© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.2
4 black-outs in 5 years
French Riviera survey – A good case for real problems
Due to HV network configuration
and population increase
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.3
PV variability on average substation – wind 4m/s – cloudy day – may 2030
French Riviera survey – A good case for real problems
-20,00%
-15,00%
-10,00%
-5,00%
0,00%
5,00%
10,00%
15,00%
20,00%
25,00%1
26
51
76
10
11
26
15
11
76
20
12
26
25
12
76
30
13
26
35
13
76
40
14
26
45
14
76
50
15
26
55
15
76
60
16
26
65
16
76
70
17
26
75
17
76
80
18
26
85
18
76
90
19
26
95
19
76
10
01
© Copyright HP 2015
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.4
Impact of EV’s on the LV network load
French Riviera survey – A good case for real problems
EV’s on 3KVA loading station
EV’s on 33 KVA loading station
TOTAL
MW
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.5
In summer not where they are today !
French Riviera survey – A good case for real problems
MW
JULYDECEMBER
MW
2000
2500
3000
3500
4000
4500
5000
5500
6000
2006 consumption 2030 cons. with Ev's
2030 HV grid flows
2000
2500
3000
3500
4000
4500
5000
5500
6000
2030 cons. with Ev's 2030 HV grid flows
© Copyright HP 2015© Copyright HP 2015
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.6
French System Operator reserve with full nuke ramp-down
Real « glocal » problem
0
2000
4000
6000
8000
10000
12000
14000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Scenario 22GW of PV
© Copyright HP 2015
Daily hours
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.7
In reality a series of major issues to be sorted out
French Riviera survey – A good sample of real problems
2015 2017 2019 2021 2023 2025 2027
Lack of reactive power injection on LV networks
Auditable capacity market capabilities
Unexpected Islanding
EV loading station
management
Sub optimal grid subscription contracts for regulated electricity
Transient gaps in PV production
17:00-19:00 ramp down (ISO)
None of those issues can be sorted out easily apart from with new DMS solutions
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.8
Smart Metering 1st generation
Con
cen
trato
rs
Head End
Data AcquisitionSupervision
MDM
Data p
ortal
Feeder capacitorsFeeder switches
Feeder voltage regulators
NetworkSupervision syst.RTU’s
Netw
ork co
ntro
l co
mm
and
Mini History
Event Logger
Meters
Security
Security
Security
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.9
Software DefinedNetworks
Towards an hybrid control
Smart Grid next generation
RTU’s with rugged hardware design
RealTimeBigData
Analytics
Event Logger
Smart meters
History
Extern
alSecu
redCo
mm
un
ication
hu
b
Settlement &Auditing
MultiprotocolComm. layer
M2M services
TimeSynchronisation
Weather ForecastWeb Services
SmartInverters
Applications and Data
Monetizationplatform
Smart Electrical DevicesOperation Center
Security Cockpit
Dispatchable MV plants
Hyd
rog
en, M
ethan
ean
d
Heatin
gn
etwo
rks
ElectricityA
dvan
ced
Distrib
utio
n
Advanced DMS center
Storage, H2 andmethanation units
HP technologies
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.10
Conclusion
Electricity control centres
will be dual
Design need to be from scratch
multi equipment's,
protocols
Security will be one of the main
issue in implementing dual
control centres
Managing millions of devices in
seconds is a “premiere” for
Utilities
Time synchronization
is also much more important than in the past
Real time big data is a must
have
Need to define system “as if”
gas and heating networks were
managed on HH basis
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.11
Contact
François Dauphin
Energy&Utility Industry Expert
HP Europe, Middle East, Africa
Mobile : +33 620 265 334
© Copyright 2012 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Thank you