(AN ISO 9001-2008 CERTIFIED COMPANY) Head Office: 131, First Floor, Patparganj Industrial Area, Delhi-110 092, Ph.: 011-22159098, 43519098 Mobile-9984229905, 9336101462 E-mail –[email protected] Regd. Office: 103, Ratandham, 12/483, McRobertganj, Kanpur-208001, Ph.: 0512-2525759 Mobile-9336185051 E-mail –[email protected] 1

Upload: vuongdung

Post on 14-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

(AN ISO 9001-2008 CERTIFIED COMPANY)

Head Office:

131, First Floor, Patparganj Industrial Area,

Delhi-110 092, Ph.: 011-22159098, 43519098

Mobile-9984229905, 9336101462

E-mail –[email protected]

Regd. Office:

103, Ratandham, 12/483,

McRobertganj,

Kanpur-208001, Ph.: 0512-2525759

Mobile-9336185051

E-mail –[email protected]

1

� Geo-technical Investigation.

� Topographical & Contour Survey.

� Rock Drilling/ Coring.

� Bored Cast-in-situ Pile

Foundation.

� Hydrographic Survey.

2

Field Test Laboratory Test

1 Standard Penetration Test (SPT)

IS.2131-1981.

1 Bulk and dry density

determination IS: 2720(Part2-

1973)

2 Static Cone Penetration Test

(SCPT) IS: 4968-3.

2 Liquid, plastic, shrinkage limit IS:

2720 (Part 5)-1985.

3 Dynamic Cone Penetration Test

(DCPT) IS: 4968-1

3 Sieve/Grain/hydrometer analysis

IS: 2720 (part-4)-1985.

4 Plate Load Test (PLT) IS: 1888. 4 Tri-axial Shear as per IS: 2720

(Part 12)-1981 (Reaffirmed 1987).

5 Cyclic Plate Load Test (CPLT)

IS:1888.

5 Specific gravity IS:2720 (P-3/S-1)-

1980.

6 Vane Shear Test (VST) IS: .4434. 6 Consolidation Properties of Soil as

per IS: 2720 (P-15)-1986.

7 Block Vibration Test (BVT) IS:. 7 Unit weight crushing strength &

co-efficient of softening of rock.

8 Cross Bore Hole Test (CBT) IS:

.13372.

8 Chemical analysis of soil and

water as per

9 California Bearing Ratio

Lab.(CBR) IS: 2720-16

9 pH value IS: 2720 (Part-26)-1987

10 California Bearing Ratio Test

Field (CBR)IS:2720-31

10 Total soluble sulfates IS: 2720

(Part-27)- 1977

11 Permeability Test Laboratory IS:

2720-part 17.

12 Permeability Test Laboratory as

per IS: 5529-part 1.

3

� The Techpro Engineers Pvt. Ltd. is a multidiscipline consulting

organization staffed with highly qualified and experienced consultants

in field of Geotechnical Investigation, Rock Core drilling for bridges,

tunnels, Structural designing, having capabilities to render services in

Haghways & Railways, Power plants, Metro Rails, Infrastructures.

� Er. Garg took up the challenge. and with undaunted determination

prevailed upon the common man that designing a building through a

set of thumb rules would never produce an optimal output as every

building is unique in its - Size, Shape, Loading, Founding System,

Location & Functionality and the role of an engineer is inevitable for an

efficient design of a structure.

� With its efficient, prompt and upright services, Techpro Engineers &

Consultants soon became a favorite consultancy firm amongst both

private and government clients and, before long, rechristened as

"Techpro Engineers Pvt. Ltd." in 2002. Today with an experience of

designing more than 1 crore sqft floor area of more than 1500 different

kinds of structures, Techpro Engineers Pvt. Ltd. stands out as a

prominent structural consultancy and sub-soil investigation company

in northern India.

4

To achieve and sustain a leading position in services of Geotechnical

Investigation, Engineering Survey, Foundation Consultancy, Highway

Engineering and Bridge Design as per National and International

Standards ensuring expectations of the customers with continual

improvement of the effectiveness of the Quality Management System.

OUR MISSION

Our organization is committed to fully satisfy its customers and all

stakeholders by providing them with safe, efficient and technologically

sound solutions in the field of Geotechnical Investigations for

Highway & Bridge design, Topographical & Contour Surveys. We

strive to achieve topmost quality in our work with continuous

improvement in all activities by using latest investigative technology

and effectively implementing our management systems.

5

� We Completed over 75000 Geo-technical investigations for buildings,

elevated water towers, roads & road bridges, Railway bridges, Metro

bridges, land fill, communication and electric towers, thermal power

plants, cooling tower etc. We have well experienced Engineers and other

technical supporting staff in our organization. A list is attached herewith

for ready reference.

Bharat Heavy

Electricals Ltd.

(BHEL).

Indian Waterways

Authority of India,

(IWAI).

Delhi Merto Rail

Corporation Ltd, New

Delhi. (DMRC).

Indian Railways.

Delhi Transco Ltd

Delhi.

Ircon International

Ltd.

Engineering Project

India Ltd (EPIL).

Indian Institute of

Technology

Hindustan Aeronautics

Ltd. (HAL).

Kolkata Port Trust,

Haldia Dock Complex.

HSCC India Ltd. Military Engineering Service (MES).

6

Indian Oil Corporation

Ltd.(IOCL).

Rail Vikas Nigam

Limited

National Building

Construction

Corporation Limited,

(NBCC).

RITES Ltd.

National Thermal

Power Corporation

Ltd.(NTPC).

Steel Authority of

India Ltd. (SAIL).

National Hihgway

Authority of India

(NHAI).

Tele Communication

India Ltd. (TCIL).

Neyveli Lignite

Corporation Limited.

Projects &

Development India Ltd.

(PDIL)

7

o In general; standards and specifications issued by the Bureau of

Indian Standards is followed. For Traffic & Transportation M.O.R.T.H.

Specifications and standards issued by Indian Road Congress is

followed. For CPWD work CPWD specifications, for Rail, Roads Code of

practice by Railway Board and building reference from Journals of

National Building Organization is followed. Where Indian specifications

are not available, international standards such as BS, AASHTO, and

ASTM etc, are followed.

8

1 Proposed position Geo-Technical Engineer

2 Name Mr. Saurabh Agarwaal

3 Contract address 15/88, Civil Lines, Kanpur-208 001

4 Date of Borth 27.03.1970

5 Nationality Indian

6 Educational

qualification

B. Tech. (civil), M. Tech. (Mechanics &

Foundations)

7 Other Training Nil

8 Language & degree or

proficiency

Speaking Reading Writing

English Excellent Excellent Excellent

Hindi Excellent Excellent Good

9 Membership of

professional societies

Professor as part time basis in civil Engg. Deptt.

At Hercourt Buttler Engineering College,

Kanpur, U.P.

10 Countries of work

Experience

India

11 Name of firm where

work

M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 14

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

Director

Geo-technical Engineer.

9

Ite

m

Sr.

No

.

Brief

Description of

project study

Name of

the

client

Cost

of

consu

ltancy

work

(Rs.

