenbeeachsideofastringconnectedtodifferentinverters.Aswiththepreviouspoint,clearlabelingateachendofwiringrunsisusuallyworththetime.Withindividualstringmonitoringandtwoseparateinputsonly,itiseasiertoseeontheTrueStringinverterthanwithlargestringinverterswithmanystringswiredinparallel.

Figure3:Connectingwiresfromunrelatedstrings

+"#"

+"#"

1"

2"

+"#"

+"#"

1"

2"

✔" ✖"

Page 4: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page4of7

ForinvertersthatusetwoormorestringsinparallelperDCinput,itisalsopossibletoaccidentallyconnectthestringsinseriesinsteadofparallel.Thisoftendamagestheinverter.

6. PoorQualityCrimpingUseofthewrongtooltocrimpconnectorscancauseoverheatingofterminals,opencircuitsandburningofconnectors.Useofthewrongtoolisverycommon,butuseofacrimperotherthanthatspecifiedbytheconnectormanufacturerwillviolatecode.

7. ConnectorsNotLatchedAnobviousone,butdifficulttoseevisually.Iftheconnectionisnotmadeitcanbeeasytoseewithgoodmonitoring;themoredangeroussituationiswherethecenterconductorsarenotfullymatedandovertimestarttoarc.

8. ConnectorsExposedtoMoistureWhileOpenThisappliestomodules,homerunsandinverters.Theprojectispartiallyfinishedthendelayed,thenarainstormcomesthrough,itsnowsorwhatever.Homerunshavetheconnectorscrimpedbutnotmatedtogether,andmoisturewicksintothewirejacketandthiscausescorrosionandperformanceandreliabilityissueslongaftertheinstallisover.ThepictureshowsaHiQTrueStringinverterintheprocessofbeinginstalled.Theinvertershipswithcapsonallconnectorstoprotectthemfrommoistureingressduringinstallation.

9. ExcessivelyHighResistanceonDCSideDamageormanufacturingdefectsinmodulessuchasbubblinginathin-filmmodulecancausehighresistancetooccur;thevoltageseemsokuntiltheinverterthetriestodrawpowerfromthemodule,thenthevoltagecollapsesandtheinvertershutsoff.Theinvertertriestorestartandthecyclerepeats.

10. NotAccountingforDifferentialThermalExpansionInthepursuitofaprofessionalandneatlookinginstall,stringwiringispulledtightandzip-tiedtotheracking,butwithoutanythermalexpansionmargin.Hotterdaysandcoldernightscombinedwiththefactthatthethermalexpansionofcopperis2xthatofaluminumrackingcanleadto:

i) Connectorpinsbeingpulledoutofsocketsleadingtodisconnectionand/orarcing

ii) Wirecrimpsbeingpulledapartiii) Strainreliefsbeingbrokeniv) Abrasionofinsulationrepeatedlyovertimeleadingtoshortingandpossiblefire

(Bakersfieldfire,forexample)

Page 5: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page5of7

Thelongerthewiringrun,thebiggertheeffect.

11. WiresNotLongEnoughSimilarly,cuttingwirestotheexactlengthtoreachtheinvertercanbeaproblem.Firstly,itcostsflexibilityforlaterintheinstallwhenitisdiscoveredthatanystringmiswiringissueshaveoccurred,andthereisn’tenoughsparelengthtoswapthewirestothecorrectterminals.Itcanalsobeaproblemlaterwhentheservicetechhastoswapaninverterouttoadifferentdesign.TheNECrequiresa‘ServiceLoop’ofbetweenhalfandoneturnofwireinsideajunctionboxpreciselyforserviceabilitylater.

12. InsulationColdFlowWherewiresaretightlyandneatlysecuredtoamoduleframeorrackingmemberpassoverasharpcorner,overaperiodofmonthsoryearsthepressureofthecorneragainsttheinsulationcancausetheinsulationtoflowawayfromthepressureuntiltheconductorshortsagainstthemetalframe.

AC-SideElectrical

13. ProblemswithGroundingManyissuesarepossiblehere,rangingfromcodeviolationstosignificantsafetyissues.MostinstallationsrequiretheDCsidetobeungroundednowthatnon-isolated(TL)invertersarecommon,whichsimplifiesthings.Afewlessobviousones:

• Groundingusingdissimilarmetals–canbemetalswithverydifferentgalvanicvalues1suchasbarecopperwirestouchingaluminumframes;canbemetalswithsimilar(butnotidentical)galvanicvaluessuchascopperandtinplustheadditionofcoastalmoisturewithsaltoveralongerperiod.Theresultisobviouslycorrosion.Inthecaseofcoastalconditions,coatingwithdielectricgreaseismessybuteffective

• Paintedenclosurescaneitherbegroundedtorackingetc.withfastenerslistedas‘paintcutting’,orthepaintmustbeclearedoffthegroundingpointduringinstallation

14. PhaseWiringIssues

APhaseNotConnectedUsuallyrelativelyeasytodetect.

