HCM 2010 Signalized Intersection Capacity Analysis 3: 600 East & 1400 North 12/2/2011 Existing AM 11/17/2011 Baseline Synchro 8 Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 38 457 41 45 284 36 62 80 16 25 48 13 Movement Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00 Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937 Lanes 1 2 0 1 2 1 1 1 1 1 1 1 Lane Assignment Capacity, veh/h 348 983 88 261 1033 459 819 1007 854 785 1047 888 Proportion Arriving On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.54 0.54 0.54 0.54 0.54 0.54 Movement Delay, s/veh 20.7 20.0 20.1 24.3 18.2 17.0 7.9 7.4 7.1 7.9 7.2 7.0 Movement LOS C C C C B B A A A A A A Approach Volume, veh/h 583 397 172 93 Approach Delay, s/veh 20.1 18.8 7.6 7.4 Approach LOS C B A A Timer: 1 2 3 4 5 6 7 8 Assigned Phase 2 4 6 8 Case No 5.0 6.0 5.0 5.0 Phase Duration (G+Y+Rc), s 41.00 24.67 41.00 24.67 Change Period (Y+Rc), s 5.50 5.50 5.50 5.50 Max. Allowable Headway (MAH), s 4.63 4.88 4.63 4.88 Maximum Green Setting (Gmax), s 35.50 43.50 35.50 43.50 Max. Queue Clearance Time (g_c+l1), s 4.47 10.07 4.15 13.23 Green Extension Time (g_e), s 1.17 6.03 1.17 5.93 Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000 Probability of Max Out (p_x) 0.000 0.015 0.000 0.024 Left-Turn Movement Data Assigned Movement 5 7 1 3 Mvmt. Sat Flow, veh/h 1344.05 1062.37 1302.56 893.39 Through Movement Data Assigned Movement 2 4 6 8 Mvmt. Sat Flow, veh/h 1862.75 3368.65 1937.25 3539.22 Right-Turn Movement Data Assigned Movement 12 14 16 18 Mvmt. Sat Flow, veh/h 1579.82 301.24 1643.01 1572.48 Left Lane Group Data Assigned Movement 0 5 0 7 0 1 0 3 Lane Assignment L L L L Lanes in Group 0 1 0 1 0 1 0 1 Group Volume (v), veh/h 0.0 67.4 0.0 41.3 0.0 27.2 0.0 48.9 Group Sat. Flow (s), veh/h/ln 0.0 1344.0 0.0 1062.4 0.0 1302.6 0.0 893.4 Queue Serve Time (g_s), s 0.0 1.6 0.0 2.1 0.0 0.7 0.0 3.2 Cycle Queue Clear Time (g_c), s 0.0 2.5 0.0 6.5 0.0 2.2 0.0 11.2

Upload: others

Post on 25-Jul-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 38 457 41 45 284 36 62 80 16 25 48 13Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 348 983 88 261 1033 459 819 1007 854 785 1047 888Proportion Arriving On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.54 0.54 0.54 0.54 0.54 0.54Movement Delay, s/veh 20.7 20.0 20.1 24.3 18.2 17.0 7.9 7.4 7.1 7.9 7.2 7.0Movement LOS C C C C B B A A A A A AApproach Volume, veh/h 583 397 172 93Approach Delay, s/veh 20.1 18.8 7.6 7.4Approach LOS C B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 41.00 24.67 41.00 24.67Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.63 4.88 4.63 4.88Maximum Green Setting (Gmax), s 35.50 43.50 35.50 43.50Max. Queue Clearance Time (g_c+l1), s 4.47 10.07 4.15 13.23Green Extension Time (g_e), s 1.17 6.03 1.17 5.93Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.000 0.015 0.000 0.024

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1344.05 1062.37 1302.56 893.39

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3368.65 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1579.82 301.24 1643.01 1572.48

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 67.4 0.0 41.3 0.0 27.2 0.0 48.9Group Sat. Flow (s), veh/h/ln 0.0 1344.0 0.0 1062.4 0.0 1302.6 0.0 893.4Queue Serve Time (g_s), s 0.0 1.6 0.0 2.1 0.0 0.7 0.0 3.2Cycle Queue Clear Time (g_c), s 0.0 2.5 0.0 6.5 0.0 2.2 0.0 11.2

Page 2: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1344.0 0.0 1062.4 0.0 1302.6 0.0 893.4Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 35.5 0.0 19.2 0.0 35.5 0.0 19.2Perm LT Serve Time (g_u), s 0.0 34.7 0.0 14.7 0.0 34.0 0.0 11.1Perm LT Que Serve Time (g_ps), s 0.0 1.6 0.0 2.1 0.0 0.7 0.0 3.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 819.2 0.0 347.8 0.0 784.5 0.0 260.6Volume-to-Capacity Ratio (X) 0.000 0.082 0.000 0.119 0.000 0.035 0.000 0.188Available Capacity (c_a), veh/h 0.0 819.2 0.0 741.5 0.0 784.5 0.0 591.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.7 0.0 20.6 0.0 7.8 0.0 24.0Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.1 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.9 0.0 20.7 0.0 7.9 0.0 24.3First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.5 0.0 0.2 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 0.5 0.0 0.2 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.06 0.00 0.03 0.00 0.10Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 87.0 0.0 274.0 0.0 52.2 0.0 308.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 1.5 0.0 8.0 0.0 0.8 0.0 4.4Cycle Queue Clear Time (g_c), s 0.0 1.5 0.0 8.0 0.0 0.8 0.0 4.4Lane Group Capacity (c), veh/h 0.0 1007.0 0.0 543.7 0.0 1047.3 0.0 1033.0Volume-to-Capacity Ratio (X) 0.000 0.086 0.000 0.504 0.000 0.050 0.000 0.299Available Capacity (c_a), veh/h 0.0 1007.0 0.0 1233.9 0.0 1047.3 0.0 2344.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.3 0.0 19.3 0.0 7.1 0.0 18.0Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.7 0.0 0.1 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.4 0.0 20.0 0.0 7.2 0.0 18.2First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 3.0 0.0 0.3 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 3.1 0.0 0.3 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.02 0.00 0.09 0.00 0.01 0.00 0.03

Page 3: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 17.4 0.0 267.3 0.0 14.1 0.0 39.1Group Sat. Flow (s), veh/h/ln 0.0 1579.8 0.0 1807.1 0.0 1643.0 0.0 1572.5Queue Serve Time (g_s), s 0.0 0.3 0.0 8.1 0.0 0.3 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.3 0.0 8.1 0.0 0.3 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.167 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 854.1 0.0 527.5 0.0 888.2 0.0 459.0Volume-to-Capacity Ratio (X) 0.000 0.020 0.000 0.507 0.000 0.016 0.000 0.085Available Capacity (c_a), veh/h 0.0 854.1 0.0 1197.1 0.0 888.2 0.0 1041.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.0 0.0 19.3 0.0 7.0 0.0 16.9Incremental Delay (d2), s/veh 0.0 0.0 0.0 0.8 0.0 0.0 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.1 0.0 20.1 0.0 7.0 0.0 17.0First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 2.9 0.0 0.1 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 3.0 0.0 0.1 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.09 0.00 0.01 0.00 0.06Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.0HCM Level of Service B

Page 4: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 1 24 12 1 5 12 240 4 1 72 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 1 26 13 1 5 13 261 4 1 78 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 378 374 81 399 375 263 84 265vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 378 374 81 399 375 263 84 265tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 97 98 100 99 99 100cM capacity (veh/h) 570 551 979 542 551 776 1513 1299

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 40 20 278 85Volume Left 13 13 13 1Volume Right 26 5 4 5cSH 781 592 1513 1299Volume to Capacity 0.05 0.03 0.01 0.00Queue Length 95th (ft) 4 3 1 0Control Delay (s) 9.9 11.3 0.4 0.1Lane LOS A B A AApproach Delay (s) 9.9 11.3 0.4 0.1Approach LOS A B

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 30.0% ICU Level of Service AAnalysis Period (min) 15

Page 5: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 41 291 116 20 200 48 87 68 13 100 248 76Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 0.99 0.99 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 381 536 468 304 536 451 604 904 792 756 1336 400Proportion Arriving On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.49 0.49 0.49 0.49 0.49 0.49Movement Delay, s/veh 16.5 15.8 13.6 18.3 14.4 12.8 9.2 6.9 6.5 8.0 7.6 7.7Movement LOS B B B B B B A A A A A AApproach Volume, veh/h 487 291 183 461Approach Delay, s/veh 15.3 14.4 8.1 7.7Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 19.43 29.00 19.43Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.77 4.63 4.77 4.63Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 7.47 9.06 5.38 9.90Green Extension Time (g_e), s 2.83 3.39 2.95 3.32Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.062 0.083 0.037 0.099

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1064.60 1198.97 1309.81 1095.23

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2752.84 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1631.40 1627.77 825.22 1569.57

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 94.6 0.0 44.6 0.0 108.7 0.0 21.7Group Sat. Flow (s), veh/h/ln 0.0 1064.6 0.0 1199.0 0.0 1309.8 0.0 1095.2Queue Serve Time (g_s), s 0.0 2.7 0.0 1.5 0.0 2.3 0.0 0.8Cycle Queue Clear Time (g_c), s 0.0 5.5 0.0 6.1 0.0 3.4 0.0 7.9

Page 6: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1064.6 0.0 1199.0 0.0 1309.8 0.0 1095.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 13.9 0.0 23.5 0.0 13.9Perm LT Serve Time (g_u), s 0.0 20.7 0.0 9.4 0.0 22.5 0.0 6.9Perm LT Que Serve Time (g_ps), s 0.0 2.7 0.0 1.5 0.0 2.3 0.0 0.8Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 604.3 0.0 380.6 0.0 756.4 0.0 304.1Volume-to-Capacity Ratio (X) 0.000 0.156 0.000 0.117 0.000 0.144 0.000 0.071Available Capacity (c_a), veh/h 0.0 604.3 0.0 667.2 0.0 756.4 0.0 565.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.7 0.0 16.4 0.0 7.6 0.0 18.2Incremental Delay (d2), s/veh 0.0 0.6 0.0 0.1 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.2 0.0 16.5 0.0 8.0 0.0 18.3First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 0.3 0.0 0.5 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 0.4 0.0 0.6 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.05 0.00 0.18 0.00 0.03Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 73.9 0.0 316.3 0.0 180.5 0.0 217.4Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.0 0.0 7.1 0.0 2.7 0.0 4.6Cycle Queue Clear Time (g_c), s 0.0 1.0 0.0 7.1 0.0 2.7 0.0 4.6Lane Group Capacity (c), veh/h 0.0 903.9 0.0 535.7 0.0 903.9 0.0 535.7Volume-to-Capacity Ratio (X) 0.000 0.082 0.000 0.590 0.000 0.200 0.000 0.406Available Capacity (c_a), veh/h 0.0 903.9 0.0 980.9 0.0 903.9 0.0 980.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.7 0.0 14.8 0.0 7.1 0.0 13.9Incremental Delay (d2), s/veh 0.0 0.2 0.0 1.0 0.0 0.5 0.0 0.5Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 6.9 0.0 15.8 0.0 7.6 0.0 14.4First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 2.3 0.0 0.7 0.0 1.5Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 2.4 0.0 0.8 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.05 0.00 0.12 0.00 0.03

Page 7: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 14.1 0.0 126.1 0.0 171.7 0.0 52.2Group Sat. Flow (s), veh/h/ln 0.0 1631.4 0.0 1627.8 0.0 1715.3 0.0 1569.6Queue Serve Time (g_s), s 0.0 0.2 0.0 2.9 0.0 2.8 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.2 0.0 2.9 0.0 2.8 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.481 0.000 1.000Lane Group Capacity (c), veh/h 0.0 791.7 0.0 468.1 0.0 832.4 0.0 451.4Volume-to-Capacity Ratio (X) 0.000 0.018 0.000 0.269 0.000 0.206 0.000 0.116Available Capacity (c_a), veh/h 0.0 791.7 0.0 857.1 0.0 832.4 0.0 826.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.5 0.0 13.3 0.0 7.1 0.0 12.7Incremental Delay (d2), s/veh 0.0 0.0 0.0 0.3 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 6.5 0.0 13.6 0.0 7.7 0.0 12.8First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.8 0.0 0.7 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.9 0.0 0.8 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.00 0.00 0.02 0.00 0.11 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.7HCM Level of Service B

Page 8: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 67 102 113 49 96 52 36 156 29 55 204 49Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.98 0.97 0.97 0.97 0.99 0.95 0.96 0.98Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 464 532 454 469 532 458 656 1673 707 676 1673 733Proportion Arriving On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.47 0.47 0.47 0.47 0.47 0.47Movement Delay, s/veh 14.0 12.5 12.9 13.8 12.5 12.2 7.6 6.8 6.6 7.6 6.9 6.7Movement LOS B B B B B B A A A A A AApproach Volume, veh/h 307 214 240 335Approach Delay, s/veh 13.0 12.7 6.9 7.0Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 18.48 27.00 18.48Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.74 4.57 4.74 4.57Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 4.51 6.04 4.57 5.54Green Extension Time (g_e), s 2.74 2.21 2.74 2.22Probability of Phase Call (p_c) 1.000 0.999 1.000 0.999Probability of Max Out (p_x) 0.028 0.004 0.028 0.004

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1137.93 1258.61 1160.14 1292.80

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1496.26 1591.27 1549.84 1605.12

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 39.1 0.0 72.8 0.0 59.8 0.0 53.3Group Sat. Flow (s), veh/h/ln 0.0 1137.9 0.0 1258.6 0.0 1160.1 0.0 1292.8Queue Serve Time (g_s), s 0.0 0.9 0.0 2.1 0.0 1.4 0.0 1.5Cycle Queue Clear Time (g_c), s 0.0 2.5 0.0 4.0 0.0 2.6 0.0 3.5

Page 9: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1137.9 0.0 1258.6 0.0 1160.1 0.0 1292.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 13.0 0.0 21.5 0.0 13.0Perm LT Serve Time (g_u), s 0.0 19.9 0.0 11.0 0.0 20.3 0.0 10.9Perm LT Que Serve Time (g_ps), s 0.0 0.9 0.0 2.1 0.0 1.4 0.0 1.5Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 656.2 0.0 464.1 0.0 676.0 0.0 468.7Volume-to-Capacity Ratio (X) 0.000 0.060 0.000 0.157 0.000 0.088 0.000 0.114Available Capacity (c_a), veh/h 0.0 656.2 0.0 866.0 0.0 676.0 0.0 881.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.4 0.0 13.8 0.0 7.4 0.0 13.7Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.6 0.0 14.0 0.0 7.6 0.0 13.8First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 0.5 0.0 0.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 0.6 0.0 0.3 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.13 0.00 0.05 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 169.6 0.0 110.9 0.0 221.7 0.0 104.3Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.2 0.0 2.1 0.0 1.6 0.0 1.9Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 2.1 0.0 1.6 0.0 1.9Lane Group Capacity (c), veh/h 0.0 1673.2 0.0 531.5 0.0 1673.2 0.0 531.5Volume-to-Capacity Ratio (X) 0.000 0.101 0.000 0.209 0.000 0.133 0.000 0.196Available Capacity (c_a), veh/h 0.0 1673.2 0.0 1126.4 0.0 1673.2 0.0 1126.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.6 0.0 12.3 0.0 6.7 0.0 12.3Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.2 0.0 0.2 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 6.8 0.0 12.5 0.0 6.9 0.0 12.5First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 0.7 0.0 0.4 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 0.8 0.0 0.4 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.02 0.00 0.03 0.00 0.02

Page 10: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 31.5 0.0 122.8 0.0 53.3 0.0 56.5Group Sat. Flow (s), veh/h/ln 0.0 1496.3 0.0 1591.3 0.0 1549.8 0.0 1605.1Queue Serve Time (g_s), s 0.0 0.5 0.0 2.7 0.0 0.9 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 2.7 0.0 0.9 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 707.4 0.0 454.1 0.0 732.7 0.0 458.0Volume-to-Capacity Ratio (X) 0.000 0.045 0.000 0.271 0.000 0.073 0.000 0.123Available Capacity (c_a), veh/h 0.0 707.4 0.0 962.2 0.0 732.7 0.0 970.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.5 0.0 12.6 0.0 6.5 0.0 12.0Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.2 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 6.6 0.0 12.9 0.0 6.7 0.0 12.2First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.8 0.0 0.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.9 0.0 0.2 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.20 0.00 0.04 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 9.8HCM Level of Service A

Page 11: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 60 178 32 44 128 12 48 148 52 8 64 32Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 65 193 35 48 139 13 52 161 57 9 70 35

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 65 228 48 152 213 57 78 35Volume Left (vph) 65 0 48 0 52 0 9 0Volume Right (vph) 0 35 0 13 0 57 0 35Hadj (s) 0.53 -0.07 0.53 -0.03 0.16 -0.67 0.09 -0.67Departure Headway (s) 6.4 5.8 6.5 5.9 6.2 5.3 6.3 5.6Degree Utilization, x 0.12 0.37 0.09 0.25 0.36 0.08 0.14 0.05Capacity (veh/h) 533 597 521 573 548 633 528 594Control Delay (s) 9.0 10.9 8.9 9.7 11.4 7.6 9.1 7.7Approach Delay (s) 10.5 9.5 10.6 8.7Approach LOS B A B A

Intersection SummaryDelay 10.1HCM Level of Service BIntersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 12: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 6 0 12 3 0 3 11 184 46 24 291 3Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 0 13 3 0 3 12 200 50 26 316 3PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 497 644 160 472 621 125 320 250vC1, stage 1 conf vol 370 370 249 249vC2, stage 2 conf vol 127 274 223 372vCu, unblocked vol 497 644 160 472 621 125 320 250tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 98 99 100 100 99 98cM capacity (veh/h) 577 530 857 619 537 902 1237 1313

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 7 12 133 117 26 211 109Volume Left 7 3 12 0 0 26 0 0Volume Right 13 3 0 0 50 0 0 3cSH 737 735 1237 1700 1700 1313 1700 1700Volume to Capacity 0.03 0.01 0.01 0.08 0.07 0.02 0.12 0.06Queue Length 95th (ft) 2 1 1 0 0 2 0 0Control Delay (s) 10.0 9.9 7.9 0.0 0.0 7.8 0.0 0.0Lane LOS B A A AApproach Delay (s) 10.0 9.9 0.4 0.6Approach LOS B A

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 24.8% ICU Level of Service AAnalysis Period (min) 15

Page 13: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 2 0 4 0 0 0 4 216 0 0 100 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 0 4 0 0 0 4 235 0 0 109 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 354 354 111 359 357 235 113 235vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 354 354 111 359 357 235 113 235tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 100 100 100 100 100 100 100 100cM capacity (veh/h) 599 569 942 593 568 804 1476 1333

Direction, Lane # EB 1 NB 1 SB 1Volume Total 7 239 113Volume Left 2 4 0Volume Right 4 0 4cSH 791 1476 1700Volume to Capacity 0.01 0.00 0.07Queue Length 95th (ft) 1 0 0Control Delay (s) 9.6 0.2 0.0Lane LOS A AApproach Delay (s) 9.6 0.2 0.0Approach LOS A

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 24.6% ICU Level of Service AAnalysis Period (min) 15

Page 14: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 24 0 6 2 223 50 24 278 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 26 0 7 2 242 54 26 302 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblockedvC, conflicting volume 489 658 153 484 633 148 307 297vC1, stage 1 conf vol 357 357 274 274vC2, stage 2 conf vol 132 301 210 359vCu, unblocked vol 489 658 153 484 633 148 307 297tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 99 96 100 99 100 98cM capacity (veh/h) 585 528 865 621 542 872 1251 1261

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 33 2 162 135 26 201 105Volume Left 13 26 2 0 0 26 0 0Volume Right 7 7 0 0 54 0 0 4cSH 656 658 1251 1700 1700 1261 1700 1700Volume to Capacity 0.03 0.05 0.00 0.10 0.08 0.02 0.12 0.06Queue Length 95th (ft) 2 4 0 0 0 2 0 0Control Delay (s) 10.7 10.8 7.9 0.0 0.0 7.9 0.0 0.0Lane LOS B B A AApproach Delay (s) 10.7 10.8 0.1 0.6Approach LOS B B

Intersection SummaryAverage Delay 1.1Intersection Capacity Utilization 24.5% ICU Level of Service AAnalysis Period (min) 15

Page 15: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 15

Page 16: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 241 306 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 262 333 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 464 166 333vC1, stage 1 conf vol 333vC2, stage 2 conf vol 131vCu, unblocked vol 464 166 333tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 659 849 1224

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 131 131 166 166Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.08 0.08 0.10 0.10Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 11.8% ICU Level of Service AAnalysis Period (min) 15

Page 17: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 24 6 158 36 4 322Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 26 7 172 39 4 350PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 375 105 211vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 375 105 211tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 99 100cM capacity (veh/h) 597 929 1357

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 33 114 96 4 175 175Volume Left 26 0 0 4 0 0Volume Right 7 0 39 0 0 0cSH 643 1700 1700 1357 1700 1700Volume to Capacity 0.05 0.07 0.06 0.00 0.10 0.10Queue Length 95th (ft) 4 0 0 0 0 0Control Delay (s) 10.9 0.0 0.0 7.7 0.0 0.0Lane LOS B AApproach Delay (s) 10.9 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 18.9% ICU Level of Service AAnalysis Period (min) 15

Page 18: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 1 2 1 163 324 2Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 1 2 1 177 352 2PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 444 177 354vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 444 177 354tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 542 835 1201

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 3 60 118 235 120Volume Left 1 1 0 0 0Volume Right 2 0 0 0 2cSH 708 1201 1700 1700 1700Volume to Capacity 0.00 0.00 0.07 0.14 0.07Queue Length 95th (ft) 0 0 0 0 0Control Delay (s) 10.1 0.2 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 10.1 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.1Intersection Capacity Utilization 19.0% ICU Level of Service AAnalysis Period (min) 15

Page 19: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

Existing AM 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 36 4 0 2 60 192 36 22 64 97Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 39 4 0 2 65 209 39 24 70 105PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 531 548 122 568 582 228 175 248vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 531 548 122 568 582 228 175 248tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 96 99 100 100 95 98cM capacity (veh/h) 435 415 929 395 398 811 1401 1318

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 52 7 313 199Volume Left 13 4 65 24Volume Right 39 2 39 105cSH 724 477 1401 1318Volume to Capacity 0.07 0.01 0.05 0.02Queue Length 95th (ft) 6 1 4 1Control Delay (s) 10.4 12.7 1.9 1.1Lane LOS B B A AApproach Delay (s) 10.4 12.7 1.9 1.1Approach LOS B B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 35.6% ICU Level of Service AAnalysis Period (min) 15

Page 20: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 47 496 105 26 496 112 151 88 47 76 152 116Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 270 964 203 236 1144 512 685 986 838 749 1025 868Proportion Arriving On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.53 0.53 0.53 0.53 0.53 0.53Movement Delay, s/veh 25.6 21.7 21.8 26.7 20.5 18.7 12.3 8.9 8.7 10.1 9.4 9.3Movement LOS C C C C C B B A A B A AApproach Volume, veh/h 704 689 311 374Approach Delay, s/veh 22.0 20.4 10.6 9.5Approach LOS C C B A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 45.00 29.62 45.00 29.62Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.53 4.88 4.53 4.88Maximum Green Setting (Gmax), s 39.50 39.50 39.50 39.50Max. Queue Clearance Time (g_c+l1), s 11.29 14.83 6.42 15.45Green Extension Time (g_e), s 3.09 8.76 3.14 8.68Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.002 0.183 0.001 0.193

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1211.71 862.68 1294.73 806.29

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 2981.46 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 628.52 1639.20 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 164.1 0.0 51.1 0.0 82.6 0.0 28.3Group Sat. Flow (s), veh/h/ln 0.0 1211.7 0.0 862.7 0.0 1294.7 0.0 806.3Queue Serve Time (g_s), s 0.0 6.0 0.0 3.8 0.0 2.5 0.0 2.2Cycle Queue Clear Time (g_c), s 0.0 9.3 0.0 12.8 0.0 4.4 0.0 13.4

Page 21: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1211.7 0.0 862.7 0.0 1294.7 0.0 806.3Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 39.5 0.0 24.1 0.0 39.5 0.0 24.1Perm LT Serve Time (g_u), s 0.0 36.2 0.0 15.0 0.0 37.6 0.0 12.9Perm LT Que Serve Time (g_ps), s 0.0 6.0 0.0 3.8 0.0 2.5 0.0 2.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 684.7 0.0 270.5 0.0 748.8 0.0 236.1Volume-to-Capacity Ratio (X) 0.000 0.240 0.000 0.189 0.000 0.110 0.000 0.120Available Capacity (c_a), veh/h 0.0 684.7 0.0 448.2 0.0 748.8 0.0 402.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.4 0.0 25.3 0.0 9.8 0.0 26.4Incremental Delay (d2), s/veh 0.0 0.8 0.0 0.3 0.0 0.3 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.3 0.0 25.6 0.0 10.1 0.0 26.7First-Term Queue (Q1), veh/ln 0.0 1.7 0.0 0.7 0.0 0.7 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.8 0.0 0.8 0.0 0.8 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.47 0.00 0.10 0.00 0.13 0.00 0.07Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 95.7 0.0 336.0 0.0 165.2 0.0 539.1Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 1.9 0.0 11.1 0.0 3.3 0.0 9.1Cycle Queue Clear Time (g_c), s 0.0 1.9 0.0 11.1 0.0 3.3 0.0 9.1Lane Group Capacity (c), veh/h 0.0 986.0 0.0 602.2 0.0 1025.4 0.0 1144.2Volume-to-Capacity Ratio (X) 0.000 0.097 0.000 0.558 0.000 0.161 0.000 0.471Available Capacity (c_a), veh/h 0.0 986.0 0.0 986.0 0.0 1025.4 0.0 1873.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.7 0.0 20.8 0.0 9.0 0.0 20.2Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.8 0.0 0.3 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.9 0.0 21.7 0.0 9.4 0.0 20.5First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 4.3 0.0 1.2 0.0 3.3Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.7 0.0 4.4 0.0 1.3 0.0 3.4Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.13 0.00 0.04 0.00 0.06