In

Lakhs

)

Period of work

completion

Description of

the actual

services provided

by the key

person Date

of

start

Date

of

comp.

Major project study completed

1 Geo technical

Investigation

at different

location for

BS-IV Project

at Barauni

Refinery.

The

Manager

(Cont.)

Indian

Oil

Corporat

ion. Ltd,

Barauni

Refinery.

7.10 18.01.

2016

23.03.

2016 Study of field

data and

laboratory data

for compilation

& designing

criteria of

allowable

bearing capacity

of founding

system for

proposed

structures.

2 GT work for

Grade

Separators,

Flyovers, & RE

Walls. Section

AB (KM

15.724) for

total length of

43KM of

Varanasi Ring

Road.

Associat

e

Director,

JACOBS

CES

Phase-1,

Gurgaon

7.35 02.07.

2015

10.08.

2015

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

15

15 Related work Experience (in

Years)

10

16 Detail of work Experience As under

10

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Rs. In

Lakhs)

Period of

work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study completed

3 GT work for

proposed

Hostel

building at

National

Sugar

Institute,

Kanpur

Executive

Engineer,

KCD,

CPWD, GT

Road,

Kanpur.

5.29 5.08.

14

10.09.

14

4 Sub Soil

Investigation

of ROBs in

lieu of L-Xing

(139,141,159,

167) and

RUBs in lieu

of 5 Nos. L-

Xing(142,146,

148,164 &

166) on

Ambala-

Ludhiyana

section.

Office of the

Dy. Chief

Engineer/

Const-II

Northern

Railways,

Chandigarh.

8.91 15.5.

14

15.11.

14

5 Soil

exploration for

rehabilitation

of old sewer

line under

Delhi Jal

Board.

TTI

ConsultinEn

gineers

(India) P.

Ltd., DJB

ITO,Deldi

5.00 25.6.

13

18.08.

13

11

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of

the client

Cost of

consulta

ncy

work

(Rs. In

Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

6 Geotechnical

Investigation

of Elevated

Viaduct & Two

Elevated

Stations Viz

Johri Enclave

& Shiv Vihar

Stations from

chainage

57357.623M

of Line 7

Mukundpur-

Yamina Vihar

Corridor

MRTS.

Globe Civil

Projects

Ltd.,

6.6 15.06.

13

11.10.

13

7 Soil

Investigation

work for

installation of

Non

Recovery-

Heat

Recovery

(NR-HR) type

Coke Oven

Battery at

Nandini

Mines, Bhilai.

Dy.

General

Manager

I/c (Project

Contract

Cell-NTK,

SAIL.,

Bhilai Steel

Plant. CG

5.84 08.01.

12

17.07.

12

12

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consulta

ncy

work

(Rs. In

Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the

key

person

Date

of

start

Date

of

comp.

Major project study completed

8 Soil

Investigation

work of plot

for

Construction

of DO/ BO,

OQ & GH at

Satna, M.P.

Dy. Chief

Engineer,

Engg. Deptt.

CZO, LIC of

India Ltd.

Bhopal

1.45 28.01.

12

10.04.

12

9 Geo Technical

Investigation

for Elevated

Metro at

Jaipur, Raj.

DSCC Ltd.

55-

Mansarowar

,Jaipur,

Rajasthan

13.6 27.01.

11

27.01.

11

10 Sub Soil

Investigation

for

Construction

of new

Lecture Hall

at IIT,

Kanpur.

Superintend

ing

Engineer,

I.I.T.Kanpur.

1.3 10.01.

11

25.02.

11

11 Geotechnical

Investigation

for

development

of township

at Korba

STPP(1x500M

W)

Korba Super

Thermal

Power

Station,

Jamnipali,

Korba.

1.83 23.03.

09

08.05.

09

13

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Rs. In

Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the

key

person

Date

of

start

Date

of

comp.

Major project study completed

12 Soil

Investigation

for Children’s

Home at Tis

Hazari Metro

Station.

Delhi Metro

Rail

Corporation

Gurudwara,

Shakarpur,

Delhi.

1.39 28.01.

09

10.03.

09

13 GT work for

ROB, RUB,

RE Walls for

rehabilitation

of existing two

lanes from

Km. 208.00 to

251.700 (pkg-

6)on Ayodhya-

Gorakhpur

section of NH-

28 in UP

B.Seenaiah

& Company

(Projects)

Ltd.

Gaurapur,

Atraura,

Khalilabad,S

ant Kabir

Nagar.

6.0 15.12.

07

10.02.

08

Major project study in Hand

14 Sub soil

investigation,

for bridges for

ROB in lieu

of level

crossing Nos.

5C, 11C,&

16C on

Meerut

Khurza

section.

CPM TATA-

ALDESA (JV),

DFCCIL, LOT

101.

MAITHA.

8.91 15.05.

16

In

progre

ss

14

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

consul

tancy

work

(Rs. In

Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the

key

person

Date

of

start

Date

of

comp.

Major project study completed

2 Geo-technical

investigation

for widening

Up gradation

to 2 Lane of

NH 301

(Kargil

Zanskar Road)

in J&K.

Feedback Infra

Private Ltd.

Highway

Division 15th;

Floor, Tower

9B, DLF Cyber

City Phase

III,Gurgaon,

Haryana.

28.03 20.05.

16

In

progre

ss

3 GT work at

Different

Locations of

Railway Major

Bridges, RUB,

ROB and

Deep Cutting

etc.Between

CH: 0 KM to

73 KM (Satna

to Panna

Section) of

Lalitpur

Singarauli

New BG rail

line project.

Chief

Engineer-II

(Constn]WCR/

JBP

West Central

Rly. BHOPAL

29.28 22.06.

17

In

progre

ss

15

1 Proposed position Geo-Technical Engineer

2 Name Mr. Arvind K. Garg

3 Contract address 603, Gangotri,pptt.

7/216, Swaroop Nagar,

Kanpur-208 002, M-9336101462

Email: [email protected]

4 Date of Borth 02.02.1965

5 Nationality Indian

6 Educational qualification B. Tech. (civil), M. Tech. (Structure)

7 Other Training Quality Manager for laboratories as per ISO

17025-2005

under Bureau of Indian Standards, New Delhi

8 Language & degree or

proficiency

Speaking Reading Writing

English Good Excellent Excellent

Hindi Excellent Excellent Good

9 Membership of

professional societies

Nil

10 Countries of work

Experience

India

11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 25 Years

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

Managing Director

Soil Exploration and Structural Designing.

16

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

20

15 Related work Experience (in

Years)

25

16 Detail of work Experience As under

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study completed

1 GT work for

proposed

beautification

of Lohia

Botanical

Garden Near

Ganga

Barrage,

Kanpur,U.P.

Executive

Engineer,

Zone-1,

Kanpur

Development

Authority,

Kanpur.

15.39 02.02.

15

25.09.

15

2 Geotechnical

Investigation

for proposed

32 Nos. LIGs

and 72 Nos.

EWS

buildings at

Sector C

under Kalindi

Vihar Yogna,

Agra, U.P.

