Head Office – Case Study. Make the most of your energy. Studying Utility Bill. Consumption. Fixed Costs. Consumption Summary. Seasonal Load Analysis. Consumption. kWh. Bill divided to two main Parts. Fixed Costs. Lighting Control. After. Before. Offices. No supervision or control. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Head Office – Case Study

Make the most of your energy

Head Office – Case Study

Page 2: Head Office – Case Study

Schneider Electric 2- Division - Name – Date

Consumption

Fixed Costs

Studying Utility Bill

Page 3: Head Office – Case Study

Schneider Electric 3- Division - Name – Date

Bill divided to two main Parts

Consum

ption

Fixed Costs

Consumption Summary

kWh

Seasonal Load Analysis

Page 4: Head Office – Case Study

Schneider Electric 4- Division - Name – Date

On 24/7

manually operated

No supervision or control

Installing Control System

Setup operating strategy

Setup an operating schedule

Lighting Control

Before After

Offices

Basement

Outside Lighting

saving will be around 57% from the Lighting consumption which is about 20% from total consumption monthly

Page 5: Head Office – Case Study

Schneider Electric 5- Division - Name – Date

21006

16209

Lighting Effect Graph

Page 6: Head Office – Case Study

Schneider Electric 6- Division - Name – Date

Air CooledChiller

Air Handling Unit

Fan Coil Unit

CHWS

CHWR

Insulation

CHW Pumps

HVAC System

Page 7: Head Office – Case Study

Schneider Electric 7- Division - Name – Date

Opportunities of Saving in HVAC System

Chillers

• 2 Chillers each is 250 ton

Air Handling Units

• 4 AHU’s with different capacities

Fan Coil Units

• 109 FCU’s with different capacities

Building Envelope

• Doors, infiltrations and windows

Chiller Tuning

Kwh

Time

Setpoints

saving will be 14% from the consumption of the chiller and 1% from the total consumption

Page 8: Head Office – Case Study

Schneider Electric 8- Division - Name – Date

Opportunities of Saving in HVAC System

Chillers

• 2 Chillers each is 250 ton

Air Handling Units

• 4 AHU’s with different capacities

Fan Coil Units

• 109 FCU’s with different capacities

Building Envelope

• Doors, infiltrations and windows

Opportunity-we have different sizes of FCU’s each have different Capacity with a specified amount of water for each Capacity

Audit action:-balancing the system by adjusting the amount of water Entering each fan

Saving will be 6% from total consumption

Page 9: Head Office – Case Study

Schneider Electric 9- Division - Name – Date

Opportunities of Saving in HVAC System

Chillers

• 2 Chillers each is 250 ton

Air Handling Units

• 4 AHU’s with different capacities

Fan Coil Units

• 109 FCU’s with different capacities

Building Envelope

• Doors, infiltrations and windows

Opportunities:1- AHU serving Training room2- AHU serving LAB

Recommendations:1- For Training room installing 2 split units and occupancy sensors in which the payback will be with in 12 months.2- For LAB installing occupancy sensor in which the payback Period will be a month.

saving will be around 33% of the Air Handling Units Consumption and 3% from total consumption

Page 10: Head Office – Case Study

Schneider Electric 10- Division - Name – Date

Opportunities of Saving in HVAC System

Chillers

• 2 Chillers each is 250 ton

Air Handling Units

• 4 AHU’s with different capacities

Fan Coil Units

• 109 FCU’s with different capacities

Building Envelope

• Doors, infiltrations and windows

Doors:-the building had 139 doors.

Infiltration:-parts of the suspended ceiling is opened.

Windows:-windows subjected to direct sunlight with no curtains gain a lot of heat.

All the above lead’s to reach the setpoint due to heat loss which make the system run in it’s maximum capacity

Page 11: Head Office – Case Study

Schneider Electric 11- Division - Name – Date

Bill divided to two main Parts

Consum

ption

Fixed Costs

Recommendations-Peak shaving using PLC with BMS and it’s payback will be in a month

5434

6194

Zero

KW

Saving will be 6% from the average monthly bill

Page 12: Head Office – Case Study

Schneider Electric 12- Division - Name – Date

Action Winter savings

Summer savings

Investments(EGP)

Expected Payback years

Date to execute

Web energy expanding - - 20,000 - Nov 09

Lighting 20% 10.5% 1500 Nov 09

Total for lighting 15 % 21,500 8 months

AHU’s - 3% 10,000 Dec 09

Chiller - 6% 2,000

Building Envelope(windows + doors) - - 24,000 Oct 09

Total for HVAC 5 % 36,000 2 years

taxes 3% 2% - -

Fixed Costs 15% 1.5% 2,500 2 month Dec 09

Saving summary in bills & ROI investment calculations