high grade gold, platinum and palladium project in brazilfile.marketwire.com/release/csi416.pdf ·...
TRANSCRIPT
![Page 1: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/1.jpg)
Serra Pelada Building Brazil’s Next Gold Mine
![Page 2: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/2.jpg)
Forward Looking Statements
Forward-looking statements in this presentation include statements regarding the timing and nature of future exploration and development
programs that are dependent on projections that may change as drilling continues, or if unexpected ground conditions are encountered. The
Company does not currently have any mineral properties that are in production or that contain a reserve as defined by National Instrument 43-
101. In addition, areas of exploration potential are identified which will require additional drilling to determine whether or not they contain
similar mineralization to areas that have been explored in more detail. Significant additional drilling is required at Serra Pelada to fully
understand system size.
Certain information contained in this presentation, including any information relating to Colossus Minerals Inc.’s (“Colossus” or the “Company”)
future financial or operating performance may be deemed “forward-looking”. All statements in this presentation, other than statements of
historical fact, that address events or developments that Colossus expects to occur, are “forward- looking statements”. Forward-looking
statements are statements that are not historical facts and are generally, but not always, identified by the words “expects”, “does not expect”,
“plans”, “anticipates”, “does not anticipate”, “believes”, “intends”, “estimates”, “projects”, “potential”, “scheduled”, “forecast”, “budget” and
similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such
forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and are
subject to important risk factors and uncertainties, many of which are beyond the Company’s ability to control or predict. Forward-looking
statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and
other factors that may cause Colossus’ actual results, level of activity, performance or achievements to be materially different from those
expressed or implied by such forward-looking statements. Such factors include, without limitation: price levels and volatility in the spot and
forward markets for commodities; the uncertainties inherent to current and future legal challenges Colossus is or may become a party to;
controls, regulations and political or economic developments in the countries in which the Company does or may carry on business; changes
in national and local government legislation in Canada, Brazil or any other country in which Colossus currently does or may in the future carry
on business; the lack of certainty with respect to foreign legal systems, which may not be immune from the influence of political pressure,
corruption or other factors that are inconsistent with the rule of law; the speculative nature of mineral exploration and development, including
the risks of obtaining and maintaining the validity and enforceability of the necessary licenses and permits and complying with the permitting
requirements of each jurisdiction that Colossus operates; fluctuations in the international currency markets and in the rates of exchange of the
currencies of Canada, the United States and Brazil; significant capital requirements; impact of any hedging activities; taxation; additional
funding requirements; loss of key employees; changes in project parameters as plans continue to be refined; accidents; labour disputes;
defective title to mineral claims or property or contests over claims to mineral properties; and competition. In addition, there are risks and
hazards associated with the business of mineral exploration, development and mining, including environmental hazards, industrial accidents,
unusual or unexpected formations, pressures, cave-ins, flooding as well as other risks discussed under the heading “Risks Factors” included
in Colossus’ latest Annual Information Form filed at www.sedar.com. Forward-looking statements are not guarantees of future performance,
and actual results and future events could materially differ from those anticipated in such statements. All of the forward-looking statements
contained in this presentation are qualified by these cautionary statements. Colossus expressly disclaims any intention or obligation to update
or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance with applicable
securities laws.
The technical information in this presentation has been reviewed by Graham Long, VP of Exploration of Colossus Minerals Inc. and Qualified Person for the project.