Executive

Engineer-5,

Agra

Development

Authority,

Agra.

2.25 09.06.

15

08.08.

15

17

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

3 Geotechnical

Examination

In connection

with the

construction

of

Hardstand/R

oad Inside

Dock Area,

Haldia Dock

Complex,

Haldia.

Manager (I &

CF)

Kolkata Port

Trust,

Haldia Dock

Complex,

Haldia

11.74 15.05.

15

06.08.

15

4 Geotechnical

Investigation

for Rail based

Mass Transit

system in

Kanpur. (Uttar

Pradesh)

Joint General

Manager/GT,

RITES Ltd,

RITES

Gurgaon

8.53 01.06.

15

31.07.

15

5 Geotechnical

Investigation

at various

locations on

open land for

proposed

Jawaharpura

m Housing

Scheme,

Kalyanpur,

Kanpur.

Executive

Engineer

Zone-II,

Kanpur

Development

Authority,

Kanpur

1.8 22.04.

15

12.06.

15

18

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

6 Geotechnical

Investigation

for proposed

ROB in lieu

of LC No.

120B,

Aligarh-

Khurja

section.

M/s. Biharilal

Menghani

WZ-13,2nd,

Floor, Bindra

Market, Sant

Pura, Delhi.

1.98 10.01.

15

18.02.

15

7 GT work at

various

location ie.

Sahjahanpur,

Muzaffarnagar

, Pilibhit,

Aligarh, &

Jaunpur at

Uttar Pradesh

for proposed

MCH projects

under NRHM

rural health

mission

scheme.

Chief General

Manager (P D

& E), H.S.C.C

(India) Ltd.

Corporate

Office: E-6 (A),

Sector-1,

Noida (U.P.)-

201 301

ed

5.57 5.08.1

4

30.09.

14

8 GT

Investigation

of ROBs in

lieu of L-Xing

and RUBs in

Ambala-

Ludhiyana

section.

Office of the

Dy. Chief

Engineer/

Const-II

Northern

Railways,

Chandigarh.

4.47 25.09.

14

15.11.

2014

19

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

9 Soil

exploration for

rehabilitation

of old sewer

line under

Delhi Jal

Board.

TTI Consulting

Engineers

(India) Pvt.

Ltd., DJB

Pumping

StationComple

x, Opp. Azad

Bhawan, ITO,

New Delhi.

5.00 25.06.

13

18.08.

13

10 GT work on

Plots -8,

Daryaganj,

Delhi for

proposed

construction

of multi

storied

building.

Execution

Engineer,

Engg, Deptt.

LIC of India,

25-KG, Marg,

New Delhi

2.35 18.12.

12

20.12.

12 It includes

evaluation

of safe

bearing

capacity

for Raft

foundation

.

11 GT work at

Different

locations at

Barauni

Refinery &

Barauni

Refinery

Township,

Barauni

Bengusarai,

Bihar.

Sr. Manager,

Contract Cell,

Refinery

Division,

IOCL,

Barauni,

Bengusarai,

Bihar.

6.45 1509.

12

20.11.

12

20

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

12 Geo Technical

Investigation

for Elevated

Metro at

Jaipur, Raj.

DSCC Ltd.

Site Office: 55-

Mansarowar,

Jaipur,

Rajasthan

13.6 27.01.

11

06.06.

11

13 Soil

Investigation

for

redevelopme

nt of steel

processing

unit (SPU) at

Jagdishpur,

Distt.

Sultanpur,U.P

DGM (MM-

Proj.) Steel

Authority of

India Ltd.,

Rourkela Steel

Plant,

Rourkela.

8.54 22.01.

10

05.06.

10

14 Sub Soil

Investigation

for

determination

bearing

capacity for

various multi

spanning

flyover, grade

seperator,

ROBs, RUBs

in lieu of

doubling of

track at

Sakurbasti.

Dy. Chief

Engineer/

const.

Northern

Railway,

Sakurbasti,

Delhi-56

5.04 23.10.

09

12.01.

10

21

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study IN Hand

1 Geotechnical

Investigation

between km

979 to 1063

for 3rd line

between Bina-

Katni

sections. The

scope include

Study of sub

stratum at

different

chainages/loc

ation

Deputy

Chief

Engineer,

West

Central

Railway-

Habibganj

Bhopal.

24.9

9

29.09.

16

In

Progres

s

Study of under

stratum

property and

required data

for

computation

of SBC for

foundation for

proposed LHS,

under pass,

Minor or Major

bridges for

tripling of rail

infrastructure

in state of

M.P.

2 GT work for

preparation of

DPR for

removing

bottleneck

point of Kone

Expressway.b

y

GGM (HW)

RITES LTD.

56 C. R.

Avenue,

4th; Floor,

Kolkata-700

012

20.1

3

23.06.

17

In

Progres

s

Preparation of

GT report

comprising of

ROB/RUB,

Flyover and

integrated

Traffic

Circulation

Plan for

Santragachi

Rly Stn. &

Santragachi

Bus Terminus

from Kona

Expressway.

22

1 Proposed position Geo-Technical Engineer

2 Name Rajiv Ranjan

3 Contract address 6159, Sector B , Pocket-8,

Vasant Kunj, New Delhi

4 Date of Borth 06.08.1965

5 Nationality Indian

6 Educational qualification B. Sc Geology, M. Sc Geology

7 Other Training Nil

8 Language & degree or

proficiency

Speaking Reading

Writing

English Good Excellent

Excellent

Hindi Excellent Good Good

9 Membership of professional

societies

Nil

10 Countries of work

Experience

India

11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 10 Years

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

Geologist

Geological Mapping.

23

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

12

15 Related work Experience (in

Years)

10

16 Detail of work Experience As under

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by the

key person Date

of

start

Date

of

comp.

1 Geo-Technical

Investigation

work for

Granulated

Single Super

Phosphate

project at

FAGMIL,

Chittorgarh,

Raj.

Projects &

Developmen

t India Ltd,

PDILBhawa

n,A-14,

Sector-1

Noida-201

301,Gauta

m Budh

Nagar, (UP).

3.61 22.04.

16

30.11.

16 Involving in

field

operations,

monitoring

sample

collection,

Preservations,

testing at lab.

And

compilation of

data.

Major project study

completed

2 Geotechnical

Investigation

for 10MW,

Solar Power

Plant at

Kadri,

Anantapur

Distt.;

Andhraprades

h.

Bharat

Heavy

Electronics

Ltd. EDN,

Mysore

Road,

Bangalore.

8.82 25.05.

15

31.07.

15

24

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

3 Geotechnical

investigation

at

Chandrabagh

a bridge of

125km new

Borad Gauge

rail link

between

Rishikesh

and

Karanprayag

in the stage of

UK.

Dy. General

Manager

Rail Vikas

Nigam,

Block-04,

Rishilok,

GMVN,

Mini-Ki-

Reti,

Rishikesh

3.79 25.09.

15

15.12.1

5

Major project study IN Hand

4 GT work of

ROBs in lieu

of L-Xing

(139,141,159,

167) and

RUBs in lieu

of 5 Nos. L-

Xing(142,146,

148,164 &

166) on

Ambala-

Ludhiyana

section.