Page 22: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 51.1 0.0 317.3 0.0 126.1 0.0 121.7Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1747.2 0.0 1639.2 0.0 1583.3Queue Serve Time (g_s), s 0.0 1.2 0.0 11.2 0.0 2.9 0.0 4.2Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 11.2 0.0 2.9 0.0 4.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.360 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 838.1 0.0 564.8 0.0 867.7 0.0 511.9Volume-to-Capacity Ratio (X) 0.000 0.061 0.000 0.562 0.000 0.145 0.000 0.238Available Capacity (c_a), veh/h 0.0 838.1 0.0 924.8 0.0 867.7 0.0 838.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.5 0.0 20.9 0.0 9.0 0.0 18.5Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.9 0.0 0.4 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.7 0.0 21.8 0.0 9.3 0.0 18.7First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 4.1 0.0 0.9 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 4.2 0.0 1.0 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.10 0.00 0.12 0.00 0.17 0.00 0.22Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.5HCM Level of Service B

Page 23: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 12 12 12 0 12 12 240 6 12 304 24Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 13 13 13 0 13 13 261 7 13 330 26PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 673 663 343 679 673 264 357 267vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 673 663 343 679 673 264 357 267tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 97 98 96 100 98 99 99cM capacity (veh/h) 357 374 699 343 369 775 1202 1296

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 39 26 280 370Volume Left 13 13 13 13Volume Right 13 13 7 26cSH 434 476 1202 1296Volume to Capacity 0.09 0.05 0.01 0.01Queue Length 95th (ft) 7 4 1 1Control Delay (s) 14.1 13.0 0.5 0.4Lane LOS B B A AApproach Delay (s) 14.1 13.0 0.5 0.4Approach LOS B B

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 31.6% ICU Level of Service AAnalysis Period (min) 15

Page 24: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 103 360 180 18 368 46 212 156 16 40 100 120Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 328 689 608 336 689 578 580 810 714 585 810 684Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.43 0.43 0.43 0.43 0.43 0.43Movement Delay, s/veh 21.0 14.9 13.0 18.3 15.0 11.6 15.3 10.5 9.2 11.5 9.9 10.4Movement LOS C B B B B B B B A B A BApproach Volume, veh/h 699 470 417 283Approach Delay, s/veh 15.3 14.8 13.1 10.4Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 30.00 26.34 30.00 26.34Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.72 4.68 4.72 4.68Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 13.33 17.32 6.50 12.31Green Extension Time (g_e), s 2.62 3.41 3.18 4.74Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.227 0.739 0.047 0.404

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1177.05 1014.16 1207.75 1027.36

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1640.99 1644.00 1573.50 1561.93

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 230.4 0.0 112.0 0.0 43.5 0.0 19.6Group Sat. Flow (s), veh/h/ln 0.0 1177.1 0.0 1014.2 0.0 1207.7 0.0 1027.4Queue Serve Time (g_s), s 0.0 8.5 0.0 5.6 0.0 1.3 0.0 0.9Cycle Queue Clear Time (g_c), s 0.0 11.3 0.0 15.3 0.0 4.5 0.0 10.3

Page 25: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1177.1 0.0 1014.2 0.0 1207.7 0.0 1027.4Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 24.5 0.0 20.8 0.0 24.5 0.0 20.8Perm LT Serve Time (g_u), s 0.0 21.6 0.0 11.1 0.0 21.3 0.0 11.4Perm LT Que Serve Time (g_ps), s 0.0 8.5 0.0 5.6 0.0 1.3 0.0 0.9Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 579.5 0.0 328.2 0.0 584.6 0.0 335.7Volume-to-Capacity Ratio (X) 0.000 0.398 0.000 0.341 0.000 0.074 0.000 0.058Available Capacity (c_a), veh/h 0.0 579.5 0.0 394.1 0.0 584.6 0.0 402.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 13.3 0.0 20.4 0.0 11.3 0.0 18.3Incremental Delay (d2), s/veh 0.0 2.0 0.0 0.6 0.0 0.2 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.3 0.0 21.0 0.0 11.5 0.0 18.3First-Term Queue (Q1), veh/ln 0.0 2.2 0.0 1.1 0.0 0.3 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.3 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.5 0.0 1.2 0.0 0.3 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.32 0.00 0.15 0.00 0.11 0.00 0.03Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 169.6 0.0 391.3 0.0 108.7 0.0 400.0Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.2 0.0 9.4 0.0 2.0 0.0 9.7Cycle Queue Clear Time (g_c), s 0.0 3.2 0.0 9.4 0.0 2.0 0.0 9.7Lane Group Capacity (c), veh/h 0.0 810.0 0.0 689.0 0.0 810.0 0.0 689.0Volume-to-Capacity Ratio (X) 0.000 0.209 0.000 0.568 0.000 0.134 0.000 0.581Available Capacity (c_a), veh/h 0.0 810.0 0.0 810.0 0.0 810.0 0.0 810.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.9 0.0 14.2 0.0 9.6 0.0 14.2Incremental Delay (d2), s/veh 0.0 0.6 0.0 0.7 0.0 0.3 0.0 0.8Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.5 0.0 14.9 0.0 9.9 0.0 15.0First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 3.1 0.0 0.6 0.0 3.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.2 0.0 3.3 0.0 0.7 0.0 3.4Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.06 0.00 0.10 0.00 0.06

Page 26: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 17.4 0.0 195.7 0.0 130.4 0.0 50.0Group Sat. Flow (s), veh/h/ln 0.0 1641.0 0.0 1644.0 0.0 1573.5 0.0 1561.9Queue Serve Time (g_s), s 0.0 0.3 0.0 4.8 0.0 2.9 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.3 0.0 4.8 0.0 2.9 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 713.6 0.0 608.1 0.0 684.3 0.0 577.8Volume-to-Capacity Ratio (X) 0.000 0.024 0.000 0.322 0.000 0.191 0.000 0.087Available Capacity (c_a), veh/h 0.0 713.6 0.0 714.9 0.0 684.3 0.0 679.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.1 0.0 12.7 0.0 9.8 0.0 11.6Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.2 0.0 13.0 0.0 10.4 0.0 11.6First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.4 0.0 0.8 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 1.4 0.0 0.9 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.00 0.00 0.03 0.00 0.12 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 14.0HCM Level of Service B

Page 27: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 79 156 80 33 120 70 60 280 20 41 341 88Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.96 0.98 0.99 0.95 0.98 0.95 0.97 0.97Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 459 577 502 448 577 484 545 1641 699 578 1641 709Proportion Arriving On Green 0.31 0.31 0.31 0.31 0.31 0.31 0.46 0.46 0.46 0.46 0.46 0.46Movement Delay, s/veh 14.6 13.0 12.4 14.5 12.6 12.3 9.8 7.9 7.2 9.0 8.1 7.8Movement LOS B B B B B B A A A A A AApproach Volume, veh/h 342 242 391 511Approach Delay, s/veh 13.2 12.8 8.2 8.1Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 28.00 20.54 28.00 20.54Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.85 4.71 4.85 4.71Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 7.10 7.28 5.72 6.45Green Extension Time (g_e), s 4.55 2.62 4.71 2.65Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.162 0.018 0.128 0.014

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 989.89 1206.22 1040.16 1245.41

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1508.19 1621.15 1528.69 1563.74

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 65.2 0.0 85.9 0.0 44.6 0.0 35.9Group Sat. Flow (s), veh/h/ln 0.0 989.9 0.0 1206.2 0.0 1040.2 0.0 1245.4Queue Serve Time (g_s), s 0.0 2.1 0.0 2.8 0.0 1.3 0.0 1.1Cycle Queue Clear Time (g_c), s 0.0 5.1 0.0 5.3 0.0 3.7 0.0 4.4

Page 28: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 989.9 0.0 1206.2 0.0 1040.2 0.0 1245.4Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 22.5 0.0 15.0 0.0 22.5 0.0 15.0Perm LT Serve Time (g_u), s 0.0 19.5 0.0 12.5 0.0 20.1 0.0 11.7Perm LT Que Serve Time (g_ps), s 0.0 2.1 0.0 2.8 0.0 1.3 0.0 1.1Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 545.1 0.0 459.3 0.0 578.0 0.0 448.1Volume-to-Capacity Ratio (X) 0.000 0.120 0.000 0.187 0.000 0.077 0.000 0.080Available Capacity (c_a), veh/h 0.0 545.1 0.0 744.2 0.0 578.0 0.0 742.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.3 0.0 14.4 0.0 8.7 0.0 14.4Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.2 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.8 0.0 14.6 0.0 9.0 0.0 14.5First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.7 0.0 0.2 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 0.7 0.0 0.3 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.17 0.00 0.05 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 304.3 0.0 169.6 0.0 370.7 0.0 130.4Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.4 0.0 3.4 0.0 3.0 0.0 2.5Cycle Queue Clear Time (g_c), s 0.0 2.4 0.0 3.4 0.0 3.0 0.0 2.5Lane Group Capacity (c), veh/h 0.0 1640.7 0.0 577.0 0.0 1640.7 0.0 577.0Volume-to-Capacity Ratio (X) 0.000 0.185 0.000 0.294 0.000 0.226 0.000 0.226Available Capacity (c_a), veh/h 0.0 1640.7 0.0 1017.0 0.0 1640.7 0.0 1017.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.6 0.0 12.7 0.0 7.8 0.0 12.4Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.3 0.0 0.3 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.9 0.0 13.0 0.0 8.1 0.0 12.6First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 1.2 0.0 0.8 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.7 0.0 1.2 0.0 0.9 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.06 0.00 0.03 0.00 0.07 0.00 0.02

Page 29: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 87.0 0.0 95.7 0.0 76.1Group Sat. Flow (s), veh/h/ln 0.0 1508.2 0.0 1621.2 0.0 1528.7 0.0 1563.7Queue Serve Time (g_s), s 0.0 0.4 0.0 1.9 0.0 1.7 0.0 1.7Cycle Queue Clear Time (g_c), s 0.0 0.4 0.0 1.9 0.0 1.7 0.0 1.7Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 699.2 0.0 502.2 0.0 708.7 0.0 484.4Volume-to-Capacity Ratio (X) 0.000 0.031 0.000 0.173 0.000 0.135 0.000 0.157Available Capacity (c_a), veh/h 0.0 699.2 0.0 885.1 0.0 708.7 0.0 853.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.1 0.0 12.2 0.0 7.4 0.0 12.2Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.2 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.2 0.0 12.4 0.0 7.8 0.0 12.3First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.6 0.0 0.4 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.6 0.0 0.5 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.14 0.00 0.09 0.00 0.15Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.1HCM Level of Service B

Page 30: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 60 220 68 96 212 36 92 164 68 36 212 120Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 65 239 74 104 230 39 100 178 74 39 230 130

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 65 313 104 270 278 74 270 130Volume Left (vph) 65 0 104 0 100 0 39 0Volume Right (vph) 0 74 0 39 0 74 0 130Hadj (s) 0.53 -0.13 0.53 -0.07 0.21 -0.67 0.11 -0.67Departure Headway (s) 8.2 7.5 8.2 7.6 7.9 7.0 7.8 7.0Degree Utilization, x 0.15 0.65 0.24 0.57 0.61 0.14 0.58 0.25Capacity (veh/h) 419 458 418 448 435 484 447 489Control Delay (s) 11.4 22.4 12.6 19.0 21.4 10.0 19.8 11.2Approach Delay (s) 20.5 17.2 19.0 17.0Approach LOS C C C C

Intersection SummaryDelay 18.4HCM Level of Service CIntersection Capacity Utilization 61.5% ICU Level of Service BAnalysis Period (min) 15

Page 31: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 48 0 48 22 393 11 36 431 3Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 52 0 52 24 427 12 39 468 3PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 862 1035 236 800 1031 220 472 439vC1, stage 1 conf vol 548 548 481 481vC2, stage 2 conf vol 314 487 319 550vCu, unblocked vol 862 1035 236 800 1031 220 472 439tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 99 88 100 93 98 96cM capacity (veh/h) 405 394 766 450 397 784 1086 1117

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 104 24 285 154 39 312 159Volume Left 13 52 24 0 0 39 0 0Volume Right 7 52 0 0 12 0 0 3cSH 480 572 1086 1700 1700 1117 1700 1700Volume to Capacity 0.04 0.18 0.02 0.17 0.09 0.04 0.18 0.09Queue Length 95th (ft) 3 17 2 0 0 3 0 0Control Delay (s) 12.8 12.7 8.4 0.0 0.0 8.3 0.0 0.0Lane LOS B B A AApproach Delay (s) 12.8 12.7 0.4 0.6Approach LOS B B

Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 31.4% ICU Level of Service AAnalysis Period (min) 15

Page 32: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Holden 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 3 0 3 0 0 0 2 258 0 0 365 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 3 0 3 0 0 0 2 280 0 0 397 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 684 684 399 687 686 280 401 280vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 684 684 399 687 686 280 401 280tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 99 100 100 100 100 100cM capacity (veh/h) 362 371 651 359 370 758 1158 1282

Direction, Lane # EB 1 NB 1 SB 1Volume Total 7 283 401Volume Left 3 2 0Volume Right 3 0 4cSH 466 1158 1700Volume to Capacity 0.01 0.00 0.24Queue Length 95th (ft) 1 0 0Control Delay (s) 12.8 0.1 0.0Lane LOS B AApproach Delay (s) 12.8 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 29.5% ICU Level of Service AAnalysis Period (min) 15

Page 33: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 3 0 3 6 411 12 12 461 12Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 3 0 3 7 447 13 13 501 13PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 1.00 1.00 1.00 1.00 1.00 1.00vC, conflicting volume 773 1007 257 749 1007 230 514 460vC1, stage 1 conf vol 534 534 466 466vC2, stage 2 conf vol 240 473 283 540vCu, unblocked vol 767 1001 257 743 1001 222 514 452tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 99 99 100 100 99 99cM capacity (veh/h) 454 421 742 483 422 780 1048 1101

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 7 7 298 162 13 334 180Volume Left 13 3 7 0 0 13 0 0Volume Right 7 3 0 0 13 0 0 13cSH 522 597 1048 1700 1700 1101 1700 1700Volume to Capacity 0.04 0.01 0.01 0.18 0.10 0.01 0.20 0.11Queue Length 95th (ft) 3 1 0 0 0 1 0 0Control Delay (s) 12.2 11.1 8.5 0.0 0.0 8.3 0.0 0.0Lane LOS B B A AApproach Delay (s) 12.2 11.1 0.1 0.2Approach LOS B B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 23.1% ICU Level of Service AAnalysis Period (min) 15

Page 34: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 0 324 344 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 352 374 0 0 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 374 726 374vC1, stage 1 conf vol 374vC2, stage 2 conf vol 352vCu, unblocked vol 374 726 374tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1185 585 672

Direction, Lane # EB 1 WB 1Volume Total 352 374Volume Left 0 0Volume Right 0 0cSH 1700 1700Volume to Capacity 0.21 0.22Queue Length 95th (ft) 0 0Control Delay (s) 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 21.4% ICU Level of Service AAnalysis Period (min) 15

Page 35: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 426 485 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 463 527 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 759 264 527vC1, stage 1 conf vol 527vC2, stage 2 conf vol 232vCu, unblocked vol 759 264 527tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 515 735 1036

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 232 232 264 264Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.14 0.14 0.16 0.16Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 16.7% ICU Level of Service AAnalysis Period (min) 15

Page 36: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 12 36 437 3 3 450Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 39 475 3 3 489PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 728 239 478vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 728 239 478tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 96 95 100cM capacity (veh/h) 358 762 1080

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 52 317 162 3 245 245Volume Left 13 0 0 3 0 0Volume Right 39 0 3 0 0 0cSH 594 1700 1700 1080 1700 1700Volume to Capacity 0.09 0.19 0.10 0.00 0.14 0.14Queue Length 95th (ft) 7 0 0 0 0 0Control Delay (s) 11.6 0.0 0.0 8.3 0.0 0.0Lane LOS B AApproach Delay (s) 11.6 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 22.4% ICU Level of Service AAnalysis Period (min) 15

Page 37: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 3 3 1 472 450 2Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 3 3 1 513 489 2PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 749 246 491vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 749 246 491tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 100 100cM capacity (veh/h) 347 755 1068

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 7 172 342 326 165Volume Left 3 1 0 0 0Volume Right 3 0 0 0 2cSH 476 1068 1700 1700 1700Volume to Capacity 0.01 0.00 0.20 0.19 0.10Queue Length 95th (ft) 1 0 0 0 0Control Delay (s) 12.7 0.1 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 12.7 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.1Intersection Capacity Utilization 23.7% ICU Level of Service AAnalysis Period (min) 15

Page 38: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

Existing PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 6 0 24 12 0 24 3 232 3 3 264 24Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 0 26 13 0 26 3 252 3 3 287 26PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 593 568 300 593 580 254 313 255vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 593 568 300 593 580 254 313 255tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 96 97 100 97 100 100cM capacity (veh/h) 402 430 740 401 424 785 1247 1310

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 33 39 259 316Volume Left 7 13 3 3Volume Right 26 26 3 26cSH 633 595 1247 1310Volume to Capacity 0.05 0.07 0.00 0.00Queue Length 95th (ft) 4 5 0 0Control Delay (s) 11.0 11.5 0.1 0.1Lane LOS B B A AApproach Delay (s) 11.0 11.5 0.1 0.1Approach LOS B B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15

Page 39: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 580 50 60 370 40 80 90 20 30 50 20Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 377 1226 106 272 1283 571 727 894 758 685 930 788Proportion Arriving On Green 0.36 0.36 0.36 0.36 0.36 0.36 0.48 0.48 0.48 0.48 0.48 0.48Movement Delay, s/veh 19.3 18.0 18.1 23.8 16.1 14.6 11.0 10.2 9.6 10.9 9.8 9.6Movement LOS B B B C B B B B A B A AApproach Volume, veh/h 739 511 207 109Approach Delay, s/veh 18.1 17.0 10.5 10.1Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 39.00 30.80 39.00 30.80Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.58 4.92 4.58 4.92Maximum Green Setting (Gmax), s 33.50 45.50 33.50 45.50Max. Queue Clearance Time (g_c+l1), s 5.64 12.22 5.01 17.19Green Extension Time (g_e), s 1.35 8.44 1.36 8.12Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.000 0.059 0.000 0.097

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1341.10 976.54 1289.58 783.06

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3381.15 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1579.37 291.08 1642.55 1574.60

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 87.0 0.0 54.3 0.0 32.6 0.0 65.2Group Sat. Flow (s), veh/h/ln 0.0 1341.1 0.0 976.5 0.0 1289.6 0.0 783.1Queue Serve Time (g_s), s 0.0 2.6 0.0 3.0 0.0 1.0 0.0 5.0Cycle Queue Clear Time (g_c), s 0.0 3.6 0.0 8.7 0.0 3.0 0.0 15.2

Page 40: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1341.1 0.0 976.5 0.0 1289.6 0.0 783.1Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 33.5 0.0 25.3 0.0 33.5 0.0 25.3Perm LT Serve Time (g_u), s 0.0 32.5 0.0 19.6 0.0 31.5 0.0 15.1Perm LT Que Serve Time (g_ps), s 0.0 2.6 0.0 3.0 0.0 1.0 0.0 5.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 726.6 0.0 377.3 0.0 684.9 0.0 272.4Volume-to-Capacity Ratio (X) 0.000 0.120 0.000 0.144 0.000 0.048 0.000 0.239Available Capacity (c_a), veh/h 0.0 726.6 0.0 659.9 0.0 684.9 0.0 499.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.7 0.0 19.1 0.0 10.8 0.0 23.4Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.1 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.0 0.0 19.3 0.0 10.9 0.0 23.8First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 0.6 0.0 0.3 0.0 0.8Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 0.6 0.0 0.3 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.21 0.00 0.08 0.00 0.05 0.00 0.14Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 97.8 0.0 346.9 0.0 54.3 0.0 402.2Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 2.0 0.0 10.2 0.0 1.0 0.0 5.7Cycle Queue Clear Time (g_c), s 0.0 2.0 0.0 10.2 0.0 1.0 0.0 5.7Lane Group Capacity (c), veh/h 0.0 894.0 0.0 675.2 0.0 929.7 0.0 1283.0Volume-to-Capacity Ratio (X) 0.000 0.109 0.000 0.514 0.000 0.058 0.000 0.313Available Capacity (c_a), veh/h 0.0 894.0 0.0 1214.2 0.0 929.7 0.0 2307.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 17.4 0.0 9.7 0.0 16.0Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.6 0.0 0.1 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.2 0.0 18.0 0.0 9.8 0.0 16.1First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 3.8 0.0 0.4 0.0 2.0Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 3.9 0.0 0.4 0.0 2.0Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.11 0.00 0.01 0.00 0.04

Page 41: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 337.9 0.0 21.7 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 1579.4 0.0 1809.5 0.0 1642.5 0.0 1574.6Queue Serve Time (g_s), s 0.0 0.5 0.0 10.2 0.0 0.5 0.0 1.3Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 10.2 0.0 0.5 0.0 1.3Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.161 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 758.0 0.0 655.9 0.0 788.3 0.0 570.8Volume-to-Capacity Ratio (X) 0.000 0.029 0.000 0.515 0.000 0.028 0.000 0.076Available Capacity (c_a), veh/h 0.0 758.0 0.0 1179.5 0.0 788.3 0.0 1026.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.6 0.0 17.4 0.0 9.6 0.0 14.6Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.6 0.0 0.1 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.6 0.0 18.1 0.0 9.6 0.0 14.6First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 3.7 0.0 0.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 3.8 0.0 0.2 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.11 0.00 0.03 0.00 0.06Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 16.2HCM Level of Service B

Page 42: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 30 5 30 15 5 5 15 270 5 5 90 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 5 33 16 5 5 16 293 5 5 98 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 448 443 101 476 443 296 103 299vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 448 443 101 476 443 296 103 299tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 94 99 97 97 99 99 99 100cM capacity (veh/h) 507 501 955 473 501 743 1489 1262

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 71 27 315 109Volume Left 33 16 16 5Volume Right 33 5 5 5cSH 646 516 1489 1262Volume to Capacity 0.11 0.05 0.01 0.00Queue Length 95th (ft) 9 4 1 0Control Delay (s) 11.3 12.4 0.5 0.4Lane LOS B B A AApproach Delay (s) 11.3 12.4 0.5 0.4Approach LOS B B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 43: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 380 140 20 230 50 100 70 10 110 280 90Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 404 616 539 280 616 519 532 850 744 705 1239 390Proportion Arriving On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.46 0.46 0.46 0.46 0.46 0.46Movement Delay, s/veh 16.3 16.1 13.0 19.6 13.8 12.1 11.7 8.2 7.7 9.6 9.3 9.4Movement LOS B B B B B B B A A A A AApproach Volume, veh/h 620 326 196 522Approach Delay, s/veh 15.4 13.9 10.1 9.4Approach LOS B B B A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 22.53 29.00 22.53Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.80 4.66 4.80 4.66Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 9.40 11.83 6.14 12.81Green Extension Time (g_e), s 3.09 3.98 3.34 3.85Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.133 0.229 0.066 0.269

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1016.89 1164.85 1306.65 1003.75

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2716.26 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1630.42 1630.22 856.15 1571.35

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 54.3 0.0 119.6 0.0 21.7Group Sat. Flow (s), veh/h/ln 0.0 1016.9 0.0 1164.9 0.0 1306.6 0.0 1003.7Queue Serve Time (g_s), s 0.0 3.8 0.0 2.0 0.0 2.9 0.0 1.0Cycle Queue Clear Time (g_c), s 0.0 7.4 0.0 7.3 0.0 4.1 0.0 10.8

Page 44: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1016.9 0.0 1164.9 0.0 1306.6 0.0 1003.7Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 17.0 0.0 23.5 0.0 17.0Perm LT Serve Time (g_u), s 0.0 19.9 0.0 11.7 0.0 22.3 0.0 7.2Perm LT Que Serve Time (g_ps), s 0.0 3.8 0.0 2.0 0.0 2.9 0.0 1.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 532.2 0.0 403.7 0.0 705.4 0.0 279.9Volume-to-Capacity Ratio (X) 0.000 0.204 0.000 0.135 0.000 0.169 0.000 0.078Available Capacity (c_a), veh/h 0.0 532.2 0.0 595.3 0.0 705.4 0.0 445.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.9 0.0 16.2 0.0 9.1 0.0 19.5Incremental Delay (d2), s/veh 0.0 0.9 0.0 0.1 0.0 0.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.7 0.0 16.3 0.0 9.6 0.0 19.6First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 0.4 0.0 0.7 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 0.5 0.0 0.8 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.11 0.00 0.06 0.00 0.25 0.00 0.04Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 76.1 0.0 413.0 0.0 206.8 0.0 250.0Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.2 0.0 9.8 0.0 3.5 0.0 5.3Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 9.8 0.0 3.5 0.0 5.3Lane Group Capacity (c), veh/h 0.0 849.6 0.0 615.5 0.0 849.6 0.0 615.5Volume-to-Capacity Ratio (X) 0.000 0.090 0.000 0.671 0.000 0.243 0.000 0.406Available Capacity (c_a), veh/h 0.0 849.6 0.0 921.9 0.0 849.6 0.0 921.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.9 0.0 14.8 0.0 8.6 0.0 13.3Incremental Delay (d2), s/veh 0.0 0.2 0.0 1.3 0.0 0.7 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.2 0.0 16.1 0.0 9.3 0.0 13.8First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 3.2 0.0 1.0 0.0 1.7Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 3.4 0.0 1.2 0.0 1.8Percentile Storage Ratio (RQ%) 0.00 0.02 0.00 0.06 0.00 0.16 0.00 0.03

