HEP ESCO experience with ESCO project in private sector
Vlasta Zanki, PhD
21.09.2016.
About HEP ESCO
• HEP ESCO (ESCO = Energy Service Company)
• HEP ESCO – Established in 2003 as implementation agency for energy efficiency program. Owned by Croatian utility company HEP
• Development, implementation and financing of ESCO projects – energy efficiency projects repaid from savings and RES integrated in buildings/facilities
- 13 years of experience (2003-2016)
- First ESCO company in Croatia
- More than 70 finished on more than 90 projects
- 23 milion EUR of investments
• ESCO model
What is ESCO project?
What is ESCO project?
Investment in reconstruction, modernisation in existing buildings implementing EE measures and integrating RES which is repaid from savings
FINANCING ESCO PROJECT’S
Principles of financing:
• Private clients - the period of financing up to 7 years
• Public clients - the period of financing up to 14 years
Typical project value
Range from 100.000 up to 2 mil EUR
OVERWIEW OF COMPLETED PROJECTS IN BUILDING SECTOR
COMPLETED PROJECTS
( in building sector)
Investment value
(EUR)
Annual
savings
(kWh)
Savings
(%)
Schools - 41 object
(Karlovac, Sisak, Varaždin C., Karlovac C.,
Međimurska C., Krapinsko-zagorska C.)
195.000 – 1.625.000 60.000 –
960.000
20 - 25
Office building CROSCO in Zagreb
247.500 140.000 65
HOSPITALS - OB “Ivo Pedišić” - Sisak
OB Varaždin
990.000
1.510.000
3.000.000
5.000.000
29
21
Meat industry MM 171.000 738.900 85
PUBLIC LIGHTNING
• Small investment in equipment... …for GREAT SAVINGS up to
47%
Zagreb Novigrad Varaždin Jastrebarsko Karlovac Rovinj
Z A V R Š E N I P R O J E K T I
Implemented projects (mill. kunas):
• Novigrad 2,5
• Zagreb – pilot 5,0
• Rovinj 1,9
• Varaždin 7,6
• Karlovac 8,2
• Jastrebarsko 5,1
• Solin 1,2
• Pula 13,5
• Čakovec 5,9
Total 50,9 mil KN (6,8 mil EUR)
Energy efficiency =
competitiveness
NEW ENERGY SERVICES
Meat Industry Milivoj Medven
Replacement of fuel oil to solar thermal collectors
Whole project is financed from savings.
Investment value: 171.000 EUR
Investment simple payback period:
4 years
Installation of thermal solar collectors and recuperation
of waste heat from chillers
Investment value: 108.500 EUR
Investment simple payback period: 6 years
HOTEL ADRIA - Biograd
Hotel ADRIA:
• seasonal hotel; April - October
• three star hotel
• 140 rooms, 320 beds
• internal and external swimming pool
• Electricity power 3,3 MW
• Feed in tarif
• Heat is used for wood drying and space heating
BIOMASS COGENERATION ‘HRAST’
Heat production- Velika Gorica 20 MW
District heating system
9 photovoltaic plants on roofs of HEP’s buildings (total 208 kW)
PV power plant – HOTEL ADRIA Biograd
Total 120 PV panels, with total power 29,6 kW
Total value of the ESCO project (PV+CNUS): 105.000,00 EUR
Estimated „savings” 19.072 EUR
PBT: 5,5 years
Project finished in
April 2013.
