hello from harmonix

13
Harmonix Construction Ltd Less Hassle – More harmony

Upload: lauramccracken

Post on 04-Jul-2015

277 views

Category:

Real Estate


0 download

DESCRIPTION

A quirky little introduction to Harmonix if you don\'t know us!

TRANSCRIPT

  • 1. Harmonix Construction LtdLess Hassle More harmony

2. Hello from Harmonix Harmonix Construction Ltd was established in 1999 by directors who have extensive experience from major contractors. We have a flat management structure, with no middle managers. We guarantee one of the three following directors will be directly involved with your project from concept to completion Less shirking More working 3. The Directors Giles Langan I am involved in all aspects of Harmonix from estimating, design coordinating, project management, planning, quantity surveying and directing a regionalbusiness. I love the diversity and the challenges that our industry throws up and I am proud to call myself a professional builder.John Farragher Youll find us user-friendly and informal. We dont need suits to give uscredibility. When pitching we wont try to blind you with science or reams of unnecessary twaddle, we cut to the chase and tell you exactly whatyou need to know.Tr o y H u n t e r Having cut our teeth working for construction giants, we bring thatexperience to every job no matter what the size. As principal contractors, we take on large contracts, coordinate all the elements and deliver through sub-contractors on brief, on time and on budget. Less prevarication More motivation 4. Hello from Harmonix Lower overheads means we can deliver best value for money 2009 marks our 10th birthday, and in those 10 years we have never handed over a project late We founded Harmonix to live a better quality of life, and build much closer relationships with our clients Most jobs break down because of unhappy subcontractors, so we look after them and pay them on time We only take on work that we can deliver. If we cant give 100% we wont take it on. We promise! We have lots of repeat business from our clients including; Countryside Properties, Tideway, Stace and Access Self StorageLess tea More work 5. H a r m o n i x K e y Fa c t s Our turnover for 2009 was 13.1mOur operating area is London and the South East of EnglandWe consider projects between the value of 100k - 7mWe are active in the following markets: office, residential, hotel& leisure and light industrialWe operate from our head office in Great Portland Street,London Our Health & Safety Policy and Site practises are audited byindependent advisorsWe have built a reputation for producing a high quality producton time, within budget and operating in a friendly non-adversarial way Less discussion More planning 6. Experience-StorageAccess Self Storage, Clapham : 7.6m - 68 weeks D&BChallenges: Harmonix Solutions: This project was the first Access Troy Hunter had a hands-on double basement store withapproach to this project from start to challenging planning issues.finish, personally ensuring the project was finished on time and to budget.Less bark More bite 7. Experience-HotelsNew Hotel, Bicester Golf & Country Club : 6m - 40 weeks D&BChallenges:Harmonix Solutions: Ensuring that the new 52 bedroom The construction was a mix of hotel was sympathetic to its traditional build in Cotswold stone surroundings and did not jar with theand block cavities, with timber roof local countryside. covered with slate. Less guessing More planning 8. Experience-Commercial Skyline 120, Braintree : 9.2m - 44 weeks D&BChallenges: Harmonix Solutions: The initial works prior to foundationsThe understanding and logistics of involved diverting the route of the diversion and lime stabilisation existing field ditches, and thenprocess was crucial to successfully carrying out lime stabilisation of thepreparing the oversight on which all whole site using excavated material construction activities would be previously stored on site by the Client.carried out.Less indecision More precision 9. Experience-Commercial2-3 Conduit Street, London : 1.2m - 18weeks D&BChallenges:Harmonix Solutions: On this project there were noThe phased construction took place over drawings, only a design intent brief an 18 week programme in this occupied and the project had to commencebuilding. The success of phase 1 meant within two weeks of the initialthat another two floors were awarded to enquiry. Harmonix, which were also successfullycompleted. Less pain More gain 10. Experience-ResidentialHarrington Court, London : 6.5m - 72 weeks TraditionalChallenges: Harmonix Solutions: This highly challenging and exciting projectDuring the process of refurbishment, the comprised the total refurbishment of an site was geared towards causing minimal existing mansion block providing 44no disruption to enable the shops beneath apartments over 1st to 5th floors. Majorthe mansion block to continue trading as internal re-configuration involved demolition normal. The strict planning condition was of floors and walls and installation of sympathetically accommodated in the structural steelwork. design of the bespoke windows and doors.Less veneer More depth 11. Contented Clients & Consultants I am sure that the standard of Harmonix exhibited a professional finish of our new hotel willapproach to 17/18 Old Bond Street impress. It was good to have thein terms of assisting with the same contact person from start to provision of design suggestions, finish, this on my part helped theproducing detailed and accurate development run smoothly. There contract documents and detailed is no doubt that on any futureitemised pricing. They also provided development I shall call upon a detailed analysis of each aspect of Harmonix first.the contract, suggesting Graham Payne, MD, Bicesterimprovements and cost saving Country Clubmeasures. We were fully satisfied with Harmonix role in the project Philip John, Tideway Investment ManagementLess no More yes 12. Contented Clients & Consultants I was really pleased with theHarmonix were diligent throughout Access Storage Stevenage finishthe Access Storage Clapham project internally and externally, you haveovercoming obstacles encountered done a great job. I would like youwith a proactive approach and ato thank your whole team.willingness to find good cost effectiveShital Thakkar, Access Self Storagesolutions. LtdWe would be happy to recommendHarmonix Construction as a reliableand professional contractor.Nick Mayger, Peter LawrenceStallworthy (QS) Less opaque More transparent 13. Less hassle More harmony