hicom-teck see manufacturing malaysia s/b to be most ... see... · hicom-teck see manufacturing...

29
To be most preferred organization HICOM-Teck See Manufacturing Malaysia S/B Homepage: www.hicomtecksee.com.my

Upload: hatuong

Post on 05-Apr-2018

220 views

Category:

Documents


5 download

TRANSCRIPT

To be most preferred organization

HICOM-Teck See Manufacturing Malaysia S/B

Homepage: www.hicomtecksee.com.my

Introduction

Cockpit

design-in

Established

Bumper production

Cockpit production

1991 2003 2006-2010 2011 20151997

VA/VE

ISO TS16949

Export to

Germany/

Mexico/

Spain/

North America/

China

ELP

plant

Laser Cutting

Best

Manufacturer of the

year (large

category)

by FMM

Best Delivery

Performance

by Isuzu

Major Milestones

2016

ICC Convention

• Gold Award

2017

External Collaboration Programs

1. MAI & Proton

(Automotive Supplier Excellent Program)

2. Perodua

(Vendor Development Program)

Pekan

Start Operation: June 2010

Manpower: 15

GPS Coordinate:

3.490,103.393

Our Plants

Tanjung Malim

Built-Up Area: 568m²

Land: 2,411m²

Manpower: 72

Start Operations: August 2003

GPS Coordinate:

3.738,101.542

Shah Alam

Built-Up Area: 20,278m²

Land: 39,841m²

Manpower: 814

Start Operation: 1992

GPS Coordinate:

3.023,101.560

PekanTanjung Malim

Shah Alam

Head Quarter (Shah Alam) Location

Chief Operating Officer

Pn. Shuhaida Nun

Human Resource Finance

Business Development

Production Planning Purchasing Manufacturing Quality Logistic

Secretary Safety

Organization Chart

Company’s vision, Mission and Shared Values

To be most preferred organization for its performance,

partnership and people

To deliver best quality products and services

through effective management system, innovative

technology and continuous improvement cultures

to our stakeholders

Decorum, Excellence, Teamwork, Integrity, Transparency,

Quality and Innovation

Vision

Mission

Values

Management System

QS 9000 QS 9000 QS 9000 QS 9000

ISO/TS

16949:2002

ISO/TS

16949:2002

ISO 14001:2004

ISO/TS

16949:2009

ISO 14001:2004

OSHAS

18001:2007

20042001 2005 2009 2013

TPM TPM HMS HMS HMS

INJECTION MOLDING

24 Units (50T ~ 3000T)

COMPONENT

ASSEMBLYBLOW MOLDING

PAINTING ELECTROPLATING LASER CUTTING

Manufacturing Processes

MACHINEPLANT

SHAH ALAM TANJUNG MALIM PEKAN

INJECTION MOLDING MACHINES

50 TONNES 1

100 TONNES 1 - -

160 TONNES 1 - -

360 TONNES 2 - -

530 TONNES 3 - -

550 TONNES 5 - -

850 TONNES 2 - -

1300 TONNES 2 - -

1600 TONNES 1 - -

2500 TONNES 3 - -

2700 TONNES 1 - -

3000 TONNES 2 - -

TOTAL 24 - -

OTHER MACHINES

PAINTING LINE 1 ( MANUAL ) 1 ( ROBOTIC ) 1 ( MANUAL )

INSTRUMENT PANEL ASSY. LINES 1 1 1

CHROMING LINE 1 - -

VIBRATION WELDING 2 - -

LASER CUTTING MACHINE 1 - -

STAMPING PRESS MOLDING 1 - -

KIMEKOMI MACHINES 1 - -

BLOW MOLDING 1 - -

GAS ASSISTED INJECTION MOLDING - - -

P.U FOAMING MACHINE 1 - -

VACUUM FORMING MACHINE 1 - -

Manufacturing Equipments

1. Headlight Housing

2. Radiator Grille

3. Door Trim

4. Front bumper

5. Timing Belt Cover

6. Cam Cover

7. Garnish Front Deck

8. Nozzle Assy Defroster

9. Instrument Panel Assy

10. Front Door Trim Lower

11. Door Bracket

12. Door Handle

20. Trim Tailgate

21. Trim Rear Side

22. Boot Tray

23. Tool Kit Tray

24. Bumper Impact Beam

25. Rear Bumper

26. Inner Handle

13. Cover Airbag D/S

14. Cover Airbag P/S

15. Glove Box Assy

16. Floor Console Assy

17. Panel Lower D/S

18. Panel Cluster Lower

19. Pillar Trim

Products Range

Main Products

Products by Customers

Part Development

STYLINGCONCEPT &

PACKAGING

ENGINEERING

DESIGNCAE PROTOTYPE

MANUFACTURINGTOOLS /

JIGSTESTINGPAINTING &

ASSEMBLY

DELIVERY

(JIT)

HICOM-TECK SEE

CUSTOMER

TOOL MAKERS & VENDORS

In Collaboration with :

Products Development Cycle

Products Design

Obeya (Project Room)

Testing Equipments

Customer Base

Customer Locations

Customers

Thank You

Homepage: www.hicomtecksee.com.my

Plant Tour Safety Alerts

ATTIRE DURING PLANT VISIT

Walk along the passageway

[painted in beige color]

EMERGENCY EXITIn case of emergency (i.e. Fire), please

proceed to Emergency Assembly

Area located in front of HTS guardhouse

Emergency Assembly Area

Thank You