hebron project team · worleyparsons was awarded the contract for front-end engineering and design...

8
The Hebron Project includes offshore surveys, engineering, procurement, fabrication, construction, installation, commissioning, development drilling, production, operations and maintenance and decommissioning of an offshore oil / gas production system and associated facilities. Hebron is a major project that will deliver VLJQL¿FDQW EHQH¿WV WR &DQDGD SDUWLFXODUO\ to Newfoundland and Labrador: engineering, fabrication and construction, employment and training of a diverse workforce, research and development opportunities, along with VLJQL¿FDQW UR\DOW\ DQG WD[ UHYHQXHV +HEURQ LV D KHDY\ RLO ¿HOG HVWLPDWHG WR FRQWDLQ PLOOLRQ EDUUHOV RI UHFRYHUDEOH UHVRXUFHV 7KH ¿HOG ZDV ¿UVW GLVFRYHUHG LQ DQG LV ORFDWHG RIIVKRUH 1HZIRXQGODQG DQG /DEUDGRU LQ WKH -HDQQH G¶$UF %DVLQ NLORPHWUHV VRXWKHDVW RI 6W -RKQ¶V the capital of Newfoundland and Labrador. Hebron Project Team The Hebron co-venturers are: ([[RQ0RELO &DQDGD 3URSHUWLHV &KHYURQ &DQDGD 5HVRXUFHV 6XQFRU (QHUJ\ ,QF 6WDWRLO &DQDGD 1DOFRU (QHUJ\ ([[RQ0RELO &DQDGD 3URSHUWLHV is the operator of the Hebron Project. For more information, please visit: www.hebronproject.com

Upload: others

Post on 20-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

The Hebron Project includes offshore surveys, engineering, procurement, fabrication, construction, installation, commissioning, development drilling, production, operations and maintenance and decommissioning of an offshore oil / gas production system and associated facilities.

Hebron is a major project that will deliver

to Newfoundland and Labrador: engineering, fabrication and construction, employment and training of a diverse workforce, research and development opportunities, along with

the capital of Newfoundland and Labrador.

Hebron Project Team

The Hebron co-venturers are:

is the operator of the Hebron Project.

For more information, please visit:

www.hebronproject.com

Page 2: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

www.kkc-gbs.comKiewit-Kvaerner Contractors

topsidesproject.worleyparsons.com

Combined Experience Means Excellent Deliverables

Bull Arm Site

Work in ProgressThe Hebron Field will be developed using a stand-alone, concrete gravity based structure (GBS) production platform. Kiewit-Kvaerner Contractors (KKC), a 50/50 partnership between Peter Kiewit Infrastructure Co. and Kvaerner, was awarded the contract by ExxonMobil Canada Properties (EMCP) for the Hebron GBS Project.

The GBS will consist of a reinforced concrete structure designed to withstand the weight of the topsides, icebergs, and meteorological and oceanographic conditions at the offshore Hebron Project Site. The total platform will be installed in approximately 95 metres water depth at the Grand Banks offshore Newfoundland and Labrador, Canada.

The GBS will be designed to store approximately 1.2 million barrels of crude oil in multiple separate storage compartments.

Peter Kiewit Infrastructure Co. and Kvaerner have a long history of working together, which includes work on the Hibernia GBS Project

vessel. With over 125 years of construction experience, Kiewit is one of North America’s largest and most respected construction and mining organizations. Kvaerner has completed some 20 GBS projects over the last 40 years, making it the leading GBS contractor worldwide.

WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron topsides platform. Topsides components include the Utilities & Process Module, Drilling Support Module, Derrick Equipment Set, Living Quarters, Flare Boom, Helideck and Lifeboat Stations. The topsides components will be installed and integrated on the Bull Arm topsides assembly pier constructed for the Hibernia

site for integration with the gravity based structure.

WorleyParsons, working with Fluor, will provide overall project management of the contract with sub-contracts to be awarded to multiple third parties, with a special emphasis on performing work in Newfoundland and Labrador.

