![Page 1: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/1.jpg)
![Page 2: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/2.jpg)
Heating Costs in Alaska Technology options Technology options
› Biomass Cordwood Chips Pellets
› District Heating Infrastructure› District Heating Infrastructure› Other Heating Technologies› Combined Heat and PowerCombined Heat and Power
Economic Development Opportunities Regional Planning Regional Planning EPA Biomass Boiler Emissions Rules
2
![Page 3: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/3.jpg)
Break-down of Energy Costs▀ Heating
AnchorageAmbler Bethel
g▀ Transportation▀ Electric (with PCE)
17%
Anchorage
21%
11%
Ambler
14%27%
Bethel
$8182$7685
13%
70%68% 59%
27%
$13011
$9461 $5368
Source: Alaska Energy Authority Internal Analysis using 2008 Energy Costs 3
![Page 4: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/4.jpg)
4
![Page 5: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/5.jpg)
Gulkana Community Wood-Fired Boiler5
![Page 6: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/6.jpg)
RE Fund Grant $500 000
Gulkana Community Wood-Fired BoilerRE Fund Grant $500,000Total Project Cost $ 500,000Est Fuel Displaced/yr 14,600 gal2010 (Oct‐Dec) ~3,000 gal
6
![Page 7: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/7.jpg)
Chip Boilers
Tok School Wood-Fired Boiler7
![Page 8: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/8.jpg)
Tok School Wood-Fired BoilerTok School Wood Fired Boiler
RE Fund Grant $ 3 245 349RE Fund Grant $ 3,245,349 Total Project Cost $ 3,805,349Est Fuel Displaced/yr 50,400 gal
8
![Page 9: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/9.jpg)
Pellet Boilers
Sealaska PlazaTotal Project Cost $ 1,400,000(efficiency upgrade transportation)(efficiency upgrade, transportation) Est Fuel Displaced/yr 35,000 galActual (Nov 19 – Dec 2010) 5000 gal
9
![Page 10: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/10.jpg)
Biomass Projects in Alaska
Biomass Projects
10
![Page 11: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/11.jpg)
Basic Infrastructure that provides heat to multiple buildings› Heating Source (diesel generator, biomass, etc.)› Heat Exchangers› Heat Exchangers› Circulating pumps› Underground piping
C t l d M t› Controls and Meters Flexible
› Can provide heat from multiple, different sourcesp p ,› Power systems can be added in the future› Can be expanded to grow with a community
11
![Page 12: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/12.jpg)
Diesel Generator Heat Recovery Systems
Electric Boilers › Excess hydroelectric or wind › Excess hydroelectric or wind
power to heat community buildings or district heating systemssystems
› Aides in grid stabilization Ground Source Heat Pumps Industrial Heat Recovery
› North Pole Refinery condenser heat is used to heat turbine heat is used to heat turbine building
12
![Page 13: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/13.jpg)
Production of electricity and useful thermal energy y gyfrom a single source of energy
Small scale biomass technology (less than 2 MW) is iemerging
Demonstration Projects› Renewable Energy FundRenewable Energy Fund
Cordova (Diesel) Unalaska (Diesel) Kotzebue (Diesel)( ) Chena Power (Biomass)
› Hoonah Micro-Scale Continuing to monitor technology development Continuing to monitor technology development
13
![Page 14: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/14.jpg)
Lowers energy costs, maintains cash flow within a it d i i d dcommunity, and increases independence
Jobs Creation› Construction› Operation/Maintenance› Harvest/Thinning/Resource Management
Business Opportunitiespp› Equipment Suppliers› Construction/Maintenance Services› Heat Utilities› Wood Pellet Manufacture
Forest Products Industry Support› Use for sawmill waste › Use for sawmill waste › Use for forest health/thinning residue
14
![Page 15: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/15.jpg)
Continue to conduct outreach to educate communities on heating opportunities
Incorporate Biomass and other pheating options into the SEIRP
Initiate additional feasibility studies for biomass and diesel heat recovery
Pursue partnerships and funding opportunities for design/construction of viable projectsdesign/construction of viable projects
15
![Page 16: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/16.jpg)
June 2010 – EPA released biomass coal and oil June 2010 EPA released biomass, coal, and oil boiler emission rules for comment› Annual stack testing for all boilers.› Emissions limits for new boilers› EPA received over 4000 comments
Dec 2010 – EPA requested an additional year to Dec 2010 EPA requested an additional year to rework standards based on comments› Courts allowed 30 days
Re ised r les released Feb 2011› Revised rules released Feb 2011 New Rules – Impact to Biomass in Alaska
› Small Boilers – boiler tune-up every 2 yearsp y y› Future opportunity for more input
16
![Page 17: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/17.jpg)
17
![Page 18: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/18.jpg)
Diesel Heat Recovery
(Since 2000)(Since 2000)
18
![Page 19: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/19.jpg)
19
![Page 20: Heating Costs in Alaska - Southeast Conference · REFundGrant $500 000 Gulkana Community Wood-Fired Boiler $500,000 Total Project Cost $ 500,000 Est Fuel Displaced/yr 14,600 gal 2010](https://reader033.vdocuments.mx/reader033/viewer/2022060310/5f0a9c577e708231d42c7b0c/html5/thumbnails/20.jpg)
Continue education and outreach for biomass heating opportunitiesopportunities
With State Forestry, prioritize and conduct resource assessments to assure sustainable harvest
“Fill th Pi li ” “Fill the Pipeline” › 3-year plan to conduct feasibility studies including technology
and resource assessments› Collaboration with Regional State and Federal Agencies› Collaboration with Regional, State, and Federal Agencies› Utilize state funding as matching for Federal Grants for design/
construction Support rapid deployment of heating systems in rural Alaska Support rapid deployment of heating systems in rural Alaska
› Garn in a Box Support Pellet Manufacturing in Alaska