April 13, 2013 2
![Page 3: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/3.jpg)
Serra Pelada
• Develop the Serra Pelada Mine in a cost-
effective, sustainable and safe manner
• Provide leading cash flow per share,
earnings per share and dividend yield to
investors
• Deliver low cost, high margin growth from
organic sources
THE VISION
April 13, 2013 3
![Page 4: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/4.jpg)
Serra Pelada 2013 OBJECTIVES
Objective Target
Extract and analyze bulk sample
from the CMZ Second quarter
Initial NI 43-101 outlining 12
months resources and reserves Second quarter
Complete process plant
construction Third quarter
Initial production and first gold pour Third quarter
Design & engineer flotation plant Fourth quarter
Complete PGM flotation plant Third quarter ‘14
April 13, 2013 4
![Page 5: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/5.jpg)
Capital Structure AS AT MARCH 31, 2013 EXCEPT WHERE OTHERWISE NOTED
All dollar amounts $CDN, unless noted Current Position
Shares outstanding - basic 107.0 million
Shares outstanding - fully diluted 121.1 million
Market capitalization (04/10/13) C$286.6 million
Share price (04/10/13) C$2.59
52-week range C$2.33 – C$6.03
Insider ownership (approximate) 1.4%
Institutional ownership (approximate) 65%
Options & Warrants (5,175,000 - CSI.WT.A –Exp. Nov 8/16 ) 14.1 million
Cash balance (December 31/12) US$63.5 million
Gold-linked Note – CSI.NT - Matures Dec 31/16 C$86.25 million
Precious metals sale (35% Pt and Pd, 1.5% Au) US$75 million
Major Shareholders
Arias Resources, Acuity, Sprott Asset Management, Van Eck, Franklin Advisers, RBC
Global Asset Management, Franklin Templeton, Fidelity, BC Investment, MFS
April 13, 2013 5
![Page 6: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/6.jpg)
Focused on Brazil
• Resource-rich country
• Pro-mining government
• World’s 6th largest economy
by GDP and largest in South
America
• Real GDP growth of 3.1%
forecast in 2013
• Inflation estimated at 5.7%
and stable monetary policy
April 13, 2013 6
![Page 7: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/7.jpg)
Serra Pelada
• Prolific Carajas
region
• Major deposits of iron
ore, copper-gold,
manganese
• Robust infrastructure
with access to roads,
power, water and
skilled labour
• Vale S.A. investing
billions of dollars over
the next decade in
the region
LOCATION AND INFRASTRUCTURE
April 13, 2013 7
![Page 8: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/8.jpg)
Serra Pelada LAND AND PERMITS
• Preliminary Environmental License –
issued March 2010
• Precedes balance of permits –
issued by COEMA
• Installation License – issued April 2010
• Para State environmental council
• Mining License – issued May 2010
• Ministry of Mines and Energy
Permits
Land Package
• 874 hectare property
• Ownership Structure:
Colossus 75%
Coomigasp 25%
April 13, 2013 8
![Page 9: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/9.jpg)
High Grade Deposit GRADE VARIABILITY
April 13, 2013 9
![Page 10: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/10.jpg)
High Grade Deposit GRADE VARIABILITY
April 13, 2013 10
![Page 11: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/11.jpg)
Underground Drilling DEFINING AND DELINEATING THE CMZ
• Exploration and definition underground
drilling commenced in Dec 2011
• Bulk sample currently being extracted
from CMZ
• An initial NI 43-101 resource and
reserve statement will be produced
which will outline the initial resource
and reserve estimate for approximately
one year, allowing the Company to
predict future earnings
• The drill spacing for this resource and
reserve statement will be as tight as
possible (5 to 10 metre centres)
• As decline and underground
development advances, so will the pace
of reserve drilling
April 13, 2013 11
![Page 12: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/12.jpg)
Serra Pelada DEVELOPMENT TIMELINE
2010 2011 2012 2013 2014
Exploration
Permitting
Construction
Underground
Development
NI 43-101 Resource
Initial Production
Ramp up to 1000 tpd
Design & Engineer
Flotation Plant
Complete PGM
Flotation Plant
April 13, 2013 12
![Page 13: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/13.jpg)
Process Plant SIMPLIFIED FLOWSHEET
April 13, 2013 13
![Page 14: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/14.jpg)
Process Plant DESIGN OVERVIEW
Gold Room
Scrubbing,
Screening and
Reagents
Primary Crushing Ball Mill and Gravity
Concentrators
April 13, 2013 14
![Page 15: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/15.jpg)
Primary Crushing INSTALLING CAST IN CHUTE
April 13, 2013 15
![Page 16: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/16.jpg)