Page 45: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 10.9 0.0 152.2 0.0 195.4 0.0 54.3Group Sat. Flow (s), veh/h/ln 0.0 1630.4 0.0 1630.2 0.0 1709.7 0.0 1571.4Queue Serve Time (g_s), s 0.0 0.2 0.0 3.6 0.0 3.6 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.2 0.0 3.6 0.0 3.6 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.501 0.000 1.000Lane Group Capacity (c), veh/h 0.0 743.6 0.0 538.7 0.0 779.8 0.0 519.2Volume-to-Capacity Ratio (X) 0.000 0.015 0.000 0.282 0.000 0.251 0.000 0.105Available Capacity (c_a), veh/h 0.0 743.6 0.0 806.8 0.0 779.8 0.0 777.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.7 0.0 12.7 0.0 8.6 0.0 12.0Incremental Delay (d2), s/veh 0.0 0.0 0.0 0.3 0.0 0.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.7 0.0 13.0 0.0 9.4 0.0 12.1First-Term Queue (Q1), veh/ln 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 1.1 0.0 1.1 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.00 0.00 0.02 0.00 0.16 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 12.6HCM Level of Service B

Page 46: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 80 120 130 60 120 60 40 180 30 60 220 60Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.98 0.97 0.98 0.98 0.99 0.94 0.96 0.98Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 460 559 479 470 559 483 630 1638 692 644 1638 717Proportion Arriving On Green 0.30 0.30 0.30 0.30 0.30 0.30 0.46 0.46 0.46 0.46 0.46 0.46Movement Delay, s/veh 14.3 12.4 12.8 14.0 12.4 12.0 8.2 7.2 7.0 8.3 7.4 7.2Movement LOS B B B B B B A A A A A AApproach Volume, veh/h 359 261 272 370Approach Delay, s/veh 13.0 12.7 7.4 7.5Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 19.45 27.00 19.45Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.74 4.59 4.74 4.59Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 4.89 7.10 5.07 6.33Green Extension Time (g_e), s 3.08 2.68 3.06 2.70Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.044 0.013 0.047 0.010

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1120.24 1231.62 1134.08 1272.95

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1494.39 1594.04 1549.12 1607.19

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 43.5 0.0 87.0 0.0 65.2 0.0 65.2Group Sat. Flow (s), veh/h/ln 0.0 1120.2 0.0 1231.6 0.0 1134.1 0.0 1273.0Queue Serve Time (g_s), s 0.0 1.1 0.0 2.7 0.0 1.6 0.0 1.9Cycle Queue Clear Time (g_c), s 0.0 2.9 0.0 5.1 0.0 3.1 0.0 4.3

Page 47: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1120.2 0.0 1231.6 0.0 1134.1 0.0 1273.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 14.0 0.0 21.5 0.0 14.0Perm LT Serve Time (g_u), s 0.0 19.7 0.0 11.5 0.0 20.0 0.0 11.5Perm LT Que Serve Time (g_ps), s 0.0 1.1 0.0 2.7 0.0 1.6 0.0 1.9Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 629.9 0.0 460.0 0.0 644.2 0.0 470.3Volume-to-Capacity Ratio (X) 0.000 0.069 0.000 0.189 0.000 0.101 0.000 0.139Available Capacity (c_a), veh/h 0.0 629.9 0.0 819.2 0.0 644.2 0.0 841.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.0 0.0 14.1 0.0 8.0 0.0 13.9Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.2 0.0 14.3 0.0 8.3 0.0 14.0First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 0.7 0.0 0.3 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 0.7 0.0 0.3 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.16 0.00 0.06 0.00 0.14Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 195.7 0.0 130.4 0.0 239.1 0.0 130.4Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.5 0.0 2.4 0.0 1.8 0.0 2.4Cycle Queue Clear Time (g_c), s 0.0 1.5 0.0 2.4 0.0 1.8 0.0 2.4Lane Group Capacity (c), veh/h 0.0 1638.1 0.0 559.5 0.0 1638.1 0.0 559.5Volume-to-Capacity Ratio (X) 0.000 0.119 0.000 0.233 0.000 0.146 0.000 0.233Available Capacity (c_a), veh/h 0.0 1638.1 0.0 1102.7 0.0 1638.1 0.0 1102.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.1 0.0 12.2 0.0 7.2 0.0 12.2Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.2 0.0 0.2 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.2 0.0 12.4 0.0 7.4 0.0 12.4First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.9 0.0 0.5 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 0.9 0.0 0.5 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.02 0.00 0.04 0.00 0.02

Page 48: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 32.6 0.0 141.3 0.0 65.2 0.0 65.2Group Sat. Flow (s), veh/h/ln 0.0 1494.4 0.0 1594.0 0.0 1549.1 0.0 1607.2Queue Serve Time (g_s), s 0.0 0.6 0.0 3.2 0.0 1.1 0.0 1.4Cycle Queue Clear Time (g_c), s 0.0 0.6 0.0 3.2 0.0 1.1 0.0 1.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 691.7 0.0 478.8 0.0 717.0 0.0 482.7Volume-to-Capacity Ratio (X) 0.000 0.047 0.000 0.295 0.000 0.091 0.000 0.135Available Capacity (c_a), veh/h 0.0 691.7 0.0 943.7 0.0 717.0 0.0 951.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.9 0.0 12.5 0.0 7.0 0.0 11.8Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.0 0.0 12.8 0.0 7.2 0.0 12.0First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.0 0.0 0.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 1.0 0.0 0.3 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.23 0.00 0.05 0.00 0.12Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.1HCM Level of Service B

Page 49: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 70 220 40 50 150 10 60 170 60 10 70 40Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 76 239 43 54 163 11 65 185 65 11 76 43

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 76 283 54 174 250 65 87 43Volume Left (vph) 76 0 54 0 65 0 11 0Volume Right (vph) 0 43 0 11 0 65 0 43Hadj (s) 0.53 -0.07 0.53 -0.01 0.16 -0.67 0.10 -0.67Departure Headway (s) 6.7 6.1 6.9 6.3 6.5 5.7 6.7 6.0Degree Utilization, x 0.14 0.48 0.10 0.31 0.45 0.10 0.16 0.07Capacity (veh/h) 510 568 493 538 521 594 493 551Control Delay (s) 9.6 13.3 9.5 10.9 13.5 8.1 9.8 8.2Approach Delay (s) 12.5 10.5 12.4 9.3Approach LOS B B B A

Intersection SummaryDelay 11.6HCM Level of Service BIntersection Capacity Utilization 46.6% ICU Level of Service AAnalysis Period (min) 15

Page 50: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 15 5 0 5 15 210 55 25 310 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 16 5 0 5 16 228 60 27 337 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 546 715 171 530 688 144 342 288vC1, stage 1 conf vol 394 394 291 291vC2, stage 2 conf vol 152 321 239 397vCu, unblocked vol 546 715 171 530 688 144 342 288tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 98 99 100 99 99 98cM capacity (veh/h) 552 503 843 583 511 877 1213 1271

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 16 152 136 27 225 118Volume Left 11 5 16 0 0 27 0 0Volume Right 16 5 0 0 60 0 0 5cSH 696 701 1213 1700 1700 1271 1700 1700Volume to Capacity 0.04 0.02 0.01 0.09 0.08 0.02 0.13 0.07Queue Length 95th (ft) 3 1 1 0 0 2 0 0Control Delay (s) 10.4 10.2 8.0 0.0 0.0 7.9 0.0 0.0Lane LOS B B A AApproach Delay (s) 10.4 10.2 0.4 0.6Approach LOS B B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 25.4% ICU Level of Service AAnalysis Period (min) 15

Page 51: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Holden 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 5 0 0 0 5 245 0 0 125 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 5 0 0 0 5 266 0 0 136 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 416 416 139 421 418 266 141 266vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 416 416 139 421 418 266 141 266tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 99 100 100 100 100 100cM capacity (veh/h) 546 525 910 538 524 772 1442 1298

Direction, Lane # EB 1 NB 1 SB 1Volume Total 11 272 141Volume Left 5 5 0Volume Right 5 0 5cSH 682 1442 1700Volume to Capacity 0.02 0.00 0.08Queue Length 95th (ft) 1 0 0Control Delay (s) 10.4 0.2 0.0Lane LOS B AApproach Delay (s) 10.4 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 26.9% ICU Level of Service AAnalysis Period (min) 15

Page 52: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 30 0 10 5 255 60 25 300 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 33 0 11 5 277 65 27 326 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblockedvC, conflicting volume 543 736 166 549 707 171 332 342vC1, stage 1 conf vol 383 383 321 321vC2, stage 2 conf vol 160 353 228 386vCu, unblocked vol 543 736 166 549 707 171 332 342tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 99 94 100 99 100 98cM capacity (veh/h) 557 498 849 580 514 843 1225 1213

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 43 5 185 158 27 217 114Volume Left 16 33 5 0 0 27 0 0Volume Right 11 11 0 0 65 0 0 5cSH 646 629 1225 1700 1700 1213 1700 1700Volume to Capacity 0.04 0.07 0.00 0.11 0.09 0.02 0.13 0.07Queue Length 95th (ft) 3 6 0 0 0 2 0 0Control Delay (s) 10.8 11.2 8.0 0.0 0.0 8.0 0.0 0.0Lane LOS B B A AApproach Delay (s) 10.8 11.2 0.1 0.6Approach LOS B B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 25.6% ICU Level of Service AAnalysis Period (min) 15

Page 53: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 15

Page 54: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 280 330 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 304 359 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 511 179 359vC1, stage 1 conf vol 359vC2, stage 2 conf vol 152vCu, unblocked vol 511 179 359tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 635 833 1197

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 152 152 179 179Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.09 0.09 0.11 0.11Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 12.5% ICU Level of Service AAnalysis Period (min) 15

Page 55: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 30 10 185 40 5 355Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 11 201 43 5 386PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 427 122 245vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 427 122 245tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 94 99 100cM capacity (veh/h) 554 906 1319

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 43 134 111 5 193 193Volume Left 33 0 0 5 0 0Volume Right 11 0 43 0 0 0cSH 613 1700 1700 1319 1700 1700Volume to Capacity 0.07 0.08 0.07 0.00 0.11 0.11Queue Length 95th (ft) 6 0 0 0 0 0Control Delay (s) 11.3 0.0 0.0 7.7 0.0 0.0Lane LOS B AApproach Delay (s) 11.3 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 19.8% ICU Level of Service AAnalysis Period (min) 15

Page 56: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 190 355 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 207 386 5Pedestrians 35Lane Width (ft) 16.0Walking Speed (ft/s) 4.0Percent Blockage 4Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 538 231 426vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 538 231 426tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 99 99cM capacity (veh/h) 453 742 1086

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 74 138 257 134Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 562 1086 1700 1700 1700Volume to Capacity 0.02 0.01 0.08 0.15 0.08Queue Length 95th (ft) 1 0 0 0 0Control Delay (s) 11.5 0.7 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 11.5 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 22.3% ICU Level of Service AAnalysis Period (min) 15

Page 57: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2016 AM 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 45 5 0 5 65 215 40 25 75 110Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 49 5 0 5 71 234 43 27 82 120PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 598 614 141 641 652 255 201 277vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 598 614 141 641 652 255 201 277tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 95 98 100 99 95 98cM capacity (veh/h) 389 378 907 346 359 783 1371 1286

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 65 11 348 228Volume Left 16 5 71 27Volume Right 49 5 43 120cSH 680 480 1371 1286Volume to Capacity 0.10 0.02 0.05 0.02Queue Length 95th (ft) 8 2 4 2Control Delay (s) 10.9 12.7 2.0 1.1Lane LOS B B A AApproach Delay (s) 10.9 12.7 2.0 1.1Approach LOS B B

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 38.7% ICU Level of Service AAnalysis Period (min) 15

Page 58: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 590 120 30 600 130 170 90 50 90 160 130Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 267 1105 224 234 1302 582 623 916 778 691 952 806Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.49 0.49 0.49 0.49 0.49 0.49Movement Delay, s/veh 25.7 20.7 20.7 26.8 19.5 17.4 15.6 10.9 10.7 12.6 11.5 11.5Movement LOS C C C C B B B B B B B BApproach Volume, veh/h 826 826 337 413Approach Delay, s/veh 21.0 19.4 13.5 11.8Approach LOS C B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 44.00 34.30 44.00 34.30Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.52 4.90 4.52 4.90Maximum Green Setting (Gmax), s 38.50 40.50 38.50 40.50Max. Queue Clearance Time (g_c+l1), s 13.87 17.75 7.65 18.44Green Extension Time (g_e), s 3.33 10.52 3.43 10.37Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.009 0.339 0.002 0.353

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1202.05 776.89 1292.18 722.51

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3003.92 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 610.00 1638.63 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 184.8 0.0 54.3 0.0 97.8 0.0 32.6Group Sat. Flow (s), veh/h/ln 0.0 1202.1 0.0 776.9 0.0 1292.2 0.0 722.5Queue Serve Time (g_s), s 0.0 7.9 0.0 4.6 0.0 3.4 0.0 3.0Cycle Queue Clear Time (g_c), s 0.0 11.9 0.0 15.7 0.0 5.6 0.0 16.4

Page 59: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1202.1 0.0 776.9 0.0 1292.2 0.0 722.5Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 38.5 0.0 28.8 0.0 38.5 0.0 28.8Perm LT Serve Time (g_u), s 0.0 34.6 0.0 17.6 0.0 36.3 0.0 15.3Perm LT Que Serve Time (g_ps), s 0.0 7.9 0.0 4.6 0.0 3.4 0.0 3.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 622.7 0.0 266.8 0.0 690.9 0.0 233.5Volume-to-Capacity Ratio (X) 0.000 0.297 0.000 0.204 0.000 0.142 0.000 0.140Available Capacity (c_a), veh/h 0.0 622.7 0.0 382.8 0.0 690.9 0.0 341.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 14.4 0.0 25.3 0.0 12.2 0.0 26.5Incremental Delay (d2), s/veh 0.0 1.2 0.0 0.4 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.6 0.0 25.7 0.0 12.6 0.0 26.8First-Term Queue (Q1), veh/ln 0.0 2.3 0.0 0.8 0.0 1.0 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.5 0.0 0.8 0.0 1.1 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.65 0.00 0.10 0.00 0.18 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 97.8 0.0 397.3 0.0 173.9 0.0 652.2Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 2.2 0.0 13.4 0.0 3.9 0.0 11.2Cycle Queue Clear Time (g_c), s 0.0 2.2 0.0 13.4 0.0 3.9 0.0 11.2Lane Group Capacity (c), veh/h 0.0 915.9 0.0 685.2 0.0 952.5 0.0 1301.9Volume-to-Capacity Ratio (X) 0.000 0.107 0.000 0.580 0.000 0.183 0.000 0.501Available Capacity (c_a), veh/h 0.0 915.9 0.0 963.4 0.0 952.5 0.0 1830.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.7 0.0 19.9 0.0 11.1 0.0 19.2Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.8 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.9 0.0 20.7 0.0 11.5 0.0 19.5First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 5.1 0.0 1.6 0.0 4.1Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 5.3 0.0 1.7 0.0 4.1Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.16 0.00 0.05 0.00 0.08

Page 60: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 54.3 0.0 374.5 0.0 141.3 0.0 141.3Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1751.2 0.0 1638.6 0.0 1583.3Queue Serve Time (g_s), s 0.0 1.4 0.0 13.5 0.0 3.8 0.0 4.9Cycle Queue Clear Time (g_c), s 0.0 1.4 0.0 13.5 0.0 3.8 0.0 4.9Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.348 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 778.5 0.0 644.2 0.0 805.7 0.0 582.4Volume-to-Capacity Ratio (X) 0.000 0.070 0.000 0.581 0.000 0.175 0.000 0.243Available Capacity (c_a), veh/h 0.0 778.5 0.0 905.7 0.0 805.7 0.0 818.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.5 0.0 19.9 0.0 11.1 0.0 17.2Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.8 0.0 0.5 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.7 0.0 20.7 0.0 11.5 0.0 17.4First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 4.9 0.0 1.3 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 5.0 0.0 1.4 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.13 0.00 0.15 0.00 0.23 0.00 0.26Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.8HCM Level of Service B

Page 61: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 10 5 15 0 15 10 250 10 15 335 25Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 11 5 16 0 16 11 272 11 16 364 27PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 726 715 378 720 723 277 391 283vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 726 715 378 720 723 277 391 283tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 97 99 95 100 98 99 99cM capacity (veh/h) 327 349 669 327 345 762 1167 1280

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 22 33 293 408Volume Left 5 16 11 16Volume Right 5 16 11 27cSH 389 457 1167 1280Volume to Capacity 0.06 0.07 0.01 0.01Queue Length 95th (ft) 4 6 1 1Control Delay (s) 14.8 13.5 0.4 0.4Lane LOS B B A AApproach Delay (s) 14.8 13.5 0.4 0.4Approach LOS B B

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 35.1% ICU Level of Service AAnalysis Period (min) 15

Page 62: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 120 440 210 20 410 90 240 170 20 50 120 140Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 320 732 646 297 732 614 527 781 688 546 781 659Proportion Arriving On Green 0.39 0.39 0.39 0.39 0.39 0.39 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 22.3 16.3 12.8 20.1 15.4 11.6 19.0 11.7 10.1 13.1 11.1 11.7Movement LOS C B B C B B B B B B B BApproach Volume, veh/h 837 565 467 337Approach Delay, s/veh 16.3 14.9 15.7 11.7Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 30.00 28.46 30.00 28.46Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.76 4.68 4.76 4.68Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 16.90 20.38 7.54 15.38Green Extension Time (g_e), s 2.47 2.58 3.70 4.76Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.577 1.000 0.094 0.673

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1131.47 973.84 1191.16 948.54

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1640.77 1644.15 1573.13 1563.18

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 260.9 0.0 130.4 0.0 54.3 0.0 21.7Group Sat. Flow (s), veh/h/ln 0.0 1131.5 0.0 973.8 0.0 1191.2 0.0 948.5Queue Serve Time (g_s), s 0.0 11.3 0.0 7.2 0.0 1.8 0.0 1.1Cycle Queue Clear Time (g_c), s 0.0 14.9 0.0 18.4 0.0 5.5 0.0 13.4

Page 63: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1131.5 0.0 973.8 0.0 1191.2 0.0 948.5Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 24.5 0.0 23.0 0.0 24.5 0.0 23.0Perm LT Serve Time (g_u), s 0.0 20.9 0.0 11.8 0.0 20.8 0.0 10.7Perm LT Que Serve Time (g_ps), s 0.0 11.3 0.0 7.2 0.0 1.8 0.0 1.1Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 527.0 0.0 319.7 0.0 546.2 0.0 296.7Volume-to-Capacity Ratio (X) 0.000 0.495 0.000 0.408 0.000 0.100 0.000 0.073Available Capacity (c_a), veh/h 0.0 527.0 0.0 345.3 0.0 546.2 0.0 321.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 15.7 0.0 21.5 0.0 12.7 0.0 20.0Incremental Delay (d2), s/veh 0.0 3.3 0.0 0.8 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 19.0 0.0 22.3 0.0 13.1 0.0 20.1First-Term Queue (Q1), veh/ln 0.0 3.0 0.0 1.4 0.0 0.4 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.5 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 3.4 0.0 1.5 0.0 0.5 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.44 0.00 0.19 0.00 0.15 0.00 0.04Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 184.8 0.0 478.3 0.0 130.4 0.0 445.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.7 0.0 12.3 0.0 2.6 0.0 11.2Cycle Queue Clear Time (g_c), s 0.0 3.7 0.0 12.3 0.0 2.6 0.0 11.2Lane Group Capacity (c), veh/h 0.0 780.7 0.0 731.6 0.0 780.7 0.0 731.6Volume-to-Capacity Ratio (X) 0.000 0.237 0.000 0.654 0.000 0.167 0.000 0.609Available Capacity (c_a), veh/h 0.0 780.7 0.0 780.7 0.0 780.7 0.0 780.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.9 0.0 14.5 0.0 10.6 0.0 14.2Incremental Delay (d2), s/veh 0.0 0.7 0.0 1.8 0.0 0.5 0.0 1.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.7 0.0 16.3 0.0 11.1 0.0 15.4First-Term Queue (Q1), veh/ln 0.0 1.3 0.0 4.1 0.0 0.9 0.0 3.7Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.4 0.0 0.1 0.0 0.3Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.4 0.0 4.4 0.0 1.0 0.0 3.9Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.08 0.00 0.13 0.00 0.07

Page 64: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 228.3 0.0 152.2 0.0 97.8Group Sat. Flow (s), veh/h/ln 0.0 1640.8 0.0 1644.2 0.0 1573.1 0.0 1563.2Queue Serve Time (g_s), s 0.0 0.5 0.0 5.7 0.0 3.6 0.0 2.4Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 5.7 0.0 3.6 0.0 2.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 687.6 0.0 645.7 0.0 659.3 0.0 613.9Volume-to-Capacity Ratio (X) 0.000 0.032 0.000 0.353 0.000 0.231 0.000 0.159Available Capacity (c_a), veh/h 0.0 687.6 0.0 689.1 0.0 659.3 0.0 655.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 12.5 0.0 10.9 0.0 11.5Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.1 0.0 12.8 0.0 11.7 0.0 11.6First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.7 0.0 1.0 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.7 0.0 1.2 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.03 0.00 0.16 0.00 0.22Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 15.1HCM Level of Service B

Page 65: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 90 170 80 40 140 80 60 290 20 50 380 100Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.96 0.99 0.99 0.95 0.98 0.95 0.97 0.96Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 462 602 524 455 602 506 507 1585 674 555 1585 684Proportion Arriving On Green 0.32 0.32 0.32 0.32 0.32 0.32 0.45 0.45 0.45 0.45 0.45 0.45Movement Delay, s/veh 14.4 12.5 11.8 14.1 12.2 11.8 10.6 8.3 7.5 9.7 8.7 8.4Movement LOS B B B B B B B A A A A AApproach Volume, veh/h 370 283 402 576Approach Delay, s/veh 12.8 12.4 8.6 8.7Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 21.01 27.00 21.01Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.85 4.72 4.85 4.72Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 7.71 8.07 6.21 6.90Green Extension Time (g_e), s 4.72 2.99 4.95 3.03Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.251 0.026 0.199 0.020

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 952.81 1186.38 1029.25 1229.17

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1505.55 1622.20 1526.76 1567.16

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 65.2 0.0 97.8 0.0 54.3 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 952.8 0.0 1186.4 0.0 1029.2 0.0 1229.2Queue Serve Time (g_s), s 0.0 2.2 0.0 3.2 0.0 1.6 0.0 1.3Cycle Queue Clear Time (g_c), s 0.0 5.7 0.0 6.1 0.0 4.2 0.0 4.9

Page 66: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 952.8 0.0 1186.4 0.0 1029.2 0.0 1229.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 15.5 0.0 21.5 0.0 15.5Perm LT Serve Time (g_u), s 0.0 18.0 0.0 12.6 0.0 18.9 0.0 11.9Perm LT Que Serve Time (g_ps), s 0.0 2.2 0.0 3.2 0.0 1.6 0.0 1.3Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 507.1 0.0 461.8 0.0 555.3 0.0 455.5Volume-to-Capacity Ratio (X) 0.000 0.129 0.000 0.212 0.000 0.098 0.000 0.095Available Capacity (c_a), veh/h 0.0 507.1 0.0 758.0 0.0 555.3 0.0 762.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.1 0.0 14.2 0.0 9.3 0.0 14.1Incremental Delay (d2), s/veh 0.0 0.5 0.0 0.2 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.6 0.0 14.4 0.0 9.7 0.0 14.1First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.8 0.0 0.3 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 0.8 0.0 0.3 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.19 0.00 0.06 0.00 0.10Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 315.2 0.0 184.8 0.0 413.0 0.0 152.2Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.6 0.0 3.6 0.0 3.5 0.0 2.9Cycle Queue Clear Time (g_c), s 0.0 2.6 0.0 3.6 0.0 3.5 0.0 2.9Lane Group Capacity (c), veh/h 0.0 1584.9 0.0 601.8 0.0 1584.9 0.0 601.8Volume-to-Capacity Ratio (X) 0.000 0.199 0.000 0.307 0.000 0.261 0.000 0.253Available Capacity (c_a), veh/h 0.0 1584.9 0.0 1066.9 0.0 1584.9 0.0 1066.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.0 0.0 12.2 0.0 8.3 0.0 12.0Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.3 0.0 0.4 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.3 0.0 12.5 0.0 8.7 0.0 12.2First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 1.3 0.0 0.9 0.0 1.0Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.3 0.0 1.0 0.0 1.1Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.03 0.00 0.08 0.00 0.02

Page 67: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 87.0 0.0 108.7 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 1505.5 0.0 1622.2 0.0 1526.8 0.0 1567.2Queue Serve Time (g_s), s 0.0 0.4 0.0 1.8 0.0 2.0 0.0 1.9Cycle Queue Clear Time (g_c), s 0.0 0.4 0.0 1.8 0.0 2.0 0.0 1.9Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 674.2 0.0 524.1 0.0 683.7 0.0 506.3Volume-to-Capacity Ratio (X) 0.000 0.032 0.000 0.166 0.000 0.159 0.000 0.172Available Capacity (c_a), veh/h 0.0 674.2 0.0 929.1 0.0 683.7 0.0 897.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.4 0.0 11.6 0.0 7.9 0.0 11.6Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.1 0.0 0.5 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.5 0.0 11.8 0.0 8.4 0.0 11.8First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.6 0.0 0.5 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.6 0.0 0.6 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.14 0.00 0.10 0.00 0.17Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.3HCM Level of Service B

Page 68: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 60 250 80 100 230 40 100 170 70 40 220 130Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 65 272 87 109 250 43 109 185 76 43 239 141

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 65 359 109 293 293 76 283 141Volume Left (vph) 65 0 109 0 109 0 43 0Volume Right (vph) 0 87 0 43 0 76 0 141Hadj (s) 0.53 -0.14 0.53 -0.07 0.22 -0.67 0.11 -0.67Departure Headway (s) 8.5 7.8 8.6 8.0 8.3 7.4 8.2 7.4Degree Utilization, x 0.15 0.78 0.26 0.65 0.68 0.16 0.64 0.29Capacity (veh/h) 406 447 402 431 416 460 417 466Control Delay (s) 11.8 32.2 13.3 23.4 25.9 10.6 23.4 12.2Approach Delay (s) 29.0 20.7 22.8 19.7Approach LOS D C C C

