  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    1/55

    HiDef BIM & Functional IPDEOR Supplied Shop DrawingsGregory P Luth GREG, GPLA, April 25, 2012

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    2/55

    The Associated General Contractors of America (AGC) is a

    Registered Provider with The American Institute of Architects

    Continuing Education Systems. Credit earned on completion of

    this program will be reported to CES Records for AIA members.

    Certificates of Completion are available on request.

    This program is registered with the AIA/CES for continuing

    professional education. As such it does not include content that

    may be deemed or construed to be an approval or endorsement

    by the AIA of any material of construction or any method or

    manner of handling, using, distributing, or dealing in any material

    or product. Questions related to specific materials, methods, andservices will be addressed at the conclusion of this presentation.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    3/55

    Copyright

    This presentation and the materials provided are protected by U.S. and International

    copyright laws. Reproduction, distribution, display and use of the presentation or materials

    without written permission is prohibited.

    AGC of America, 2012

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    4/55

    Course Description

    In the world of design and construction the technological revolution started with the advent

    of computer analysis in the 70s and accelerated through the use of CAD in the 80s and90s. BIM, Integrated Project Delivery, and DesignBuild are driving changes, that, if

    implemented effectively, offer the promise of reductions of up to 25% in cost and schedule

    relative to a project delivered by the conventional design-bid-build process.

    In structural engineering, the use of design models with construction level detail, HiDef

    BIM, and Functional Integrated Project Delivery to implement performance based

    engineering enables unprecedented reliability, coordination, and true lean construction

    based on actual labor, means, methods, and sequences.

    This technology is disruptive at its core and will require fundamental changes in the delivery

    process and scopes of services on the design side well beyond contractual arrangements.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    5/55

    Learning ObjectivesAt the end of this presentation, attendees will be able to:

    Attendees will be able to identify achievable levels of detail (LOD) in

    design models.

    Attendees will be able to summarize the Integration prerequisites for

    incorporating construction level detail in a design model.

    Attendees will be able to identify the work flow for a verticallyintegrated design-construction process.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    6/55

    Albert Einstein,German born American Physicist

    1879-1955

    Insanity is doing the same

    thing over and over again

    and expecting differentresults

    Luth Corollaries

    Corollary 1: If you want the same

    results, do the same thing.Corollary 2: If you want something

    better, do something different

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    7/55

    Where We Are Headed

    Design/Construction Industry

    HiDef BIM

    Functional IPD

    Virtual Design and Construction (VDC)utilize HiDef BIM to

    visualize, analyze, coordinate, and evaluate different design andconstruction alternatives

    Structural Engineering

    Performance-Based Design (PBD) of all building systems

    Performance Based Earthquake Engineering beyond life safety toeliminate sacrificial structures and control losses

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    8/55

    BIM: Building Information Model

    BIM Graphical

    Representation

    Graphics

    Renderings

    Approximate/

    Design Intent

    Concept to Design

    Clash-detection

    HiDef BIM Database of

    Information

    Knowledge

    Heuristics Shop Drawing

    Level Detail

    Concept to

    Facilities

    Clash avoidance

    Virtual Design &

    Construction------ GIGO Effect ------

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    9/55

    HiDef BIM

    High Definition BIM (HiDef BIM) incorporates shop drawing leveldetail into the design model (AIA LOD = 5)

    There is only one BIM model, and it is used for all life cycle

    processes. During one short interval in the life cycledesign-

    constructionthe model is used to produce shop drawings andsupport design, fabrication, construction, and maintenance

    processes.

    This requires explicit consideration of and provision for, means,

    methods, and sequences during the design phase.

    This is possible today in structural engineering

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    10/55

    HiDef BIM

    This is a disruptive technology

    The design/construction processes must change to get

    maximum benefit from the technology.

