Page 1: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Hg Fate and Transport Within the Hg Fate and Transport Within the San Jose/Santa Clara WPCP:San Jose/Santa Clara WPCP:

Study Design and Interim Progress Study Design and Interim Progress ReportReport

Item #4

Page 2: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
Page 3: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Why?

• Baywide Hg TMDL• Anything Special About POTW Hg?• Do POTWs Methylate Hg?• Where Does the Hg Go?

• NPDES Discharge Permit Provision• Workplan (collection and analytical methods, schedule)• Final Report (Hg F&T, Trends, Correlations, Evaluate

Feasibility of CH3Hg Reduction Program)

Item #4

Page 4: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Steps to CompletionMethod Development WorkplanLiterature ReviewDetailed SAPPhase 1 Sample CollectionStudy OptimizationPhase 2 SamplingFinal Report

Item #4

Page 5: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

MethodDevelopment

Page 6: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

The Treatment Process (simplified)

Page 7: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Treatment Process

Page 8: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

The PlanPhase 1

Weekly RS, PE, SS, NE, SE, FI, TFE, FE Total, Filtered, Total Methyl (Selected Filtered

Methyl) TSS, Chloride, Sulfate, Sulfide DO, Temp, pH, Conductivity

Monthly As above + Secondary/ Nitrification Quads Sludge Seasonal 24 hour sampling Monthly

Item #4

Page 9: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

The PlanPhase 2

Longer term, reduced frequency Monthly RS, PE, NE, SE, FI, TFE, TFBW, FE Weekly RS, FE

Special Focused Studies More sludge? Composites? More 24 hour samples? Other parameters?

Item #4

Page 10: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
Page 11: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

TSS(mg/L)

195

9095

8 8 7 102<1

0

50

100

150

200

250

RS PE SS N E SE FI TFE FBW FE

Page 12: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Total Mercury(ng/L)

178.6

94.2 87.7

5.5 5.2 5.3 1.7 5.6 2.20

50

100

150

200

250

300

RS PE SS N E SE FI TFE FBW FE

Item #4

Page 13: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Methylmercury(ng/L)

1.551.47

1.29

0.05 0.05 0.030.11

0.040.04 0.030.03

0.11

0.0

0.5

1.0

1.5

2.0

2.5

RS PE SS N E SE FI TFE FBW FE

Total

Filtered

Item #4

Page 14: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Dissolved Mercury (ng/L)

3.12

4.11

3.58

1.011.14 1.17 1.25

2.48

1.48

0.0

1.0

2.0

3.0

4.0

5.0

RS PE SS N E SE FI TFE FBW FE

* **

*

* Addition of Cl2 or H2O2

Item #4

Page 15: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

24 Hr. TSS in RS (mg/L)

0

50

100

150

200

250

300

06:00 10:00 14:00 18:00 22:00 02:00

4/28/2005

6/23/2005

9/22/2005

Item #4

Page 16: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

24 Hr. Total Hg in RS

0

50

100

150

200

250

300

350

400

06:00 10:00 14:00 18:00 22:00 02:00

4/28/2005

6/23/2005

9/22/2005

Item #4

Page 17: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

24 Hr. Dissolved Mercury in RS (ng/L)

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

06:00 10:00 14:00 18:00 22:00 02:00

4/28/2005

6/23/2005

9/22/2005

Item #4

Page 18: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
Page 19: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Sludge Total Mercury(mg/kg dry) n=5

1.80

0.72

0.84 0.85

1.55

1.90

0.0

0.5

1.0

1.5

2.0

2.5

PS WAS WNS TAS DS SL

Item #4

Page 20: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Mass Balance?

Item #4

Page 21: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
Page 22: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4
Page 23: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Interim Conclusions

• Efficiencies:– HgTOT 99%– Methyl Hg 97%– Dissolved Hg 50%

• Removal correlated with solids removal• No evidence of methylation• Flows sufficient to account for removal• Temporal bias (daily fluctuation)

Item #4

Page 24: Hg Fate and Transport Within the San Jose/Santa Clara WPCP: Study Design and Interim Progress Report Item #4

Next Steps

• Continue baseline Phase II sampling

• Independent review of Phase I results

• Discuss with Water Board

• Optimize sampling to answer questions

• Carry out optimized sampling

• Final Report 2007