8460 W Ken Caryl Avenue, Littleton Colorado, 80128 | 720-258-6836 | www.pnt-llc.com February 1, 2017 Ty Robbins City Planner City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E DP- Development Permit Filing 3 – DP2016-009 Thornton, CO. Dear Mr. Robbins, Please find the 6th Development Plan submittal for The Grove Hilton Garden Inn. Attached to this cover letter is the response to the issue letter, updated plans and response to all redlines. If you have any questions please feel free to contact me. Sincerely, Nick Sheremeta Point Consulting, LLC

Upload: others

Post on 03-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hilton 6TH DP Cover Letter - City of Thornton · 2017-02-01 · RE: Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E DP- Development Permit Filing 3 – DP2016-009 Thornton,

8460 W Ken Caryl Avenue, Littleton Colorado, 80128 | 720-258-6836 | www.pnt-llc.com

February 1, 2017 Ty Robbins City Planner City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Hilton Garden Inn @ The Grove

The Grove Filing No 1, lot 5E DP- Development Permit Filing 3 – DP2016-009

Thornton, CO. Dear Mr. Robbins, Please find the 6th Development Plan submittal for The Grove Hilton Garden Inn. Attached to this cover letter is the response to the issue letter, updated plans and response to all redlines. If you have any questions please feel free to contact me. Sincerely,  

 

Nick Sheremeta Point Consulting, LLC

Page 2: Hilton 6TH DP Cover Letter - City of Thornton · 2017-02-01 · RE: Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E DP- Development Permit Filing 3 – DP2016-009 Thornton,

City Hall City Development Department 9500 Civic Center Drive 303-538-7295 Thornton, Colorado 80229-4326 FAX 303-538-7373

www.cityofthornton.net

January 18, 2017 Moira Bright Spirit Hospitality, LLC 4836 South College Avenue, Suite 11 Fort Collins, CO 80525 RE: Fifth Review of The Grove Filing No. 1, Amendment No. 5, Lot 5-E, Block 1

– Hilton Garden Inn DP 2016-009 Dear Ms. Bright: Staff has completed its review of the above-referenced application. This review letter and attachments will help you and your consultants revise the identified documents and provide any supplemental materials necessary to revise your plans for the next submittal. When the requested revisions have been completed, please submit the required documents for review. In order to ensure your submittal is complete and ready for immediate distribution for review, the following should be noted: 1. A cover letter giving specific responses to each comment must be included

with the submittal.

2. No partial or incomplete submittals will be accepted. CURRENT PLANNING Planner I (Ty Robbins, 303-538-7443) 1. No further planning comments on the DP.

2. FRICO comments must be resolved prior to DP approval – attached are

FRICO comments and a copy of the easement agreement for your reference.

DEVELOPMENT ENGINEERING Project Manager (Nate Hatleback, 303-538-7694) 1. Please refer to attached red-lines for comments. END OF COMMENTS

NickSheremeta
Typewritten Text
FRICO COMMENTS PERTAINING TO DP HAVE BEEN RESOLVED.
NickSheremeta
Typewritten Text
COMMENTS HAVE BEEN ADDRESSED.
Page 3: Hilton 6TH DP Cover Letter - City of Thornton · 2017-02-01 · RE: Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E DP- Development Permit Filing 3 – DP2016-009 Thornton,

Moira Bright January 18, 2017 Page 2 When submitting your response to these comments, please include the following: 1. Electronic PDF copy of the revised DP plan set including revised colored

elevations. 2. Electronic PDF copy of a cover letter giving an item by item response to the

review concerns and/or comments, as well as all red-lined documents from the city.

Staff looks forward to working with you to bring your development plans to completion. Please do not hesitate to contact me at 303-538-7443, or via e-mail at [email protected] should you have questions or concerns related to this response. Sincerely,

Ty Robbins Planner I TR/vt Enclosure(s) cc: Moira Bright, Applicant ([email protected]) Jim Shipton, Applicant ([email protected])

Edwin Mocke, Applicant ([email protected]) Jason O’Shea, Development Director Grant Penland, Current Planning Manager Cassie Free, Development Engineering Manager Nate Hatleback, Project Manager File: The Grove

V:\PROJECTS\144th Avenue Subdivision (aka The Grove)\144th Avenue Subdivision (aka The Grove)\DP\144th Avenue - The Grove Hilton Garden Inn DP 2016-009 AP 7793\5th Submittal\Issue Letter\Issue_Letter_5.docx