Primary Crushing FINAL PREPARATION FOR CRUSHER INSTALLATION
April 13, 2013 16
![Page 17: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/17.jpg)
Primary Crushing INSTALLING PRIMARY CRUSHER
April 13, 2013 17
![Page 18: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/18.jpg)
Primary Crushing INSTALLING PRIMARY CRUSHER
April 13, 2013 18
![Page 19: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/19.jpg)
Transfer Tower ERECTION OF STRUCTURAL STEEL
April 13, 2013 19
![Page 20: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/20.jpg)
Transfer Tower ERECTION OF STRUCTURAL STEEL
April 13, 2013 20
![Page 21: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/21.jpg)
Primary Crushing INSTALLATION OF CONVEYORS FROM PRIMARY CRUSHER AREA
April 13, 2013 21
![Page 22: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/22.jpg)
Scrubbing POURING CONCRETE
April 13, 2013 22
![Page 23: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/23.jpg)
Reagents Building ERECTION OF STRUCTURAL STEEL
April 13, 2013 23
![Page 24: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/24.jpg)
Reagents Building ERECTION OF STRUCTURAL STEEL
April 13, 2013 24
![Page 25: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/25.jpg)
April 13, 2013
Process Plant BALL MILL, GRAVITY CONCENTRATORS & GOLD ROOM DESIGN
Gold Room
Ball Mill
Gravity Concentrators
25
![Page 26: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/26.jpg)
Process Plant BALL MILL FOUNDATION CONSTRUCTION
April 13, 2013 26
![Page 27: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/27.jpg)
Mill Feed Bin ERECTING COLUMNS
April 13, 2013 27
![Page 28: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/28.jpg)
Mill Bin & Secondary Crusher ERECTING COLUMNS & INSTALLING fORMWORK
April 13, 2013 28
![Page 29: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/29.jpg)
Ball Mill FINISHING SLAB ON GRADE
April 13, 2013 29
![Page 30: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/30.jpg)
Gold Room INSTALLING REBAR IN SLAB
April 13, 2013 30
![Page 31: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/31.jpg)
Gold Room INSTALLATION OF SCAFFOLDING
April 13, 2013 31
![Page 32: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/32.jpg)
Gold Room REMOVAL OF FORMS FROM COLUMNS
April 13, 2013 32
![Page 33: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/33.jpg)
Gold Room POURING CONCRETE IN TANK BASES
April 13, 2013 33
![Page 34: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/34.jpg)
Process Water Tank INSTALLING REBAR IN FOOTING
April 13, 2013 34
![Page 35: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/35.jpg)
Thickener POURING STRUCTURAL CONCRETE
April 13, 2013 35
![Page 36: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/36.jpg)
Thickener INSTALLING SUPPORT STEEL
April 13, 2013 36
![Page 37: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/37.jpg)
Thickener BOTTOM PLATES INSTALLED, SIDE WALLS & STAIR TOWER STARTED
April 13, 2013 37
![Page 38: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/38.jpg)
Thickener ERECTION OF THICKENER WALLS
April 13, 2013 38
![Page 39: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/39.jpg)
Power House ROOF ON – CONSTRUCTION OF MEZZANINE UNDERWAY
April 13, 2013 39
![Page 40: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/40.jpg)
Power House INSTALLATION OF THIRD TRANSFORMER
April 13, 2013 40
![Page 41: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/41.jpg)
Power House INSTALLATION OF FIRST GENERATOR
April 13, 2013 41
![Page 42: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/42.jpg)
Development Decline
April 13, 2013 42
![Page 43: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/43.jpg)
Underground Development CONTINUING WITH PRIMARY DEVELOPMENT
April 13, 2013 43
![Page 44: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/44.jpg)
Underground Development DEVELOPMENT IN THE BULK SAMPLE ACCESS DRIFT
April 13, 2013 44
![Page 45: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/45.jpg)
Underground Development ELECTRICAL SUBSTATION COMMISSIONED IN DECEMBER 2012
April 13, 2013 45
![Page 46: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/46.jpg)
Underground Development REFUGE STATION COMMISSIONED IN JANUARY 2013
April 13, 2013 46
![Page 47: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/47.jpg)
Mining Method UNDERHAND CUT & FILL
• Underhand Cut & Fill mining method for
100% extraction of the ore
• Work from top of the orebody down
excavating under cemented rock fill
• Used in a number of high-grade gold
mines including Goldcorp’s Red Lake
Mine, Barrick’s Miekle Mine, Turquoise
Ridge Mine, former Eskay Creek Mine
