Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing Experience & Safety Improvements Analysis

Upload: others

Post on 08-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing Experience & Safety 

Improvements Analysis

Page 2: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

Background• Stonebrooke Engineering was hired by Hennepin County to evaluate pedestrian/bicycle crossing experience concerns at (3) key intersections along Hiawatha Avenue from E 32nd Street to E 46th Street

• Historical review of area improvements/analysis undertaken

• Technical Advisory Committee (TAC) formed to evaluate viability of identified improvement options– Hennepin County, City of Minneapolis, Mn/DOT, Metro Transit

• TAC/Resident concern noted• Potential feasible improvement projects identified

Page 3: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

Key Project Issues

• Address pedestrian/bicycle crossing safety issues• Improve traffic signal timing• Decrease pedestrian crossing distances• Provide appropriately sized pedestrian refuge locations

• Incorporate improvements into greater area rehabilitation efforts

• Improved accessibility

Page 4: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

32nd Street Project Issues

Page 5: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

32nd Street – Possible Improvement Areas

Page 6: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

32nd Street – Improvements Rendering

Page 7: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

38th Street Project Issues

Page 8: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

38th Street Possible Improvement Areas

Page 9: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

38th Street Improvements Rendering

Page 10: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

46th Street Project Issues

Page 11: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

46th Street Possible Improvement Areas

Page 12: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

46th Street Improvements Rendering

Page 13: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

45th/46th Street Project Issues

Page 14: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

44th to 46th Street Improvement Options

• Pedestrian bridge/skyway‐ High cost ($2M+ expected)‐ Access ramp length (ADA requirements)‐ Unknown tie‐in locations (bridge)‐ Maintenance costs

• Pedestrian Tunnel‐ High cost‐ Not feasible (water table level)‐ Eliminates vehicle to pedestrian/bicycle interaction ‐ Maintenance costs

Page 15: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

44th to 46th Street Improvement Options

• Pedestrian signal at 45th Street with median barrier from 44thStreet to 46th Street‐ Medium cost‐ Potential for low compliance by pedestrians and vehicles‐ Signal timing challenges (progression)‐ Maintenance  costs

• Median barrier from 44th to 46th Street with no access points‐ Medium cost‐ Limits mobility‐ Funnels pedestrian/bicycles to traffic controlled intersection‐ Maintenance  costs

Page 16: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

44th to 46th Street Improvement Options

• T‐intersection at 44th/45th Street with full traffic signal‐ Low probability to meet traffic signal warrants‐ High cost ‐ Challenging signal timing (progression)‐ Access management/safety concern

• Do nothing option

‐ Low cost‐ Allow current mobility patterns

Page 17: Hiawatha Avenue (TH 55) Pedestrian/Bike Crossing ...hennepin.s3.amazonaws.com/wp-content/uploads/2012/03/...Background • Stonebrooke Engineering was hired by Hennepin County to evaluate

Next Steps

• Continue to explore 44thto 46th Street improvement options

• Public involvement• Develop implementation and design plan specifics and timelines

• Preliminary Design with engineered cost estimate(s)

• Design and Implementation