higher education portfolio

28
KEEGAN CARMICHAEL HIGHER EDUCATION WORK

Upload: keegan-carmichael

Post on 14-Mar-2016

227 views

Category:

Documents


1 download

DESCRIPTION

Professional work from the past 4 years

TRANSCRIPT

Page 1: Higher Education Portfolio

KEEGAN CARMICHAELHIGHER EDUCATION WORK

Page 2: Higher Education Portfolio
Page 3: Higher Education Portfolio

PROFESSIONAL EXPERIENCECANNON DESIGNBOSTON, MA APRIL 2011 JUNE 2012ARCHITECTURAL DESIGNERPROJECTS WORKED FROM DESIGN DEVELOPMENT THROUGH CONSTRUCTION DOCUMENTS INCLUDE: • MHCP WAYPOINT CENTER IN PENETANGUISHENE, ONTARIO• LANSDOWNE ATHLETIC STADIUM IN OTTAWA, ONTARIO• NEW RESIDENCE, BATES COLLEGE, MAINE• BENINCASA AND KOLASA HALL REDESIGN IN MIAMI, FLORIDA• SOUTH SHORE HOSPITAL EXPANSION, MASSACHUSETTS

SKILLSREVIT, AUTOCAD 2D & 3D, RHINO, SKETCHUP, 3D STUDIO MAX, ADOBE INDESIGN, PHOTOSHOP, ILLUSTRATOR, BRIDGE, ACROBAT, POWERPOINT, WORD, EXCEL

ASSOCIATIONSBSA MEMBERNCARB IDP IN PROCESS

EDUCATIONBOSTON ARCHITECTURAL COLLEGE

BOSTON, MABACHELOR OF ARCHITECTURE

2012

ALTERNATE EDUCATIONARCOSANTI

PHOENIX, AZPAOLO SOLERI WORK SHOP

JULY 2009

PUBLICATIONS / AWARDSBOSTON ARCHITECTURAL COLLEGE

MAY 2012GREEN ARCHITECTURE DEGREE PROJECT

STUDIO AWARDWINNER

MAY 2012 UNDERGRADUATE THESIS

COMMENDS

DECEMBER 2011ADELINE GRAVES SKETCH PRIZE

WINNER

ARCHITECTURAL RECORDAUGUST 2010

ANNUAL NAPKIN SKETCH COMPETITIONFIRST RUNNER UP

BOSTON ARCHITECTURAL COLLEGEFALL 2010

HERBERT GLASSMAN PRACTICE AWARDWINNER

NEW HAMPSHIRE COMMUNITY TECHNICAL COLLEGE

PORTSMOUTH, NHDRAFTING CERTIFICATE

2006

KALLMANN MCKINNELL AND WOOD ARCHITECTSBOSTON, MA SEPTEMBER 2007 APRIL 2011LEVEL 1 ARCHITECTDRAFTING REVIT & CAD , CONSTRUCTION ADMINISTRATION ANSWERING RFI’S, COMMUNICATING WITH CONSULTANTS, REDLINES , CREATING PHYSICAL MODELS STUDY AND FINAL , RENDERINGS, GRAPHICAL COMMUNICATION AND MARKETING PRODUCTION.PROJECTS INCLUDE:• UKRAINIAN CATHOLIC UNIVERSITY; NEW STRYISKY PARK CAMPUS, CHURCH, RESIDENCE AND REFECTORY • GEORGETOWN UNIVERSITY LAUINGER LIBRARY MASTER PLAN• UNIVERSITY OF WYOMING, COLLEGE OF BUSINESS• BRANDEIS UNIVERSITY, MANDEL CENTER FOR THE HUMANITIES• THE OHIO STATE UNIVERSITY,MAX FISHER COLLEGE OF BUSINESS RENOVATION• CHRISTOPHER S. BOND, UNITED STATES COURTHOUSE, JEFFERSON CITY, MO

PETERSON GRIFFIN ARCHITECTSWALTHAM, MA MARCH 2007ARCHITECTURAL INTERNRESPONSIBILITIES INCLUDE: DRAFTING, SKETCH UP MODELS, RED LINES AND FLOOR PLANS