    Scope shifts from construction to design

    Construction knowledge must be deployed to support

    designwe pull the knowledge forward in the process

    In a complementary fashion, knowledge of designprocesses can inform construction facilitating the

    identification of the optimum vertically integrated solution

    Copyright Gregory P. Luth & Associates

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    11/55

    To date we have used HiDef BIM to:

    Model concrete, rebar, structural steel, wood, light gage

    Produce shop drawings for steel, light gage, rebar

    Coordinate construction sequences

    Facilitate the design & construction of innovative high performance

    structures

    Perform in model shop drawing review and work on the same

    model as the steel detailer with model remotely located in the cloud

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    12/55

    Functional IPD

    f IPD: Incorporating detailed construction knowledge and

    planning into the design

    Means, methods, and

    sequencing Enabling details

    Prefabrication

    Precision

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    13/55

    Conventional BIM Practice

    Contract documents reflect a

    concept design that is basedon no particular construction

    sequence or means and

    methods,

    IPD with HiDef BIM

    The SEOR produces a complete

    design predicated on the mostefficient construction sequence

    with structure topography and

    details tailored to optimize

    construction efficiency, economy,

    and quality, complete with

    construction aids and/or

    temporary structures included.

    Knowing the details of both the

    design and constructionfacilitates true lean construction

    getting exactly the right

    resources in exactly the right

    place at exactly the right time.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    14/55

    Panelized Light Gage Roof

    Decreases Schedule

    Less Off Ground Work

    Acoustical Details Included

    Plywood, LG Studs 12 OC, Insulation, 2

    Layers of ceiling Gyp Board

    Savings:

    roof finished in 3 days

    3 weeks exterior

    3 weeks interior

    eliminated scaffolding

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    15/55

    50 ft x 10 ft Panel - 4 tons - 15 min

    Panelized Rebar Cages

    Decreased Schedule (with EOR detailing)

    Phase 16 weeks

    Phase 215 weeks (30% schedule)

    Saves Space On Site

    Rebar hoops 4 O.C. in slit

    plates require precision in

    prefabrication & placing

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    16/55

    Conventional Practice

    Fixed price is an estimate

    based incomplete details.Subcontractors have to cover

    risk in price. Final quantities

    arent known until after shop

    drawings. Final price is

    adjusted through change order

    process based on revised

    estimates of concept drawings.

    IPD with HiDef BIM

    Unit price is based on exact

    quantities in the model andadjusted based on actual

    quantities delivered. (RE:

    Denver Health Project) This

    saves all of the overhead of the

    RFI and change order process

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    17/55

    Isle of CapriCape Girardeau

    Rebar modeling and Shop Drawings by EORaccelerated the schedule and resulted in higher

    quality end product. 2000 yd pour with 250 tons

    of rebar starting at 7 pm 2 weeks after award of

    concrete contract. Photo at noon on day of pour.f

    pour.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    18/55

    Conventional Practice

    Construction sequence is

    determined by superintendent

    long after contract is awarded

    and detailed construction

    means and methods by the

    foreman of the trade involved.

    Quite often the details of the

    design have to be amended bythe RFI process to tune the

    design to the eventual means

    and methods

    IPD with HiDef BIM

    Construction sequence on which

    the design is based is includedwith the contract documents

    providing a reliable starting point

    for the contractors logistical

    planning. All of the detailing that

    is necessary to support the

    sequenceincluding anytemporary structuresis

    included in the design.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    19/55

    Livermore Performing Arts Center

    Construction sequence 3D HiDef BIM visualization construction steps 1-4,

    concrete substructure and partial superstructure

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    20/55

    Livermore Performing Arts Center

    Construction sequence 3D HiDef BIM visualization steps 5-8 at concept

    steel & facade

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    21/55

    Livermore Performing Arts CenterRoof truss with temporary construction bracing

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    22/55

    LIVERMOREBuilding Section

    with temporary construction columns under cantilever

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    23/55

    Conventional Practice

    The structural steel and rebar

    detailers have to interpret the

    SEORs intent in preparing

    complete shop drawings. Any

    question are resolved using the

    RFI process. The shop

    drawings have to be submitted

    to the SEOR to verify that theintent has been faithfully

    captured. Drawings are

    marked up by hand or

    manually in PDF and iterated

    until a clean set is produced.The process takes months.

