HIGH SPEED RAIL TEST TRACK XIAN
Facts Project DescriptionHigh-speed railway track (up to 350km/h) with a total length of 500 km incl. bedding andballastless track system "Slab Track System Züblin". Thereof 80km tunnels, 280kmbridges, 140km earth structures.
1. Test TrackDesign and construction of all substructures (800m tunnel, 4.5km bridges, 4.5km cuts,embankments) incl. major foundation measures.Design and construction of track works as ballastless track system, incl. numerous turn-outs. 1 station.
2. Know-how Transfer of the Ballastless Track Technology- Transfer of specific know-how and utilisation riths for the "Züblin Type" Ballastless TrackSystem- Technical documentation for the design- Training of the design institutes with regard to design and surveying- Checking and revision of the design- Training of the Chinese companies- Site supervision and quality management during construction- Technical support and quality management of the sleeper production
3. Production and delivery of special machineryZüblin developed and produced in total 16 machinery and equipment units in China
City/Country
Xi`an / China
Client
PG "Special Passenger Railway LineZhengzhou-Xi'an", Zhengzhou
Architect
DEC/Parsons Brinckerhoff/Design Institut
Contract Value
€ 69,60 Mio.
Construction Period
10/2005 - 10/2007 (24 months)
.