highland community center · highland community center play area eplacement proect design and...
TRANSCRIPT
Design and Construction DivisionMarch 2017
HIGHLAND COMMUNITY CENTER PLAY AREA REPLACEMENT PROJECT
Design and Construction DivisionMarch 2017
PROJECT INTRODUCTION
DESIGN ADVISORY GROUP ROLES AND INTRODUCTIONS
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
PROJECT SCHEDULE
PROJECT DESIGN AND DEVELOPMENT
March Community Meeting - Site Inventory/Analysis/Programming/Schematic concepts/public art opportunities
April Community Meeting - Refined Park Concept/play equipment options May Community Meeting - Design finalization
Open House/Pop-up meetings
CONSTRUCTION DOCUMENTS/ BIDDING
June - July Construction Documents Public Artist Site Plan Review/approvals
August/September Advertise/Bid/Award Construction Contract
CONSTRUCTION
October Tentative - Begin Construction
Spring Tentative - End Construction
201
7 2
018
Ford Pkwy.
Bohland Ave.
Fair
view
Ave
.
Cle
vela
nd A
ve.
*
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
Horace Mann School
Highland Park Elementary
School
Highland Catholic School
Future Ford Site
Development
Commercial Land Use
1/4
Mile
Radius - 5 minute walk
Highland Community Center Play
Area
1/2
Mile
Rad
ius - 1
0 minu
te walk
3/4 Mile Radius - 15 m
inute walk
SITE CONTEXT
G:
G:
G:
ENHANCE APPEARANCE/ENVIRONMENT OF PLAY AREA
ENHANCE USERS HEALTH AND WELL-BEING
ENHANCE PARK SAFETY & SECURITY
• Remove/Repair/Replace dilapidated park features• Utilize topography to develop useful and attractive play area• Encourage new plantings (tree, shrubs, perennials)• Utilize ‘Green’ products and practices• Effectively manage storm water from hill east of play area• Develop public art at play area• • •
• Provide activities for children aged 2-5, 5-12, and tweens• Provide a balance of active and passive activities• Encourage parent interaction• Provide accessibility for all park users• • •
• Utilize durable products• Retain sight lines• Employ CPTED (Crime Prevention Through Environmental Design) guidelines in development of play area plan• • •
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
GOALS AND OBJECTIVES
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
ISSUES AND OPPORTUNITIES
1
3 3 3
7
2
2
4
6
6
1
2
3
4
7
5
8
6
10
11
12
13
9
6
5
5
Site circulation
Play area
Play area access
Existing ramp
Seating area and picnic tables
Retaining walls
Security light
Trees
Landscaping
Tennis court
Play area watershed
Flat field space area
Sledding hill
8
8
9
910
13
12
11
NEEDS WANTS
EquipmentSwingsTire SwingClimbing StructureNet ClimberTeeter TotterSlides‘Natural’ Play equipment
Site AmenitiesBenchesPicnic TablesTrash cans
Other usesRoller SkatingSlidingIce RinkFour-square
EnvironmentalShadeLandscaping
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
NEEDS AND WANTS
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
CONCEPT A
TO BOHLAND AVE.
TO HILLCREST AVE.
TO FORD PKWY.BUILDING ENTRANCE
2-5YEAR OLD
PLAY AREA - lower levelSEATING
AREA
5-12YEAR OLD
PLAY AREA - middle level
5-12YEAR OLD
PLAY AREA -upper level
EXISTING LANDSCAPING
HIGHLAND PARKCOMMUNITY
CENTER
EXISTING LANDSCAPING
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
CONCEPT B
2-5YEAR OLD
PLAY AREA - lower level
5-12YEAR OLD
PLAY AREA - upper level
HIGHLAND PARKCOMMUNITY
CENTER
5-12YEAR OLD
PLAY AREA - lower level 5-12
YEAR OLD PLAY AREA - middle level
RAINGARDEN
TO BOHLAND AVE.
TO HILLCREST AVE.
TO FORD PKWY.BUILDING ENTRANCE
EXISTING LANDSCAPING
EXISTING LANDSCAPING
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
CONCEPT C
TO BOHLAND AVE.
TO HILLCREST AVE.
TO FORD PKWY.BUILDING ENTRANCE
2-5YEAR OLD
PLAY AREA - lower level
5-12YEAR OLD
PLAY AREA - upper level
5-12YEAR OLDPLAY AREA
5-12YEAR OLDPLAY
AREA - middlelevel
INFILTRATION
HIGHLAND PARKCOMMUNITY
CENTER
EXISTING LANDSCAPING
EXISTING LANDSCAPING
Highland Community Center Play Area Replacement Project Design and Construction Division
March 2017
PUBLIC ART OPPORTUNITIES