HEP ESCO experience with ESCO project in private sector

Vlasta Zanki, PhD

21.09.2016.

Page 2: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

About HEP ESCO

• HEP ESCO (ESCO = Energy Service Company)

• HEP ESCO – Established in 2003 as implementation agency for energy efficiency program. Owned by Croatian utility company HEP

• Development, implementation and financing of ESCO projects – energy efficiency projects repaid from savings and RES integrated in buildings/facilities

- 13 years of experience (2003-2016)

- First ESCO company in Croatia

- More than 70 finished on more than 90 projects

- 23 milion EUR of investments

Page 3: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

• ESCO model

What is ESCO project?

Page 4: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

What is ESCO project?

Investment in reconstruction, modernisation in existing buildings implementing EE measures and integrating RES which is repaid from savings

Page 5: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

FINANCING ESCO PROJECT’S

Principles of financing:

• Private clients - the period of financing up to 7 years

• Public clients - the period of financing up to 14 years

Typical project value

Range from 100.000 up to 2 mil EUR

Page 6: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

OVERWIEW OF COMPLETED PROJECTS IN BUILDING SECTOR

COMPLETED PROJECTS

( in building sector)

Investment value

(EUR)

Annual

savings

(kWh)

Savings

(%)

Schools - 41 object

(Karlovac, Sisak, Varaždin C., Karlovac C.,

Međimurska C., Krapinsko-zagorska C.)

195.000 – 1.625.000 60.000 –

960.000

20 - 25

Office building CROSCO in Zagreb

247.500 140.000 65

HOSPITALS - OB “Ivo Pedišić” - Sisak

OB Varaždin

990.000

1.510.000

3.000.000

5.000.000

29

21

Meat industry MM 171.000 738.900 85

Page 7: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

PUBLIC LIGHTNING

• Small investment in equipment... …for GREAT SAVINGS up to

47%

Zagreb Novigrad Varaždin Jastrebarsko Karlovac Rovinj

Z A V R Š E N I P R O J E K T I

Implemented projects (mill. kunas):

• Novigrad 2,5

• Zagreb – pilot 5,0

• Rovinj 1,9

• Varaždin 7,6

• Karlovac 8,2

• Jastrebarsko 5,1

• Solin 1,2

• Pula 13,5

• Čakovec 5,9

Total 50,9 mil KN (6,8 mil EUR)

Page 8: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Energy efficiency =

competitiveness

NEW ENERGY SERVICES

Page 9: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Meat Industry Milivoj Medven

Replacement of fuel oil to solar thermal collectors

Whole project is financed from savings.

Investment value: 171.000 EUR

Investment simple payback period:

4 years

Page 10: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Installation of thermal solar collectors and recuperation

of waste heat from chillers

Investment value: 108.500 EUR

Investment simple payback period: 6 years

HOTEL ADRIA - Biograd

Hotel ADRIA:

• seasonal hotel; April - October

• three star hotel

• 140 rooms, 320 beds

• internal and external swimming pool

Page 11: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

• Electricity power 3,3 MW

• Feed in tarif

• Heat is used for wood drying and space heating

BIOMASS COGENERATION ‘HRAST’

Page 12: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Heat production- Velika Gorica 20 MW

District heating system

Page 13: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

9 photovoltaic plants on roofs of HEP’s buildings (total 208 kW)

Page 14: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

PV power plant – HOTEL ADRIA Biograd

Total 120 PV panels, with total power 29,6 kW

Total value of the ESCO project (PV+CNUS): 105.000,00 EUR

Estimated „savings” 19.072 EUR

PBT: 5,5 years

Project finished in

April 2013.