and Newcrest Kencana Mine
• Trucks to haul ore to surface via the
decline
• Target a 1,000 TPD mining rate
April 13, 2013 47
![Page 48: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/48.jpg)
Bulk Sample MINERALIZED MATERIAL ON THE RUN OF MINE PAD
April 13, 2013 48
![Page 49: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/49.jpg)
Exploration Potential
• Down-plunge extension of
Central Mineralized Zone
• Connecting the Lower Limb to
the Central Mineralized Zone
• Elefante – Potential satellite
deposit two kilometres away
THREE PROSPECTIVE AREAS
April 13, 2013 49
![Page 50: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/50.jpg)
Exploration Potential CONNECTING THE LOWER LIMB TO THE CMZ
April 13, 2013 50
![Page 51: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/51.jpg)
Exploration Potential ELEFANTE – POTENTIAL DEPOSIT TWO KILOMETRES AWAY
• Hole EL-12-001 returned 5.70 metres grading
5.41 g/t gold, 0.04 g/t platinum and 0.29 g/t
palladium
• Hole EL-12-002 returned 5.10 metres grading
0.45 g/t gold, 1.27 g/t platinum and 2.04 g/t
palladium
• Auger drilling included SPTRD-017 (124.78g/t
Au, 6.52g/t Pt and 7.67g/t Pd over 1.5 m)
• Auger drilling in saprolite together with
diamond drilling suggest a broad halo of
mineralization in the Elefante Area sourced by
deeper bedrock zone
Please see news releases issued November 14, 2011, March 12,
2012, August 20, 2012 and January 10, 2013 for complete NI 43-
101 compliant disclosures.
April 13, 2013 51
![Page 52: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/52.jpg)
Sierra Pelada
Cutia
Cutia Project DRILLING COMMENCES IN 2013
• 75% ownership interest purchased from
COOMIC for R$3.6 million (~USD $2.0
million) payable in installments upon
satisfaction of certain milestones.
• Mesothermal gold and silver project
• 633 hectares, 13 km SE of Serra Pelada,
accessed by same road
• Mineralized vein system occurs along the Cutia
Fault Zone that separates two major lithologic
domains
• 3 metre thick quartz veins outcropping on
surface
• ~ 65,000 ounces produced by artisanal
miners between 1988 and 1992
• 2.5 km of strike length and still open to
the west and east
April 13, 2013 52
![Page 53: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/53.jpg)
Serra Pelada A COMPELLING INVESTMENT
• Gold & PGM grades at Serra Pelada are among the highest on record
• High grade, potential low cost emerging producer
• Project is permitted, financed to initial production and construction is well
underway
• 110,000 metres drilled, significant exploration upside
April 13, 2013 53
![Page 54: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/54.jpg)
TSX: CSI www.colossusminerals.com
OTCQX: COLUF
Colossus Minerals Inc.
1 University Avenue, Suite 401
Toronto, ON M5J 2P1
Ann Wilkinson
Vice President, Investor Relations
416.643.7655
www.colossusminerals.com
April 13, 2013 54
![Page 55: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/55.jpg)
APPENDICES
April 13, 2013 55
![Page 56: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/56.jpg)
Community
• Striving to build a stronger community – community
based projects
• Hiring locally is a priority
• Education and training
• Community donations (ambulance and police vehicles)
• Health and dental services
• Children’s programs (sports teams, first aid training, social events)
April 13, 2013 56
![Page 57: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/57.jpg)
Community Programs
Community based projects
• Donation of ambulance and police vehicles
• Public security and police training
• School renovation
• Hospital renovation
• Municipal stadium renovation
• Municipal theatre renovation
• 2012 - installation of a community centre focused on worker training
and qualifications, income generation programs, computer training
centre and environmental education
Health • Vaccination programs
• Medical and dental
services
April 13, 2013 57
![Page 58: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/58.jpg)
Community Programs
Children
• Soccer school
• Sporting events
• Social events
• Visual arts workshops
• Reading programs
Education and training programs
• Literacy programs
• First aid and safety training
• Serra Pelada Capoeira school for children,
teenagers, youth and adults
April 13, 2013 58
![Page 59: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/59.jpg)
Area A PAYMENT STRUCTURE
Range of production (millions of ounces of
metal)
Royalty as a
percentage of gold
price on precious
metal sold* From To
--- 2.03 ~ 2.1%
2.03 4.79 ~ 1.4%
4.79+ --- ~ 1.3%
Colossus must pay COOMIGASP R$350,000
(US$177,665**) per month and payments cease when
production begins.