NeutralConnectedtoHotPhaseAgain,usuallyrelativelyeasytodetect.

TwoHotPhasesConnectedtoOneSeepicture,twophasesoftheinverteroutputmightaccidentallyconnecttothesamegridphase.Commonlyleadstoaninverterfault.

1http://inspectapedia.com/BestPractices/Galvanic_Scale_Corrosion.php

U"lity'Side'

A'

B'

C'

A'

B'

C'

Inverter'Side'

Rack%corner%

Wire%Insula0on%cold%flow%

Page 6: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page6of7

15. PhasePowerImbalanceCanbeadesignissue,oranelectricianissue.Withamaximumimbalanceallowedof6kW,thiscanbeanissueincommercialinstallsparticularlywithsingle-phaseinverters.Obviouslyaninherently3-phaseinvertersuchasourTrueStringdoesnothavethisissue.

16. IssueswithExternalVoltageTranslationTransformersThelackofcost-effective208Vinvertersuntilrecentlyhasmeanttheuseoftransformers.Somepossibleissues:

• Neutralnotcarriedthroughthetransformer.Ifcommunicationsbetweeninverterandgatewayisoverpowerline,thiscaninhibitthemtalkingifthegatewayisontheothersideofthetransformer

• Transformershaveparasiticlosses24hoursaday,soitiscommontodisconnectthemovernight,controlledbyatimer.Ifpowertothetimerisinterruptedthearraycanhaveproductivehourswastedformonthsoryearsifnobodynoticesthatthetimeisoffset.

17. HighResistanceGridvoltagemeasuresokuntilpowerisexportedfromtheinverter–becauseofthehighresistancethevoltagethenrises,andcancauseovervoltagetrippingoftheinverter.Thepictureshowsonephaseofa3-phasebreakernottorqueddownproperly,whichresultedinahighresistanceandovervoltagetrippingoftheinverter.

18. BreakerIssuesInadditiontotheexampleabove,breakerscanfailinalotofwaysontheirown,althoughthisismorecommoninoldersystems–theycanfailopenorclosed,orjustonephasecanfailopenorclosedwhenthehandleindicatesallthreephasesareclosedorviceversa.Verydangerous,alwaysde-energizeandtest,testagainbeforetouching–don’ttrustthelabelonthehandle.Ofcoursethereisalsoselectingtherightbreakerinthefirstplace–sizingit,physicalformfactorforthepanelboard,havingtherightinterruptionratingwhichissomethingthatdoesn’t

Shutdown)

(a)) (b))

Page 7: HiQ Solar - 20 Common Mistakes Installing PV Systems v1.1hiqsolar.com/assets/hiq-solar---20-common-mistakes-installing-pv... · 20 Common Mistakes Installing PV Systems 21 December

20CommonMistakesInstallingPVSystems 21December2015

HiQSolar,Inc. www.hiqsolar.com Page7of7

comeupuntilit’scalledupontostopthebuildingcatchingonfire.TheOCPDInterruptRatingmustbesizedtobethesameorgreaterthantheshortcircuitcurrentcapabilityoftheutilityconnection.Thencoordinatingwiththeotherovercurrentprotectiondevices.

19. ProblemswithTerminationsWhenyouhavealotofthemorthey’rebig,there’salottogetright.Thesecanbeterminals,inverters,spliceboxes,otherconductors.Aretheconnectionstight,letalonetorquedproperly,atleasttight?Forstrandedconductors,arethereanywaywardstrandsthatcouldoccasionallyarcovertothenextconductor?Forbreakersarethewiresterminatingproperly,andthenisthebreakerterminatingproperlyonthebusbars?Andtherecanbeanissuewithcoldflow.Afteraconnectionistorqued,andovertime,thesoftcopperoraluminumconductor“givesway”andcausestheconnectiontoloosen.Itisalwaysadvisabletodoafollow-upretorqueingofmajorconnectionssomemonthsafterinstallation.

Communications

20. CustomerInternetConnectionsUsingthecustomer’sinternetconnectiontokeeptrackofthesystemperformanceisalowcostapproach,butcanbefraughtwithissueslater.ThesecanincludedelaysgettingthesystemconnectedatthebeginningwhilethelocalITdepartmentdragsitsfeetopeningtherightportsontherouter.ItcancatchyoulaterwhentheytakeonanewITguy,orchangesecuritypolicyandclosealltheportsthatdon’tdirectlyaffectthem.Fromthispointofviewcellularmodemsthatareentirelyindependentofthecustomerseemexpensivebutareprobablyworththecost.ForcellularmodemsinfarawayareasitcanbeagoodideatohavethemonanACtimertoautomaticallyandregularlypowercyclethemincaseoflock-up.

AcknowledgementsThankstoBlakeGleasonofSunLightandPower(http://sunlightandpower.com)forhelpwiththisarticle.CopyrightHiQSolar,Inc.,2015www.hiqsolar.com