Intersection SummaryDelay 23.1HCM Level of Service CIntersection Capacity Utilization 65.4% ICU Level of Service CAnalysis Period (min) 15

Page 69: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 55 0 55 25 420 10 40 480 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 60 0 60 27 457 11 43 522 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 954 1133 264 875 1130 234 527 467vC1, stage 1 conf vol 611 611 516 516vC2, stage 2 conf vol 342 522 359 614vCu, unblocked vol 954 1133 264 875 1130 234 527 467tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 99 86 100 92 97 96cM capacity (veh/h) 367 366 735 418 366 768 1036 1090

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 120 27 304 163 43 348 179Volume Left 16 60 27 0 0 43 0 0Volume Right 11 60 0 0 11 0 0 5cSH 459 541 1036 1700 1700 1090 1700 1700Volume to Capacity 0.06 0.22 0.03 0.18 0.10 0.04 0.20 0.11Queue Length 95th (ft) 5 21 2 0 0 3 0 0Control Delay (s) 13.3 13.5 8.6 0.0 0.0 8.4 0.0 0.0Lane LOS B B A AApproach Delay (s) 13.3 13.5 0.5 0.6Approach LOS B B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 34.0% ICU Level of Service AAnalysis Period (min) 15

Page 70: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Holden 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 5 0 0 0 5 265 0 0 385 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 5 0 0 0 5 288 0 0 418 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 720 720 421 726 723 288 424 288vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 720 720 421 726 723 288 424 288tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 99 100 100 100 100 100cM capacity (veh/h) 342 352 632 336 351 751 1135 1274

Direction, Lane # EB 1 NB 1 SB 1Volume Total 11 293 424Volume Left 5 5 0Volume Right 5 0 5cSH 444 1135 1700Volume to Capacity 0.02 0.00 0.25Queue Length 95th (ft) 2 0 0Control Delay (s) 13.3 0.2 0.0Lane LOS B AApproach Delay (s) 13.3 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 30.6% ICU Level of Service AAnalysis Period (min) 15

Page 71: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 5 0 5 10 435 15 15 515 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 5 0 5 11 473 16 16 560 16PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 0.99 0.99 0.99 0.99 0.99 0.99vC, conflicting volume 864 1111 288 826 1111 245 576 489vC1, stage 1 conf vol 601 601 503 503vC2, stage 2 conf vol 264 511 323 609vCu, unblocked vol 852 1101 288 814 1101 229 576 475tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 98 99 100 99 99 98cM capacity (veh/h) 413 390 709 451 389 769 993 1077

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 11 315 174 16 373 203Volume Left 16 5 11 0 0 16 0 0Volume Right 11 5 0 0 16 0 0 16cSH 496 569 993 1700 1700 1077 1700 1700Volume to Capacity 0.05 0.02 0.01 0.19 0.10 0.02 0.22 0.12Queue Length 95th (ft) 4 1 1 0 0 1 0 0Control Delay (s) 12.7 11.5 8.7 0.0 0.0 8.4 0.0 0.0Lane LOS B B A AApproach Delay (s) 12.7 11.5 0.2 0.2Approach LOS B B

Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 24.7% ICU Level of Service AAnalysis Period (min) 15

Page 72: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 0 360 370 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 391 402 0 0 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 402 793 402vC1, stage 1 conf vol 402vC2, stage 2 conf vol 391vCu, unblocked vol 402 793 402tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1156 558 648

Direction, Lane # EB 1 WB 1Volume Total 391 402Volume Left 0 0Volume Right 0 0cSH 1700 1700Volume to Capacity 0.23 0.24Queue Length 95th (ft) 0 0Control Delay (s) 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 22.8% ICU Level of Service AAnalysis Period (min) 15

Page 73: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 450 545 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 489 592 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 837 296 592vC1, stage 1 conf vol 592vC2, stage 2 conf vol 245vCu, unblocked vol 837 296 592tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 478 700 979

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 245 245 296 296Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.14 0.14 0.17 0.17Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 18.4% ICU Level of Service AAnalysis Period (min) 15

Page 74: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 15 45 480 5 5 505Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 49 522 5 5 549PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 810 264 527vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 810 264 527tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 95 93 99cM capacity (veh/h) 316 735 1036

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 65 348 179 5 274 274Volume Left 16 0 0 5 0 0Volume Right 49 0 5 0 0 0cSH 552 1700 1700 1036 1700 1700Volume to Capacity 0.12 0.20 0.11 0.01 0.16 0.16Queue Length 95th (ft) 10 0 0 0 0 0Control Delay (s) 12.4 0.0 0.0 8.5 0.0 0.0Lane LOS B AApproach Delay (s) 12.4 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 24.2% ICU Level of Service AAnalysis Period (min) 15

Page 75: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 520 505 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 565 549 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 845 277 554vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 845 277 554tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 98 99 99cM capacity (veh/h) 300 720 1012

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 194 377 366 188Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 424 1012 1700 1700 1700Volume to Capacity 0.03 0.01 0.22 0.22 0.11Queue Length 95th (ft) 2 0 0 0 0Control Delay (s) 13.7 0.3 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 13.7 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 27.9% ICU Level of Service AAnalysis Period (min) 15

Page 76: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2016 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 30 15 0 25 5 245 5 5 290 25Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 33 16 0 27 5 266 5 5 315 27PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 647 622 329 652 633 269 342 272vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 647 622 329 652 633 269 342 272tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 95 95 100 96 100 100cM capacity (veh/h) 368 399 713 361 394 770 1217 1292

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 43 43 277 348Volume Left 11 16 5 5Volume Right 33 27 5 27cSH 578 540 1217 1292Volume to Capacity 0.08 0.08 0.00 0.00Queue Length 95th (ft) 6 7 0 0Control Delay (s) 11.7 12.2 0.2 0.2Lane LOS B B A AApproach Delay (s) 11.7 12.2 0.2 0.2Approach LOS B B

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 29.8% ICU Level of Service AAnalysis Period (min) 15

Page 77: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 880 80 90 580 70 120 140 30 50 80 20Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 420 1752 159 275 1843 821 495 638 540 438 663 562Proportion Arriving On Green 0.52 0.52 0.52 0.52 0.52 0.52 0.34 0.34 0.34 0.34 0.34 0.34Movement Delay, s/veh 15.3 13.4 13.4 22.6 11.3 9.7 22.5 19.8 18.0 22.1 18.6 17.7Movement LOS B B B C B A C B B C B BApproach Volume, veh/h 1120 804 315 163Approach Delay, s/veh 13.5 12.6 20.7 19.7Approach LOS B B C B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 33.00 47.34 33.00 47.34Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.64 5.04 4.64 5.04Maximum Green Setting (Gmax), s 27.50 51.50 27.50 51.50Max. Queue Clearance Time (g_c+l1), s 10.65 17.30 9.37 28.68Green Extension Time (g_e), s 1.96 16.32 2.01 13.16Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.016 0.329 0.010 0.508

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1301.25 792.12 1227.02 559.99

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3364.31 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1577.78 305.82 1640.89 1577.25

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 130.4 0.0 76.1 0.0 54.3 0.0 97.8Group Sat. Flow (s), veh/h/ln 0.0 1301.2 0.0 792.1 0.0 1227.0 0.0 560.0Queue Serve Time (g_s), s 0.0 6.2 0.0 5.0 0.0 2.7 0.0 11.4Cycle Queue Clear Time (g_c), s 0.0 8.6 0.0 13.3 0.0 7.4 0.0 26.7

Page 78: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1301.2 0.0 792.1 0.0 1227.0 0.0 560.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 27.5 0.0 41.8 0.0 27.5 0.0 41.8Perm LT Serve Time (g_u), s 0.0 25.0 0.0 33.5 0.0 22.8 0.0 26.5Perm LT Que Serve Time (g_ps), s 0.0 6.2 0.0 5.0 0.0 2.7 0.0 11.4Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 494.8 0.0 419.9 0.0 437.8 0.0 274.7Volume-to-Capacity Ratio (X) 0.000 0.264 0.000 0.181 0.000 0.124 0.000 0.356Available Capacity (c_a), veh/h 0.0 494.8 0.0 515.1 0.0 437.8 0.0 341.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 21.2 0.0 15.1 0.0 21.6 0.0 21.8Incremental Delay (d2), s/veh 0.0 1.3 0.0 0.2 0.0 0.6 0.0 0.8Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 22.5 0.0 15.3 0.0 22.1 0.0 22.6First-Term Queue (Q1), veh/ln 0.0 2.0 0.0 0.9 0.0 0.8 0.0 1.3Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.2 0.0 0.9 0.0 0.8 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.55 0.00 0.11 0.00 0.14 0.00 0.22Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 152.2 0.0 529.6 0.0 87.0 0.0 630.4Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 4.7 0.0 15.3 0.0 2.5 0.0 8.3Cycle Queue Clear Time (g_c), s 0.0 4.7 0.0 15.3 0.0 2.5 0.0 8.3Lane Group Capacity (c), veh/h 0.0 637.6 0.0 970.1 0.0 663.1 0.0 1843.3Volume-to-Capacity Ratio (X) 0.000 0.239 0.000 0.546 0.000 0.131 0.000 0.342Available Capacity (c_a), veh/h 0.0 637.6 0.0 1194.0 0.0 663.1 0.0 2268.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 18.9 0.0 12.9 0.0 18.2 0.0 11.2Incremental Delay (d2), s/veh 0.0 0.9 0.0 0.5 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 19.8 0.0 13.4 0.0 18.6 0.0 11.3First-Term Queue (Q1), veh/ln 0.0 2.0 0.0 5.3 0.0 1.1 0.0 2.7Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.1 0.0 5.4 0.0 1.1 0.0 2.8Percentile Storage Ratio (RQ%) 0.00 0.08 0.00 0.16 0.00 0.03 0.00 0.05

Page 79: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 32.6 0.0 513.9 0.0 21.7 0.0 76.1Group Sat. Flow (s), veh/h/ln 0.0 1577.8 0.0 1807.4 0.0 1640.9 0.0 1577.3Queue Serve Time (g_s), s 0.0 1.1 0.0 15.3 0.0 0.7 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 1.1 0.0 15.3 0.0 0.7 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.169 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 540.0 0.0 941.3 0.0 561.6 0.0 821.5Volume-to-Capacity Ratio (X) 0.000 0.060 0.000 0.546 0.000 0.039 0.000 0.093Available Capacity (c_a), veh/h 0.0 540.0 0.0 1158.5 0.0 561.6 0.0 1011.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 17.7 0.0 12.9 0.0 17.6 0.0 9.7Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.5 0.0 0.1 0.0 0.0Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 18.0 0.0 13.4 0.0 17.7 0.0 9.7First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 5.1 0.0 0.3 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 5.2 0.0 0.3 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.11 0.00 0.15 0.00 0.05 0.00 0.09Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 14.6HCM Level of Service B

Page 80: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 25 5 40 15 5 5 20 390 5 5 135 10Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 5 43 16 5 5 22 424 5 5 147 11PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 641 636 152 679 639 427 158 429vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 641 636 152 679 639 427 158 429tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 93 99 95 95 99 99 98 100cM capacity (veh/h) 374 388 894 339 386 628 1422 1130

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 76 27 451 163Volume Left 27 16 22 5Volume Right 43 5 5 11cSH 562 383 1422 1130Volume to Capacity 0.14 0.07 0.02 0.00Queue Length 95th (ft) 12 6 1 0Control Delay (s) 12.4 15.1 0.5 0.3Lane LOS B C A AApproach Delay (s) 12.4 15.1 0.5 0.3Approach LOS B C

Intersection SummaryAverage Delay 2.3Intersection Capacity Utilization 40.2% ICU Level of Service AAnalysis Period (min) 15

Page 81: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 590 200 30 410 80 150 100 20 180 380 140Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 348 774 679 211 774 654 370 742 648 580 1038 378Proportion Arriving On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.40 0.40 0.40 0.40 0.40 0.40Movement Delay, s/veh 19.2 22.4 11.9 24.8 14.2 10.8 22.4 11.8 10.9 15.8 14.3 14.5Movement LOS B C B C B B C B B B B BApproach Volume, veh/h 935 565 293 761Approach Delay, s/veh 19.7 14.3 17.6 14.8Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 30.03 29.00 30.03Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.88 4.73 4.88 4.73Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 18.47 20.11 11.09 22.31Green Extension Time (g_e), s 2.48 3.48 4.53 2.22Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.981 0.953 0.376 1.000

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 875.10 976.10 1267.97 815.10

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2606.26 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1628.05 1633.59 949.20 1573.81

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 163.0 0.0 76.1 0.0 195.7 0.0 32.6Group Sat. Flow (s), veh/h/ln 0.0 875.1 0.0 976.1 0.0 1268.0 0.0 815.1Queue Serve Time (g_s), s 0.0 9.7 0.0 3.8 0.0 6.9 0.0 2.2Cycle Queue Clear Time (g_c), s 0.0 16.5 0.0 14.7 0.0 9.1 0.0 20.3

Page 82: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 875.1 0.0 976.1 0.0 1268.0 0.0 815.1Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 24.5 0.0 23.5 0.0 24.5Perm LT Serve Time (g_u), s 0.0 16.7 0.0 13.7 0.0 21.3 0.0 6.4Perm LT Que Serve Time (g_ps), s 0.0 9.7 0.0 3.8 0.0 6.9 0.0 2.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 369.8 0.0 348.1 0.0 579.5 0.0 210.5Volume-to-Capacity Ratio (X) 0.000 0.441 0.000 0.219 0.000 0.338 0.000 0.155Available Capacity (c_a), veh/h 0.0 369.8 0.0 364.2 0.0 579.5 0.0 224.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 18.6 0.0 18.9 0.0 14.3 0.0 24.4Incremental Delay (d2), s/veh 0.0 3.8 0.0 0.3 0.0 1.6 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 22.4 0.0 19.2 0.0 15.8 0.0 24.8First-Term Queue (Q1), veh/ln 0.0 1.7 0.0 0.7 0.0 1.9 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.4 0.0 0.0 0.0 0.3 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.1 0.0 0.8 0.0 2.2 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.26 0.00 0.10 0.00 0.69 0.00 0.07Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 641.3 0.0 293.8 0.0 445.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.2 0.0 18.1 0.0 6.7 0.0 10.8Cycle Queue Clear Time (g_c), s 0.0 2.2 0.0 18.1 0.0 6.7 0.0 10.8Lane Group Capacity (c), veh/h 0.0 741.6 0.0 774.0 0.0 741.6 0.0 774.0Volume-to-Capacity Ratio (X) 0.000 0.147 0.000 0.829 0.000 0.396 0.000 0.576Available Capacity (c_a), veh/h 0.0 741.6 0.0 804.7 0.0 741.6 0.0 804.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.4 0.0 15.4 0.0 12.7 0.0 13.3Incremental Delay (d2), s/veh 0.0 0.4 0.0 7.0 0.0 1.6 0.0 0.9Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.8 0.0 22.4 0.0 14.3 0.0 14.2First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 5.9 0.0 2.3 0.0 3.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 1.5 0.0 0.3 0.0 0.2Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 7.4 0.0 2.6 0.0 3.7Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.14 0.00 0.36 0.00 0.07

Page 83: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 217.4 0.0 271.4 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 1628.1 0.0 1633.6 0.0 1692.7 0.0 1573.8Queue Serve Time (g_s), s 0.0 0.5 0.0 5.3 0.0 6.8 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 5.3 0.0 6.8 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.561 0.000 1.000Lane Group Capacity (c), veh/h 0.0 648.2 0.0 678.8 0.0 673.9 0.0 653.9Volume-to-Capacity Ratio (X) 0.000 0.034 0.000 0.320 0.000 0.403 0.000 0.133Available Capacity (c_a), veh/h 0.0 648.2 0.0 705.7 0.0 673.9 0.0 679.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.8 0.0 11.6 0.0 12.7 0.0 10.7Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 1.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.9 0.0 11.9 0.0 14.5 0.0 10.8First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.5 0.0 2.1 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.3 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.6 0.0 2.4 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.03 0.00 0.34 0.00 0.18Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 16.8HCM Level of Service B

Page 84: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 100 160 170 80 170 80 60 240 50 90 300 70Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 0.97 0.98 0.98 0.99 0.94 0.96 0.98Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 450 615 528 469 615 532 549 1568 661 576 1568 686Proportion Arriving On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.44 0.44 0.44 0.44 0.44 0.44Movement Delay, s/veh 15.1 12.3 12.7 14.4 12.4 11.7 10.2 8.3 8.1 10.3 8.6 8.2Movement LOS B B B B B B B A A B A AApproach Volume, veh/h 467 359 380 500Approach Delay, s/veh 13.1 12.7 8.6 8.9Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 21.51 27.00 21.51Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.78 4.63 4.78 4.63Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 6.74 9.25 7.08 8.08Green Extension Time (g_e), s 4.19 3.65 4.14 3.72Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.161 0.065 0.172 0.051

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1036.43 1176.14 1071.72 1228.48

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1490.44 1598.78 1547.61 1610.75

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 65.2 0.0 108.7 0.0 97.8 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 1036.4 0.0 1176.1 0.0 1071.7 0.0 1228.5Queue Serve Time (g_s), s 0.0 2.0 0.0 3.7 0.0 2.9 0.0 2.7Cycle Queue Clear Time (g_c), s 0.0 4.7 0.0 7.3 0.0 5.1 0.0 6.1

Page 85: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1036.4 0.0 1176.1 0.0 1071.7 0.0 1228.5Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 16.0 0.0 21.5 0.0 16.0Perm LT Serve Time (g_u), s 0.0 18.8 0.0 12.4 0.0 19.4 0.0 12.7Perm LT Que Serve Time (g_ps), s 0.0 2.0 0.0 3.7 0.0 2.9 0.0 2.7Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 549.2 0.0 449.9 0.0 575.9 0.0 469.2Volume-to-Capacity Ratio (X) 0.000 0.119 0.000 0.242 0.000 0.170 0.000 0.185Available Capacity (c_a), veh/h 0.0 549.2 0.0 728.3 0.0 575.9 0.0 760.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.7 0.0 14.8 0.0 9.6 0.0 14.3Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.3 0.0 0.6 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.2 0.0 15.1 0.0 10.3 0.0 14.4First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.9 0.0 0.6 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 1.0 0.0 0.7 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.22 0.00 0.12 0.00 0.21Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 260.9 0.0 173.9 0.0 326.1 0.0 184.8Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.1 0.0 3.3 0.0 2.7 0.0 3.6Cycle Queue Clear Time (g_c), s 0.0 2.1 0.0 3.3 0.0 2.7 0.0 3.6Lane Group Capacity (c), veh/h 0.0 1568.5 0.0 614.9 0.0 1568.5 0.0 614.9Volume-to-Capacity Ratio (X) 0.000 0.166 0.000 0.283 0.000 0.208 0.000 0.301Available Capacity (c_a), veh/h 0.0 1568.5 0.0 1055.9 0.0 1568.5 0.0 1055.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.1 0.0 12.0 0.0 8.3 0.0 12.1Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.3 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.3 0.0 12.3 0.0 8.6 0.0 12.4First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 1.2 0.0 0.7 0.0 1.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 1.2 0.0 0.8 0.0 1.3Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.03 0.00 0.06 0.00 0.03

Page 86: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 54.3 0.0 184.8 0.0 76.1 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 1490.4 0.0 1598.8 0.0 1547.6 0.0 1610.7Queue Serve Time (g_s), s 0.0 1.0 0.0 4.2 0.0 1.4 0.0 1.9Cycle Queue Clear Time (g_c), s 0.0 1.0 0.0 4.2 0.0 1.4 0.0 1.9Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 660.5 0.0 527.7 0.0 685.9 0.0 531.7Volume-to-Capacity Ratio (X) 0.000 0.082 0.000 0.350 0.000 0.111 0.000 0.164Available Capacity (c_a), veh/h 0.0 660.5 0.0 906.3 0.0 685.9 0.0 913.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.8 0.0 12.3 0.0 7.9 0.0 11.5Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.4 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.1 0.0 12.7 0.0 8.2 0.0 11.7First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 1.3 0.0 0.3 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 1.3 0.0 0.4 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.31 0.00 0.07 0.00 0.17Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.8HCM Level of Service B

Page 87: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 80 240 50 70 190 20 70 280 80 10 100 50Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 87 261 54 76 207 22 76 304 87 11 109 54

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 87 315 76 228 380 87 120 54Volume Left (vph) 87 0 76 0 76 0 11 0Volume Right (vph) 0 54 0 22 0 87 0 54Hadj (s) 0.53 -0.09 0.53 -0.03 0.13 -0.67 0.08 -0.67Departure Headway (s) 7.6 7.0 7.8 7.2 7.1 6.3 7.6 6.9Degree Utilization, x 0.18 0.61 0.16 0.46 0.75 0.15 0.25 0.10Capacity (veh/h) 449 490 437 465 492 545 437 478Control Delay (s) 11.1 19.3 11.1 15.0 27.4 9.3 12.0 9.5Approach Delay (s) 17.5 14.0 24.0 11.2Approach LOS C B C B

Intersection SummaryDelay 18.2HCM Level of Service CIntersection Capacity Utilization 55.2% ICU Level of Service BAnalysis Period (min) 15

Page 88: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 15 5 0 5 15 280 70 40 430 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 16 5 0 5 16 304 76 43 467 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 747 970 236 712 935 190 473 380vC1, stage 1 conf vol 557 557 375 375vC2, stage 2 conf vol 190 413 337 560vCu, unblocked vol 747 970 236 712 935 190 473 380tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 98 99 100 99 98 96cM capacity (veh/h) 436 411 765 490 420 819 1085 1175

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 16 203 178 43 312 161Volume Left 11 5 16 0 0 43 0 0Volume Right 16 5 0 0 76 0 0 5cSH 588 613 1085 1700 1700 1175 1700 1700Volume to Capacity 0.05 0.02 0.02 0.12 0.10 0.04 0.18 0.09Queue Length 95th (ft) 4 1 1 0 0 3 0 0Control Delay (s) 11.4 11.0 8.4 0.0 0.0 8.2 0.0 0.0Lane LOS B B A AApproach Delay (s) 11.4 11.0 0.3 0.7Approach LOS B B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 28.7% ICU Level of Service AAnalysis Period (min) 15

Page 89: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 5 0 0 0 5 375 0 0 150 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 5 0 0 0 5 408 0 0 163 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 584 584 166 590 587 408 168 408vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 584 584 166 590 587 408 168 408tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 99 100 100 100 100 100cM capacity (veh/h) 422 422 879 416 420 644 1409 1151

Direction, Lane # EB 1 NB 1 SB 1Volume Total 11 413 168Volume Left 5 5 0Volume Right 5 0 5cSH 570 1409 1700Volume to Capacity 0.02 0.00 0.10Queue Length 95th (ft) 1 0 0Control Delay (s) 11.4 0.1 0.0Lane LOS B AApproach Delay (s) 11.4 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.3Intersection Capacity Utilization 33.7% ICU Level of Service AAnalysis Period (min) 15

Page 90: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 40 0 10 5 340 75 35 410 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 43 0 11 5 370 82 38 446 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblockedvC, conflicting volume 731 986 226 731 948 226 451 451vC1, stage 1 conf vol 524 524 421 421vC2, stage 2 conf vol 207 462 310 527vCu, unblocked vol 731 986 226 731 948 226 451 451tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 99 91 100 99 100 97cM capacity (veh/h) 453 413 778 489 430 778 1106 1106

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 54 5 246 205 38 297 154Volume Left 16 43 5 0 0 38 0 0Volume Right 11 11 0 0 82 0 0 5cSH 544 528 1106 1700 1700 1106 1700 1700Volume to Capacity 0.05 0.10 0.00 0.14 0.12 0.03 0.17 0.09Queue Length 95th (ft) 4 9 0 0 0 3 0 0Control Delay (s) 12.0 12.6 8.3 0.0 0.0 8.4 0.0 0.0Lane LOS B B A AApproach Delay (s) 12.0 12.6 0.1 0.7Approach LOS B B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 28.9% ICU Level of Service AAnalysis Period (min) 15

Page 91: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 15

Page 92: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 365 450 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 397 489 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 688 245 489vC1, stage 1 conf vol 489vC2, stage 2 conf vol 198vCu, unblocked vol 688 245 489tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 543 756 1070

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 198 198 245 245Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.12 0.12 0.14 0.14Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 15.8% ICU Level of Service AAnalysis Period (min) 15

Page 93: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 40 10 240 55 5 440Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 11 261 60 5 478PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 541 160 321vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 541 160 321tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 91 99 100cM capacity (veh/h) 469 856 1236

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 54 174 147 5 239 239Volume Left 43 0 0 5 0 0Volume Right 11 0 60 0 0 0cSH 516 1700 1700 1236 1700 1700Volume to Capacity 0.11 0.10 0.09 0.00 0.14 0.14Queue Length 95th (ft) 9 0 0 0 0 0Control Delay (s) 12.8 0.0 0.0 7.9 0.0 0.0Lane LOS B AApproach Delay (s) 12.8 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 22.2% ICU Level of Service AAnalysis Period (min) 15

Page 94: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 245 440 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 266 478 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 625 242 484vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 625 242 484tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 99 99cM capacity (veh/h) 415 759 1075

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 94 178 319 165Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 536 1075 1700 1700 1700Volume to Capacity 0.02 0.01 0.10 0.19 0.10Queue Length 95th (ft) 2 0 0 0 0Control Delay (s) 11.9 0.5 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 11.9 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 22.3% ICU Level of Service AAnalysis Period (min) 15

Page 95: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2035 AM 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 25 0 60 5 0 5 90 295 55 35 105 160Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 0 65 5 0 5 98 321 60 38 114 174PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 829 853 201 889 910 351 288 380vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 829 853 201 889 910 351 288 380tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 90 100 92 98 100 99 92 97cM capacity (veh/h) 264 265 840 224 245 693 1274 1178