Office of the

Dy. Chief

Engineer/

Const-II

Northern

Railways,

Chandigarh

.

4.47 25.09.

14

15.11.1

4

25

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of

work

completion

Description of

the actual

services

provided by the

key person Date

of

start

Date

of

comp.

Major project study IN Hand

5 Geotechnical

Investigation

for proposed

Rural Self

Employment

Training

Institute at

various rural

area in state

of Bihar.

Executive

Engineer,

Engg.

Deptt.

North

Central

Zonal

Office, MG

Road,

Kanpur

11.2

2

28.06.

13

15.08.

13

6 Geotechnical

investigation

for at NTPC,

Unchahar,

Raebareli in

state of Uttar

Pradesh.

Manager

civil,

CV/PV,

BHEL,

Electronic

Division,

Mysore

Road,

Bangalore-

4.34 24.05.

13

10.07.

13

7 Soil

Investigation

work for

installation of

Non Recovery-

Heat Recovery

(NR-HR) type

Coke Oven

Battery at

Nandini

Mines, Bhilai.

Dy. GM I/c

(Project

Contract

Cell-NTK,

Steel

Authority of

India Ltd.,

Bhilai Steel

Plant,

Bhilai,

5.84 08.11.

12

17.07.

12

26

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

consul

tancy

work

(Lakhs

)

Period of

work

completio

n

Descriptio

n of the

actual

services

provided

by the key

person Date

of

start

Date

of

comp.

Major project study IN Hand

8 Geotechnical

Investigation at

Different

locations at

Barauni

Refinery &

Barauni

Refinery

Township,

Barauni, Bihar

Sr. Manager,

Contract Cell,

Refinery

Division, IOCL,

Barauni,

Bengusarai,

Bihar.

6.45 15.09

.12

20.11.

12

9 Carrying out

Soil

Investigation

work for the

proposed REC

world HQ

building at

Gurgaon/

TCIL Bhawan,

Greater

Kailesh-I,

New Delhi-110

048

1.25 22.08.

2011

18.10.2

011

10 GT work of the

Rocky/ Hard

strata at

shallow

parches

between

Gazipur to

Varanasi in

National

Waterway No.-

1 for

Inlandwaterway

Authority of

India,

Ministry of

Shipping,5th;

Floor,

Biscomaun

Bhawan, West

Gandhi

Maidan, Patna

7.50 08.04.

10

20.07.2

010

the

purpose of

investigatio

n is to

study of

hard

patches &

removal of

same

through

under

water

blasting.

27

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of

work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study IN Hand

11 Geo Technical

Investigation

for

construction

of cooling

tower and

other ancillary

structure in

lieu of

extension of

Korba

Thermal

Power Plant.

GAMMON

INDIA LTD,

Gammon

House, Veer

Sarvarkar

Marg,

Prabhadevi,

Mumbai-

400025

5.23 12.01.

2010

25.04.2

010

12 Geotechnical

investigation

for ROB, RUB,

RE Walls for

rehabilitation

of existing two

lanes from

Km. 208.00 to

251.700 (pkg-

6)on Ayodhya-

Gorakhpur

section of NH-

28 in UP

B. Seenaiah

& Company

(Projects)

Ltd.

Km.:

229.500 on

NH-28,

Village:

Gaurapur,

Post:

Atraura,

Khalilabad-

272175,

Distt.: Sant

Kabir

Nagar.

6.0 15.12.

2007

10.02.2

008

28

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study IN Hand

13 Geo Technical

Investigation

for

construction

of cooling

tower and

other ancillary

structure in

lieu of

extension of

Korba

Thermal

Power Plant.

GAMMON

INDIA LTD,

Gammon

House, Veer

Sarvarkar

Marg,

Prabhadevi,

Mumbai-

400025

5.23 12.01.

10

25.04.1

0

14 Geotechnical

investigation

for ROB, RUB,

RE Walls for

rehabilitation

of existing two

lanes from

Km. 208.00 to

251.700 (pkg-

6)on Ayodhya-

Gorakhpur

section of NH-

28 in UP

B. Seenaiah

& Company

(Projects)

Ltd.

Km.:

229.500 on

NH-28,

Village:

Gaurapur,

Post:

Atraura,

Khalilabad-

272175,

Distt.: Sant

Kabir

Nagar.

6.0 15.12.

07

10.02.0

8

29

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study IN Hand

1 Topographical

Survey and

Soil Testing &

Investigation

for 10MW

Solar

Photovoltaic

Power Plant at

Santhaldih,

Purulia, W.B.

for WBSEDCL

AGM

(SC&PV-

Engg),

BHEL-EDN,

Mysore

Road,

Bangalore.

2.24 09.06.

17

In

Progres

s

Project co-

ordination,

monitoring of

drilling &

sampling as

per TS, sample

testing and

data

compilation

for

computation

of safe

founding

system.

2 Carrying out

the Geo

Technical

Investigation

and

recommendati

on of Bridge

foundation

type for the

Major Railway

Bridges in

between Bina-

Jhansi.

Director,

Kristi

Engineering

Services

Pvt. Ltd.

2nd Floor,

Divine

Palace,

Bimal Sinha

Sarani,

Hakimpara,

Siliguri-

734001

9.12 15.05 In

Progres

s

Involving in

laboratory

testing on soil

and rock

samples,

compilation of

data and

preparation

laboratory test

summary.

30

1 Proposed position Geo-Technical Engineer

2 Name Dr. Lok Priya Srivastava

3 Contract address 96-C, Shivpur Shahbajgang,

P.O: Jangal Shalikram,

Gorakhpur (Uttar Pradesh),

4 Date of Borth 05.01.1985

5 Nationality Indian

6 Educational qualification B. Tech. (Civil), M. Tech. (Geo-tech), Ph.D.

7 Other Training Nil

8 Language & degree or

proficiency

Speaking Reading

Writing

English Good Excellent

Excellent

Hindi Excellent Excellent Good

9 Membership of professional

societies

Nil

10 Countries of work

Experience

India

11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 10 Years

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

General Manager

Geotechnical Engineer

31

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

05

15 Related work Experience (in

Years)

10

16 Detail of work Experience As under Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Description

of the actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study completed

1 GT for

proposed

Rural Self

Employment

Training

Institute at

various rural

area in state

of Bihar.

Executive

Engineer,

Engg. Deptt.

North

Central Zonal

Office, MG

Road,

Kanpur

11.22 28.06.

13

15.08.

13

2 GT work for

proposed

multi storied

building

under

Ambedkar

puram Yojna

No. 03,

Sector-E at

Plot No. 6 & 7,

Ambedkarpur

am, Kanpur.

E.E. Nirman

Khand, Uttar

Pradesh Avas

& Vikas

Parisad,

Office

Complex,

Keshavpura

m,

Kalyanpur,

Kanpur

2.10 15.06.

13

11.07.