ELKA – cable industry
After implementation:
Total Investment: 137.700 EUR Estimated electrical energy savings: 540.000 kWh/year Simple payback period: 3,8 years
New high bay and linear luminaires with LED are installed More efficient lamps: >100 lm/W Optimized arrangement: from 442 old (400W mercury vapor lamps) down to 330 new luminaires Consumption reduced by more than 70% plus additional savings from reduced maintenance
PPK Karlovac meat industry
Recuperation of waste heat from chillers for heating sanitary hot water in accumulator tanks (4 x 10 m³), back up – natural gas
After implementation:
Total Investment: 302.500 EUR Estimated savings: 64.400 EUR/year Estimated savings of natural gas: 138.000 m³/year Simple payback period: 4,7 years
PROJECT SHIPYARD VIKTOR LENAC
Scope of work: more than 5500 lamps)
• Inside production halls
• Docks
• Special temporary lighting
Lighting requirement:
• Robust
• durability
• High efficiency
Contract value 1,6 mil EUR
Contract duration 7 years
SHIPYARDS 3. MAJ and ULJANIK
Scope of work: more than 5000 lamps)
• Special temporary lighting
Compressor station heat recovery: • Before: heat source - district heating network
• After: DHW heating and support for space heating from recovered
heat from compressor station • It was not typical solution but „tailor made”
• Project value: 80.000 EUR • Pay back time: 1,5 year.
PROJECT ELEKTRO-KONTAKT
EU projects and international cooperation
Partnerships with 12 EU countries
• Structural EU funds: • Preparation and implementation for clients (private companies, multi-
residential buildings, public sector) • Preparation of EE programmes for HEP group:
EU projects:
HEP ESCO developed new energy services and partnerships
Partnerships Products
NEW ENERGY SERVICES
• Energy consumption optimisation
• ESCO Monitor
• ESCO Monitor Panel
• Education – HEP ESCO training centar
Energy management – new energy service
ESCO company needs
- ESCO monitor software - Tool for improvement of ESCO projects
- Monitoring of ESCO projects – EPC contracts
- Measurement and verification of savings
- Alarming
- New services of energy management: - Smart metering of energy and water
- Energy consumption analysis
- Energy optimisation
ESCO monitor – tool for implementation of ISO 50001
Customer needs
- Establishment of property registry (buildings, industry halls, outside lighting systems)
- Collection, monitoring and analysis of energy data (on monthly, daily and hourly basis)
- Alarming
- Support in energy management and implementation of ISO 50001
- Tool for identification of energy efficiency measures
- Tool for development of energy efficiency action plans and reporting
ESCO monitor i ESCO monitor panel
Meteorological data (Zagreb)
Heat consumption and inside temperature
Public lighting – electricity consumption
Comparison of electricity consumption for two buildings
ESCO monitor panel
ESCO monitor panel
ESCO monitor panel
ESCO monitor panel
ESCO monitor panel
ESCO monitor panel
ESCO monitor panel
HEP ESCO – NEW ENERGY SERVICES
SPECIALIZED COURSES
HEP ESCO TRAINING CENTAR New energy services in the Croatian market Long term sustainable approach to energy management Education of clients and partners for the implementaton of EE and RES projects
BUILDING UP CAPACITIES FOR IMPLEMENTATION OF ESCO PROJECTS
All info available at www.hep.hr/esco/tecajevi
• HEP ESCO is organizing the course in cooperation with the Canadian
company ECONOLER, with the support of the Croatian Energy Efficiency and Environmental Protection Fund.
• Measurement and verification (M&V) of savings is becoming essential for proving the successfulness of energy efficiency projects.
HEP ESCO SPECIALIZED COURSES
CERTIFIED PROFESSIONAL FOR MEASUREMENT AND VERIFICATION (CMVP)
CERTIFIED PROFESSIONAL FOR THE USE OF RETScreen® (CRU)
ENERGY MANAGEMENT ACCORDING TO ISO 50001
Purpose of seminar • Energy management – legal obligation and response to an increasing need for
reduction of energy costs
• Legal obligation in place in public sector in Croatia
• Private sector players who already have a system in place will have benefits
• The approach based on HRN EN ISO 50001:2012 enables energy costs management in a long term manner and reduce them with the optimal ratio between investment and achieved.
• The seminar enables monitoring energy costs in public sector, industry, small
and big enterprise, energy suppliers etc..
Thank you!