KEEGAN CARMICHAEL38 SAVOY STREETPORTLAND, ME 04103603 828 8784

KEEGANJCARMICHAEL GMAIL.COM

RESUME

Page 4: Higher Education Portfolio
Page 5: Higher Education Portfolio

CONTENTS

PROFESSIONAL WORK: LANSDOWNE ATHLETIC STADIUM WHILE AT CANNON DESIGN

GEORGETOWN UNIVERSITY LAUINGER LIBRARY WHILE AT KALLMANN MCKINNEL & WOOD

UCU NEW STRYJSKI PARK CAMPUS WHILE AT KALLMANN MCKINNEL & WOOD

UCU NEW STRYJSKI PARK CAMPUS RESIDENCE WHILE AT KALLMANN MCKINNEL & WOOD

UCU NEW STRYJSKI PARK CAMPUS MULTI PURPOSE REFECTORY WHILE AT KALLMANN MCKINNEL & WOOD

4-13

14-17

18-19

20-23

24-27

Page 6: Higher Education Portfolio

PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

THE PROJECT IS LOCATED IN OTTAWA, ONTARIO ALONG THE FAMOUS RIDEAU CANAL. THE SCOPE WAS FOR A COMPLETE REVAMP OF LANDSDOWNE PARK AND THE PROJECT WILL BE THE SUMMER OF 2012.

THE ATHLETIC FACILITY HOUSED A CFL FIELD CANADIAN FOOTBALL LEAGUE WITH AN EXISTING NORTHERN STADIUM. OTTAWA IS SCHEDULED TO HOST THE 2012 WOMEN’S WORLD CUP AND IN ORDER TO BETTER ACCOMMODATE THIS EVENT, A SOUTHERN STADIUM WAS DESIGNED.

THE NEW SOUTHERN STADIUM HAS A VEIL DRAPING OVER TO REDUCE THE AMOUNT OF LIGHT PROJECTED ON THE FIELD. ONE OF THE DESIGN CONSTRAINTS OF THE NEW STADIUM WAS THAT IT COULD NOT IMPEDE THE EXISTING PEDESTRIAN PATHS ALONG THE RIDEAU CANAL. CANNON WORKED VIGOROUSLY TO DESIGN THE NEW STRUCTURE TO INCORPORATE PART OF THE CONCOURSE AND OPEN THE EXISTING CANAL PATHS TO PROMOTE MORE USER INTERACTION WHEN THERE WAS NO SCHEDULED STADIUM EVENT.

SITE PLAN

USERS INTERACTING WITH VEIL STRUCTURE

FIELD SECTION OF SOUTHERN STADIUM

RIDEAU CANAL

40

Page 7: Higher Education Portfolio

PLAN OF SOUTHERN STADIUM WITH VEIL

AERIAL VIEW OF LANSDOWNE PARK

41

Page 8: Higher Education Portfolio

PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

THE VEIL IS SUPPORTED VERTICALLY BY STEEL COLUMNS PROJECT FROM FOUNDATION THROUGH THE CONCOURSES. THESE SUPPORTS WERE REFERRED TO AS “PALMS” ONCE THEY PENETRATED THROUGH THE ROOF BECAUSE THEY ABSTRACTLY LOOK LIKE

HANDS HOLDING UP AN OBJECT . THE VEIL ALSO NEEDED TO BE TIED INTO THE STADIUM TO PREVENT HORIZONTAL SHIFTING FROM WIND LOADS.

THE VEIL SPINES & INTEGRATED SHADES ARE COMPOSED OF LAMINATED WOOD WHICH GIVES MORE OF A NATURAL PRESENCE TO THE ORGANIC FORM. THE SPACING OF THE SUN SHADES ALLOW HORIZONTAL VIEWS OUT, BUT RESTRICTS THE SUMMER SUN ON THE STADIUM.

LAMINATED WOOD VEIL SPINE DETAIL

PLAN DETAIL OF PALM SUPPORT

VEIL & LOWER CONCOURSE RENDERING

42

Page 9: Higher Education Portfolio

PALM DETAIL THROUGH CONCRETE PALM DETAIL THROUGH ROOFING

HORIZONTAL BRACING OF VEIL SUPPORT

TRANSVERSE BUILDING SECTION

MEDIA BOX

VEIL STRUCTURE`

UPPER CONCOURSE

SUITE LEVEL

MAIN CONCOURSE

LOWER CONCOURSE

43

Page 10: Higher Education Portfolio

PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

THE STADIUM ITSELF IS COMPOSED OF CAST IN PLACE CONCRETE, STANDARD CFMS STUDS, AND CORRUGATED METAL SIDING TO BREAK UP THE SHADE ON THE FACADE.