In addition Colossus will finance their portion of
CAPEX (25%). * Precious metal is defined as any one of gold, platinum,
palladium, rhodium, osmium, ruthenium or iridium
** Basis 1.97 R$ per US$ (2/22/13)
April 13, 2013 59
![Page 60: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/60.jpg)
Area B PAYMENT STRUCTURE
• COOMIGASP paid R$8 million (US$4.5 million)
• Will pay COOMIGASP a royalty payment of 0.4326
of gold price of precious metals sold*
• Exercised option on Vale agreement Mar 18/13
• Vale has 45 days to request additional documents
to support US$5 million spent over 3 years
• Assignment of mining rights expected to occur 30
days after Vale is satisfied requirements met.
• Pay Vale a fee of US$35/oz of gold, platinum,
palladium based on the reserve estimate.
700 – Hectare Land Tenement
•Precious metal is defined as any one of gold, platinum, palladium,
rhodium, osmium, ruthenium or iridium.
April 13, 2013 60
![Page 61: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/61.jpg)
Area C PAYMENT STRUCTURE
• Have paid COOMIGASP R$4
million (US $2.2 million)
• Will pay COOMIGASP a royalty
of 2.0908% of gold price on
precious metals sold*
* Precious metal is defined as any one of gold, platinum,
palladium, rhodium, osmium, ruthenium or iridium
Consideration
74 - Hectare Land Tenement
April 13, 2013 61
![Page 62: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/62.jpg)
Warrants and Options AS AT MARCH 31, 2013
Warrant price # of
warrants Expiry
$8.50 5,175,000 Nov 8, 2016
Range Options
Outstanding Options
Exercisable
$0.48CAD - $1.50CAD
150,000 150,000
$1.51CAD - $3.00CAD 75,000 75,000
$3.01CAD - $4.50CAD 3,125,000 1,703,750
$4.51CAD - $6.00CAD 2,511,250 1,065,000
$6.01CAD - $8.37CAD 3,130,000 2,830,000
TOTAL: 8,991,250 5,823,750
April 13, 2013 62
![Page 63: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/63.jpg)
Senior Management
Claudio Mancuso,
CA
CEO, Director
• Over 10 years experience in mining industry and capital markets
• Previously VP, Treasurer of Agnico-Eagle Mines Limited
• Involved in raising over $4 billion over the past five years in both equity and debt capital markets
David Anthony
President & COO
• Previously Senior Vice President, Mining of Forbes & Manhattan
• Previously worked for Kinross, as the Project Director, responsible for execution of the Fruta del Norte Project and held Senior positions
at Barrick Gold in Tanzania responsible for the development of the Bulyanhulu, Buzwagi and Tulawaka mines
Alden Greenhouse, CFA
CFO
• Over 10 years capital markets experience in commodity risk management, foreign-exchange and fixed income
• Senior management positions with RBC Capital Markets and Senior Analyst at Dominion Bond Rating Service
Graham Long
VP, Exploration Qualified Person
under NI 43-101
• Over 25 years’ experience in the mining industry, spent the majority of his career with Agnico-Eagle Mines where he held progressively
changing roles from exploration geologist to Exploration Manager for Canada.
• Mr. Long has a broad range of mining experience having worked in several operating mines both underground and open-pit as well as
experiencing the discovery of a gold deposit and seeing it through to production.
Luis Albano Tando VP, Operations &
Country Manager,
Brazil Qualified Person
under NI 43-101
• Mining engineer with twenty five years’ experience working at increasingly senior levels of a number of organizations.
• Previously COO at OROSUR Mining Inc.
• Prior to this, worked in a variety of capacities for Kinross
• He is also a fellow of the Australian Institute of Mining and Metallurgy (AusIMM)
Jason Brooks
VP, Finance
• More than 10 years of finance and accounting experience in the mining industry. He most recently served as Assistant Controller of
NewGold Inc., an intermediate gold producer. Previously, he spent six years with Barrick Gold Corporation in various financial
management positions. Prior to joining Barrick, he spent five years at BDO Dunwoody LLP, a public accounting firm.
