herb baker, deputy manager exploration systems procurement office / bt

6
JSC Exploration Systems Procurement Office Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT Cx Procurement Activities at JSC

Upload: starr

Post on 14-Feb-2016

34 views

Category:

Documents


1 download

DESCRIPTION

Cx Procurement Activities at JSC. Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT. Programs/Projects Supported. Contracts Awarded. Orion Contract – Lockheed Martin Orion Project Integration Contract (OPIC) – Barrios Technology Small Business Set-Aside - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice

Herb Baker, Deputy ManagerExploration Systems Procurement Office / BT

Cx Procurement Activities at JSC

Page 2: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

2

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice

Programs/Projects Supported

Page 3: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

3

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice

Contracts Awarded

• Orion Contract – Lockheed Martin

• Orion Project Integration Contract (OPIC) – Barrios Technology– Small Business Set-Aside– 5 year period of performance, including options

• COTS Space Act Agreements – SpaceEx & Orbital Sciences Corp.

• Other contracts– John Frassanito & Assoc. (graphics support) / Tecolote

(cost estimating support)

Page 4: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

4

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice

Procurements Underway• Constellation Program Support Contract (CPSC) – To Be Announced

– Small Business Set-Aside– 5 year period of performance, including options

• Constellation Space Suit System (CSSS)– Full & Open Competition– Proposals Rec’d. 12/20/07– Contract Start planned for 6/16/08

• Constellation Technical Services Contract (CTSC)– Full & Open Competition– Proposals Rec’d. 1/29/08– Contract Start planned for 7/17/08

• Lunar Lander Development Study– Broad Agency Announcement– Proposals Rec’d. 2/15/08– 3 to 5 FFP awards NTE $350K each planned

Page 5: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

5

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice

Backup Charts

Page 6: Herb Baker, Deputy Manager Exploration Systems Procurement Office / BT

6

JSC

Expl

orat

ion

Syst

ems P

rocu

rem

ent O

ffice