    IPD with HiDef BIM

    The SEOR produces shop

    drawings that are, by definition,

    consistent with the design intent.

    The shop drawings can be

    furnished to the supplier at the

    time the contract is awarded.

    (RE: Cape Girardeau, Denver

    Health, USC, and Toledoprojects)

    A bonus is that constructibility

    conflicts are trapped andcorrected during design. The

    EOR starts including

    constructibility as a basis of

    design.

    C i H ll d T l d OH

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    24/55

    Challenge: 10 Rouge fill & fast schedule

    Enabling Concepts

    Single pile foundations

    Prefabricated 5-piece cages detailed for quick install.

    Casino HollywoodToledo, OH

    Single Pile Foundations

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    25/55

    Conventional Practice

    The process is cumbersome,

    fraught with opportunities for

    miscommunication, conflict,and abuse.

    IPD with HiDef BIM

    The process is set up around the

    need to efficiently manage

    change while maintaining aproductive construction

    operation. Design IS the process

    of managing change until the

    optimum design is arrived at. In

    modern projects, the structurealways goes first, so managing

    change is essential to the art of

    structural engineering. The best

    way to manage change is to

    minimize the length of the supply

    chain.

    D H lth P ili M

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    26/55

    Design Build Team:Mortenson ConstructionHeery International Architecture

    Martino & Luth Structural Engineers

    Four Story + Basement115,000 Square Feet of

    Structured Space

    Outpatient Dialysis

    Outpatient Procedure

    Administration

    Adolescent Psychiatry

    Underground Parking

    First Floor Parking

    Photo by Joel Eden

    Denver Health Pavilion M:A Renaissance in Project Delivery

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    27/55

    Martino and Luth:

    SEOR

    Full Structural HiDef

    BIM Model

    3D Rebar Shop

    Drawings

    3D Light Gauge

    Curtain Wall Shop

    Drawings

    Photo by Joel Eden

    Contracts:

    With Heery:SEOR, Full Structural Model

    With Mortenson:

    3D Rebar & 3D Light Gauge Shop Drawings

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    28/55

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    29/55

    Material Takeoffs at

    DD

    Detailed StructuralModel Allows Accurate

    Estimating

    Steel includesConnections

    Concrete Planter

    Boxes and Built Up

    Column BasesModeled

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    30/55

    Structural Model Sent

    To Steel Fabricator

    Zimmerman Metals

    Also on HiDef BIM

    Shop Drawing

    Creation Faster and

    Easier

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    31/55

    3D Rebar Detailing

    Rebar Take off At DD

    Rebar Bar Lists for

    Fabrication

    Rebar Field

    Placement Drawings

    for Rodbusters

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    32/55

    Rebar Takeoffs At DD

    DD Quantity375

    TonsUsed to Signunit price Contract

    Shop Drawing

    Quantity365 Tons (-2.6% from DD)

    Final Delivered

    Quantity 372 Tons (-

    0.8% From DD, +1.9%

    from Detailed

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    33/55

    Rebar Bar Lists for Fabrication (Typical Foundation Wall Shown)

    M&L worked with Rio Grande to produce a Bar List that wasCompatible with their process.

    Fabricator Redlined and Checked our Bar list, vice versa from

    Normal

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    34/55

    Rebar Placement DrawingsTyp Elevated Slab

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    35/55

    3D HiDef BIM Light

    Gauge Shop Drawings

    Full Member Material

    Takeoff

    Discover Curtain Wall

    Issues Prior toConstruction

    Coordinated,

    Constructible ShopDrawings

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    36/55

    Coordinated

    Constructible ShopDrawings

    Produced Directly

    From the Model

    Every Member

    Modeled as it is and

    where it will go

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    37/55

    Typical Light Gauge Wall Elevations

    Project Delivery Benefits

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    38/55

    Project Delivery Benefits

    More Realistic Analysis of Volumetric and Layout

    Based Design RequirementsWater Retention

    Accurate B.O.M. during Design Phase

    Shared Model with Steel Fabricator

    Virtually Installed Rebar Prior to Actual Construction

    3D Rebar Shop Drawings

    Virtually Installed Structural Curtain Wall Prior to ActualConstruction3D Exterior Light Gauge Shop

    Drawings.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    39/55

    HiBIM - Implementation Challenges

    How are the services contracted?