Ann Wilkinson
VP, Investor
Relations
• 20 years in the mining industry in investor relations and other management roles. Prior to joining Colossus, served as Vice President,
Investor Relations of Breakwater Resources Ltd. Prior to Breakwater she held a number of roles with several capital market firms and a
couple of junior gold exploration companies.
Lesley Duncan
VP, Corporate
Secretary
• Over 10 years experience as a securities law clerk and corporate secretary.
• Held the Corporate Secretary position at Breakwater Resources Ltd. for 4 years. Prior to that she was Breakwater’s Corporate and
Securities Law Clerk.
• Ms Duncan is a member of Canadian Society of Corporate Secretaries.
April 13, 2013 63
![Page 64: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/64.jpg)
Board of Directors
John Frostiak,
P.Eng Chairman Qualified Person under NI 43-101
• Over 35 years experience in the mining industry. Managed Metallurgy and Process Development for Barrick Gold Corp.
• Lead developer of both Pierina Mine and Bulyanhulu Mine for Barrick
Claudio Mancuso,
CA Chief Executive Officer
• Over 10 years experience in mining industry and capital markets
• Previously VP, Treasurer of Agnico-Eagle Mines Limited
• Involved in raising over $4 billion over the past five years in both equity and debt capital markets
J. Alberto Arias • Founder, General Partner and Portfolio Manager of Arias Resource Capital Management LP
• Previously Managing Director of Goldman Sachs – Metals & Mining Research from 1998 to 2006,
• Mr. Arias has engineering degrees in mining and metallurgy and an MBA (B.Sc. from the Colorado School of Mines and three
Masters degrees from Columbia University), mining industry operational experience, and holds a patent for a gold mineral
processing technology.
David Garofalo • President and Chief Executive Officer of Hudbay Minerals Inc.
• Previously served as Senior Vice President, Finance and Chief Financial Officer and a director with Agnico-Eagle Mines Limited
Mr. Garofalo worked in various finance roles including Treasurer with Inmet Mining Corporation.
Greg Hall Qualified Person under NI 43-101
• Over 40 years experience in the mining industry. Chief geologist world-wide of Placer Dome until the Barrick takeover
• Credited discoveries include Granny Smith Mine (Barrick), Yandi Mine (Rio Tinto)
Mel Leiderman,
CA, CPA • Managing Partner of Lipton LLP, Chartered Accountants.
• Current Member of Agnico-Eagle Mines Limited Audit Committee (Chair from 2005 – 2011)
• Board of Trustees – Morguard North American Residential REIT. Audit committee member.
Douglas Reeson,
MBA
• Current CEO of Gossan Resources Limited and a director of Lithium Americas Corp., Mega Uranium Ltd. and Soltoro Ltd.
John S.M. Turner • Partner at Fasken Martineau DuMoulin LLP and the Leader of its Global Mining Group
• Has been recognized on numerous occasions including Best Lawyers in Canada for Natural Resources Law
• Recipient of the Queen's Golden Jubilee Medal and is a member of both the Canadian Association and the Law Society of
England and Wales.
April 13, 2013 64
![Page 65: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/65.jpg)
Analyst Coverage
Research Firm Analyst Latest Coverage Target/Rating
Clarus Securities Jamie Spratt April 1, 2013 $8.25 – Spec. Buy
GMP Securities George Albino April 1, 2013 $11.50 – Buy
Canaccord Genuity Nicholas Campbell April 11, 2013 $7.50 – Spec. Buy
Stifel, Nicolaus Craig Stanley February 8, 2013 $6.70 – Buy
Dundee Securities Joseph Fazzini Under Review
Macquarie Securities Michael Gray April 1, 2013 $4.00 – Outperform
April 13, 2013 65
![Page 66: High Grade Gold, Platinum and Palladium Project in Brazilfile.marketwire.com/release/csi416.pdf · Serra Pelada • Develop the Serra Pelada Mine in a cost-effective, sustainable](https://reader031.vdocuments.mx/reader031/viewer/2022022601/5b5007cf7f8b9a2a6e8d7caf/html5/thumbnails/66.jpg)
NOTES
April 13, 2013 66