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 92 11 478 326Volume Left 27 5 98 38Volume Right 65 5 60 174cSH 512 338 1274 1178Volume to Capacity 0.18 0.03 0.08 0.03Queue Length 95th (ft) 16 2 6 3Control Delay (s) 13.6 16.0 2.3 1.2Lane LOS B C A AApproach Delay (s) 13.6 16.0 2.3 1.2Approach LOS B C

Intersection SummaryAverage Delay 3.2Intersection Capacity Utilization 51.4% ICU Level of Service AAnalysis Period (min) 15

Page 96: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 80 800 170 40 860 190 250 150 80 130 260 190Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 217 1284 273 190 1526 683 463 829 704 558 862 729Proportion Arriving On Green 0.43 0.43 0.43 0.43 0.43 0.43 0.44 0.44 0.44 0.44 0.44 0.44Movement Delay, s/veh 32.3 22.4 22.6 31.7 20.2 16.8 30.4 15.5 14.8 19.7 17.0 16.6Movement LOS C C C C C B C B B B B BApproach Volume, veh/h 1141 1185 522 630Approach Delay, s/veh 23.2 20.0 23.1 17.5Approach LOS C C C B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 45.00 43.78 45.00 43.78Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.64 4.97 4.64 4.97Maximum Green Setting (Gmax), s 39.50 39.50 39.50 39.50Max. Queue Clearance Time (g_c+l1), s 29.59 31.84 13.82 28.91Green Extension Time (g_e), s 4.00 6.44 5.92 8.55Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.505 0.938 0.066 0.874

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1089.58 596.57 1217.88 554.32

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 2977.78 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 632.61 1637.78 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 271.7 0.0 87.0 0.0 141.3 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 1089.6 0.0 596.6 0.0 1217.9 0.0 554.3Queue Serve Time (g_s), s 0.0 19.2 0.0 11.7 0.0 7.1 0.0 6.1Cycle Queue Clear Time (g_c), s 0.0 27.6 0.0 29.8 0.0 11.8 0.0 26.9

Page 97: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1089.6 0.0 596.6 0.0 1217.9 0.0 554.3Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 39.5 0.0 38.3 0.0 39.5 0.0 38.3Perm LT Serve Time (g_u), s 0.0 31.1 0.0 20.2 0.0 34.8 0.0 17.4Perm LT Que Serve Time (g_ps), s 0.0 19.2 0.0 11.7 0.0 7.1 0.0 6.1Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 462.6 0.0 216.5 0.0 558.1 0.0 190.0Volume-to-Capacity Ratio (X) 0.000 0.587 0.000 0.402 0.000 0.253 0.000 0.229Available Capacity (c_a), veh/h 0.0 462.6 0.0 224.7 0.0 558.1 0.0 197.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 25.0 0.0 31.0 0.0 18.6 0.0 31.1Incremental Delay (d2), s/veh 0.0 5.4 0.0 1.2 0.0 1.1 0.0 0.6Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 30.4 0.0 32.3 0.0 19.7 0.0 31.7First-Term Queue (Q1), veh/ln 0.0 4.8 0.0 1.6 0.0 1.9 0.0 0.8Second-Term Queue (Q2), veh/ln 0.0 0.7 0.0 0.1 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 5.4 0.0 1.6 0.0 2.1 0.0 0.8Percentile Storage Ratio (RQ%) 0.00 1.38 0.00 0.21 0.00 0.36 0.00 0.13Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 163.0 0.0 543.9 0.0 282.6 0.0 934.8Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 4.7 0.0 20.8 0.0 8.4 0.0 18.1Cycle Queue Clear Time (g_c), s 0.0 4.7 0.0 20.8 0.0 8.4 0.0 18.1Lane Group Capacity (c), veh/h 0.0 828.8 0.0 803.1 0.0 862.0 0.0 1526.0Volume-to-Capacity Ratio (X) 0.000 0.197 0.000 0.677 0.000 0.328 0.000 0.613Available Capacity (c_a), veh/h 0.0 828.8 0.0 828.8 0.0 862.0 0.0 1574.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 15.0 0.0 20.3 0.0 16.0 0.0 19.5Incremental Delay (d2), s/veh 0.0 0.5 0.0 2.1 0.0 1.0 0.0 0.7Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.5 0.0 22.4 0.0 17.0 0.0 20.2First-Term Queue (Q1), veh/ln 0.0 1.9 0.0 8.0 0.0 3.6 0.0 6.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.5 0.0 0.2 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.1 0.0 8.5 0.0 3.8 0.0 6.8Percentile Storage Ratio (RQ%) 0.00 0.08 0.00 0.25 0.00 0.10 0.00 0.13

Page 98: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 87.0 0.0 510.5 0.0 206.5 0.0 206.5Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1747.6 0.0 1637.8 0.0 1583.3Queue Serve Time (g_s), s 0.0 2.9 0.0 20.8 0.0 7.1 0.0 7.6Cycle Queue Clear Time (g_c), s 0.0 2.9 0.0 20.8 0.0 7.1 0.0 7.6Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.362 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 704.5 0.0 753.5 0.0 728.7 0.0 682.7Volume-to-Capacity Ratio (X) 0.000 0.123 0.000 0.677 0.000 0.283 0.000 0.303Available Capacity (c_a), veh/h 0.0 704.5 0.0 777.6 0.0 728.7 0.0 704.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 14.5 0.0 20.3 0.0 15.6 0.0 16.5Incremental Delay (d2), s/veh 0.0 0.4 0.0 2.3 0.0 1.0 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 14.8 0.0 22.6 0.0 16.6 0.0 16.8First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 7.5 0.0 2.6 0.0 2.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.5 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 8.0 0.0 2.8 0.0 2.5Percentile Storage Ratio (RQ%) 0.00 0.27 0.00 0.24 0.00 0.47 0.00 0.40Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 21.1HCM Level of Service C

Page 99: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 10 5 15 0 15 20 375 10 15 490 35Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 11 5 16 0 16 22 408 11 16 533 38PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 1057 1046 552 1052 1060 413 571 418vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1057 1046 552 1052 1060 413 571 418tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 94 95 99 91 100 97 98 99cM capacity (veh/h) 192 220 534 190 216 639 1002 1141

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 27 33 440 587Volume Left 11 16 22 16Volume Right 5 16 11 38cSH 234 292 1002 1141Volume to Capacity 0.12 0.11 0.02 0.01Queue Length 95th (ft) 10 9 2 1Control Delay (s) 22.4 18.8 0.7 0.4Lane LOS C C A AApproach Delay (s) 22.4 18.8 0.7 0.4Approach LOS C C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 42.9% ICU Level of Service AAnalysis Period (min) 15

Page 100: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 170 620 280 30 600 120 330 215 20 60 150 200Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 232 880 777 217 880 740 401 755 665 445 755 638Proportion Arriving On Green 0.47 0.47 0.47 0.47 0.47 0.47 0.41 0.41 0.41 0.41 0.41 0.41Movement Delay, s/veh 55.5 23.7 15.7 32.4 22.7 13.8 57.3 19.2 16.2 22.7 18.1 19.9Movement LOS E C B C C B E B B C B BApproach Volume, veh/h 1163 815 614 446Approach Delay, s/veh 26.7 21.6 41.4 19.7Approach LOS C C D B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 42.00 48.00 42.00 48.00Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.88 4.78 4.88 4.78Maximum Green Setting (Gmax), s 36.50 42.50 36.50 42.50Max. Queue Clearance Time (g_c+l1), s 38.50 44.50 13.39 32.12Green Extension Time (g_e), s 0.00 0.00 5.91 7.29Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 1.000 1.000 0.096 0.804

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1036.04 807.96 1140.06 791.80

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1640.58 1644.57 1572.79 1566.57

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 358.7 0.0 184.8 0.0 65.2 0.0 32.6Group Sat. Flow (s), veh/h/ln 0.0 1036.0 0.0 808.0 0.0 1140.1 0.0 791.8Queue Serve Time (g_s), s 0.0 27.9 0.0 16.9 0.0 3.7 0.0 3.2Cycle Queue Clear Time (g_c), s 0.0 36.5 0.0 42.5 0.0 11.4 0.0 30.1

Page 101: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1036.0 0.0 808.0 0.0 1140.1 0.0 791.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 36.5 0.0 42.5 0.0 36.5 0.0 42.5Perm LT Serve Time (g_u), s 0.0 27.9 0.0 16.9 0.0 28.8 0.0 15.6Perm LT Que Serve Time (g_ps), s 0.0 27.9 0.0 16.9 0.0 3.7 0.0 3.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 401.4 0.0 231.8 0.0 445.1 0.0 217.0Volume-to-Capacity Ratio (X) 0.000 0.894 0.000 0.797 0.000 0.147 0.000 0.150Available Capacity (c_a), veh/h 0.0 401.4 0.0 231.8 0.0 445.1 0.0 217.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 32.5 0.0 38.1 0.0 22.1 0.0 32.1Incremental Delay (d2), s/veh 0.0 24.8 0.0 17.5 0.0 0.7 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 57.3 0.0 55.5 0.0 22.7 0.0 32.4First-Term Queue (Q1), veh/ln 0.0 7.6 0.0 4.0 0.0 1.0 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 2.8 0.0 1.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 10.4 0.0 5.1 0.0 1.1 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 1.32 0.00 0.65 0.00 0.34 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 233.7 0.0 673.9 0.0 163.0 0.0 652.2Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 7.7 0.0 26.9 0.0 5.1 0.0 25.6Cycle Queue Clear Time (g_c), s 0.0 7.7 0.0 26.9 0.0 5.1 0.0 25.6Lane Group Capacity (c), veh/h 0.0 755.4 0.0 879.6 0.0 755.4 0.0 879.6Volume-to-Capacity Ratio (X) 0.000 0.309 0.000 0.766 0.000 0.216 0.000 0.741Available Capacity (c_a), veh/h 0.0 755.4 0.0 879.6 0.0 755.4 0.0 879.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 18.2 0.0 19.6 0.0 17.4 0.0 19.3Incremental Delay (d2), s/veh 0.0 1.1 0.0 4.1 0.0 0.7 0.0 3.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 19.2 0.0 23.7 0.0 18.1 0.0 22.7First-Term Queue (Q1), veh/ln 0.0 3.1 0.0 10.2 0.0 2.1 0.0 9.7Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 1.0 0.0 0.1 0.0 0.8Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 3.3 0.0 11.2 0.0 2.2 0.0 10.5Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.21 0.00 0.30 0.00 0.19

Page 102: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 304.3 0.0 217.4 0.0 130.4Group Sat. Flow (s), veh/h/ln 0.0 1640.6 0.0 1644.6 0.0 1572.8 0.0 1566.6Queue Serve Time (g_s), s 0.0 0.7 0.0 10.8 0.0 8.6 0.0 4.3Cycle Queue Clear Time (g_c), s 0.0 0.7 0.0 10.8 0.0 8.6 0.0 4.3Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 665.3 0.0 776.6 0.0 637.9 0.0 739.8Volume-to-Capacity Ratio (X) 0.000 0.033 0.000 0.392 0.000 0.341 0.000 0.176Available Capacity (c_a), veh/h 0.0 665.3 0.0 776.6 0.0 637.9 0.0 739.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 16.1 0.0 15.4 0.0 18.5 0.0 13.7Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 1.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 16.2 0.0 15.7 0.0 19.9 0.0 13.8First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 3.6 0.0 2.9 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.3 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 3.7 0.0 3.2 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.07 0.00 0.43 0.00 0.44Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 27.3HCM Level of Service C

Page 103: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 110 220 110 50 200 110 80 360 30 60 470 120Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.97 0.99 0.99 0.95 0.99 0.95 0.97 0.96Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 431 642 560 432 642 542 443 1558 662 498 1558 672Proportion Arriving On Green 0.34 0.34 0.34 0.34 0.34 0.34 0.44 0.44 0.44 0.44 0.44 0.44Movement Delay, s/veh 16.1 13.0 12.0 15.3 12.7 12.1 13.1 9.4 8.3 11.4 9.9 9.4Movement LOS B B B B B B B A A B A AApproach Volume, veh/h 478 391 511 707Approach Delay, s/veh 13.5 12.9 10.0 10.0Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 28.00 23.12 28.00 23.12Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.89 4.76 4.89 4.76Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 10.52 10.94 7.89 8.80Green Extension Time (g_e), s 5.50 3.89 6.16 4.08Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.456 0.147 0.341 0.101

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 873.55 1125.17 963.46 1171.64

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1504.20 1623.73 1525.78 1572.13

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 87.0 0.0 119.6 0.0 65.2 0.0 54.3Group Sat. Flow (s), veh/h/ln 0.0 873.6 0.0 1125.2 0.0 963.5 0.0 1171.6Queue Serve Time (g_s), s 0.0 3.7 0.0 4.5 0.0 2.3 0.0 1.9Cycle Queue Clear Time (g_c), s 0.0 8.5 0.0 8.9 0.0 5.9 0.0 6.8

Page 104: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 873.6 0.0 1125.2 0.0 963.5 0.0 1171.6Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 22.5 0.0 17.6 0.0 22.5 0.0 17.6Perm LT Serve Time (g_u), s 0.0 17.7 0.0 13.2 0.0 18.9 0.0 12.7Perm LT Que Serve Time (g_ps), s 0.0 3.7 0.0 4.5 0.0 2.3 0.0 1.9Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 442.9 0.0 431.2 0.0 497.9 0.0 431.5Volume-to-Capacity Ratio (X) 0.000 0.196 0.000 0.277 0.000 0.131 0.000 0.126Available Capacity (c_a), veh/h 0.0 442.9 0.0 626.7 0.0 497.9 0.0 635.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.2 0.0 15.7 0.0 10.9 0.0 15.2Incremental Delay (d2), s/veh 0.0 1.0 0.0 0.3 0.0 0.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 13.1 0.0 16.1 0.0 11.4 0.0 15.3First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 1.1 0.0 0.4 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.2 0.0 0.5 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.27 0.00 0.09 0.00 0.14Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 391.3 0.0 239.1 0.0 510.9 0.0 217.4Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.6 0.0 4.9 0.0 4.8 0.0 4.4Cycle Queue Clear Time (g_c), s 0.0 3.6 0.0 4.9 0.0 4.8 0.0 4.4Lane Group Capacity (c), veh/h 0.0 1557.9 0.0 642.0 0.0 1557.9 0.0 642.0Volume-to-Capacity Ratio (X) 0.000 0.251 0.000 0.372 0.000 0.328 0.000 0.339Available Capacity (c_a), veh/h 0.0 1557.9 0.0 965.7 0.0 1557.9 0.0 965.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.0 0.0 12.6 0.0 9.4 0.0 12.4Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.4 0.0 0.6 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.4 0.0 13.0 0.0 9.9 0.0 12.7First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 1.8 0.0 1.4 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 1.8 0.0 1.5 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.05 0.00 0.12 0.00 0.04

Page 105: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 32.6 0.0 119.6 0.0 130.4 0.0 119.6Group Sat. Flow (s), veh/h/ln 0.0 1504.2 0.0 1623.7 0.0 1525.8 0.0 1572.1Queue Serve Time (g_s), s 0.0 0.6 0.0 2.7 0.0 2.7 0.0 2.8Cycle Queue Clear Time (g_c), s 0.0 0.6 0.0 2.7 0.0 2.7 0.0 2.8Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 662.1 0.0 559.6 0.0 671.6 0.0 541.8Volume-to-Capacity Ratio (X) 0.000 0.049 0.000 0.214 0.000 0.194 0.000 0.221Available Capacity (c_a), veh/h 0.0 662.1 0.0 841.8 0.0 671.6 0.0 815.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.2 0.0 11.8 0.0 8.8 0.0 11.9Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.2 0.0 0.6 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.3 0.0 12.0 0.0 9.4 0.0 12.1First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 0.8 0.0 0.7 0.0 0.8Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 0.9 0.0 0.8 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.06 0.00 0.20 0.00 0.14 0.00 0.24Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.3HCM Level of Service B

Page 106: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 80 280 100 140 280 50 130 270 100 50 300 160Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 87 304 109 152 304 54 141 293 109 54 326 174

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 87 413 152 359 435 109 380 174Volume Left (vph) 87 0 152 0 141 0 54 0Volume Right (vph) 0 109 0 54 0 109 0 174Hadj (s) 0.53 -0.15 0.53 -0.07 0.20 -0.67 0.11 -0.67Departure Headway (s) 9.7 9.0 9.9 9.3 9.4 8.5 9.4 8.7Degree Utilization, x 0.23 1.04 0.42 0.93 1.13 0.26 0.99 0.42Capacity (veh/h) 359 395 348 376 397 407 380 411Control Delay (s) 14.4 84.9 18.6 58.8 115.7 13.3 74.3 16.5Approach Delay (s) 72.6 46.8 95.2 56.2Approach LOS F E F F

Intersection SummaryDelay 67.9HCM Level of Service FIntersection Capacity Utilization 82.1% ICU Level of Service EAnalysis Period (min) 15

Page 107: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 70 0 75 30 530 15 50 585 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 76 0 82 33 576 16 54 636 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 1182 1405 321 1087 1399 296 641 592vC1, stage 1 conf vol 747 747 649 649vC2, stage 2 conf vol 435 658 438 750vCu, unblocked vol 1182 1405 321 1087 1399 296 641 592tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 94 100 98 78 100 88 97 94cM capacity (veh/h) 288 296 675 340 299 700 939 979

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 158 33 384 208 54 424 217Volume Left 16 76 33 0 0 54 0 0Volume Right 11 82 0 0 16 0 0 5cSH 374 463 939 1700 1700 979 1700 1700Volume to Capacity 0.07 0.34 0.03 0.23 0.12 0.06 0.25 0.13Queue Length 95th (ft) 6 37 3 0 0 4 0 0Control Delay (s) 15.4 16.7 9.0 0.0 0.0 8.9 0.0 0.0Lane LOS C C A AApproach Delay (s) 15.4 16.7 0.5 0.7Approach LOS C C

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 39.2% ICU Level of Service AAnalysis Period (min) 15

Page 108: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 5 0 0 0 5 395 0 0 510 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 5 0 0 0 5 429 0 0 554 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 997 997 557 1003 1000 429 560 429vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 997 997 557 1003 1000 429 560 429tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 95 100 99 100 100 100 99 100cM capacity (veh/h) 222 243 530 218 242 626 1011 1130

Direction, Lane # EB 1 NB 1 SB 1Volume Total 16 435 560Volume Left 11 5 0Volume Right 5 0 5cSH 275 1011 1700Volume to Capacity 0.06 0.01 0.33Queue Length 95th (ft) 5 0 0Control Delay (s) 18.9 0.2 0.0Lane LOS C AApproach Delay (s) 18.9 0.2 0.0Approach LOS C

Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 37.1% ICU Level of Service AAnalysis Period (min) 15

Page 109: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 5 0 5 10 555 15 15 635 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 5 0 5 11 603 16 16 690 16PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 0.96 0.96 0.96 0.96 0.96 0.96vC, conflicting volume 1060 1372 353 1022 1372 310 707 620vC1, stage 1 conf vol 731 731 633 633vC2, stage 2 conf vol 329 641 389 739vCu, unblocked vol 987 1311 353 947 1311 208 707 530tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 95 100 98 99 100 99 99 98cM capacity (veh/h) 348 336 643 397 334 769 888 996

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 11 402 217 16 460 246Volume Left 16 5 11 0 0 16 0 0Volume Right 11 5 0 0 16 0 0 16cSH 427 523 888 1700 1700 996 1700 1700Volume to Capacity 0.06 0.02 0.01 0.24 0.13 0.02 0.27 0.14Queue Length 95th (ft) 5 2 1 0 0 1 0 0Control Delay (s) 14.0 12.0 9.1 0.0 0.0 8.7 0.0 0.0Lane LOS B B A AApproach Delay (s) 14.0 12.0 0.2 0.2Approach LOS B B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 28.0% ICU Level of Service AAnalysis Period (min) 15

Page 110: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 0 430 470 0 0 0Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 467 511 0 0 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 511 978 511vC1, stage 1 conf vol 511vC2, stage 2 conf vol 467vCu, unblocked vol 511 978 511tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 100 100 100cM capacity (veh/h) 1054 491 563

Direction, Lane # EB 1 WB 1Volume Total 467 511Volume Left 0 0Volume Right 0 0cSH 1700 1700Volume to Capacity 0.27 0.30Queue Length 95th (ft) 0 0Control Delay (s) 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 28.1% ICU Level of Service AAnalysis Period (min) 15

Page 111: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 0 0 0 575 665 0Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 0 0 0 625 723 0PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 1035 361 723vC1, stage 1 conf vol 723vC2, stage 2 conf vol 312vCu, unblocked vol 1035 361 723tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 406 635 875

Direction, Lane # NB 1 NB 2 SB 1 SB 2Volume Total 312 312 361 361Volume Left 0 0 0 0Volume Right 0 0 0 0cSH 1700 1700 1700 1700Volume to Capacity 0.18 0.18 0.21 0.21Queue Length 95th (ft) 0 0 0 0Control Delay (s) 0.0 0.0 0.0 0.0Lane LOSApproach Delay (s) 0.0 0.0Approach LOS

Intersection SummaryAverage Delay 0.0Intersection Capacity Utilization 21.7% ICU Level of Service AAnalysis Period (min) 15

Page 112: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 20 55 615 5 5 620Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 60 668 5 5 674PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 1019 337 674vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1019 337 674tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 91 91 99cM capacity (veh/h) 232 659 913

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 82 446 228 5 337 337Volume Left 22 0 0 5 0 0Volume Right 60 0 5 0 0 0cSH 442 1700 1700 913 1700 1700Volume to Capacity 0.18 0.26 0.13 0.01 0.20 0.20Queue Length 95th (ft) 17 0 0 0 0 0Control Delay (s) 15.0 0.0 0.0 9.0 0.0 0.0Lane LOS B AApproach Delay (s) 15.0 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 28.3% ICU Level of Service AAnalysis Period (min) 15

Page 113: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 665 620 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 723 674 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 1049 340 679vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1049 340 679tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 98 99 99cM capacity (veh/h) 222 656 909

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 246 482 449 230Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 331 909 1700 1700 1700Volume to Capacity 0.03 0.01 0.28 0.26 0.14Queue Length 95th (ft) 3 0 0 0 0Control Delay (s) 16.2 0.3 0.0 0.0 0.0Lane LOS C AApproach Delay (s) 16.2 0.1 0.0Approach LOS C

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 31.9% ICU Level of Service AAnalysis Period (min) 15

Page 114: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2035 PM Peak 11/17/2011 Baseline Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 35 15 0 25 5 375 5 5 435 40Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 38 16 0 27 5 408 5 5 473 43PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblocked 0.94 0.94 0.94 0.94 0.94 0.94vC, conflicting volume 954 929 495 965 948 410 516 413vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 917 891 427 929 911 410 451 413tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 93 100 94 92 100 96 99 100cM capacity (veh/h) 225 261 588 216 254 641 1040 1146

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 54 43 418 522Volume Left 16 16 5 5Volume Right 38 27 5 43cSH 396 369 1040 1146Volume to Capacity 0.14 0.12 0.01 0.00Queue Length 95th (ft) 12 10 0 0Control Delay (s) 15.5 16.1 0.2 0.1Lane LOS C C A AApproach Delay (s) 15.5 16.1 0.2 0.1Approach LOS C C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 38.5% ICU Level of Service AAnalysis Period (min) 15

Page 115: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 38 466 44 47 306 40 67 88 18 26 50 13Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 355 1022 96 272 1079 480 796 975 827 755 1014 860Proportion Arriving On Green 0.30 0.30 0.30 0.30 0.30 0.30 0.52 0.52 0.52 0.52 0.52 0.52Movement Delay, s/veh 19.8 18.9 18.9 23.1 17.2 16.0 8.4 7.9 7.4 8.4 7.6 7.4Movement LOS B B B C B B A A A A A AApproach Volume, veh/h 596 427 188 97Approach Delay, s/veh 19.0 17.8 8.0 7.8Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 39.00 25.02 39.00 25.02Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.63 4.88 4.63 4.88Maximum Green Setting (Gmax), s 33.50 45.50 33.50 45.50Max. Queue Clearance Time (g_c+l1), s 4.68 9.95 4.37 13.17Green Extension Time (g_e), s 1.25 6.44 1.25 6.35Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.000 0.014 0.000 0.022

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1341.33 1039.70 1292.30 882.80

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3351.90 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1579.70 315.47 1642.89 1572.95

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 72.8 0.0 41.3 0.0 28.3 0.0 51.1Group Sat. Flow (s), veh/h/ln 0.0 1341.3 0.0 1039.7 0.0 1292.3 0.0 882.8Queue Serve Time (g_s), s 0.0 1.8 0.0 2.0 0.0 0.7 0.0 3.2Cycle Queue Clear Time (g_c), s 0.0 2.7 0.0 6.6 0.0 2.4 0.0 11.2

Page 116: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1341.3 0.0 1039.7 0.0 1292.3 0.0 882.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 33.5 0.0 19.5 0.0 33.5 0.0 19.5Perm LT Serve Time (g_u), s 0.0 32.6 0.0 14.9 0.0 31.8 0.0 11.6Perm LT Que Serve Time (g_ps), s 0.0 1.8 0.0 2.0 0.0 0.7 0.0 3.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 795.9 0.0 354.5 0.0 755.3 0.0 272.0Volume-to-Capacity Ratio (X) 0.000 0.092 0.000 0.117 0.000 0.037 0.000 0.188Available Capacity (c_a), veh/h 0.0 795.9 0.0 776.4 0.0 755.3 0.0 630.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.1 0.0 19.6 0.0 8.3 0.0 22.8Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.4 0.0 19.8 0.0 8.4 0.0 23.1First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 0.5 0.0 0.2 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 0.5 0.0 0.2 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.13 0.00 0.06 0.00 0.03 0.00 0.10Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 95.7 0.0 280.8 0.0 54.3 0.0 332.6Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 1.7 0.0 7.9 0.0 0.9 0.0 4.6Cycle Queue Clear Time (g_c), s 0.0 1.7 0.0 7.9 0.0 0.9 0.0 4.6Lane Group Capacity (c), veh/h 0.0 974.7 0.0 568.0 0.0 1013.7 0.0 1079.1Volume-to-Capacity Ratio (X) 0.000 0.098 0.000 0.494 0.000 0.054 0.000 0.308Available Capacity (c_a), veh/h 0.0 974.7 0.0 1323.9 0.0 1013.7 0.0 2515.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.7 0.0 18.2 0.0 7.5 0.0 17.1Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.7 0.0 0.1 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.9 0.0 18.9 0.0 7.6 0.0 17.2First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 2.9 0.0 0.3 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 3.0 0.0 0.3 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.02 0.00 0.09 0.00 0.01 0.00 0.03