THE HEBRON TOPSIDES PROJECT

PROVEN track record in the delivery of large, integrated topside facilities.

www.worleyparsons.com

THE HEBRON GBS PROJECT

World Leaders in Gravity Based Structures

COMBINED engineering, procurement, construction and marine EXPERIENCE, from many SUCCESSFUL projects, applied RIGHT HERE.

www.kkc-gbs.comKiewit-Kvaerner Contractors

Page 3: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

View Looking North

Hebron Drilling and Production Platform

topsidesproject.worleyparsons.com

View Looking Northwest

View From Above

Page 4: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

ou

www.kkc-gbs.comKiewit-Kvaerner Contractors

Overall Hebron PlatformExecution Basis

WorleyParsons Topsides

Construction Planning

COMPLETED TOPSIDESCOMPLETED TOPSIDES

Topsides

Shuttle Tanker

Support Vessel

Gravity-Based StructureOffshore Loading System (OLS)

Oil

Water

OLS

Pipeline

Pipeline

GBS Construction Sequence

GBS Key Quantities

Topsides Construction Sequence

Topsides Platform Execution Basis

Topsides Key Metrics

Kiewit-Kvaerner ContractorsGravity Based Structure Construction Planning

Page 5: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

SAFETY PERFORMANCE TARGETS

Zero Harm Nobody Gets Hurt No Incidents No Adverse Environmental Impacts

The minimum Personal Protection Equipment (PPE) is as follows:

at all times in work areas

“Never walk past an unsafe act or condition”.

Is the proper Permit to W

Is the person carrying the material properly? O

Name:____________________________Date:___________

Badge # ____ ____ ____ ____ ____

Discipline:

O Staff

O Craft

O Sub

O Other

Company:

O EM

O KKC

O WP

Department:O Engineers O Operations

O Electrical O Office O Iron Person

O Camp O Paint

O Pipe / Welding

O Maintenance O Quality O Site Wide Services

O Mechanical O SSH&E O Labourers

O Carpenters O Marine

Shift: O Day

O Night

The Project thanks you for taking the extra step in completing

this Observation Intervention Card. Your effort will improve all of our safety

and well-being. With the information you have provided, together we will

build a safer and better place to work!“NOBODY GETS HURT”

n? O Yes O No

________

es

Serious About Zero

April 28, 2011

Minimum mandatory Personal Protective Equipment (PPE)

Safety PoliciesObservation and intervention from SAZ cards

Being safe means everybody goes home to the people they love.

Combined Experience Means Excellent Deliverables

Delivering Extraordinary Safety Performance... Leaving a Lasting Legacy

www.kkc-gbs.comKiewit-Kvaerner Contractors

topsidesproject.worleyparsons.com

Visitor responsibilities

Keep in mind

Questions?

REDUCE, REUSE, RECYCLEPlease help us protect

Page 6: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

THE HEBRON TOPSIDES PROJECT

www.worleyparsons.com

Incorporating environmental

and social sustainability into

Topsides design and construction

THE HEBRON TOPSIDES PROJECT

OneWayTM incorporates

health, safety and

environment into all

aspects of Topsides

design and construction

www.worleyparsons.com

Zero harm ... to people the environment and assets

THE HEBRON GBS PROJECT

World Leaders in Gravity Based Structures

We all work SAFELY so everyone getsto go HOME to the FRIENDS

and FAMILY they LOVE.

www.kkc-gbs.comKiewit-Kvaerner Contractors

www.kkc-gbs.comKiewit-Kvaerner Contractors

THE HEBRON GBS PROJECT

World Leaders in Gravity Based Structures

We STRIVEto leave the BEAUTIFUL places

we work in BETTER than we found them.

Contractors committed to Health, Safety,

Environment and Community

Page 7: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

Hebron Project Milestones

2017First Oil

2016Hook-up

and Commissioning

2013Topsides Fabrication

2012Detailed Design

Development Application Approval

Project Sanction

GBS Construction

2011Development Application

Bull Arm Site Work

Comprehensive Study Report Approval

2010Commenced Front End Engineering and Design

Page 8: Hebron Project Team · WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron

Engineering, Procurement and Construction of a Gravity Based Structure

World ClassGBS Execution

www.kkc-gbs.com

Construction in Dry Dock

Construction at Deep Water Site