Page 15: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ELKA – cable industry

After implementation:

Total Investment: 137.700 EUR Estimated electrical energy savings: 540.000 kWh/year Simple payback period: 3,8 years

New high bay and linear luminaires with LED are installed More efficient lamps: >100 lm/W Optimized arrangement: from 442 old (400W mercury vapor lamps) down to 330 new luminaires Consumption reduced by more than 70% plus additional savings from reduced maintenance

Page 16: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

PPK Karlovac meat industry

Recuperation of waste heat from chillers for heating sanitary hot water in accumulator tanks (4 x 10 m³), back up – natural gas

After implementation:

Total Investment: 302.500 EUR Estimated savings: 64.400 EUR/year Estimated savings of natural gas: 138.000 m³/year Simple payback period: 4,7 years

Page 17: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

PROJECT SHIPYARD VIKTOR LENAC

Scope of work: more than 5500 lamps)

• Inside production halls

• Docks

• Special temporary lighting

Lighting requirement:

• Robust

• durability

• High efficiency

Contract value 1,6 mil EUR

Contract duration 7 years

Page 18: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

SHIPYARDS 3. MAJ and ULJANIK

Scope of work: more than 5000 lamps)

• Special temporary lighting

Page 19: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Compressor station heat recovery: • Before: heat source - district heating network

• After: DHW heating and support for space heating from recovered

heat from compressor station • It was not typical solution but „tailor made”

• Project value: 80.000 EUR • Pay back time: 1,5 year.

PROJECT ELEKTRO-KONTAKT

Page 20: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

EU projects and international cooperation

Partnerships with 12 EU countries

• Structural EU funds: • Preparation and implementation for clients (private companies, multi-

residential buildings, public sector) • Preparation of EE programmes for HEP group:

EU projects:

Page 21: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

HEP ESCO developed new energy services and partnerships

Partnerships Products

Page 22: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

NEW ENERGY SERVICES

• Energy consumption optimisation

• ESCO Monitor

• ESCO Monitor Panel

• Education – HEP ESCO training centar

Page 23: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Energy management – new energy service

ESCO company needs

- ESCO monitor software - Tool for improvement of ESCO projects

- Monitoring of ESCO projects – EPC contracts

- Measurement and verification of savings

- Alarming

- New services of energy management: - Smart metering of energy and water

- Energy consumption analysis

- Energy optimisation

Page 24: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor – tool for implementation of ISO 50001

Customer needs

- Establishment of property registry (buildings, industry halls, outside lighting systems)

- Collection, monitoring and analysis of energy data (on monthly, daily and hourly basis)

- Alarming

- Support in energy management and implementation of ISO 50001

- Tool for identification of energy efficiency measures

- Tool for development of energy efficiency action plans and reporting

Page 25: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor i ESCO monitor panel

Page 26: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Meteorological data (Zagreb)

Page 27: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Heat consumption and inside temperature

Page 28: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Public lighting – electricity consumption

Page 29: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

Comparison of electricity consumption for two buildings

Page 30: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 31: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 32: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 33: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 34: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 35: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 36: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ESCO monitor panel

Page 37: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

HEP ESCO – NEW ENERGY SERVICES

SPECIALIZED COURSES

HEP ESCO TRAINING CENTAR New energy services in the Croatian market Long term sustainable approach to energy management Education of clients and partners for the implementaton of EE and RES projects

BUILDING UP CAPACITIES FOR IMPLEMENTATION OF ESCO PROJECTS

All info available at www.hep.hr/esco/tecajevi

Page 38: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

• HEP ESCO is organizing the course in cooperation with the Canadian

company ECONOLER, with the support of the Croatian Energy Efficiency and Environmental Protection Fund.

• Measurement and verification (M&V) of savings is becoming essential for proving the successfulness of energy efficiency projects.

HEP ESCO SPECIALIZED COURSES

CERTIFIED PROFESSIONAL FOR MEASUREMENT AND VERIFICATION (CMVP)

CERTIFIED PROFESSIONAL FOR THE USE OF RETScreen® (CRU)

Page 39: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

ENERGY MANAGEMENT ACCORDING TO ISO 50001

Purpose of seminar • Energy management – legal obligation and response to an increasing need for

reduction of energy costs

• Legal obligation in place in public sector in Croatia

• Private sector players who already have a system in place will have benefits

• The approach based on HRN EN ISO 50001:2012 enables energy costs management in a long term manner and reduce them with the optimal ratio between investment and achieved.

• The seminar enables monitoring energy costs in public sector, industry, small

and big enterprise, energy suppliers etc..

Page 40: HEP ESCO experience with ESCO project in private sector · 2016-10-04 · PROJECT ELEKTRO-KONTAKT . EU projects and international cooperation Partnerships with 12 EU countries •

[email protected]

Thank you!