ON SOLID FOUNDATION…
DESIGN, CONSTRUCTION AND MANAGEMENTFOR THE NEW HOME OF THE HIGH RIVER BAPTIST CHURCH
Cameron & Associates Construction
WHAT DO YOU LIKE?
What did / didn’t you like?
Concepts vs. Needs Design to your vision
We’ll use our expertise and your feedback to balance your needs, wants and requirements.
BUDGET AFFECTING DECISIONS
SAVING COSTS ADDING COSTS
Capital vs. operating costs
Sub-Trade Selection Avoiding Winter Work Budget in mind through
design process Strong upfront planning
Capital vs. operating costs
Trades affecting schedule
Heating and Hoarding Lengthy Architectural &
Engineering Decisions Quick start then adding
items too late
WORKING WITH CAMERON & ASSOCIATES
We are innovate & creative We are nimble and move quickly We will out serve our competition We won’t put anyone in harms way We value teamwork We are legal, honest & ethical We will minimize our impact on the
environment We will do what is right for the
customer We want out people to flourish and
be proud of the company they build We will excel through continued
learning and training
“Our expertise will save you hidden costs and headaches”
OUR MISSION
OUR ROLE
“Stewards looking
after your best interests
”
Provide expertise during planning
Schedule an expedited delivery
Respect budgetary needs Construct a multifunctional
church facility Bring the congregation back
together Set an example of Teamwork
and Fellowship Meet & exceed building codes Heal the Community and give
hope for New Beginnings
OUR MANAGEMENT PROCESS
PMBOK & SMART Project Management Body Of Knowledge Specific Measurable Attainable Realistic & Time-bound
BUDGET & VENDOR TRANSPARENCY Design & Advice to construct church with respect to finances Open book trade selections with expert recommendations
MONTHLY STAKEHOLDER MEETINGS Full updates on schedule, budgets, completions and input Control communications and risks
CONTINUOUS SCHEDULE AVAILABILITY “Scrub” (Review and confirm) with trades after drawings are finalized Baseline Main Schedule Multiple baselines/updates with progress
MANAGING VOLUNTEERS
CHURCH MEMBER TO SERVE AS VOLUNTEER COORDINATOR? Keep a Volunteer Registry In charge of site orientation and trainingSITE & SAFETY ORIENTATION Workplace safety sign-offs Scheduled EventEVALUATING POSITIONS Accommodate volunteer skills to needs without risks Skilled volunteers will have to apply to volunteer with sub tradesSCHEDULED VOLUNTEER DAYS Removes site walk-ons during critical or dangerous tasks Builds community through teamwork Builds excitement through anticipation
OUR PROJECT TIMELINE
MS Project Schedule We will have the design process complete by April 17th 2014 Engineering approval and full permits in place by June 10th 2014 Site prepared for services by June 12th 2014 Piles and grade beam installed by Aug 6th 2014 Structural steel framing will be completed by Sept 15th 2014 Building will be water proof by Oct 9th 2014 Concrete Slab will be cast by Oct 14th 2014 Interior framing and rough in to begin by Oct 28th 2014 Interior finishes to begin by Jan 13th 2015
Staged/Phased Entry Process Risks and complications Early entrance timeline effects on completion schedule Permitting Requirements
Lighter & Stronger Saves time and cost on
foundation requirements
Build to last 100+yearsEfficient 10-50 R value
insulation rating in panels
Low maintenanceNo Limitations• Aesthetically pleasing
& inviting• Nobel and Serene
OUR PRODUCT