13

32

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study IN Hand

3 Geotechnical

Investigation

at Different

locations at

Barauni

Refinery &

Barauni

Refinery

Township,

Barauni,

Bihar

Sr. Manager,

Contract Cell,

Refinery

Division,

IOCL,

Barauni,

Bengusarai,

Bihar.

6.45 15.09.

12

20.11.

12

4 Soil

Investigation

work of plot

for

Construction

of DO/ BO,

OQ & GH at

Satna, M.P.

Dy.C.E.,

Engg. Deptt.

Central Zonal

Office, LIC of

India Ltd.,

Hoshangabad

Road,

Bhopal,

1.45 28.01.

12

10.04.

12

5 Carrying out

Soil

Investigation

work for the

proposed REC

world HQ

building at

Gurgaon

(Haryana)

TCIL

Bhawan,

Greater

Kailesh-I,

New Delhi-

110 048

1.25 22.08.

11

18.10.

11

33

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consulta

ncy

work

(Lakhs)

Period of

work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study IN Hand

6 GT work at

project area

for

construction

of 6 MGD new

Sewage

Pumping

Station and

laying of

gravity sewer

etc of Delhi

Jal Board.

Tech.

Director

(Water &

Urban

Development)

AECOM India

Pvt. Ltd. 5th

Floor,

Building

No.10B, DLF

Cyber City,

DLF PhaseII

Gurgaon

2.50 25.08

.11

09.10.

11

7 GT work of

the Rocky/

Hard strata at

shallow

parches

between

Gazipur to

Varanasi in

N.W. No.-1

Inland

Waterways

Authority of

India,5th;

Floor,

Biscomaun

Bhawan,

West Gandhi

Maidan,

Patna

7.50 08.04

.10

20.07.

10

Purpose of

investigatio

n is to

study of

hard

deposits at

bottom on

& removal

of same

through

under water

blasting.

1 GT work for

Development

of Korba

West Thermal

Power Project

at Chattisgarh

State in Korba

Distt.

M/s. Indu

Projects Ltd.

Reg. Off;

1009, 13th;

Phase, KPHB

Colony,

Hyderabad.

13.28 19.01

.10

08.03.

10

34

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study IN Hand

2 GT work for

Development

of four-lanes

with paved

side shoulders

of Shahkot-

Moga section

of NH-71 (New

NH No. 52)

from km

44.600 of NH-

71 to km

77.200 in the

state of

Punjab under

NHDP-IV.

Infinite Civil

Solutions

Pvt. Ltd.,

Infinite

House, F.P.-

25, Near

Aditya

Elegance &

Railway

Track,

CIMS

Hospital

Road, Sola,

Ahmedabad

2.27 21.04.

16

35

1 Proposed position Geo-Technical Engineer

2 Name Mr. Yagyadutta Mishra

3 Contract address 96-C, Shivpur Shahbajgang,

P.O: Jangal Shalikram,

Gorakhpur (Uttar Pradesh),

[email protected],

4 Date of Borth 13.07.1989

5 Nationality Indian

6 Educational qualification B. Tech. (Civil),

7 Other Training Nil

8 Language & degree or

proficiency

Speaking Reading

Writing

English Good Excellent

Excellent

Hindi Excellent Excellent Good

9 Membership of professional

societies

Nil

10 Countries of work

Experience

India

11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 03 Years

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

Project Manager

Soil Exploration Topographical study of

terrain.

36

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

03

15 Related work Experience (in

Years)

04

16 Detail of work Experience As under

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study completed

1 Soil

Investigation

at for

proposed

NalandaUnive

rsity, Rajgir,

Bihar

Nalanda

University,

Rajgir,

District

Nalanda,

Bihar

2.78 10.10.

15

25.11.

15

2 Sub Soil

Investigation

for RUBs work

in Etawah-

Mainpuri

section,U.P.

Dy. C.E.

(Const.) North

Central RLys,

Opp. Kanpur,

U.P.

1.97 05.02.

15

15.03.

15

3 GT work for

the proposed

Commercial/R

esidential

development

of 239.64 acre

land of CPWD

at Ghitorni,

Delhi.

NBCC, Real

Estate Div.,

NBCC

Bhawan,

Lodhi Road

New Delhi-

110 003

2.88 05.11.

13

09.12.

13

37

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of work

completion

Description

of the

actual

services

provided by

the key

person

Date

of

start

Date

of

comp.

Major project study completed

4 GT work of

Elevated

Viaduct & Two

Elevated

Stations Viz

Johri Enclave

& Shiv Vihar

Stations from

chainage

57357.623M

of Line7

Mukundpur-

Yamina Vihar,

Delhi.

Globe Civil

Projects Ltd.,

6.6 15.06.

13

11.10.

13

5 Geotechnical

investigation

for at NTPC,

Unchahar,

Raebareli in

state of Uttar

Pradesh.

Manager civil,

CV/PV, BHEL,

Electronic

Division,

Mysore Road,

Bangalore-560

026

4.34 24.05.

13

10.07.

13

Geotechnical

Investigation

at Different

locations at

Barauni

Refinery

Township.

Sr. Manager,

Contract Cell,

IOCL, Barauni

Refinery,

Bengusarai

Distt. Bihar.

6.45 03.10.

12

02.12.

12

38

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study In Hand

1 Soil

Investigation

and Survey of

a Land Parcle

of DDA at

Sanjay Lake

Park,

Trilokpuri for

development

by NBCC Ltd.

Chief

General

Manager

(RE)

NBCC

Bhawan,

Lodhi Road,

New Delhi-

2.99 15.04.

16

2 GT work for

Preparation of

Detailed

Project Report

(DPR) for

removing

bottleneck

point of Kone

Expressway.

by

Dy. G. M.

(HW), RITES

Ltd. Metro

Railway

Bld. 4th;

Floor 56,

C.R avenue,

Kolkata.

20.1

3

23.06.

17 The work

consist of

Construction

of new

ROB/RUB,

Flyover and

integrated

Traffic

Circulation

Plan for

Santragachi

Railway

Station and

Santragachi

Bus Terminus

from Kona

Expressway.

39

1 Proposed position Geologist

2 Name Mr. Prashant Mukharjee

3 Contract address B-3/2, Tata Steel Apartment

Beta-II , Opp. Kasana Police

Station Greater Noida,

Gautam Budha Nagar

Email:[email protected]

4 Date of Borth 21.12.1972

5 Nationality Indian

6 Educational

qualification

B.Sc. (Civil Engg), M. Tech.(Geotech.), Ph D.

(Geotech)

7 Other Training Nil

8 Language & degree or

proficiency

Speaking Reading Writing

English Excellent Excellent Excellent

Hindi Excellent Good Good

9 Membership of

professional societies

Nil

10 Countries of work

Experience

India

11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)

12 Years with the Firm 01 Years

13 Employment record

1. Name of Employer

2. Position held

3. Nature of duties

M/s. Techpro Engineers Pvt. Ltd.

Geotechnical Engineer

Compilation of test results and preparation of

report.