WITH THE EXCEPTION OF THE SUITE LEVEL AND MEDIA BOX, THE CONCOURSE AND GRANDSTAND SEATING IS EXPOSED TO THE ELEMENTS. THUS THE MAJORITY OF THE BUILDING USE WILL BE DURING THE SUMMER MONTHS.

UPPER CONCOURSE RAILING DETAIL

MEDIA BOX/UPPER CONCOURSE DETAIL

STEPPED PARAPET DETAIL

44

Page 11: Higher Education Portfolio

AXON DETAIL OF PARAPET CORNER CONNECTIONWALL SECTION

VIEW OF STANDS FROM MAIN CONCOURSE

45

Page 12: Higher Education Portfolio

PROFESSIONAL WORK CANNON DESIGNLANDSDOWNE ATHLETIC STADIUM

VEIL /STADIUM CONNECTION

EXTERIOR STAIR STADIUM RENDERING

EXTERIOR STAIR SECTION

ON EITHER SIDE OF THE VEIL LIES THE EXTERIOR EGRESS STAIRS, OF WHICH CONTAIN MECHANICAL LOUVERS. THE MAJORITY OF THE VERTICAL CIRCULATION IS THROUGH THESE MEANS OF EGRESS, AND ELEVATORS ARE IN PLACE TO ACCOMMODATE ADA NEEDS.

46

Page 13: Higher Education Portfolio

PLAN OF EXTERIOR STAIR

NIGHT RENDERING OF SOUTH STADIUM

47

Page 14: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODGEORGETOWN UNIVERSITY LAUINGER LIBRARY

46

A STUDY WAS DONE FOR GEORGETOWN UNIVERSITY IN ORDER TO UPDATE THE LAUINGER LIBRARY MASTER PLAN FOR FUTURE EXPANSION. TO KEEP UP WITH THE GROWING UNIVERSITY POPULATION THE LIBRARY NEEDED TO EVOLVE IN ORDER TO BETTER SERVE STUDENTS AND FACULTY.

THIS STUDY WOULD EXPAND THE LIBRARY INTO THE EXISTING SOUTHERN PARKING LOT. THE FULL BUILD OUT WOULD CREATE A GRAND READING ROOM, INCREASE STUDY SPACES, FACULTY AREAS, AND CAFE EXPANSION.

THE LIBRARY WAS THEN EXTRUDED, WHICH PROMOTED A THROUGHWAY WITH THE CAMPUS AND THE POTOMAC RIVER. SITE PLAN

EXISTING LIBRARY CIRCULATION

PROPOSED LIBRARY CIRCULATION

Page 15: Higher Education Portfolio

47

EXISTING LIBRARY ELEVATION

EXISTING ENTRY LEVEL

PROPOSED ENTRY LEVEL

PROPOSED LIBRARY ELEVATION

Page 16: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODGEORGETOWN UNIVERSITY LAUINGER LIBRARY

46

PROPOSED LIBRARY BUILD OUT

PROPOSED SOUTH ELEVATION

EXITING SOUTH ELEVATION

Page 17: Higher Education Portfolio

47

PROPOSED READING ROOM SOUTH

PROPOSED MAIN ENTRANCE

PROPOSED READING ROOM EAST

Page 18: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS

IN 2009 THE UKRAINIAN CATHOLIC UNIVERSITY UCU APPROACHED KMW ABOUT DESIGNING A NEW CAMPUS IN LVIV. THIS WAS A MULTI PHASE PROJECT INITIATED WITH THREE NEW BUILDINGS; A RESIDENCE, REFECTORY AND CAMPUS CHURCH. A LIBRARY AND ACADEMIC BUILDING WERE TO FOLLOW PENDING COMPLETION OF DESIGN DEVELOPMENT AND CLIENT APPROVAL.

THE UKRAINE HAS A LARGE DEPENDENCE ON NATURAL GAS FROM RUSSIA, THE UNIVERSITY ASKED KMW TO PURSUE ALTERNATIVE ENERGY SOURCES IN AN ATTEMPT TO BECOME MORE INDEPENDENT. HYDROPOWER IS CURRENTLY THE LEADING SOURCE OF RENEWABLE ENERGY, BUT GIVEN THE LOCATION OF THE CAMPUS, SOLAR AND WIND OPTIONS WERE EXPLORED.

