high point pittsburgh

42
62-240 ENVISIONING HIGH POINT PITTSBURGH

Upload: johneskss

Post on 21-May-2015

72 views

Category:

Design


1 download

TRANSCRIPT

Page 1: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 2: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

BEAR | KIM | KO | NEUMANN | PUN | RAPOPORT | SCAROLA | FALL 2011

62-240: ENVISIONING HIGH POINT PITTSBURGH

Page 3: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 4: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 5: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 6: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 7: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 8: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 9: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 10: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 11: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 12: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 13: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 14: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 15: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Elevator/Mech

Sub Floor

Roof Deck

Mechanical Floors

Page 16: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 17: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 18: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 19: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 20: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 21: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 22: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 23: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Bangkok Lift & Crane Co. www.bangkoklift.com

ASME A17-1978 Elevator Specifications Rated load: 12 kips, elevator speed: 850 ft/min

Maximum allowable area 103.0 ft2 Rule 202.1

Guide Rail

Size Rule 200.3

Fishplate Thickness Rule 200.7b

Bolt Diameter

Suspension Wire

# Wires 4 Rule 212.3

Diameter Rule 212.3

Page 24: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 25: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 26: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 27: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 28: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 29: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 30: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 31: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 32: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 33: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH62-240 ENVISIONING HIGH POINT PITTSBURGH

Roof Structure Series

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 34: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 35: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 36: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 37: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 38: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 39: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 40: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

Page 41: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Page 42: High Point Pittsburgh

62-240 ENVISIONING HIGH POINT PITTSBURGH

Roof Structure Series

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing

faceted glazing system

water collection system

primary steel beam structure

secondary steel beam structure

steel webbing

spider joint glazing support

1’ thick sub-glazing