High Resolution Site Characterization and In Situ Remediation in a Complex
Fracture-Flow Regime
Bill Brab, CPG, PG Senior Geologist
AST Environmental, Inc.
Douglas N. Cantrell, P. E., P.G. and Rick Hutchinson Tennessee Department of Environment & Conservation
![Page 2: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/2.jpg)
Site Background
•Rural Retail Petroleum Station with Grocery Store • Numerous drinking water receptors w/in 300-feet • Release discovered in 1996, LNAPL recovery via Pump &
Treat and MEME performed until 2008 • DPE operated between 2009-2017 with limited success;
COCs and LNAPL rebound when system turned of • TDEC began research of suitable technologies to
remediate dissolved-phase impacts and LNAPL in fractured bedrock
![Page 3: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/3.jpg)
Site Background (cont.)
•Geology • Valley and Ridge Physiographic Province of Tennessee • Fine-grained (clay and silt) overburden varying 10’ to 29’
thick • Ordovician Calcarenitic Limestone – Pine Mountain Thrust
Sequence • Groundwater 12’ to 27’ bgs
• Overburden aquifer not present across much of site • Shallow bedrock aquifer
![Page 4: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/4.jpg)
Site Background (cont.) – CSM 2Q2017
• Dissolved Benzene Plume • Site-specific
clean-up goal 0.212 mg/L
• LNAPL persistence in on-site Domestic-use well
• Off-site access restricted (revoked) east of facility
![Page 5: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/5.jpg)
Site Background (cont.) – CSM 2Q2017
![Page 6: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/6.jpg)
Existing CSM 2Q2017
Contaminant F&T Geologically Controlled • Plume orientation parallel to strike
No Characterization of Aquifer • Existing well network limited to sampling or extraction
• Cased wells with constructed filterpack, long screened intervals
• Boreholes advanced via air rotary, no cores to log geology
Elevated Screening Levels • Sorbed impacts not considered
![Page 7: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/7.jpg)
Remedial Objectives
• TDEC requested an alternative Remedial Action Plan • Reduction in groundwater VOC concentrations below RBCLs
• Protection of GW beyond the property line (east of DW-1)
• Mitigation of LNAPL in the on-site domestic-use well (DW-1)
• AST contracted in 2017 to provide a remedial solution • Preliminary Design based on existing CSM for budgeting
• Remedial Approach: Rapid Characterization, Evaluation, and Revised Design
• LNAPL and Plume Treatment – Trap & Treat® BOS 200®
![Page 8: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/8.jpg)
Remedial Approach
Remedial Design Characterization • Surface Geophysics – 2D-ERI • Confirmatory Soil Sampling • Aquifer Characterization
• Well Installation – aquifer testing and in-situ injection • Downhole Geophysics and Imagery • Groundwater Survey – hydraulics and chemistry
In-situ Injection
![Page 9: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/9.jpg)
Preliminary Design
Open Borehole Wells
• 8” steel casing 1’ to 5’ into rock
• 6” open borehole to 60’ bgs
• Locations and orientation confirm using 2D-ERI Survey
![Page 10: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/10.jpg)
Remedial Design Characterization (RDC) – 2D-ERI
![Page 11: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/11.jpg)
RDC – Sonic Drilling and Rock Coring
![Page 12: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/12.jpg)
RDC – Downhole Geophysics
BR-01 BR-04
![Page 13: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/13.jpg)
RDC – Aquifer Characterization
Pressure Transducer Above Discrete Interval
Grundfos Rediflo 2
Pressure Transducer Below Discrete Interval
Pressure Transducer w/in Discrete Interval
![Page 14: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/14.jpg)
RDC – Aquifer Discrete Sampling and Stress
![Page 15: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/15.jpg)
RDC – Aquifer Discrete Sampling and Stress (cont.)
![Page 16: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/16.jpg)
RDC – Aquifer Discrete Sampling and Stress (cont.)
![Page 17: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/17.jpg)
RDC – Aquifer Discrete Sampling and Stress (cont.)
![Page 18: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/18.jpg)
Revised Design and In-Situ Injection
• Preliminary Design Pre-RDC • Contingency plan for limited overburden treatment – potential soil mass contribution
• Up to twelve (12) injection intervals in consolidated material – 15’ to 60’ bgs • Unknown frequency of secondary porosity features
• Uniform distribution of reagent site wide – assumption that mass extent uniform
• Revised Design Post-RDC • No overburden treatment – minimal impacts remaining, negligible contribution
• Four (4) to six (6) intervals in consolidated media • Intervals selected based on permeability and mass present
• Trap & Treat® BOS 200® varied with each interval
![Page 19: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/19.jpg)
In-Situ Injection
![Page 20: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/20.jpg)
In-Situ Injection (cont.)
![Page 21: High Resolution Site Characterization and In Situ](https://reader031.vdocuments.mx/reader031/viewer/2022012002/61d91ddb7967a1480e508f04/html5/thumbnails/21.jpg)
Closing Comments…
• Notice to Proceed Remediation Implementation: 43-days
• LNAPL Eliminated from on-site domestic-use well immediately following injections
• MCLs met and maintained w/in the existing monitoring well network, anions showed progression of active bioremediation
• No Further Action memo issued for facility in late December 2017