40

14 Overall professional

experience in highway/ traffic

& transportation/ bridge

engineering or in related field

(in years)

05

15 Related work Experience (in

Years)

10

16 Detail of work Experience As under

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost of

consult

ancy

work

(Lakhs)

Period of

work

completion

Descriptio

n of the

actual

services

provided

by the key

person

Date

of

start

Date

of

comp.

Major project study completed

1 Geotechnical

Investigation

for 10MW,

Solar Power

Plant at Kadri,

Anantapur

Distt.; Andhra

pradesh.

Bharat Heavy

Electronics Ltd.

EDN, Mysore

Road,

Bangalore.

8.82 25.05

.15

31.07.

15

2 Geotechnical

investigation at

Chandrabagha

bridge of

125km new

Borad Gauge

rail link

between

Rishikesh and

Karanprayag in

the stage of

Uttarakhand.

Dy. General

Manager Rail

Vikas Nigam,

Block-04,

Rishilok,

GMVN, Mini-Ki-

Reti, Rishikesh

3.79 25.09

.15

15.12.

15

41

Ite

m

Sr

.

No

.

Brief

Description of

project study

Name of the

client

Cost

of

cons

ultan

cy

work

(Lak

hs)

Period of work

completion

Description of

the actual

services

provided by

the key person Date

of

start

Date of

comp.

Major project study in Hand

1 GT work for

proposed

Lingraj Silo

Connectivity

with NTPC

Cpative Line

at Talcher

Coalfield.

Jt. General

Manager

RITES Ltd.

RPO,

Bhubanesh

war.

2.54 25.11.

16

In

Progres

s

2 Geotechnical

Investigation

between km

979 to 1063

for 3rd line

between Bina-

Katni

sections. The

scope include

Study of sub

stratum at

different

chainages/loc

ation

Deputy

Chief

Engineer,

West

Central

Railway-

Habibganj

Bhopal.

25.0 29.09.

16

In

Progres

s

Involving in

laboratory test

on soil & rock

cores as per

assign

technical

specification

and

compilation of

test results for

evaluation of

SBC as per

designing

work for

bridges.

42

RELEVANT SERVICES CARRIED OUT BY THE FIRM WHICH

ILLUSTRATES THEIR BEST QUALIFICATIONS DURING LAST 5

YEAR:

Project-I

Project Name:

Sub Soil Investigation for

section AB (KM 15.724) for

subgrade, High Embankment,

under passes & material

sampling and testing of total

length of 43KM of Varanasi Ring

Road.

Country: India

Project location

within country:

Varanasi

Dist. Varanasi

State- Uttar

Pradesh

Date of Agreement:

14.06.2015

Name and address of

client:

Associate Director,

JACOBS CES

Plot No. 184, Platinum

Tower, Udyog Vihar,

Phase-1, Gurgaon

122016

Professional staff

provided:

a) No. of staff- 10

b) No. of

man/months-

25/3.5

Start date

(month/year):

02.07.2015

Completion

date

(month/year):

10.08.2015

Approx. value of consultancy services:

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.7, 35,375.00 excluding ST.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): 02

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi Dy.

GM (Proj.)- Coordination, execution & Planing.( Functions performed by the

associated firm (s) to be given separately) 43

Project-I

Narrative Description of Project: Geo-Technical investigation in lieu of new

Ring road at Varanasi for preparation of detailed project report.

Total length of the Project Highway

(in Km): 43

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

NA

Detail description of Actual Services Provided by the firm under different

categories:

(Please select from the following)

• Ground Surveys & Investigation……………………………………………………Yes

• Material Surveys…………………………………………….………………………….Yes

• Geo-tech Investigation for Bridges……………………………………………….…Yes

• Geo-tech investigation for high embankments…….…..…………………...…..Yes

• Preparation of designs for road pavement………………………………………...No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…....................................................................................No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………….………………………..….No

44

Project-II

Project Name:

Geotechnical Investigation for

Rail based Mass Transit system

in Kanpur. (Uttar Pradesh).

Country: India

Project location

within country:

Kanpur

Dist. Kanpur

State- Uttar

Pradesh

Date of Agreement:

27.05.2015

Name and address of

client:

Joint General

Manager/GT,

RITES Ltd,

RITES Bhawan, No. 1,

Sector-29, Gurgaon-

122001

Professional staff

provided:

a) No. of staff- 15

b) No. of

man/months-

15/2

Start date

(month/year):

01.06.2015

Completion

date

(month/year):

31.07.2015

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted]Rs.8, 53,000.00 excluding service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): 02

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi Dy.

GM (Proj.)- Coordination, execution & Planing.( Functions performed by the

associated firm (s) to be given separately) 45

Project-II

Narrative Description of Project: Geo-Technical investigation in proposed

alignment for Merto stations, under passes, tunnels and Depoe for preparation

of feasibility report for DPR.

Total length of the Project Highway

(in Km): 47

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

NA

• Ground Surveys & Investigation….……………………………………….……..…Yes

• Material

Surveys……………………………………………………….……………………..….…….No

• Geo-tech Investigation for Bridges……………………………………..……..……Yes

• Geo-tech investigation for high embankments……………..………………..…..No

• Preparation of designs for road pavement………………………………………....No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………….……….…No

• Investigations for bridge foundations resting on rock by drilling through

rock……………………………………………………………….……………………..….No

46

Project-III

Project Name:

Geotechnical investigations at

Chandrabagha bridge of 125 km

new Broad Gauge rail link

between Rishikesh and

Karanprayag in the state of

Uttarakhand, India.

Country: India

Project location

within country:

Rishikesh

Dist. Rishikesh

State- Uttar

Pradesh

Date of Agreement:

11.09.2015

Name and address of

client:

DGM/Project-1,

Rail Vikas Nigam Ltd,

Rishikesh.-249137

Professional staff

provided:

a) No. of staff- 10

b) No. of

man/months-

10/1.5

Start date

(month/year):

02.07.2015

Completion

date

(month/year):

31.12.2015

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.4, 32,562.00 excluding service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): 1.5

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Arvind K. Garg

M.D.- Coordination, Execution,

( Functions performed by the associated firm (s) to be given separately)

47

Project-III

Narrative Description of Project: Geo-Technical investigation in proposed

alignment for Merto stations, under passes, tunnels and Depoe for preparation

of feasibility report for DPR.

Total length of the Project Highway

(in Km): NA

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

NA

• Ground Surveys &

Investigation………………………………………………………………………..………Yes

• Material

Surveys……………………………………..………………….……………………….…….No

• Geo-tech Investigation for Bridges……………………………….…………..……Yes

• Geo-tech investigation for high embankments…………….……………….…..No

• Preparation of designs for road pavement…………….………………………....No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………………….…Yes

• Investigations for bridge foundations resting on rock by drilling through

rock……………………………………………………………………………………..….Yes

48

Project-IV

Project Name:

Topographical Survey and Soil

Testing & Investigation for

50MW PV Solar Project at

Kadiri, Dist. Anantapur, Andhra

Pradesh.