INITIAL MASTER PLAN CAMPUS SKETCH

Page 19: Higher Education Portfolio

SITE AT CITY SCALE

NEW CAMPUS PLAN

PHASE 1 CAMPUS RENDERING

Page 20: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS RESIDENCE

THE RESIDENCE WAS DESIGNED TO HOUSE BOTH STUDENTS AND FACULTY FOR THE EARLY STAGES OF THE NEW CAMPUS. FOR THIS REASON MULTIPLE ROOM TYPES WERE CREATED FOR FUTURE ORGANIZATION AND RENOVATIONS. FOR THIS REASON STUDENT ROOMS WERE RESTRICTED TO THE SECOND THROUGH FORTH LEVELS, AND THE FACULTY ROOMS WOULD RESIDE ON THE FIFTH FLOOR.

A CHAPEL WAS DESIGNED ON THE FIFTH FLOOR AS IT WOULD OVERLOOK THE FUTURE CHURCH. THIS WAS AS ISSUE BECAUSE IT WOULD REQUIRE AN ASSEMBLY AREA THAT MIGHT INTERFERE WITH EGRESS, AS WELL AS REQUIRE AN ADEQUATE AMOUNT OF NATURAL LIGHT.

LOWER LEVEL GROUND LEVEL

Page 21: Higher Education Portfolio

2ND LEVEL 3RD & 4TH LEVEL 5TH LEVEL

Page 22: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS RESIDENCE

RENDERING OF TWO BED SUITE

Page 23: Higher Education Portfolio
Page 24: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS MULTI PURPOSE REFECTORY

THE REFECTORY BUILDING WAS MEANT TO BE THE WORKHORSE OF THE CAMPUS. IN ORDER TO ACHIEVE THIS MODULAR SEATING WAS DESIGNED FOR THE GROUND FLOOR, BECAUSE IT WAS TO BE USED FOR A CAFETERIA AS WELL AS A LECTURE HALL.

FOOD SERVICE DELIVERY WOULD BE ACCESSED IN THE REAR OF THE BUILDING, CLASSROOMS ON THE SECOND WITH OFFICES AND ADMINISTRATIVE SPACES ON THE THIRD FLOOR. THE NEXT PHASE WOULD EVOLVE A LIBRARY AND ACADEMIC BUILDING, AT WHICH POINT THE CLASSROOMS WILL BE CONVERTED INTO OFFICES AND MEETING ROOMS.

Page 25: Higher Education Portfolio
Page 26: Higher Education Portfolio

PROFESSIONAL WORK KALLMANN MCKINNEL & WOODUCU NEW STRYJSKI PARK CAMPUS MULTI PURPOSE REFECTORY

CAFETERIA VIEW OUT

CAFETERIA VIEW IN

IN AN EFFORT TO IMPLEMENT CURRENT DESIGN IDEAS INTO THE MULTIPURPOSE BUILDING, A GREEN ROOF WAS DESIGNED ABOVE THE MEZZANINE LEVEL. CARLISLE MODULAR PLANTERS WERE SELECTED FOR THE LANDSCAPE OF THE GREEN ROOF. SKYLIGHTS WERE ADDED SO THAT MORE NATURAL LIGHT WOULD BE ALLOWED INTO THE CAFETERIA / LECTURE HALL.

A CLIMATE STUDY WAS DONE BY THE MEP CONSULTANT BURO HAPPOLD . THE SOLUTION WAS TO CREATE AN INTERIOR ENVELOPE SO THAT THE CLIMATE COULD BE REGULATED EASILY WITHOUT EFFECTING THAT EXCESS AREA OF THE BUILDING.

THERE WERE TWO OPTIONS FOR THE ROOF OVER THE CURTAIN WALL OF THE CAFETERIA; FLUSH WITH THE FACADE OR CANTILEVER. THE SECOND OPTION WOULD HAVE AN EXTERIOR COLUMN THAT WOULD FIT THE STRUCTURAL NEEDS BUT REDUCE THE AMOUNT OF NATURAL LIGHT. THE OVERHANG WAS CHOSEN TO REDUCE THE GREENHOUSE EFFECT CAUSED BY THE FLUSH CURTAINWALL.

Page 27: Higher Education Portfolio

CARLISLE GREEN ROOF EXAMPLES

Page 28: Higher Education Portfolio

KEEGAN CARMICHAELKEEGANJCARMICHAEL GMAIL.COM