AGENDA: Tonight, the meeting will be more focused on the park improvements as the funding is in place and the first phase of the project can be implemented in 2018
Items to review: Phase I: Park Improvements Phase II: Park and Pool
Rules of the Road: Welcome! Thank you for your participation. • Please Hold all questions until the end of the presentation. • Sign-In Before you leave.
![Page 3: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/3.jpg)
Design Guidelines: (as discussed in September) • Community Input • Existing Condition Surveys • Engineering Surveys • Engineering Calculations & Design Best Practices • DC Department of the Environment (DDOE) • DDOE - Low Impact Development (LID) Construction and Maintenance Guidance Manual • Sustainable DC • DC Historic Preservation Office (HPO) • DC Department of Consumer and Regulatory Affairs (DCRA) • Urban Forestry Administration (UFA) – Arborist(s) Recommendations
![Page 4: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/4.jpg)
Hearst Park & Pool Schedule
• Project Design – Present – Spring 2018 • Park Construction Start – Summer 2018 – Winter 2018 • Playground Construction – Summer 2018 • Pool and Pool House Construction Start – 2019 • Park and Pool Construction – Early 2019 to Late 2019
![Page 5: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/5.jpg)
Hearst Park Location Map
- Southern Lot: DPR (1) - Northern Lot: DPR & DCPS (2) - Eastern Lot: DDOT (3)
3
2
1
N
![Page 6: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/6.jpg)
Hearst Park: Existing
Conditions
![Page 7: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/7.jpg)
Hearst Overall Project: Concept Progression:
Three locations were explored for feasibility.
Concept I: South
Concept II: North
Concept III: East
![Page 8: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/8.jpg)
Hearst Park: Phase I (2018) Concept Options:
- Newly graded field - Irrigation System - Playground Shade - Walking Trail - Bio-filtration area - Plantings - Site Furnishing - New ADA Improvements - Vegetation Enhancement
on East & South Slopes
Existing
![Page 9: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/9.jpg)
Field Improvements:
- Regrade the site - Engineered draining organic soils - Install Irrigation - Sod the playing field - Improved Field Drainage System
Natural Sod Grass
![Page 10: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/10.jpg)
Walking Trail
Concrete Paths
Permeable Rubber Paths Boardwalks
Recommended Paths: - Concrete - Boardwalks
Optional Paths: - Permeable Rubber - Pavers
Paver Paths
![Page 11: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/11.jpg)
Bio-Filtration Area
Raised boardwalk & western bio-retention area
- Stormwater Management - Native Habitats - Butterfly Garden - Educational Signage - Boardwalks
![Page 12: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/12.jpg)
Northeast entrance – facing south
- Accent trees - Directional / Informational
Signage
Park Entrances
![Page 13: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/13.jpg)
Proposed new signage to compliment selected concept
![Page 14: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/14.jpg)
Site Furnishings
Bicycle Racks Path Lighting
Bench Drinking Fountain
Picnic Tables Grill Racks
![Page 15: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/15.jpg)
Playground
- Improved shading - Modify Play Areas - Additional Site
Amenities
![Page 16: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/16.jpg)
+/-42’
Hearst Park & Pool: Phase II (2019)
Concept Overview:
- All work is to stay south of the existing tennis fence
- The heritage trees are a minimum of 40’ away from the limit of work
Limits of Ex. Tennis Courts
Limits of Proposed Construction
![Page 17: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/17.jpg)
Aerial View Facing North
Pool & Tennis Courts
![Page 18: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/18.jpg)
Pool & Tennis Courts
Aerial View Facing North
![Page 19: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/19.jpg)
Pool House
View facing north from corner of 37th Street and Quebec Street
![Page 20: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/20.jpg)
Landscaping - Trees
![Page 21: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/21.jpg)
Landscaping - Grasses
![Page 22: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/22.jpg)
Landscaping - Shrubs
![Page 23: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/23.jpg)
Landscaping Perennials & Bulbs
![Page 24: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/24.jpg)
Landscaping Perennials & Bulbs
![Page 25: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/25.jpg)
Next Steps: - DPR/DGS will update the ANC3F on Tuesday November 21st regarding this
community meeting;
- This presentation will be posted on the DGS website; - General Contractor Procurement for Phase 1 to start Early 2018;
- The next community meeting will be to review the updated developments of the
park & pool house designs.
![Page 26: Hearst community meeting 11.16.2017 430pm final](https://reader033.vdocuments.mx/reader033/viewer/2022052706/5a64dfce7f8b9a6d5d8b4c0f/html5/thumbnails/26.jpg)
Contact Information
Department of General Services (DGS)
Jackie Stanley, Community Outreach Specialist [email protected]
Department of Parks & Recreation (DPR)
Peter Nohrden, ASLA / Project Manager [email protected]