Country: India

Project location

within country:

Kadri,

Dist.- Anantapur

State.-

Andhrapradesh

Date of Agreement:

13.05.2016

Name and address of

client:

Manager (SC&PV-PVSS),

BHEL, Electronics

Division,

Bangalore-560026

Professional staff

provided:

a) No. of staff- 15

b) No. of

man/months-

15/2.5

Start date

(month/year):

03.06.2015

Completion

date

(month/year):

23.06.2015

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs. 8,82,363.00 including service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

49

Project-IV

Narrative Description of Project: Topographical Survey and Soil Testing &

Investigation for 50MW PV Solar Project.

Total length of the Project Highway

(in Km): NA

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

NA

• Ground Surveys & Investigat…………………..……………………………….……Yes

• Material

Surveys………………………………………………………….…………………………….No

• Geo-tech Investigation for Bridges…………………………..………………….……No

• Geo-tech investigation for high embankments……………………………..……..No

• Preparation of designs for road pavement…………………..……………………...No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………………….…No

• Investigations for bridge foundations resting on rock by drilling through

rock………………………………………………………… .……………….…………. No

50

Project-V

Project Name: Geotechnical

Examination In connection with

the construction of

Hardstand/Road Inside Dock

Area, Haldia Dock Complex,

Haldia.

Country: India

Project location

within country:

Dock Complex,

Haldia Port

Dist. Haldia

State- West Bengal

Date of Agreement:

07.05.2015

Name and address of

client:

Manager (I & CF)

Kolkata Port Trust,

Haldia Dock Complex,

Haldia

Professional staff

provided:

a) No. of staff- 12

b) No. of

man/months-

20/4

Start date

(month/year):

03.06.2015

Completion

date

(month/year):

06.08.2015

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.11,74,270.23 Excluding service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

51

Project-V

Narrative Description of Project: Geo-Technical Examination” is to be carried

out at different locations of proposed hardstand/road inside the dock area at

Haldia Dock Complex, Haldia, with an objective of finding out the relevant soil

parameters which will be required for design of suitable structures e.g.

pavements, hardstand etc.

Total length of the Project Highway

(in Km): NA

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

NA

• Ground Surveys & Investigation….………………………………………….……Yes

• Material Surveys………………………..……………….…………………………….No

• Geo-tech Investigation for Bridges…………………………..……………….……No

• Geo-tech investigation for high embankments…………………………..……..No

• Preparation of designs for road pavement……………….……………………...Yes

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………………….…No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………………………….…………. No

52

Project-VI

Project Name: Sub Soil

Investigation, Plate Load Test,

design and drawing of bridge for

Road over Bridge in lieu of Level

crossing Nos. 5-C, 11-C & 16-C

on Meerut – Khurja section &

for 45 numbers Road Under

Bridge on Meerut – Khurja

section.

Country: India

Project location

within country:

Meerut & Khurja

Dist. Meerut

State- Uttar

Pradesh

Date of Agreement:

12.01.2016

Name and address of

client:

Dy. Chief

Engineer/Const,

NDWCS, Northern

Railway, New Delhi.

Professional staff

provided:

a) No. of staff- 04

b) No. of

man/months-

12/2.5

Start date

(month/year):

25.01.2016

Completion

date

(month/year):

15.03.2016

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.8, 90,550.00 including service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

53

Project-VI

Narrative Description of Project: Geo-Technical investigation at various level

crossing for construction of RUB or ROB from Meerut to Khurja rail line.

Total length of the Project Highway

(in Km): 70

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

5 to 8

• Ground Surveys & Investigation……………………………………………….……Yes

• Material

Surveys………………….…………………………………….…………………………….No

• Geo-tech Investigation for Bridges……………..…………………………….……Yes

• Geo-tech investigation for high embankment………..…………………..……..No

• Preparation of designs for road pavement………………..……………………...No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods………………………………………………………………….….…No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………….……………….…………. No

54

Project-VII

Project Name: Soil

Investigation work for proposed

ROB at Raebareli to Jaunpur

section (Km 0+000 to Km.

166.400) of NH-231 Country: India

Project location

within country:

Raebareli

Dist. Raebareli

State- Uttar

Pradesh

Date of Agreement:

25.08.2014

Name and address of

client:

Arvind Techno

Engineers Pvt. Ltd. 3rd

Floor, A-22Green Park

(Main), Aurobindo Marg,

New Delhi-110016

Professional staff

provided:

a) No. of staff- 04

b) No. of

man/months-

12/2.5

Start date

(month/year):

05.09.2014

Completion

date

(month/year):

05.09.2014

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.6, 95,126.00 including service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

55

Project-VII

Narrative Description of Project: Geo-Technical investigation in connection

with construction of Rail Over Bridge at NH231, at Jaunpur, Uttar Pradesh

Total length of the Project Highway

(in Km): NA

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

5 to 8

• Ground Surveys & Investigation……………………………………………….……Yes

• Material

Surveys………………………………………………………….…………………………….No

• Geo-tech Investigation for Bridges…………………………………………….……Yes

• Geo-tech investigation for high embankments……………..……………..……..No

• Preparation of designs for road pavement……………….………………………...No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods……………………………………………………………….…….…No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………….……………….…………. No

56

Project-VIII

Project Name: Geo-technical

investigation work of 50

Strategic locations along Sewer

Alignment at New Delhi. Country: India

Project location

within country:

New Delhi

Date of Agreement:

25.08.2014

Name and address of

client:

Executive Director

DJB Pumping Station

Complex, opposite Azad

Bhawan (In gate), ITO,

New Delhi-110002

Ph. No. 011-23378736

Professional staff

provided:

a) No. of staff- 08

b) No. of

man/months-

25/3.5

Start date

(month/year):

05.09.2014

Completion

date

(month/year):

05.09.2014

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.5, 00,000.00 including service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

57

Project-VIII

Narrative Description of Project: Geo-Technical investigation in connection

with construction of Rail Over Bridge at NH231, at Jaunpur, Uttar Pradesh.

Total length of the Project Highway

(in Km): NA

Carriageway Width (in m): NA

Length of Bridge (in m) (if

applicable): NA

Span configuration of bridge (in m):

5 to 8

• Ground Surveys & Investigation…..………………………………………….……Yes

• Material

Surveys………………….…………………………………….…………………………….No

• Geo-tech Investigation for Bridges……………..…………………………….……No

• Geo-tech investigation for high embankments…………………………..……..No

• Preparation of designs for road pavement…………..…………………………...No

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………………….…No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………..……………….…………. No

58

Project-IX

Project Name:

Rehabilitation and up gradation

to four laning of Chhapra –

Hazipur section of NH- 19 from

Km. 188.68 to 209.94 in the

state of Bihar under NHDP – III

on annuity.

Country: India

Project location

within country:

Hazipur & Chhapra

State- Bihar

Date of Agreement:

11.06.2013

Name and address of

client:

General Manager, Proj.

Vijay Nirman Company

Pvt. Ltd.

Near Gandak bridge,

village Anandpura,

Hazipur Bihar

Professional staff

provided:

a) No. of staff- 08

b) No. of

man/months-

25/3.5

Start date

(month/year):

28.04.2010

Completion

date

(month/year):

28.06.2010

(cost as per Agreement in INR(Lakhs) [In

case of foreign currency, conversion factor as

on date of Agreement with proof shall be

submitted] Rs.3, 07,516.00 including service

tax.