    What does it do to project communications?

    How does it change liabilities?

    How much does it cost?

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    40/55

    IPD and HiDef BIM Concluding Remarks from an ArchitectsPerspective Cliff Bourland

    A more expansive view is required. IPD doesnt start with design

    and it doesnt end with construction. We need to elevate our goals.

    Life Cycle savings should match those of construction. For

    example stop building throw away buildings

    We can design efficient buildings that can be managed

    efficiently, but only if the knowledge is passed from one

    phase to the next.

    Means and methods is not just about construction. The

    owner needs a Users Manual. And the general contractor

    is in the best position to provide it.

    Copyright Gregory P. Luth & Associates

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    41/55

    Our objective is to produce as the deliverableproduct of the designa model with sufficient

    detail and data to facilitate Lean Constructionand Functional Integrated Project delivery

    today, using technology that is scalable to

    support Life Cycle Facility Management

    processes in the future.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    42/55

    .

    Contribution to Life Cycle Cost

    5% controls the other 95%

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    43/55

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    44/55

    IPD in the old days Life Cycle?

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    45/55

    Historical Context Tramway Building

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    46/55

    Historical ContextTramway Building

    Construction Complete, February 6, 1911 The completed building includes the 8 story tower in foreground as well as a

    concert hall and bowling alley housed in the pop up immediately behind thetower. The construction was completed in 11 months by Whitney-SteenEngineers and Builders. By the time the photos were archived, Whitney-Steenhad dropped the word Engineers from their name.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    47/55

    USC PIIBuilding B Pivoting Wall Model, Shop Drawings, & Constructed

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    48/55

    Performance Based EarthquakeEngineering (PBEE)

    CanBecome

    Performance Planned

    Non - Catastrophic Engineering (PPNCE)

    We can do better than designing sacrificial

    structures in order to preserve life safety

    We can and should design to control losses

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    49/55

    The World can no longer tolerate anything

    but the very best design and construction.

    We cannot afford less.

    Natural disasters cost a record $380

    billion in 2011

    HiDEF BIM can propel the industry to achieve

    better results

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    50/55

    Performance Based Engineering

    Performance-

    based engineering is the design, evaluationand construction of engineered facilities that meet, as

    economically as possible, the uncertain future demands

    that both owner-users and nature will put upon them. The

    premise is that performance levels and objectives can be

    quantified, that performance can be predicted analytically,and that the cost of improved performance can be

    evaluated, so that rational trade-offs can be made based

    on life-cycle considerations rather than construction costs

    alone.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    51/55

    20% OF THE WORLD POPULATION lives in or near an earthquake zone.MORE than 70% of that percentage is in poverty level socio-economicclasses.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    52/55

    More than 65 Million Americans live in Tornado Alley

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    53/55

    The Construction Model is the Facilities Management

    Model

    Lease

    Mgmt

    Space

    Mgmt

    Asset

    Mgmt

    Facility

    MgmtConstructionDesign

    Capital

    Planning

    Construction/

    Capital Projects

    Operations &

    Maintenance

    Knowledge amassed through operating and

    maintaining the portfolio

    Operational Wisdom

    applied to next design

    People Process Systems

    O&M Guidelines/Requirements,

    Operational Standards

    As Built Intelligence &

    Building Performance Proforma

    Integrating people, processes and systems throughout the building lifecycle creates the

    opportunity for portfolio value optimization.

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    54/55

  • 8/13/2019 HiDef BIM and SEOR Supplied Shop Drawings

    55/55

    Thank you for your time.

    Questions?

    [email protected]

    415 310 5955

    Gregory P. Luth & AssociatesStructural Engineers and Builders

    mailto:[email protected]:[email protected]