CHESAPEAKE BAY FIELD OFFICE COASTAL PROGRAM Hickey Run Bank Erosion Rate Curves – Why, How, and the Future Mark A. Secrist U.S. Fish and Wildlife Service Chesapeake Bay Field Office 177 Admiral Cochrane Drive Annapolis, Maryland 21401 www.fws.gov/chesapeakebay

Upload: others

Post on 03-Dec-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Hickey Run Bank Erosion Rate Curves –

Why, How, and the Future

Mark A. SecristU.S. Fish and Wildlife ServiceChesapeake Bay Field Office177 Admiral Cochrane DriveAnnapolis, Maryland 21401

www.fws.gov/chesapeakebay

Page 2: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

• Why Were The Erosion Rate Curves Were Developed

• How Were They Developed

• What Are Future Plans

Overview

Page 3: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Project Background

• USFWS – CBFO • DC DDOE

Partners

Watershed Assessments

• Watts Branch -2002• Oxon Run - 2004 • Hickey Run - 2005

Page 4: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Watershed Assessments

• Rosgen Level I, II, and III Assessment• Bankfull, Planform, and Floodprone

dimensions• Bank and Bed Stability• Predicted Sediment Supply using BANCS

Page 5: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Bank Assessment for Non-point source Consequences of Sediment (BANCS )

Page 6: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

BANCS Forms

Page 7: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

USFWS DRAFT Bank Erosion Rate Curve Development

• Monumented Cross Sections with Rebar Endpoints, Toe Pin, and Bank Pins

• Survey at Year One During Installation

• Repeat Surveys at Year Two• Compare Data to Determine

Change• Plot Data – Lateral Bank

Erosion Rate vs. NBS• Develop Regional Bank

Erosion Rate Curve

Rosgen Level III BANCS Assessment

Page 8: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run• Included in 2014 Recommendations of the Expert Panel to Define Removal

Rates for Individual Stream Restoration Projects as the Hickey Curve

Page 9: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Limitations of Curve

• 30 BEHI/NBS Combinations• Limited Data Points – 46• Large Portion of Data is High/Very High BEHI With Low/Moderate NBS• USFWS Decided Additional Data Was Needed to Make Data Set More Robust

Page 10: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

Future Plans for BANCS Data & Curve

• Informal group of individuals interested in improving regional bank erosion rate curves

• Combine Data from Partners • Obtain 6 Data Points For Each of

The 30 BEHI/NBS Combinations• Obtain 6 Data Points For Each of

The 30 BEHI/NBS Combinations• Recently decided to set up a more

formal arrangement

Collect More Data!Partners

• USFWS – CBFO • Stantec• Fairfax County • Ecosystem Planning and Restoration (EPR) • Virginia Department of Environmental

Quality

Page 11: Hickey Run Bank Erosion Rate Curves Why, How, and the Future...• Contains 46 Data Points from Watts Branch, Oxon Run, and Hickey Run • Included in . 2014 Recommendations of the

CHESAPEAKE BAY FIELD OFFICECOASTAL PROGRAM

U.S. Fish & Wildlife Service

Chesapeake Bay Field Office

177 Admiral Cochrane Drive

Annapolis, Maryland 21401

www.fws.gov/chesapeakebay

Mark A. Secrist

[email protected]