Page 117: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 19.6 0.0 273.6 0.0 14.1 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 1579.7 0.0 1804.6 0.0 1642.9 0.0 1572.9Queue Serve Time (g_s), s 0.0 0.4 0.0 8.0 0.0 0.3 0.0 1.3Cycle Queue Clear Time (g_c), s 0.0 0.4 0.0 8.0 0.0 0.3 0.0 1.3Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.175 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 826.6 0.0 550.2 0.0 859.7 0.0 479.6Volume-to-Capacity Ratio (X) 0.000 0.024 0.000 0.497 0.000 0.016 0.000 0.091Available Capacity (c_a), veh/h 0.0 826.6 0.0 1282.6 0.0 859.7 0.0 1117.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.4 0.0 18.2 0.0 7.3 0.0 15.9Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.7 0.0 0.0 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.4 0.0 18.9 0.0 7.4 0.0 16.0First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 2.8 0.0 0.1 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 2.9 0.0 0.1 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.03 0.00 0.09 0.00 0.01 0.00 0.06Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 16.2HCM Level of Service B

Page 118: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 5 24 12 5 5 12 250 4 5 79 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 26 13 5 5 13 272 4 5 86 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 408 402 89 428 402 274 91 276vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 408 402 89 428 402 274 91 276tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 99 97 97 99 99 99 100cM capacity (veh/h) 540 530 970 513 530 765 1504 1287

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 37 24 289 97Volume Left 5 13 13 5Volume Right 26 5 4 5cSH 783 559 1504 1287Volume to Capacity 0.05 0.04 0.01 0.00Queue Length 95th (ft) 4 3 1 0Control Delay (s) 9.8 11.7 0.4 0.5Lane LOS A B A AApproach Delay (s) 9.8 11.7 0.4 0.5Approach LOS A B

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15

Page 119: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 41 293 126 22 201 48 113 98 21 100 271 77Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 0.99 0.99 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 383 541 472 305 541 456 586 901 789 723 1356 378Proportion Arriving On Green 0.29 0.29 0.29 0.29 0.29 0.29 0.48 0.48 0.48 0.48 0.48 0.48Movement Delay, s/veh 16.5 15.8 13.7 18.3 14.4 12.8 10.0 7.1 6.6 8.4 7.8 7.9Movement LOS B B B B B B B A A A A AApproach Volume, veh/h 500 295 252 487Approach Delay, s/veh 15.3 14.4 8.5 8.0Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 19.61 29.00 19.61Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.79 4.63 4.79 4.63Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 8.78 9.12 6.01 10.05Green Extension Time (g_e), s 3.22 3.45 3.43 3.38Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.123 0.088 0.068 0.107

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1039.47 1197.85 1272.25 1093.11

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2803.93 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1631.34 1627.94 781.86 1569.69

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 122.8 0.0 44.6 0.0 108.7 0.0 23.9Group Sat. Flow (s), veh/h/ln 0.0 1039.5 0.0 1197.8 0.0 1272.3 0.0 1093.1Queue Serve Time (g_s), s 0.0 3.8 0.0 1.5 0.0 2.5 0.0 0.9Cycle Queue Clear Time (g_c), s 0.0 6.8 0.0 6.1 0.0 4.0 0.0 8.0

Page 120: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1039.5 0.0 1197.8 0.0 1272.3 0.0 1093.1Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 14.1 0.0 23.5 0.0 14.1Perm LT Serve Time (g_u), s 0.0 20.5 0.0 9.5 0.0 22.0 0.0 7.0Perm LT Que Serve Time (g_ps), s 0.0 3.8 0.0 1.5 0.0 2.5 0.0 0.9Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 586.3 0.0 382.8 0.0 723.4 0.0 305.4Volume-to-Capacity Ratio (X) 0.000 0.209 0.000 0.116 0.000 0.150 0.000 0.078Available Capacity (c_a), veh/h 0.0 586.3 0.0 663.6 0.0 723.4 0.0 561.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.2 0.0 16.3 0.0 8.0 0.0 18.2Incremental Delay (d2), s/veh 0.0 0.8 0.0 0.1 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.0 0.0 16.5 0.0 8.4 0.0 18.3First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 0.4 0.0 0.5 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 0.4 0.0 0.6 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.11 0.00 0.05 0.00 0.19 0.00 0.04Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 106.5 0.0 318.5 0.0 193.8 0.0 218.5Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.5 0.0 7.1 0.0 2.9 0.0 4.6Cycle Queue Clear Time (g_c), s 0.0 1.5 0.0 7.1 0.0 2.9 0.0 4.6Lane Group Capacity (c), veh/h 0.0 900.6 0.0 540.6 0.0 900.6 0.0 540.6Volume-to-Capacity Ratio (X) 0.000 0.118 0.000 0.589 0.000 0.215 0.000 0.404Available Capacity (c_a), veh/h 0.0 900.6 0.0 977.2 0.0 900.6 0.0 977.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.9 0.0 14.8 0.0 7.2 0.0 13.9Incremental Delay (d2), s/veh 0.0 0.3 0.0 1.0 0.0 0.5 0.0 0.5Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.1 0.0 15.8 0.0 7.8 0.0 14.4First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 2.3 0.0 0.8 0.0 1.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.2 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 2.5 0.0 0.9 0.0 1.6Percentile Storage Ratio (RQ%) 0.00 0.02 0.00 0.05 0.00 0.13 0.00 0.03

Page 121: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 22.8 0.0 137.0 0.0 184.4 0.0 52.2Group Sat. Flow (s), veh/h/ln 0.0 1631.3 0.0 1627.9 0.0 1723.1 0.0 1569.7Queue Serve Time (g_s), s 0.0 0.4 0.0 3.2 0.0 3.0 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.4 0.0 3.2 0.0 3.0 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.454 0.000 1.000Lane Group Capacity (c), veh/h 0.0 788.7 0.0 472.5 0.0 833.0 0.0 455.6Volume-to-Capacity Ratio (X) 0.000 0.029 0.000 0.290 0.000 0.221 0.000 0.115Available Capacity (c_a), veh/h 0.0 788.7 0.0 854.0 0.0 833.0 0.0 823.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 6.6 0.0 13.4 0.0 7.3 0.0 12.7Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 6.6 0.0 13.7 0.0 7.9 0.0 12.8First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.9 0.0 0.8 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.9 0.0 0.9 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.00 0.00 0.02 0.00 0.12 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.7HCM Level of Service B

Page 122: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 90 132 143 49 107 56 40 167 29 67 248 64Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.96 0.95 0.96 0.96 0.97 0.91 0.94 0.95Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 519 651 549 511 651 550 554 1523 623 592 1523 645Proportion Arriving On Green 0.35 0.35 0.35 0.35 0.35 0.35 0.43 0.43 0.43 0.43 0.43 0.43Movement Delay, s/veh 13.2 11.6 12.0 13.1 11.4 11.1 10.2 8.7 8.4 10.1 9.0 8.8Movement LOS B B B B B B B A A B A AApproach Volume, veh/h 397 230 257 412Approach Delay, s/veh 12.2 11.7 8.9 9.2Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 22.97 27.00 22.97Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.77 4.60 4.77 4.60Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 5.65 7.17 5.62 6.29Green Extension Time (g_e), s 3.19 2.73 3.19 2.76Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.063 0.014 0.063 0.011

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1069.14 1225.44 1121.57 1244.17

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1447.19 1570.35 1498.70 1573.18

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 43.5 0.0 97.8 0.0 72.8 0.0 53.3Group Sat. Flow (s), veh/h/ln 0.0 1069.1 0.0 1225.4 0.0 1121.6 0.0 1244.2Queue Serve Time (g_s), s 0.0 1.3 0.0 3.0 0.0 2.1 0.0 1.6Cycle Queue Clear Time (g_c), s 0.0 3.7 0.0 5.2 0.0 3.6 0.0 4.3

Page 123: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1069.1 0.0 1225.4 0.0 1121.6 0.0 1244.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 17.5 0.0 21.5 0.0 17.5Perm LT Serve Time (g_u), s 0.0 19.2 0.0 15.3 0.0 20.0 0.0 14.8Perm LT Que Serve Time (g_ps), s 0.0 1.3 0.0 3.0 0.0 2.1 0.0 1.6Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 553.9 0.0 519.4 0.0 592.2 0.0 511.5Volume-to-Capacity Ratio (X) 0.000 0.078 0.000 0.188 0.000 0.123 0.000 0.104Available Capacity (c_a), veh/h 0.0 553.9 0.0 765.5 0.0 592.2 0.0 761.3Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.9 0.0 13.1 0.0 9.6 0.0 13.0Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.2 0.0 13.2 0.0 10.1 0.0 13.1First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 0.8 0.0 0.4 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 0.8 0.0 0.5 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.18 0.00 0.09 0.00 0.12Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 181.5 0.0 143.5 0.0 269.6 0.0 116.3Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.5 0.0 2.7 0.0 2.3 0.0 2.2Cycle Queue Clear Time (g_c), s 0.0 1.5 0.0 2.7 0.0 2.3 0.0 2.2Lane Group Capacity (c), veh/h 0.0 1522.9 0.0 651.1 0.0 1522.9 0.0 651.1Volume-to-Capacity Ratio (X) 0.000 0.119 0.000 0.220 0.000 0.177 0.000 0.179Available Capacity (c_a), veh/h 0.0 1522.9 0.0 1025.2 0.0 1522.9 0.0 1025.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.5 0.0 11.5 0.0 8.8 0.0 11.3Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.7 0.0 11.6 0.0 9.0 0.0 11.4First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 1.0 0.0 0.7 0.0 0.8Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 1.0 0.0 0.7 0.0 0.8Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.03 0.00 0.06 0.00 0.02

Page 124: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 31.5 0.0 155.4 0.0 69.6 0.0 60.9Group Sat. Flow (s), veh/h/ln 0.0 1447.2 0.0 1570.4 0.0 1498.7 0.0 1573.2Queue Serve Time (g_s), s 0.0 0.6 0.0 3.6 0.0 1.4 0.0 1.3Cycle Queue Clear Time (g_c), s 0.0 0.6 0.0 3.6 0.0 1.4 0.0 1.3Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 622.7 0.0 548.9 0.0 644.9 0.0 549.9Volume-to-Capacity Ratio (X) 0.000 0.051 0.000 0.283 0.000 0.108 0.000 0.111Available Capacity (c_a), veh/h 0.0 622.7 0.0 864.3 0.0 644.9 0.0 865.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.3 0.0 11.7 0.0 8.5 0.0 11.0Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.3 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.4 0.0 12.0 0.0 8.8 0.0 11.1First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.1 0.0 0.3 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.1 0.0 0.4 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.06 0.00 0.25 0.00 0.07 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.5HCM Level of Service B

Page 125: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 63 199 32 61 178 19 48 157 58 9 68 34Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 68 216 35 66 193 21 52 171 63 10 74 37

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 68 251 66 214 223 63 84 37Volume Left (vph) 68 0 66 0 52 0 10 0Volume Right (vph) 0 35 0 21 0 63 0 37Hadj (s) 0.53 -0.06 0.53 -0.03 0.15 -0.67 0.09 -0.67Departure Headway (s) 6.6 6.0 6.7 6.1 6.5 5.7 6.7 5.9Degree Utilization, x 0.13 0.42 0.12 0.36 0.40 0.10 0.16 0.06Capacity (veh/h) 514 571 509 561 520 594 495 553Control Delay (s) 9.4 12.2 9.4 11.4 12.5 8.1 9.7 8.1Approach Delay (s) 11.6 10.9 11.6 9.2Approach LOS B B B A

Intersection SummaryDelay 11.1HCM Level of Service BIntersection Capacity Utilization 44.1% ICU Level of Service AAnalysis Period (min) 15

Page 126: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 6 0 12 5 0 5 11 248 46 24 324 3Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 0 13 5 0 5 12 270 50 26 352 3PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 570 749 178 560 726 160 355 320vC1, stage 1 conf vol 406 406 318 318vC2, stage 2 conf vol 164 343 241 408vCu, unblocked vol 570 749 178 560 726 160 355 320tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 98 99 100 99 99 98cM capacity (veh/h) 542 493 835 571 502 857 1200 1237

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 11 12 180 140 26 235 121Volume Left 7 5 12 0 0 26 0 0Volume Right 13 5 0 0 50 0 0 3cSH 707 685 1200 1700 1700 1237 1700 1700Volume to Capacity 0.03 0.02 0.01 0.11 0.08 0.02 0.14 0.07Queue Length 95th (ft) 2 1 1 0 0 2 0 0Control Delay (s) 10.2 10.3 8.0 0.0 0.0 8.0 0.0 0.0Lane LOS B B A AApproach Delay (s) 10.2 10.3 0.3 0.5Approach LOS B B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 25.7% ICU Level of Service AAnalysis Period (min) 15

Page 127: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 2 0 4 6 0 9 4 222 13 6 101 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 0 4 7 0 10 4 241 14 7 110 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 392 389 112 386 384 248 114 255vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 392 389 112 386 384 248 114 255tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 100 100 100 99 100 99 100 100cM capacity (veh/h) 557 542 941 566 545 790 1475 1310

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 7 16 260 121Volume Left 2 7 4 7Volume Right 4 10 14 4cSH 765 682 1475 1310Volume to Capacity 0.01 0.02 0.00 0.00Queue Length 95th (ft) 1 2 0 0Control Delay (s) 9.7 10.4 0.2 0.5Lane LOS A B A AApproach Delay (s) 9.7 10.4 0.2 0.5Approach LOS A B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 23.7% ICU Level of Service AAnalysis Period (min) 15

Page 128: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 24 0 6 2 261 50 24 349 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 26 0 7 2 284 54 26 379 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblockedvC, conflicting volume 586 776 192 564 751 169 384 338vC1, stage 1 conf vol 434 434 315 315vC2, stage 2 conf vol 153 342 248 436vCu, unblocked vol 586 776 192 564 751 169 384 338tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 99 95 100 99 100 98cM capacity (veh/h) 526 485 817 577 497 845 1171 1218

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 33 2 189 149 26 253 131Volume Left 13 26 2 0 0 26 0 0Volume Right 7 7 0 0 54 0 0 4cSH 597 616 1171 1700 1700 1218 1700 1700Volume to Capacity 0.03 0.05 0.00 0.11 0.09 0.02 0.15 0.08Queue Length 95th (ft) 3 4 0 0 0 2 0 0Control Delay (s) 11.2 11.2 8.1 0.0 0.0 8.0 0.0 0.0Lane LOS B B A AApproach Delay (s) 11.2 11.2 0.1 0.5Approach LOS B B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 26.4% ICU Level of Service AAnalysis Period (min) 15

Page 129: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 23 243 195 19 78 63Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 264 212 21 85 68Pedestrians 30 30 30Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 3 3 3Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 263 596 282vC1, stage 1 conf vol 252vC2, stage 2 conf vol 344vCu, unblocked vol 263 596 282tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 98 86 90cM capacity (veh/h) 1269 606 718

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 25 264 233 85 68Volume Left 25 0 0 85 0Volume Right 0 0 21 0 68cSH 1269 1700 1700 606 718Volume to Capacity 0.02 0.16 0.14 0.14 0.10Queue Length 95th (ft) 2 0 0 12 8Control Delay (s) 7.9 0.0 0.0 11.9 10.5Lane LOS A B BApproach Delay (s) 0.7 0.0 11.3Approach LOS B

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 35.8% ICU Level of Service AAnalysis Period (min) 15

Page 130: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 46 66 20 259 311 30Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 50 72 22 282 338 33PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 539 185 371vC1, stage 1 conf vol 354vC2, stage 2 conf vol 184vCu, unblocked vol 539 185 371tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 92 91 98cM capacity (veh/h) 624 825 1184

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 50 72 22 141 141 225 145Volume Left 50 0 22 0 0 0 0Volume Right 0 72 0 0 0 0 33cSH 624 825 1184 1700 1700 1700 1700Volume to Capacity 0.08 0.09 0.02 0.08 0.08 0.13 0.09Queue Length 95th (ft) 7 7 1 0 0 0 0Control Delay (s) 11.3 9.8 8.1 0.0 0.0 0.0 0.0Lane LOS B A AApproach Delay (s) 10.4 0.6 0.0Approach LOS B

Intersection SummaryAverage Delay 1.8Intersection Capacity Utilization 26.2% ICU Level of Service AAnalysis Period (min) 15

Page 131: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 30 10 222 36 5 360Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 11 241 39 5 391PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 467 140 280vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 467 140 280tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 94 99 100cM capacity (veh/h) 522 882 1279

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 43 161 120 5 196 196Volume Left 33 0 0 5 0 0Volume Right 11 0 39 0 0 0cSH 581 1700 1700 1279 1700 1700Volume to Capacity 0.07 0.09 0.07 0.00 0.12 0.12Queue Length 95th (ft) 6 0 0 0 0 0Control Delay (s) 11.7 0.0 0.0 7.8 0.0 0.0Lane LOS B AApproach Delay (s) 11.7 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Page 132: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 1 2 1 231 360 2Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 1 2 1 251 391 2PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 520 197 393vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 520 197 393tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 100 100 100cM capacity (veh/h) 485 811 1162

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 3 85 167 261 133Volume Left 1 1 0 0 0Volume Right 2 0 0 0 2cSH 663 1162 1700 1700 1700Volume to Capacity 0.00 0.00 0.10 0.15 0.08Queue Length 95th (ft) 0 0 0 0 0Control Delay (s) 10.5 0.1 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 10.5 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.1Intersection Capacity Utilization 20.0% ICU Level of Service AAnalysis Period (min) 15

Page 133: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

Existing AM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 36 4 0 2 60 207 36 22 71 97Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 39 4 0 2 65 225 39 24 77 105PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 555 572 130 592 605 245 183 264vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 555 572 130 592 605 245 183 264tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 96 99 100 100 95 98cM capacity (veh/h) 419 402 920 381 385 794 1392 1300

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 52 7 329 207Volume Left 13 4 65 24Volume Right 39 2 39 105cSH 709 460 1392 1300Volume to Capacity 0.07 0.01 0.05 0.02Queue Length 95th (ft) 6 1 4 1Control Delay (s) 10.5 12.9 1.9 1.0Lane LOS B B A AApproach Delay (s) 10.5 12.9 1.9 1.0Approach LOS B B

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 36.6% ICU Level of Service AAnalysis Period (min) 15

Page 134: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 47 550 121 30 529 120 158 93 49 88 174 116Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 283 1042 229 235 1247 558 628 938 798 707 976 826Proportion Arriving On Green 0.35 0.35 0.35 0.35 0.35 0.35 0.50 0.50 0.50 0.50 0.50 0.50Movement Delay, s/veh 24.6 20.9 21.0 26.6 19.4 17.7 14.6 10.2 9.9 11.8 10.9 10.6Movement LOS C C C C B B B B A B B BApproach Volume, veh/h 780 738 326 411Approach Delay, s/veh 21.2 19.4 12.5 11.0Approach LOS C B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 44.00 32.43 44.00 32.43Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.56 4.89 4.56 4.89Maximum Green Setting (Gmax), s 38.50 40.50 38.50 40.50Max. Queue Clearance Time (g_c+l1), s 13.22 15.46 7.39 17.40Green Extension Time (g_e), s 3.36 9.86 3.45 9.53Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.008 0.233 0.002 0.268

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1185.72 834.53 1288.37 751.50

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 2957.57 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 649.03 1638.82 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 171.7 0.0 51.1 0.0 95.7 0.0 32.6Group Sat. Flow (s), veh/h/ln 0.0 1185.7 0.0 834.5 0.0 1288.4 0.0 751.5Queue Serve Time (g_s), s 0.0 7.1 0.0 3.9 0.0 3.2 0.0 2.8Cycle Queue Clear Time (g_c), s 0.0 11.2 0.0 13.5 0.0 5.4 0.0 15.4

Page 135: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1185.7 0.0 834.5 0.0 1288.4 0.0 751.5Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 38.5 0.0 26.9 0.0 38.5 0.0 26.9Perm LT Serve Time (g_u), s 0.0 34.4 0.0 17.3 0.0 36.3 0.0 14.3Perm LT Que Serve Time (g_ps), s 0.0 7.1 0.0 3.9 0.0 3.2 0.0 2.8Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 627.8 0.0 283.4 0.0 706.5 0.0 235.3Volume-to-Capacity Ratio (X) 0.000 0.274 0.000 0.180 0.000 0.135 0.000 0.139Available Capacity (c_a), veh/h 0.0 627.8 0.0 431.6 0.0 706.5 0.0 368.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 13.5 0.0 24.3 0.0 11.4 0.0 26.4Incremental Delay (d2), s/veh 0.0 1.1 0.0 0.3 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 14.6 0.0 24.6 0.0 11.8 0.0 26.6First-Term Queue (Q1), veh/ln 0.0 2.0 0.0 0.7 0.0 0.9 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.2 0.0 0.8 0.0 1.0 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.56 0.00 0.10 0.00 0.17 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 101.1 0.0 376.0 0.0 189.1 0.0 575.0Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 2.2 0.0 12.5 0.0 4.1 0.0 9.6Cycle Queue Clear Time (g_c), s 0.0 2.2 0.0 12.5 0.0 4.1 0.0 9.6Lane Group Capacity (c), veh/h 0.0 938.3 0.0 656.3 0.0 975.9 0.0 1247.0Volume-to-Capacity Ratio (X) 0.000 0.108 0.000 0.573 0.000 0.194 0.000 0.461Available Capacity (c_a), veh/h 0.0 938.3 0.0 987.1 0.0 975.9 0.0 1875.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 20.1 0.0 10.4 0.0 19.1Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.8 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.2 0.0 20.9 0.0 10.9 0.0 19.4First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 4.8 0.0 1.6 0.0 3.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 4.9 0.0 1.7 0.0 3.5Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.15 0.00 0.05 0.00 0.07

Page 136: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 53.3 0.0 353.4 0.0 126.1 0.0 130.4Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1743.9 0.0 1638.8 0.0 1583.3Queue Serve Time (g_s), s 0.0 1.3 0.0 12.6 0.0 3.2 0.0 4.4Cycle Queue Clear Time (g_c), s 0.0 1.3 0.0 12.6 0.0 3.2 0.0 4.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.372 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 797.6 0.0 614.4 0.0 825.5 0.0 557.9Volume-to-Capacity Ratio (X) 0.000 0.067 0.000 0.575 0.000 0.153 0.000 0.234Available Capacity (c_a), veh/h 0.0 797.6 0.0 924.1 0.0 825.5 0.0 839.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.7 0.0 20.1 0.0 10.2 0.0 17.5Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.9 0.0 0.4 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.9 0.0 21.0 0.0 10.6 0.0 17.7First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 4.5 0.0 1.0 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 4.7 0.0 1.1 0.0 1.5Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.14 0.00 0.19 0.00 0.24Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.5HCM Level of Service B

Page 137: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 3 12 3 12 1 12 12 254 6 12 346 24Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 3 13 3 13 1 13 13 276 7 13 376 26PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 734 724 389 730 734 279 402 283vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 734 724 389 730 734 279 402 283tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 96 100 96 100 98 99 99cM capacity (veh/h) 324 345 659 321 340 759 1156 1280

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 20 27 296 415Volume Left 3 13 13 13Volume Right 3 13 7 26cSH 370 445 1156 1280Volume to Capacity 0.05 0.06 0.01 0.01Queue Length 95th (ft) 4 5 1 1Control Delay (s) 15.3 13.6 0.5 0.3Lane LOS C B A AApproach Delay (s) 15.3 13.6 0.5 0.3Approach LOS C B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 34.0% ICU Level of Service AAnalysis Period (min) 15

Page 138: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 104 361 246 24 371 76 253 200 21 40 139 121Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 325 690 609 334 690 579 562 813 717 545 813 687Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.44 0.44 0.44 0.44 0.44 0.44Movement Delay, s/veh 21.4 15.1 14.0 18.7 15.3 12.0 17.3 11.1 9.3 12.3 10.4 10.5Movement LOS C B B B B B B B A B B BApproach Volume, veh/h 773 512 515 326Approach Delay, s/veh 15.6 14.9 14.3 10.7Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 30.40 26.63 30.40 26.63Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.77 4.62 4.77 4.62Maximum Green Setting (Gmax), s 24.90 24.10 24.90 24.10Max. Queue Clearance Time (g_c+l1), s 16.19 17.69 7.67 12.77Green Extension Time (g_e), s 2.83 3.35 3.93 4.89Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.485 0.824 0.102 0.485

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1131.53 1011.28 1156.59 1026.34

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1641.01 1644.00 1573.54 1561.96

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 275.0 0.0 113.0 0.0 43.5 0.0 26.1Group Sat. Flow (s), veh/h/ln 0.0 1131.5 0.0 1011.3 0.0 1156.6 0.0 1026.3Queue Serve Time (g_s), s 0.0 11.3 0.0 5.8 0.0 1.4 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 14.2 0.0 15.7 0.0 5.7 0.0 10.8

