hebron project team · worleyparsons was awarded the contract for front-end engineering and design...
TRANSCRIPT
The Hebron Project includes offshore surveys, engineering, procurement, fabrication, construction, installation, commissioning, development drilling, production, operations and maintenance and decommissioning of an offshore oil / gas production system and associated facilities.
Hebron is a major project that will deliver
to Newfoundland and Labrador: engineering, fabrication and construction, employment and training of a diverse workforce, research and development opportunities, along with
the capital of Newfoundland and Labrador.
Hebron Project Team
The Hebron co-venturers are:
is the operator of the Hebron Project.
For more information, please visit:
www.hebronproject.com
www.kkc-gbs.comKiewit-Kvaerner Contractors
topsidesproject.worleyparsons.com
Combined Experience Means Excellent Deliverables
Bull Arm Site
Work in ProgressThe Hebron Field will be developed using a stand-alone, concrete gravity based structure (GBS) production platform. Kiewit-Kvaerner Contractors (KKC), a 50/50 partnership between Peter Kiewit Infrastructure Co. and Kvaerner, was awarded the contract by ExxonMobil Canada Properties (EMCP) for the Hebron GBS Project.
The GBS will consist of a reinforced concrete structure designed to withstand the weight of the topsides, icebergs, and meteorological and oceanographic conditions at the offshore Hebron Project Site. The total platform will be installed in approximately 95 metres water depth at the Grand Banks offshore Newfoundland and Labrador, Canada.
The GBS will be designed to store approximately 1.2 million barrels of crude oil in multiple separate storage compartments.
Peter Kiewit Infrastructure Co. and Kvaerner have a long history of working together, which includes work on the Hibernia GBS Project
vessel. With over 125 years of construction experience, Kiewit is one of North America’s largest and most respected construction and mining organizations. Kvaerner has completed some 20 GBS projects over the last 40 years, making it the leading GBS contractor worldwide.
WorleyParsons was awarded the contract for front-end engineering and design work and to provide detailed engineering, procurement and construction of the Hebron topsides platform. Topsides components include the Utilities & Process Module, Drilling Support Module, Derrick Equipment Set, Living Quarters, Flare Boom, Helideck and Lifeboat Stations. The topsides components will be installed and integrated on the Bull Arm topsides assembly pier constructed for the Hibernia
site for integration with the gravity based structure.
WorleyParsons, working with Fluor, will provide overall project management of the contract with sub-contracts to be awarded to multiple third parties, with a special emphasis on performing work in Newfoundland and Labrador.
THE HEBRON TOPSIDES PROJECT
PROVEN track record in the delivery of large, integrated topside facilities.
www.worleyparsons.com
THE HEBRON GBS PROJECT
World Leaders in Gravity Based Structures
COMBINED engineering, procurement, construction and marine EXPERIENCE, from many SUCCESSFUL projects, applied RIGHT HERE.
www.kkc-gbs.comKiewit-Kvaerner Contractors
View Looking North
Hebron Drilling and Production Platform
topsidesproject.worleyparsons.com
View Looking Northwest
View From Above
ou
www.kkc-gbs.comKiewit-Kvaerner Contractors
Overall Hebron PlatformExecution Basis
WorleyParsons Topsides
Construction Planning
COMPLETED TOPSIDESCOMPLETED TOPSIDES
Topsides
Shuttle Tanker
Support Vessel
Gravity-Based StructureOffshore Loading System (OLS)
Oil
Water
OLS
Pipeline
Pipeline
GBS Construction Sequence
GBS Key Quantities
Topsides Construction Sequence
Topsides Platform Execution Basis
Topsides Key Metrics
Kiewit-Kvaerner ContractorsGravity Based Structure Construction Planning
SAFETY PERFORMANCE TARGETS
Zero Harm Nobody Gets Hurt No Incidents No Adverse Environmental Impacts
The minimum Personal Protection Equipment (PPE) is as follows:
at all times in work areas
“Never walk past an unsafe act or condition”.
Is the proper Permit to W
Is the person carrying the material properly? O
Name:____________________________Date:___________
Badge # ____ ____ ____ ____ ____
Discipline:
O Staff
O Craft
O Sub
O Other
Company:
O EM
O KKC
O WP
Department:O Engineers O Operations
O Electrical O Office O Iron Person
O Camp O Paint
O Pipe / Welding
O Maintenance O Quality O Site Wide Services
O Mechanical O SSH&E O Labourers
O Carpenters O Marine
Shift: O Day
O Night
The Project thanks you for taking the extra step in completing
this Observation Intervention Card. Your effort will improve all of our safety
and well-being. With the information you have provided, together we will
build a safer and better place to work!“NOBODY GETS HURT”
n? O Yes O No
________
es
Serious About Zero
April 28, 2011
Minimum mandatory Personal Protective Equipment (PPE)
Safety PoliciesObservation and intervention from SAZ cards
Being safe means everybody goes home to the people they love.
Combined Experience Means Excellent Deliverables
Delivering Extraordinary Safety Performance... Leaving a Lasting Legacy
www.kkc-gbs.comKiewit-Kvaerner Contractors
topsidesproject.worleyparsons.com
Visitor responsibilities
Keep in mind
Questions?
REDUCE, REUSE, RECYCLEPlease help us protect
THE HEBRON TOPSIDES PROJECT
www.worleyparsons.com
Incorporating environmental
and social sustainability into
Topsides design and construction
THE HEBRON TOPSIDES PROJECT
OneWayTM incorporates
health, safety and
environment into all
aspects of Topsides
design and construction
www.worleyparsons.com
Zero harm ... to people the environment and assets
THE HEBRON GBS PROJECT
World Leaders in Gravity Based Structures
We all work SAFELY so everyone getsto go HOME to the FRIENDS
and FAMILY they LOVE.
www.kkc-gbs.comKiewit-Kvaerner Contractors
www.kkc-gbs.comKiewit-Kvaerner Contractors
THE HEBRON GBS PROJECT
World Leaders in Gravity Based Structures
We STRIVEto leave the BEAUTIFUL places
we work in BETTER than we found them.
Contractors committed to Health, Safety,
Environment and Community
Hebron Project Milestones
2017First Oil
2016Hook-up
and Commissioning
2013Topsides Fabrication
2012Detailed Design
Development Application Approval
Project Sanction
GBS Construction
2011Development Application
Bull Arm Site Work
Comprehensive Study Report Approval
2010Commenced Front End Engineering and Design
Engineering, Procurement and Construction of a Gravity Based Structure
World ClassGBS Execution
www.kkc-gbs.com
Construction in Dry Dock
Construction at Deep Water Site