hewlett packard building 5 seismic upgrade corvallis, oregon, usa tom a. armour, p.e. session iii...

14
HEWLETT PACKARD HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. TOM A. ARMOUR, P.E. SESSION III SESSION III STRUCTURAL SUPPORT & STRUCTURAL SUPPORT & SEISMIC APPLICATIONS SEISMIC APPLICATIONS IWM 2002 IWM 2002 MAY 29 – JUNE 1, 2002 MAY 29 – JUNE 1, 2002

Upload: britney-blake

Post on 05-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

HEWLETT PACKARD HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADEBUILDING 5 SEISMIC UPGRADE

CORVALLIS, OREGON, USACORVALLIS, OREGON, USA

TOM A. ARMOUR, P.E.TOM A. ARMOUR, P.E.

SESSION III SESSION III STRUCTURAL SUPPORT & STRUCTURAL SUPPORT &

SEISMIC APPLICATIONSSEISMIC APPLICATIONSIWM 2002IWM 2002

MAY 29 – JUNE 1, 2002MAY 29 – JUNE 1, 2002

Page 2: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

PROJECT SYNOPSISPROJECT SYNOPSIS“Foundation Design & Construction”“Foundation Design & Construction”

PROJECT SYNOPSISPROJECT SYNOPSIS“Foundation Design & Construction”“Foundation Design & Construction”

Voluntary Seismic Upgrade ProgramVoluntary Seismic Upgrade Program

Braced Frame Retrofit SchemeBraced Frame Retrofit Scheme

Foundation Support RequiredFoundation Support Required

Vibration and Noise SensitivityVibration and Noise Sensitivity

Access IssuesAccess Issues

Strict Pile Deflection CriteriaStrict Pile Deflection Criteria

Micropiles Most Feasible OptionMicropiles Most Feasible Option

Page 3: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

SUBSURFACE PROFILESUBSURFACE PROFILE“Ground Conditions”“Ground Conditions”

Soft Clayey Silt (ML)

Medium Dense Sands (SP)

Very Dense Sandy Gravels (GP)

8 m

3 m

Page 4: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

DESIGN SUMMARYDESIGN SUMMARY“Foundation Support System”“Foundation Support System”

DESIGN SUMMARYDESIGN SUMMARY“Foundation Support System”“Foundation Support System”

Three Micropile TypesThree Micropile Types CASE 1 Type B micropilesCASE 1 Type B micropiles 135 total micropiles135 total micropiles

Seismic Design LoadsSeismic Design Loads CompressionCompression = 540 kN – 720 kN= 540 kN – 720 kN TensionTension = 450 kN – 540 kN= 450 kN – 540 kN

Deflection Criteria Deflection Criteria Verif. = 6.4 mm @ 900 kN Test Load (1.67 SDL)Verif. = 6.4 mm @ 900 kN Test Load (1.67 SDL) Proof = 3.8 mm @ 810 kN Test Load (1.5 SDL)Proof = 3.8 mm @ 810 kN Test Load (1.5 SDL)

New and Existing Pile FootingsNew and Existing Pile Footings

3 meters to Unlimited Headroom Access 3 meters to Unlimited Headroom Access

Pile Load Test ProgramPile Load Test Program One Each Verification Test to 200% SDL on Non-Production PilesOne Each Verification Test to 200% SDL on Non-Production Piles 5% Proof Tests on Production Piles 5% Proof Tests on Production Piles

Page 5: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

TYPICAL PILE DETAILTYPICAL PILE DETAIL“H.P. Building 5”“H.P. Building 5”

10 m Casing

140 mm to 178 mm x

10.5 mm to 16 mm wall

casing

15 m Reinforcing Bar

50 mm & 63,5 mm

Plu

ng

e

Le

ng

th

Bo

nd

Z

on

e

Centralizer

Neat Cement Grout

Med. Dense Sands

Page 6: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE MATERIALSMICROPILE MATERIALS“H.P. Building 5”“H.P. Building 5”

Permanent Steel PipePermanent Steel Pipe API 5CT & ASTM A252API 5CT & ASTM A252 550 MPa yield550 MPa yield Flush joint threadsFlush joint threads

Steel ReinforcementSteel Reinforcement ASTM A615ASTM A615 Mechanical couplingMechanical coupling

Cement GroutCement Grout Neat cement – ASTM C150Neat cement – ASTM C150 W/C ratio of 0.45W/C ratio of 0.45 27,6 MPa (min)27,6 MPa (min)

Page 7: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 8: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 9: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 10: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 11: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 12: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 13: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

MICROPILE CONSTRUCTIONMICROPILE CONSTRUCTION“ H.P. Building 5”“ H.P. Building 5”

Page 14: HEWLETT PACKARD BUILDING 5 SEISMIC UPGRADE CORVALLIS, OREGON, USA TOM A. ARMOUR, P.E. SESSION III STRUCTURAL SUPPORT & SEISMIC APPLICATIONS IWM 2002 MAY

CONCLUSIONSCONCLUSIONS“H.P. Building 5 Micropiles”“H.P. Building 5 Micropiles”

Another successful Another successful

application of micropile application of micropile use for use for

seismic retrofit ofseismic retrofit of

sensitive buildings.sensitive buildings.

H.P. continuing to use H.P. continuing to use

micropiles on othermicropiles on other

building retrofits.building retrofits.