Page 139: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1131.5 0.0 1011.3 0.0 1156.6 0.0 1026.3Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 24.9 0.0 21.1 0.0 24.9 0.0 21.1Perm LT Serve Time (g_u), s 0.0 22.0 0.0 11.2 0.0 20.7 0.0 11.5Perm LT Que Serve Time (g_ps), s 0.0 11.3 0.0 5.8 0.0 1.4 0.0 1.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 562.2 0.0 325.0 0.0 545.2 0.0 334.0Volume-to-Capacity Ratio (X) 0.000 0.489 0.000 0.348 0.000 0.080 0.000 0.078Available Capacity (c_a), veh/h 0.0 562.2 0.0 377.7 0.0 545.2 0.0 387.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 14.2 0.0 20.7 0.0 12.1 0.0 18.6Incremental Delay (d2), s/veh 0.0 3.0 0.0 0.6 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 17.3 0.0 21.4 0.0 12.3 0.0 18.7First-Term Queue (Q1), veh/ln 0.0 2.9 0.0 1.2 0.0 0.3 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.5 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 3.4 0.0 1.2 0.0 0.4 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.43 0.00 0.16 0.00 0.11 0.00 0.05Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 217.4 0.0 392.4 0.0 151.1 0.0 403.3Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 4.2 0.0 9.6 0.0 2.8 0.0 9.9Cycle Queue Clear Time (g_c), s 0.0 4.2 0.0 9.6 0.0 2.8 0.0 9.9Lane Group Capacity (c), veh/h 0.0 813.4 0.0 690.1 0.0 813.4 0.0 690.1Volume-to-Capacity Ratio (X) 0.000 0.267 0.000 0.569 0.000 0.186 0.000 0.584Available Capacity (c_a), veh/h 0.0 813.4 0.0 787.2 0.0 813.4 0.0 787.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.2 0.0 14.3 0.0 9.8 0.0 14.4Incremental Delay (d2), s/veh 0.0 0.8 0.0 0.7 0.0 0.5 0.0 0.9Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.1 0.0 15.1 0.0 10.4 0.0 15.3First-Term Queue (Q1), veh/ln 0.0 1.4 0.0 3.2 0.0 0.9 0.0 3.3Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.2Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.6 0.0 3.3 0.0 1.0 0.0 3.5Percentile Storage Ratio (RQ%) 0.00 0.06 0.00 0.06 0.00 0.14 0.00 0.06

Page 140: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 22.8 0.0 267.4 0.0 131.5 0.0 82.6Group Sat. Flow (s), veh/h/ln 0.0 1641.0 0.0 1644.0 0.0 1573.5 0.0 1562.0Queue Serve Time (g_s), s 0.0 0.5 0.0 7.0 0.0 2.9 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 7.0 0.0 2.9 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 716.5 0.0 609.0 0.0 687.1 0.0 578.6Volume-to-Capacity Ratio (X) 0.000 0.032 0.000 0.439 0.000 0.191 0.000 0.143Available Capacity (c_a), veh/h 0.0 716.5 0.0 694.8 0.0 687.1 0.0 660.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.2 0.0 13.5 0.0 9.9 0.0 11.9Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.5 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.3 0.0 14.0 0.0 10.5 0.0 12.0First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 2.0 0.0 0.8 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 2.1 0.0 0.9 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.04 0.00 0.13 0.00 0.18Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 14.4HCM Level of Service B

Page 141: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 113 196 100 33 156 84 79 335 20 47 391 117Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.94 0.98 0.99 0.92 0.97 0.91 0.95 0.93Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 482 684 593 477 684 555 458 1505 614 483 1505 625Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.43 0.43 0.43 0.43 0.43 0.43Movement Delay, s/veh 14.7 12.2 11.5 14.0 11.9 11.4 13.4 10.1 9.0 11.9 10.4 10.3Movement LOS B B B B B B B B A B B BApproach Volume, veh/h 445 297 472 603Approach Delay, s/veh 12.7 12.0 10.7 10.5Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 28.00 24.93 28.00 24.93Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.88 4.76 4.88 4.76Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 9.68 9.81 7.38 7.50Green Extension Time (g_e), s 5.04 3.34 5.49 3.48Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.345 0.078 0.253 0.048

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 928.31 1139.24 966.23 1195.20

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1443.67 1615.71 1469.74 1512.07

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 85.9 0.0 122.8 0.0 51.1 0.0 35.9Group Sat. Flow (s), veh/h/ln 0.0 928.3 0.0 1139.2 0.0 966.2 0.0 1195.2Queue Serve Time (g_s), s 0.0 3.5 0.0 4.5 0.0 1.9 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 7.7 0.0 7.8 0.0 5.4 0.0 5.5

Page 142: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 928.3 0.0 1139.2 0.0 966.2 0.0 1195.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 22.5 0.0 19.4 0.0 22.5 0.0 19.4Perm LT Serve Time (g_u), s 0.0 18.3 0.0 16.1 0.0 19.0 0.0 15.1Perm LT Que Serve Time (g_ps), s 0.0 3.5 0.0 4.5 0.0 1.9 0.0 1.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 457.9 0.0 482.0 0.0 483.1 0.0 477.0Volume-to-Capacity Ratio (X) 0.000 0.188 0.000 0.255 0.000 0.106 0.000 0.075Available Capacity (c_a), veh/h 0.0 457.9 0.0 634.2 0.0 483.1 0.0 636.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.4 0.0 14.4 0.0 11.5 0.0 13.9Incremental Delay (d2), s/veh 0.0 0.9 0.0 0.3 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 13.4 0.0 14.7 0.0 11.9 0.0 14.0First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 1.1 0.0 0.3 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.2 0.0 0.4 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.27 0.00 0.07 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 364.1 0.0 213.0 0.0 425.0 0.0 169.6Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.5 0.0 4.3 0.0 4.2 0.0 3.4Cycle Queue Clear Time (g_c), s 0.0 3.5 0.0 4.3 0.0 4.2 0.0 3.4Lane Group Capacity (c), veh/h 0.0 1504.6 0.0 683.7 0.0 1504.6 0.0 683.7Volume-to-Capacity Ratio (X) 0.000 0.242 0.000 0.312 0.000 0.282 0.000 0.248Available Capacity (c_a), veh/h 0.0 1504.6 0.0 932.7 0.0 1504.6 0.0 932.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.7 0.0 12.0 0.0 9.9 0.0 11.7Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.3 0.0 0.5 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.1 0.0 12.2 0.0 10.4 0.0 11.9First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 1.5 0.0 1.2 0.0 1.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 1.6 0.0 1.3 0.0 1.2Percentile Storage Ratio (RQ%) 0.00 0.10 0.00 0.04 0.00 0.11 0.00 0.03

Page 143: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 108.7 0.0 127.2 0.0 91.3Group Sat. Flow (s), veh/h/ln 0.0 1443.7 0.0 1615.7 0.0 1469.7 0.0 1512.1Queue Serve Time (g_s), s 0.0 0.5 0.0 2.4 0.0 2.9 0.0 2.2Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 2.4 0.0 2.9 0.0 2.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 613.7 0.0 593.0 0.0 624.8 0.0 555.0Volume-to-Capacity Ratio (X) 0.000 0.035 0.000 0.183 0.000 0.204 0.000 0.165Available Capacity (c_a), veh/h 0.0 613.7 0.0 809.0 0.0 624.8 0.0 757.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.9 0.0 11.4 0.0 9.6 0.0 11.3Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.1 0.0 0.7 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.0 0.0 11.5 0.0 10.3 0.0 11.4First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.7 0.0 0.7 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.8 0.0 0.8 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.18 0.00 0.15 0.00 0.18Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.3HCM Level of Service B

Page 144: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 71 276 68 123 272 51 92 193 85 46 215 122Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 300 74 134 296 55 100 210 92 50 234 133

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 77 374 134 351 310 92 284 133Volume Left (vph) 77 0 134 0 100 0 50 0Volume Right (vph) 0 74 0 55 0 92 0 133Hadj (s) 0.53 -0.10 0.53 -0.08 0.20 -0.67 0.12 -0.67Departure Headway (s) 8.9 8.3 8.9 8.3 8.7 7.9 8.7 7.9Degree Utilization, x 0.19 0.86 0.33 0.81 0.75 0.20 0.68 0.29Capacity (veh/h) 391 427 394 424 401 438 396 437Control Delay (s) 12.8 43.3 15.0 36.8 32.6 11.7 27.3 12.9Approach Delay (s) 38.1 30.8 27.8 22.7Approach LOS E D D C

Intersection SummaryDelay 30.1HCM Level of Service DIntersection Capacity Utilization 68.2% ICU Level of Service CAnalysis Period (min) 15

Page 145: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 48 0 48 22 483 11 36 534 3Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 52 0 52 24 525 12 39 580 3PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 1023 1245 292 954 1241 268 584 537vC1, stage 1 conf vol 660 660 579 579vC2, stage 2 conf vol 362 585 375 662vCu, unblocked vol 1023 1245 292 954 1241 268 584 537tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 99 87 100 93 98 96cM capacity (veh/h) 346 341 705 390 343 730 987 1027

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 104 24 350 187 39 387 197Volume Left 13 52 24 0 0 39 0 0Volume Right 7 52 0 0 12 0 0 3cSH 417 508 987 1700 1700 1027 1700 1700Volume to Capacity 0.05 0.21 0.02 0.21 0.11 0.04 0.23 0.12Queue Length 95th (ft) 4 19 2 0 0 3 0 0Control Delay (s) 14.1 13.9 8.7 0.0 0.0 8.6 0.0 0.0Lane LOS B B A AApproach Delay (s) 14.1 13.9 0.4 0.5Approach LOS B B

Intersection SummaryAverage Delay 1.7Intersection Capacity Utilization 34.2% ICU Level of Service AAnalysis Period (min) 15

Page 146: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 5 5 0 5 5 264 46 32 373 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 5 5 0 5 5 287 50 35 405 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 806 826 408 806 803 312 411 337vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 806 826 408 806 803 312 411 337tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 99 98 100 99 100 97cM capacity (veh/h) 291 297 643 290 306 728 1148 1222

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 11 11 342 446Volume Left 5 5 5 35Volume Right 5 5 50 5cSH 400 415 1148 1222Volume to Capacity 0.03 0.03 0.00 0.03Queue Length 95th (ft) 2 2 0 2Control Delay (s) 14.2 13.9 0.2 0.9Lane LOS B B A AApproach Delay (s) 14.2 13.9 0.2 0.9Approach LOS B B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 48.3% ICU Level of Service AAnalysis Period (min) 15

Page 147: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 12 0 6 3 0 3 6 514 12 12 546 12Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 0 7 3 0 3 7 559 13 13 593 13PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 0.97 0.97 0.97 0.97 0.97 0.97vC, conflicting volume 922 1211 303 908 1211 286 607 572vC1, stage 1 conf vol 626 626 578 578vC2, stage 2 conf vol 296 585 329 633vCu, unblocked vol 850 1149 303 835 1149 192 607 488tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 99 99 100 100 99 99cM capacity (veh/h) 404 377 693 440 378 790 968 1036

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 20 7 7 372 199 13 396 211Volume Left 13 3 7 0 0 13 0 0Volume Right 7 3 0 0 13 0 0 13cSH 469 565 968 1700 1700 1036 1700 1700Volume to Capacity 0.04 0.01 0.01 0.22 0.12 0.01 0.23 0.12Queue Length 95th (ft) 3 1 1 0 0 1 0 0Control Delay (s) 13.0 11.4 8.7 0.0 0.0 8.5 0.0 0.0Lane LOS B B A AApproach Delay (s) 13.0 11.4 0.1 0.2Approach LOS B B

Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 25.5% ICU Level of Service AAnalysis Period (min) 15

Page 148: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 68 339 362 73 79 84Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 74 368 393 79 86 91Pedestrians 43 43 43Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 4 5 4Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 516 1035 519vC1, stage 1 conf vol 476vC2, stage 2 conf vol 559vCu, unblocked vol 516 1035 519tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 93 80 82cM capacity (veh/h) 1012 425 516

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 74 368 473 86 91Volume Left 74 0 0 86 0Volume Right 0 0 79 0 91cSH 1012 1700 1700 425 516Volume to Capacity 0.07 0.22 0.28 0.20 0.18Queue Length 95th (ft) 6 0 0 19 16Control Delay (s) 8.8 0.0 0.0 15.6 13.5Lane LOS A C BApproach Delay (s) 1.5 0.0 14.5Approach LOS B

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 49.0% ICU Level of Service AAnalysis Period (min) 15

Page 149: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 71 69 84 445 501 87Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 75 91 484 545 95Pedestrians 438Lane Width (ft) 12.0Walking Speed (ft/s) 4.0Percent Blockage 36Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 1454 758 1077vC1, stage 1 conf vol 1030vC2, stage 2 conf vol 424vCu, unblocked vol 1454 758 1077tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 57 66 78cM capacity (veh/h) 180 222 408

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 77 75 91 242 242 363 276Volume Left 77 0 91 0 0 0 0Volume Right 0 75 0 0 0 0 95cSH 180 222 408 1700 1700 1700 1700Volume to Capacity 0.43 0.34 0.22 0.14 0.14 0.21 0.16Queue Length 95th (ft) 49 35 21 0 0 0 0Control Delay (s) 39.2 29.3 16.3 0.0 0.0 0.0 0.0Lane LOS E D CApproach Delay (s) 34.3 2.6 0.0Approach LOS D

Intersection SummaryAverage Delay 4.9Intersection Capacity Utilization 35.2% ICU Level of Service AAnalysis Period (min) 15

Page 150: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 12 36 527 3 3 561Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 13 39 573 3 3 610PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 886 288 576vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 886 288 576tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 95 94 100cM capacity (veh/h) 283 709 993

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 52 382 194 3 305 305Volume Left 13 0 0 3 0 0Volume Right 39 0 3 0 0 0cSH 515 1700 1700 993 1700 1700Volume to Capacity 0.10 0.22 0.11 0.00 0.18 0.18Queue Length 95th (ft) 8 0 0 0 0 0Control Delay (s) 12.8 0.0 0.0 8.6 0.0 0.0Lane LOS B AApproach Delay (s) 12.8 0.0 0.0Approach LOS B

Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 25.5% ICU Level of Service AAnalysis Period (min) 15

Page 151: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 3 3 1 562 561 3Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 3 3 1 611 610 3Pedestrians 559Lane Width (ft) 16.0Walking Speed (ft/s) 4.0Percent Blockage 62Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 1478 866 1172vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1478 866 1172tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 93 97 100cM capacity (veh/h) 44 112 224

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 7 205 407 407 207Volume Left 3 1 0 0 0Volume Right 3 0 0 0 3cSH 63 224 1700 1700 1700Volume to Capacity 0.10 0.00 0.24 0.24 0.12Queue Length 95th (ft) 8 0 0 0 0Control Delay (s) 68.4 0.2 0.0 0.0 0.0Lane LOS F AApproach Delay (s) 68.4 0.1 0.0Approach LOS F

Intersection SummaryAverage Delay 0.4Intersection Capacity Utilization 26.2% ICU Level of Service AAnalysis Period (min) 15

Page 152: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

Existing PM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 6 0 24 12 0 24 3 246 3 3 306 24Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 7 0 26 13 0 26 3 267 3 3 333 26PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 654 629 346 654 641 269 359 271vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 654 629 346 654 641 269 359 271tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 96 96 100 97 100 100cM capacity (veh/h) 366 397 697 364 391 770 1200 1293

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 33 39 274 362Volume Left 7 13 3 3Volume Right 26 26 3 26cSH 590 561 1200 1293Volume to Capacity 0.06 0.07 0.00 0.00Queue Length 95th (ft) 4 6 0 0Control Delay (s) 11.5 11.9 0.1 0.1Lane LOS B B A AApproach Delay (s) 11.5 11.9 0.1 0.1Approach LOS B B

Intersection SummaryAverage Delay 1.3Intersection Capacity Utilization 29.6% ICU Level of Service AAnalysis Period (min) 15

Page 153: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 589 53 62 392 44 85 98 22 31 52 20Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 373 1247 112 274 1310 583 715 883 749 668 918 779Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.47 0.47 0.47 0.47 0.47 0.47Movement Delay, s/veh 19.4 17.9 17.9 23.9 16.1 14.5 11.5 10.6 10.0 11.4 10.2 10.0Movement LOS B B B C B B B B B B B AApproach Volume, veh/h 752 541 223 112Approach Delay, s/veh 18.0 16.9 10.9 10.5Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 39.00 31.66 39.00 31.66Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.59 4.93 4.59 4.93Maximum Green Setting (Gmax), s 33.50 45.50 33.50 45.50Max. Queue Clearance Time (g_c+l1), s 5.95 12.46 5.32 17.71Green Extension Time (g_e), s 1.45 8.84 1.46 8.45Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.000 0.071 0.000 0.116

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1338.44 955.50 1279.48 773.68

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3367.53 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1579.33 302.62 1642.50 1574.78

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 92.4 0.0 54.3 0.0 33.7 0.0 67.4Group Sat. Flow (s), veh/h/ln 0.0 1338.4 0.0 955.5 0.0 1279.5 0.0 773.7Queue Serve Time (g_s), s 0.0 2.8 0.0 3.1 0.0 1.1 0.0 5.2Cycle Queue Clear Time (g_c), s 0.0 4.0 0.0 9.1 0.0 3.3 0.0 15.7

Page 154: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1338.4 0.0 955.5 0.0 1279.5 0.0 773.7Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 33.5 0.0 26.2 0.0 33.5 0.0 26.2Perm LT Serve Time (g_u), s 0.0 32.4 0.0 20.1 0.0 31.2 0.0 15.7Perm LT Que Serve Time (g_ps), s 0.0 2.8 0.0 3.1 0.0 1.1 0.0 5.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 715.3 0.0 373.3 0.0 667.7 0.0 273.8Volume-to-Capacity Ratio (X) 0.000 0.129 0.000 0.146 0.000 0.050 0.000 0.246Available Capacity (c_a), veh/h 0.0 715.3 0.0 634.8 0.0 667.7 0.0 485.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.1 0.0 19.2 0.0 11.3 0.0 23.4Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.2 0.0 0.1 0.0 0.5Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.5 0.0 19.4 0.0 11.4 0.0 23.9First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 0.6 0.0 0.3 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 0.7 0.0 0.3 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.23 0.00 0.08 0.00 0.05 0.00 0.14Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 106.5 0.0 353.8 0.0 56.5 0.0 426.1Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 2.3 0.0 10.4 0.0 1.1 0.0 6.1Cycle Queue Clear Time (g_c), s 0.0 2.3 0.0 10.4 0.0 1.1 0.0 6.1Lane Group Capacity (c), veh/h 0.0 883.1 0.0 689.6 0.0 918.4 0.0 1310.3Volume-to-Capacity Ratio (X) 0.000 0.121 0.000 0.513 0.000 0.062 0.000 0.325Available Capacity (c_a), veh/h 0.0 883.1 0.0 1199.5 0.0 918.4 0.0 2279.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.4 0.0 17.3 0.0 10.1 0.0 15.9Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.6 0.0 0.1 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.6 0.0 17.9 0.0 10.2 0.0 16.1First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 3.8 0.0 0.4 0.0 2.1Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 4.0 0.0 0.5 0.0 2.2Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.12 0.00 0.01 0.00 0.04

Page 155: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 23.9 0.0 344.1 0.0 21.7 0.0 47.8Group Sat. Flow (s), veh/h/ln 0.0 1579.3 0.0 1807.4 0.0 1642.5 0.0 1574.8Queue Serve Time (g_s), s 0.0 0.6 0.0 10.5 0.0 0.5 0.0 1.4Cycle Queue Clear Time (g_c), s 0.0 0.6 0.0 10.5 0.0 0.5 0.0 1.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.167 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 748.7 0.0 669.2 0.0 778.7 0.0 583.0Volume-to-Capacity Ratio (X) 0.000 0.032 0.000 0.514 0.000 0.028 0.000 0.082Available Capacity (c_a), veh/h 0.0 748.7 0.0 1163.8 0.0 778.7 0.0 1014.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.9 0.0 17.3 0.0 9.9 0.0 14.5Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.6 0.0 0.1 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.0 0.0 17.9 0.0 10.0 0.0 14.5First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 3.7 0.0 0.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 3.9 0.0 0.2 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.11 0.00 0.03 0.00 0.07Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 16.2HCM Level of Service B

Page 156: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 5 30 15 5 5 15 285 5 5 98 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 5 33 16 5 5 16 310 5 5 107 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 473 468 109 501 468 312 112 315vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 473 468 109 501 468 312 112 315tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 99 97 96 99 99 99 100cM capacity (veh/h) 487 485 944 455 485 728 1478 1245

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 54 27 332 117Volume Left 16 16 16 5Volume Right 33 5 5 5cSH 686 498 1478 1245Volume to Capacity 0.08 0.05 0.01 0.00Queue Length 95th (ft) 6 4 1 0Control Delay (s) 10.7 12.6 0.5 0.4Lane LOS B B A AApproach Delay (s) 10.7 12.6 0.5 0.4Approach LOS B B

Intersection SummaryAverage Delay 2.1Intersection Capacity Utilization 30.6% ICU Level of Service AAnalysis Period (min) 15

Page 157: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 382 150 22 231 50 126 100 18 110 303 91Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 406 620 543 281 620 523 516 847 741 673 1256 371Proportion Arriving On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.45 0.45 0.45 0.45 0.45 0.45Movement Delay, s/veh 16.3 16.1 13.1 19.7 13.7 12.0 12.8 8.5 7.9 10.2 9.5 9.6Movement LOS B B B B B B B A A B A AApproach Volume, veh/h 633 329 265 548Approach Delay, s/veh 15.3 13.9 10.7 9.7Approach LOS B B B A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 22.71 29.00 22.71Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.83 4.65 4.83 4.65Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 11.03 11.90 6.86 12.98Green Extension Time (g_e), s 3.38 4.03 3.81 3.88Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.240 0.237 0.111 0.282

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 992.83 1163.74 1269.24 1001.78

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2763.37 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1630.36 1630.34 816.19 1571.44

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 137.0 0.0 54.3 0.0 119.6 0.0 23.9Group Sat. Flow (s), veh/h/ln 0.0 992.8 0.0 1163.7 0.0 1269.2 0.0 1001.8Queue Serve Time (g_s), s 0.0 5.1 0.0 2.0 0.0 3.1 0.0 1.1Cycle Queue Clear Time (g_c), s 0.0 9.0 0.0 7.3 0.0 4.9 0.0 11.0

Page 158: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 992.8 0.0 1163.7 0.0 1269.2 0.0 1001.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 17.2 0.0 23.5 0.0 17.2Perm LT Serve Time (g_u), s 0.0 19.6 0.0 11.8 0.0 21.8 0.0 7.3Perm LT Que Serve Time (g_ps), s 0.0 5.1 0.0 2.0 0.0 3.1 0.0 1.1Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 515.8 0.0 405.6 0.0 673.2 0.0 280.9Volume-to-Capacity Ratio (X) 0.000 0.266 0.000 0.134 0.000 0.178 0.000 0.085Available Capacity (c_a), veh/h 0.0 515.8 0.0 592.2 0.0 673.2 0.0 441.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.6 0.0 16.1 0.0 9.6 0.0 19.5Incremental Delay (d2), s/veh 0.0 1.3 0.0 0.1 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.8 0.0 16.3 0.0 10.2 0.0 19.7First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 0.4 0.0 0.7 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.2 0.0 0.5 0.0 0.8 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.15 0.00 0.06 0.00 0.26 0.00 0.04Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 415.2 0.0 220.2 0.0 251.1Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.7 0.0 9.9 0.0 3.8 0.0 5.4Cycle Queue Clear Time (g_c), s 0.0 1.7 0.0 9.9 0.0 3.8 0.0 5.4Lane Group Capacity (c), veh/h 0.0 846.6 0.0 619.9 0.0 846.6 0.0 619.9Volume-to-Capacity Ratio (X) 0.000 0.128 0.000 0.670 0.000 0.260 0.000 0.405Available Capacity (c_a), veh/h 0.0 846.6 0.0 918.6 0.0 846.6 0.0 918.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.2 0.0 14.8 0.0 8.7 0.0 13.3Incremental Delay (d2), s/veh 0.0 0.3 0.0 1.3 0.0 0.7 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.5 0.0 16.1 0.0 9.5 0.0 13.7First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 3.2 0.0 1.1 0.0 1.7Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.2 0.0 0.2 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 3.4 0.0 1.3 0.0 1.8Percentile Storage Ratio (RQ%) 0.00 0.02 0.00 0.06 0.00 0.18 0.00 0.03

Page 159: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 19.6 0.0 163.0 0.0 208.1 0.0 54.3Group Sat. Flow (s), veh/h/ln 0.0 1630.4 0.0 1630.3 0.0 1716.8 0.0 1571.4Queue Serve Time (g_s), s 0.0 0.3 0.0 3.8 0.0 3.9 0.0 1.2Cycle Queue Clear Time (g_c), s 0.0 0.3 0.0 3.8 0.0 3.9 0.0 1.2Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.475 0.000 1.000Lane Group Capacity (c), veh/h 0.0 740.9 0.0 542.6 0.0 780.2 0.0 523.0Volume-to-Capacity Ratio (X) 0.000 0.026 0.000 0.300 0.000 0.267 0.000 0.104Available Capacity (c_a), veh/h 0.0 740.9 0.0 804.0 0.0 780.2 0.0 775.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 7.8 0.0 12.8 0.0 8.8 0.0 11.9Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 0.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 7.9 0.0 13.1 0.0 9.6 0.0 12.0First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 1.1 0.0 1.1 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 1.1 0.0 1.2 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.00 0.00 0.02 0.00 0.17 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 12.6HCM Level of Service B

Page 160: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 103 150 160 60 131 64 44 191 30 72 264 72Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.97 0.95 0.97 0.96 0.97 0.91 0.94 0.95Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 509 668 564 506 668 565 536 1502 613 569 1502 636Proportion Arriving On Green 0.36 0.36 0.36 0.36 0.36 0.36 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 13.7 11.6 12.0 13.3 11.4 11.0 10.7 9.1 8.8 10.7 9.4 9.3Movement LOS B B B B B B B A A B A AApproach Volume, veh/h 449 277 288 443Approach Delay, s/veh 12.3 11.8 9.3 9.6Approach LOS B B A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 23.66 27.00 23.66Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.78 4.62 4.78 4.62Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 6.08 8.31 6.20 7.12Green Extension Time (g_e), s 3.50 3.20 3.49 3.25Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.090 0.034 0.093 0.026