Whether project was done alone or as a JV or in association with other

firm/ firms: No.

Name of Lead

partner in case

of

JV/association

: Nil

JV Share of the

firm in case of

JV: NA

No. of man-months of

professional staff

provided by associated

firm (s): Nil

Name of Lead

partner in

case of

JV/association: NA

Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.

GM (Proj.)- Coordination, Execution, ( Functions performed by the associated

firm (s) to be given separately)

59

Project-VIII

Narrative Description of Project: Rehabilitation and up gradation to four

laning of Chhapra – Hazipur section of NH- 19 from Km. 188.68 to 209.94.

Total length of the Project Highway

(in Km): 65

Carriageway Width (in m): 09

Length of Bridge (in m) (if

applicable): 700

Span configuration of bridge (in m):

09

• Ground Surveys & Investigation..…………………………………………….……Yes

• Material

Surveys………………………….…………………………….…………………………….No

• Geo-tech Investigation for Bridges……………..…………………………….……Yes

• Geo-tech investigation for high embankments…………………………..……..No

• Preparation of designs for road pavement… …………………………………...Yes

• Preliminary investigation for bridge foundations resting on rock using geo-

physical methods…………………………………………………………………….…No

• Investigations for bridge foundations resting on rock by drilling through

rock…………………………………………………………………….…….…………. No

60

DETAILED INFORMATION OF TECHNICAL PERSONNEL

AVAILABLE WITH THE FIRM

Sl.

No.

Name Academic

Qualification

Degree(civil)

Year of

passing

No. of years

experience

in the field

of Highway/

Bridge Engg

Signature

of

respective

technical

personnel

1 Mr. Saurabh

Agarwal

B. Tech (civil)

M. Tech

(Mechanic & Fdn)

1991

1994 15 Years

2 Dr. Lok Priya

Srivastava

B. Tech (civil)

M. Tech

(GeoTech-Engg)

2007

2009 05 Years

3 Mr. Yagyadutta

Mishra B. Tech (Civil) 2012 03 Years

4 Arvind Kumar

Garg

B. Tech (civil)

M. Tech

(structure)

1991

1994 20 Years

5 Mr. Prashant

Kr. Yadav

B. Sc (Geology)

M. Sc (Geology)

2010

2013 02 Years

6 Mr. Prashant

Mukharjee

M. Tech (Civil)

Ph. D: Geotech)

2000

2015 05 Years

7 Mr. Nazrul

Qamer B. Tech (civil) 2015 02 Years

8 Mr. Abhijeet

Singh

B. Tech (civil)

B. Tech

(Structure)

2013

2016 02 Years

9 Mr. Sushil

Kumar Tripathi

Diploma civil

Engg. 1991 18 Years

10 Anoj Dhyani

Diploma civil

Engg. 1995 10 Years

11 Mr. Shivam

Mathur B. Tech (civil) 1910 02 Years

Signature of the authorized

Signatory of the firm 61

UNDERTAKING REGARDING NON-DEBARREMENT/

BLACKLISTING/DETAILS OF LITIGATION HISTORY

We hereby declare that we neither have been placed on any holiday list nor

black listed by Ministry of Road Transport & Highway Or by any Department

of any Government (State, Provincial, Federal or Central) or by any Public

Sector Organization in India or in any other country and that there is no

pending inquiry by organization on in any country against us, in respect of

corrupt or fraudulent practice(s).

It is understood that if this declaration is found to be false, in any particular,

Ministry of Road Transport & Highway, shall have the right to reject our/bid,

and if the bid has resulted in a contract, the contract is liable to be

terminated without prejudice to any other right or remedy (including black

listing or holiday listing) available to MORTH.

Place :

Signature of Company Authority:

Date :

Name of Signatory:

62

UNDERTAKING REGARDING AVAILABILITY

OF EQUIPMENTS MENTIONED IN

APPENDIX-A

This is to undertake that the total essential field and laboratory

equipment required for the works as per appendix-A are available with

M/s. Techpro Engineers Pvt. Ltd. For the project and details of such

equipment are mentioned in Field/ Laboratory Equipment Attachment

1&2.

Authorized Signatory

Techpro Engineers Pvt. Ltd.

63

� ANNUAL TURNOVER OF THE COMPANY

o 2012 - 2013 was Rs.59.80 lacs.

o 2013 - 2014 was Rs.111.59 lacs.

o 2014 – 2015 was Rs.384.00 lacs.

o 2015 – 2016 was Rs.171.12 lacs

o 2016 – 2017 was Rs. 184.64 lacs

� LABORATORY:

Our laboratory is situated at following address:-

131, 1st; Floor,

Patparganj Industrial Area,

Delhi-110092

64

SOIL INVESTIGATION

ROCK DRILLING

TESTING ON SOIL,ROCK SAMPLES

CHEMICAL TEST ON SOIL,WATER

SAMPLES

SEISMIC REFRACTION

TEST

CROSSHOLE, DOWNHOLE

SEISMIC&TOMOGRAPHY

GROUND PENETRATING RADARURVEYS

TOPOGRAPHY AND CONTOUR

SURVEYS

PILE FOUNDATION

HYDROGRAPHICAL

SURVEYS

GAS SERVICES

65

FIELD TESTING EQUIPMENTS

• Trailer mounted Rotary rigs-08

• Power operated winches for

percussion method drilling in

over burden soil.– 10 Nos.

• Manually operated Shell &

Auger drilling & sampling

equipment- 10sets.

• Plate load & K-value test setups

as per IS: 1888.

• Electric resistivity test setups – 4

nos.

• Dynamic Cone (DCPT) test

setups as per IS: 4968-1

• Static Cone (SCPT) test setup (1

no of 10T capacity)-as per

IS.2131-1981

• Field CBR test setups – 2 nos.

• In-situ Permeability test setups

(2 nos.)

• In-situ density test setups (core

cutter and sand replacement -2

• Water Content (Oven Dry Method) IS 2720 (Part 2): 1973 (RA 2010)

• Liquid Limit apparatus as per IS 2720 (Part 5): 1985 (RA 2010)

• Plastic Limit IS 2720 (Part 5): 1985 (RA 2010)

• Shrinkage Limit IS 2720 (Part 6): 1972 (RA 2011)

• Light Compaction IS 2720 (Part 7): 1980 (RA 2011)

• Direct Shear Test IS 2720 (Part 13): 1986 (RA 2011)

• California Bearing Ratio (CBR) IS 2720 (Part 16): 1987 (RA 2011)

• Permeability (By Falling Head) IS 2720 (Part 27): 1986 (RA 2011)

• Chemical test apparatus for soil and water samples

• Weighing machines(Manual & electronic)

• Sample Extractor

• CBR test apparatus

• Proctor test apparatus

• Apparatus for UCS and Point load test for rock core testing

• Sieve Analysis IS 2720 (Part 4): 1985 (RA 2010) Clause No. 3,4.3, & 5.2