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1053.08 1199.93 1097.59 1224.88

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1445.29 1572.26 1497.52 1575.01

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 47.8 0.0 112.0 0.0 78.3 0.0 65.2Group Sat. Flow (s), veh/h/ln 0.0 1053.1 0.0 1199.9 0.0 1097.6 0.0 1224.9Queue Serve Time (g_s), s 0.0 1.5 0.0 3.6 0.0 2.4 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 4.1 0.0 6.3 0.0 4.2 0.0 5.1

Page 161: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1053.1 0.0 1199.9 0.0 1097.6 0.0 1224.9Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 18.2 0.0 21.5 0.0 18.2Perm LT Serve Time (g_u), s 0.0 18.9 0.0 15.5 0.0 19.7 0.0 15.0Perm LT Que Serve Time (g_ps), s 0.0 1.5 0.0 3.6 0.0 2.4 0.0 2.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 535.5 0.0 508.6 0.0 568.5 0.0 505.9Volume-to-Capacity Ratio (X) 0.000 0.089 0.000 0.220 0.000 0.138 0.000 0.129Available Capacity (c_a), veh/h 0.0 535.5 0.0 729.7 0.0 568.5 0.0 731.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.4 0.0 13.5 0.0 10.2 0.0 13.2Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.7 0.0 13.7 0.0 10.7 0.0 13.3First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 0.9 0.0 0.5 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 1.0 0.0 0.6 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.22 0.00 0.10 0.00 0.15Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 207.6 0.0 163.0 0.0 287.0 0.0 142.4Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 1.8 0.0 3.1 0.0 2.6 0.0 2.7Cycle Queue Clear Time (g_c), s 0.0 1.8 0.0 3.1 0.0 2.6 0.0 2.7Lane Group Capacity (c), veh/h 0.0 1502.0 0.0 667.8 0.0 1502.0 0.0 667.8Volume-to-Capacity Ratio (X) 0.000 0.138 0.000 0.244 0.000 0.191 0.000 0.213Available Capacity (c_a), veh/h 0.0 1502.0 0.0 1011.1 0.0 1502.0 0.0 1011.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.9 0.0 11.4 0.0 9.1 0.0 11.3Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 0.3 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.1 0.0 11.6 0.0 9.4 0.0 11.4First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 1.1 0.0 0.7 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 1.1 0.0 0.8 0.0 1.0Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.03 0.00 0.06 0.00 0.02

Page 162: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 32.6 0.0 173.9 0.0 78.3 0.0 69.6Group Sat. Flow (s), veh/h/ln 0.0 1445.3 0.0 1572.3 0.0 1497.5 0.0 1575.0Queue Serve Time (g_s), s 0.0 0.7 0.0 4.0 0.0 1.6 0.0 1.5Cycle Queue Clear Time (g_c), s 0.0 0.7 0.0 4.0 0.0 1.6 0.0 1.5Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 613.3 0.0 563.7 0.0 635.5 0.0 564.6Volume-to-Capacity Ratio (X) 0.000 0.053 0.000 0.309 0.000 0.123 0.000 0.123Available Capacity (c_a), veh/h 0.0 613.3 0.0 853.4 0.0 635.5 0.0 854.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.6 0.0 11.7 0.0 8.9 0.0 10.9Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.3 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.8 0.0 12.0 0.0 9.3 0.0 11.0First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 1.2 0.0 0.4 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.2 0.0 0.5 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.06 0.00 0.29 0.00 0.08 0.00 0.13Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.8HCM Level of Service B

Page 163: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 73 241 40 67 200 17 60 179 66 11 74 42Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 79 262 43 73 217 18 65 195 72 12 80 46

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 79 305 73 236 260 72 92 46Volume Left (vph) 79 0 73 0 65 0 12 0Volume Right (vph) 0 43 0 18 0 72 0 46Hadj (s) 0.53 -0.07 0.53 -0.02 0.16 -0.67 0.10 -0.67Departure Headway (s) 7.0 6.4 7.1 6.5 6.8 6.0 7.1 6.4Degree Utilization, x 0.15 0.54 0.14 0.43 0.49 0.12 0.18 0.08Capacity (veh/h) 489 545 481 527 496 561 464 514Control Delay (s) 10.0 15.4 10.0 13.1 15.1 8.6 10.5 8.7Approach Delay (s) 14.3 12.4 13.7 9.9Approach LOS B B B A

Intersection SummaryDelay 13.1HCM Level of Service BIntersection Capacity Utilization 48.6% ICU Level of Service AAnalysis Period (min) 15

Page 164: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 15 5 0 5 15 274 55 25 342 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 16 5 0 5 16 298 60 27 372 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 616 819 189 617 792 179 377 358vC1, stage 1 conf vol 429 429 360 360vC2, stage 2 conf vol 187 390 257 432vCu, unblocked vol 616 819 189 617 792 179 377 358tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 98 99 100 99 99 98cM capacity (veh/h) 520 468 821 537 477 833 1178 1198

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 16 199 159 27 248 129Volume Left 11 5 16 0 0 27 0 0Volume Right 16 5 0 0 60 0 0 5cSH 666 653 1178 1700 1700 1198 1700 1700Volume to Capacity 0.04 0.02 0.01 0.12 0.09 0.02 0.15 0.08Queue Length 95th (ft) 3 1 1 0 0 2 0 0Control Delay (s) 10.6 10.6 8.1 0.0 0.0 8.1 0.0 0.0Lane LOS B B A AApproach Delay (s) 10.6 10.6 0.4 0.5Approach LOS B B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 26.3% ICU Level of Service AAnalysis Period (min) 15

Page 165: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 2 0 4 6 0 9 4 252 13 6 117 4Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 2 0 4 7 0 10 4 274 14 7 127 4PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 442 439 129 436 434 281 132 288vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 442 439 129 436 434 281 132 288tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 100 100 100 99 100 99 100 99cM capacity (veh/h) 516 508 920 524 511 758 1454 1274

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 7 16 292 138Volume Left 2 7 4 7Volume Right 4 10 14 4cSH 730 643 1454 1274Volume to Capacity 0.01 0.03 0.00 0.01Queue Length 95th (ft) 1 2 0 0Control Delay (s) 10.0 10.7 0.1 0.4Lane LOS A B A AApproach Delay (s) 10.0 10.7 0.1 0.4Approach LOS A B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 25.4% ICU Level of Service AAnalysis Period (min) 15

Page 166: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 30 0 10 5 293 60 25 368 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 33 0 11 5 318 65 27 400 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblockedvC, conflicting volume 638 852 203 627 822 192 405 384vC1, stage 1 conf vol 457 457 362 362vC2, stage 2 conf vol 181 395 265 460vCu, unblocked vol 638 852 203 627 822 192 405 384tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 99 94 100 99 100 98cM capacity (veh/h) 503 460 804 540 473 817 1150 1171

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 43 5 212 171 27 267 139Volume Left 16 33 5 0 0 27 0 0Volume Right 11 11 0 0 65 0 0 5cSH 592 590 1150 1700 1700 1171 1700 1700Volume to Capacity 0.05 0.07 0.00 0.12 0.10 0.02 0.16 0.08Queue Length 95th (ft) 4 6 0 0 0 2 0 0Control Delay (s) 11.4 11.6 8.1 0.0 0.0 8.1 0.0 0.0Lane LOS B B A AApproach Delay (s) 11.4 11.6 0.1 0.5Approach LOS B B

Intersection SummaryAverage Delay 1.2Intersection Capacity Utilization 27.0% ICU Level of Service AAnalysis Period (min) 15

Page 167: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 23 295 221 19 78 63Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 321 240 21 85 68Pedestrians 30 30 30Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 3 3 3Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 291 681 311vC1, stage 1 conf vol 281vC2, stage 2 conf vol 401vCu, unblocked vol 291 681 311tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 98 85 90cM capacity (veh/h) 1239 569 692

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 25 321 261 85 68Volume Left 25 0 0 85 0Volume Right 0 0 21 0 68cSH 1239 1700 1700 569 692Volume to Capacity 0.02 0.19 0.15 0.15 0.10Queue Length 95th (ft) 2 0 0 13 8Control Delay (s) 8.0 0.0 0.0 12.4 10.8Lane LOS A B BApproach Delay (s) 0.6 0.0 11.7Approach LOS B

Intersection SummaryAverage Delay 2.6Intersection Capacity Utilization 35.8% ICU Level of Service AAnalysis Period (min) 15

Page 168: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 46 66 20 298 332 30Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 50 72 22 324 361 33PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 583 197 393vC1, stage 1 conf vol 377vC2, stage 2 conf vol 205vCu, unblocked vol 583 197 393tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 92 91 98cM capacity (veh/h) 603 811 1162

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 50 72 22 162 162 241 153Volume Left 50 0 22 0 0 0 0Volume Right 0 72 0 0 0 0 33cSH 603 811 1162 1700 1700 1700 1700Volume to Capacity 0.08 0.09 0.02 0.10 0.10 0.14 0.09Queue Length 95th (ft) 7 7 1 0 0 0 0Control Delay (s) 11.5 9.9 8.2 0.0 0.0 0.0 0.0Lane LOS B A AApproach Delay (s) 10.5 0.5 0.0Approach LOS B

Intersection SummaryAverage Delay 1.7Intersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

Page 169: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 30 10 247 40 5 390Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 33 11 268 43 5 424PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 513 156 312vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 513 156 312tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 93 99 100cM capacity (veh/h) 489 862 1245

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 43 179 133 5 212 212Volume Left 33 0 0 5 0 0Volume Right 11 0 43 0 0 0cSH 548 1700 1700 1245 1700 1700Volume to Capacity 0.08 0.11 0.08 0.00 0.12 0.12Queue Length 95th (ft) 6 0 0 0 0 0Control Delay (s) 12.1 0.0 0.0 7.9 0.0 0.0Lane LOS B AApproach Delay (s) 12.1 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 20.8% ICU Level of Service AAnalysis Period (min) 15

Page 170: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 252 390 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 274 424 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 574 215 429vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 574 215 429tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 99 100cM capacity (veh/h) 447 790 1127

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 97 183 283 147Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 571 1127 1700 1700 1700Volume to Capacity 0.02 0.00 0.11 0.17 0.09Queue Length 95th (ft) 1 0 0 0 0Control Delay (s) 11.4 0.5 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 11.4 0.2 0.0Approach LOS B

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 20.9% ICU Level of Service AAnalysis Period (min) 15

Page 171: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2016 AM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 45 5 0 5 65 230 40 25 82 110Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 49 5 0 5 71 250 43 27 89 120PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 622 638 149 665 676 272 209 293vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 622 638 149 665 676 272 209 293tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 95 98 100 99 95 98cM capacity (veh/h) 375 366 898 334 348 767 1362 1268

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 65 11 364 236Volume Left 16 5 71 27Volume Right 49 5 43 120cSH 665 465 1362 1268Volume to Capacity 0.10 0.02 0.05 0.02Queue Length 95th (ft) 8 2 4 2Control Delay (s) 11.0 12.9 1.9 1.1Lane LOS B B A AApproach Delay (s) 11.0 12.9 1.9 1.1Approach LOS B B

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 39.7% ICU Level of Service AAnalysis Period (min) 15

Page 172: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 50 644 136 34 633 138 177 95 52 102 182 130Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 276 1176 248 230 1396 624 570 872 741 652 907 767Proportion Arriving On Green 0.39 0.39 0.39 0.39 0.39 0.39 0.47 0.47 0.47 0.47 0.47 0.47Movement Delay, s/veh 24.7 20.0 20.0 26.9 18.5 16.4 18.4 12.3 11.9 14.5 13.2 12.9Movement LOS C B C C B B B B B B B BApproach Volume, veh/h 902 875 352 450Approach Delay, s/veh 20.3 18.5 15.6 13.4Approach LOS C B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 43.00 37.08 43.00 37.08Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.55 4.91 4.55 4.91Maximum Green Setting (Gmax), s 37.50 41.50 37.50 41.50Max. Queue Clearance Time (g_c+l1), s 16.12 18.40 8.75 20.58Green Extension Time (g_e), s 3.56 11.61 3.74 11.01Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.027 0.395 0.006 0.442

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1176.28 751.41 1285.83 673.04

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 2981.45 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 629.22 1638.23 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 192.4 0.0 54.3 0.0 110.9 0.0 37.0Group Sat. Flow (s), veh/h/ln 0.0 1176.3 0.0 751.4 0.0 1285.8 0.0 673.0Queue Serve Time (g_s), s 0.0 9.3 0.0 4.7 0.0 4.3 0.0 3.7Cycle Queue Clear Time (g_c), s 0.0 14.1 0.0 16.4 0.0 6.8 0.0 18.6

Page 173: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1176.3 0.0 751.4 0.0 1285.8 0.0 673.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 37.5 0.0 31.6 0.0 37.5 0.0 31.6Perm LT Serve Time (g_u), s 0.0 32.7 0.0 19.9 0.0 35.0 0.0 16.7Perm LT Que Serve Time (g_ps), s 0.0 9.3 0.0 4.7 0.0 4.3 0.0 3.7Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 569.6 0.0 276.4 0.0 651.9 0.0 230.2Volume-to-Capacity Ratio (X) 0.000 0.338 0.000 0.197 0.000 0.170 0.000 0.161Available Capacity (c_a), veh/h 0.0 569.6 0.0 369.5 0.0 651.9 0.0 313.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 16.8 0.0 24.4 0.0 13.9 0.0 26.5Incremental Delay (d2), s/veh 0.0 1.6 0.0 0.3 0.0 0.6 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 18.4 0.0 24.7 0.0 14.5 0.0 26.9First-Term Queue (Q1), veh/ln 0.0 2.4 0.0 0.8 0.0 1.3 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.3 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.6 0.0 0.8 0.0 1.4 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.67 0.00 0.10 0.00 0.23 0.00 0.09Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 103.3 0.0 437.2 0.0 197.8 0.0 688.0Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 2.5 0.0 14.9 0.0 4.8 0.0 11.7Cycle Queue Clear Time (g_c), s 0.0 2.5 0.0 14.9 0.0 4.8 0.0 11.7Lane Group Capacity (c), veh/h 0.0 872.3 0.0 734.6 0.0 907.1 0.0 1395.8Volume-to-Capacity Ratio (X) 0.000 0.118 0.000 0.595 0.000 0.218 0.000 0.493Available Capacity (c_a), veh/h 0.0 872.3 0.0 965.3 0.0 907.1 0.0 1834.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.0 0.0 19.2 0.0 12.6 0.0 18.2Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.8 0.0 0.6 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.3 0.0 20.0 0.0 13.2 0.0 18.5First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 5.7 0.0 2.0 0.0 4.2Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.2 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.0 0.0 5.8 0.0 2.1 0.0 4.3Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.17 0.00 0.06 0.00 0.08

Page 174: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 56.5 0.0 410.6 0.0 141.3 0.0 150.0Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1747.9 0.0 1638.2 0.0 1583.3Queue Serve Time (g_s), s 0.0 1.6 0.0 14.9 0.0 4.0 0.0 5.1Cycle Queue Clear Time (g_c), s 0.0 1.6 0.0 14.9 0.0 4.0 0.0 5.1Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.360 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 741.4 0.0 689.3 0.0 767.1 0.0 624.4Volume-to-Capacity Ratio (X) 0.000 0.076 0.000 0.596 0.000 0.184 0.000 0.240Available Capacity (c_a), veh/h 0.0 741.4 0.0 905.8 0.0 767.1 0.0 820.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.7 0.0 19.2 0.0 12.4 0.0 16.2Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.8 0.0 0.5 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.9 0.0 20.0 0.0 12.9 0.0 16.4First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 5.3 0.0 1.4 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.2 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 5.5 0.0 1.5 0.0 1.7Percentile Storage Ratio (RQ%) 0.00 0.14 0.00 0.16 0.00 0.25 0.00 0.27Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.8HCM Level of Service B

Page 175: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 10 5 15 0 15 10 264 10 15 377 25Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 11 5 16 0 16 11 287 11 16 410 27PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 786 776 423 781 784 292 437 298vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 786 776 423 781 784 292 437 298tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 97 99 94 100 98 99 99cM capacity (veh/h) 298 321 631 296 318 747 1123 1263

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 22 33 309 453Volume Left 5 16 11 16Volume Right 5 16 11 27cSH 358 424 1123 1263Volume to Capacity 0.06 0.08 0.01 0.01Queue Length 95th (ft) 5 6 1 1Control Delay (s) 15.7 14.2 0.4 0.4Lane LOS C B A AApproach Delay (s) 15.7 14.2 0.4 0.4Approach LOS C B

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 37.4% ICU Level of Service AAnalysis Period (min) 15

Page 176: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 121 441 276 26 413 90 281 214 25 50 159 141Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 314 728 642 292 728 610 514 787 694 510 787 665Proportion Arriving On Green 0.39 0.39 0.39 0.39 0.39 0.39 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 22.9 16.7 13.9 20.6 15.8 11.8 21.7 12.2 10.1 13.9 11.5 11.7Movement LOS C B B C B B C B B B B BApproach Volume, veh/h 911 575 565 380Approach Delay, s/veh 16.7 15.4 17.2 11.9Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 30.40 28.51 30.40 28.51Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.81 4.65 4.81 4.65Maximum Green Setting (Gmax), s 24.90 24.10 24.90 24.10Max. Queue Clearance Time (g_c+l1), s 20.38 20.81 8.80 15.93Green Extension Time (g_e), s 2.02 2.20 4.44 4.59Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 1.000 1.000 0.173 0.749

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1087.63 970.98 1140.69 947.59

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1640.82 1644.14 1573.22 1563.06

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 305.4 0.0 131.5 0.0 54.3 0.0 28.3Group Sat. Flow (s), veh/h/ln 0.0 1087.6 0.0 971.0 0.0 1140.7 0.0 947.6Queue Serve Time (g_s), s 0.0 14.7 0.0 7.4 0.0 1.9 0.0 1.5Cycle Queue Clear Time (g_c), s 0.0 18.4 0.0 18.8 0.0 6.8 0.0 13.9

Page 177: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1087.6 0.0 971.0 0.0 1140.7 0.0 947.6Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 24.9 0.0 23.0 0.0 24.9 0.0 23.0Perm LT Serve Time (g_u), s 0.0 21.2 0.0 11.6 0.0 20.0 0.0 10.6Perm LT Que Serve Time (g_ps), s 0.0 14.7 0.0 7.4 0.0 1.9 0.0 1.5Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 514.2 0.0 313.6 0.0 510.4 0.0 292.2Volume-to-Capacity Ratio (X) 0.000 0.594 0.000 0.419 0.000 0.106 0.000 0.097Available Capacity (c_a), veh/h 0.0 514.2 0.0 331.6 0.0 510.4 0.0 309.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 16.8 0.0 22.0 0.0 13.5 0.0 20.4Incremental Delay (d2), s/veh 0.0 5.0 0.0 0.9 0.0 0.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 21.7 0.0 22.9 0.0 13.9 0.0 20.6First-Term Queue (Q1), veh/ln 0.0 3.0 0.0 1.5 0.0 0.4 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.7 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 3.7 0.0 1.5 0.0 0.5 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.47 0.00 0.19 0.00 0.16 0.00 0.05Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 232.6 0.0 479.3 0.0 172.8 0.0 448.9Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 4.9 0.0 12.4 0.0 3.5 0.0 11.4Cycle Queue Clear Time (g_c), s 0.0 4.9 0.0 12.4 0.0 3.5 0.0 11.4Lane Group Capacity (c), veh/h 0.0 787.4 0.0 727.5 0.0 787.4 0.0 727.5Volume-to-Capacity Ratio (X) 0.000 0.295 0.000 0.659 0.000 0.219 0.000 0.617Available Capacity (c_a), veh/h 0.0 787.4 0.0 762.1 0.0 787.4 0.0 762.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.2 0.0 14.7 0.0 10.8 0.0 14.4Incremental Delay (d2), s/veh 0.0 1.0 0.0 2.0 0.0 0.6 0.0 1.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.2 0.0 16.7 0.0 11.5 0.0 15.8First-Term Queue (Q1), veh/ln 0.0 1.6 0.0 4.1 0.0 1.2 0.0 3.8Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.4 0.0 0.1 0.0 0.3Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.8 0.0 4.5 0.0 1.3 0.0 4.1Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.09 0.00 0.18 0.00 0.07

Page 178: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 27.2 0.0 300.0 0.0 153.3 0.0 97.8Group Sat. Flow (s), veh/h/ln 0.0 1640.8 0.0 1644.1 0.0 1573.2 0.0 1563.1Queue Serve Time (g_s), s 0.0 0.6 0.0 8.0 0.0 3.7 0.0 2.4Cycle Queue Clear Time (g_c), s 0.0 0.6 0.0 8.0 0.0 3.7 0.0 2.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 693.6 0.0 642.2 0.0 665.0 0.0 610.5Volume-to-Capacity Ratio (X) 0.000 0.039 0.000 0.467 0.000 0.230 0.000 0.160Available Capacity (c_a), veh/h 0.0 693.6 0.0 672.6 0.0 665.0 0.0 639.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 13.4 0.0 10.9 0.0 11.7Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.5 0.0 0.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.1 0.0 13.9 0.0 11.7 0.0 11.8First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 2.4 0.0 1.0 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 2.4 0.0 1.2 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.05 0.00 0.16 0.00 0.22Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 15.7HCM Level of Service B

Page 179: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 124 210 110 40 176 94 79 345 20 56 430 127Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.94 0.98 0.99 0.92 0.97 0.91 0.95 0.93Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 472 694 602 471 694 564 433 1492 608 473 1492 619Proportion Arriving On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 15.2 12.3 11.5 14.3 11.9 11.4 14.1 10.4 9.2 12.5 10.8 10.7Movement LOS B B B B B B B B A B B BApproach Volume, veh/h 483 337 483 666Approach Delay, s/veh 12.9 12.1 11.0 11.0Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 28.00 25.37 28.00 25.37Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.89 4.77 4.89 4.77Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 10.47 10.94 8.00 8.14Green Extension Time (g_e), s 5.21 3.65 5.78 3.87Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.422 0.128 0.313 0.075

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 895.19 1120.72 957.27 1179.35

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1442.49 1616.15 1468.78 1514.00

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 85.9 0.0 134.8 0.0 60.9 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 895.2 0.0 1120.7 0.0 957.3 0.0 1179.4Queue Serve Time (g_s), s 0.0 3.8 0.0 5.1 0.0 2.3 0.0 1.5Cycle Queue Clear Time (g_c), s 0.0 8.5 0.0 8.9 0.0 6.0 0.0 6.1

Page 180: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 895.2 0.0 1120.7 0.0 957.3 0.0 1179.4Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 22.5 0.0 19.9 0.0 22.5 0.0 19.9Perm LT Serve Time (g_u), s 0.0 17.8 0.0 16.0 0.0 18.8 0.0 15.2Perm LT Que Serve Time (g_ps), s 0.0 3.8 0.0 5.1 0.0 2.3 0.0 1.5Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 433.5 0.0 471.7 0.0 472.8 0.0 470.7Volume-to-Capacity Ratio (X) 0.000 0.198 0.000 0.286 0.000 0.129 0.000 0.092Available Capacity (c_a), veh/h 0.0 433.5 0.0 610.8 0.0 472.8 0.0 617.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 13.1 0.0 14.8 0.0 11.9 0.0 14.2Incremental Delay (d2), s/veh 0.0 1.0 0.0 0.3 0.0 0.6 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 14.1 0.0 15.2 0.0 12.5 0.0 14.3First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 1.3 0.0 0.4 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.3 0.0 0.5 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.13 0.00 0.31 0.00 0.09 0.00 0.11Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 375.0 0.0 228.3 0.0 467.4 0.0 191.3Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.7 0.0 4.7 0.0 4.7 0.0 3.8Cycle Queue Clear Time (g_c), s 0.0 3.7 0.0 4.7 0.0 4.7 0.0 3.8Lane Group Capacity (c), veh/h 0.0 1492.0 0.0 693.6 0.0 1492.0 0.0 693.6Volume-to-Capacity Ratio (X) 0.000 0.251 0.000 0.329 0.000 0.313 0.000 0.276Available Capacity (c_a), veh/h 0.0 1492.0 0.0 924.9 0.0 1492.0 0.0 924.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 12.0 0.0 10.3 0.0 11.7Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.3 0.0 0.5 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.4 0.0 12.3 0.0 10.8 0.0 11.9First-Term Queue (Q1), veh/ln 0.0 1.1 0.0 1.7 0.0 1.4 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.2 0.0 1.7 0.0 1.5 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.10 0.00 0.05 0.00 0.12 0.00 0.03

Page 181: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 21.7 0.0 119.6 0.0 138.0 0.0 102.2Group Sat. Flow (s), veh/h/ln 0.0 1442.5 0.0 1616.2 0.0 1468.8 0.0 1514.0Queue Serve Time (g_s), s 0.0 0.5 0.0 2.7 0.0 3.2 0.0 2.4Cycle Queue Clear Time (g_c), s 0.0 0.5 0.0 2.7 0.0 3.2 0.0 2.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 608.1 0.0 601.8 0.0 619.2 0.0 563.7Volume-to-Capacity Ratio (X) 0.000 0.036 0.000 0.199 0.000 0.223 0.000 0.181Available Capacity (c_a), veh/h 0.0 608.1 0.0 802.4 0.0 619.2 0.0 751.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.1 0.0 11.4 0.0 9.9 0.0 11.3Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.2 0.0 0.8 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.2 0.0 11.5 0.0 10.7 0.0 11.4First-Term Queue (Q1), veh/ln 0.0 0.1 0.0 0.8 0.0 0.8 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.1 0.0 0.9 0.0 0.9 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.20 0.00 0.17 0.00 0.21Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.6HCM Level of Service B

Page 182: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 71 306 70 127 290 55 100 199 87 50 223 132Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 333 76 138 315 60 109 216 95 54 242 143

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 77 409 138 375 325 95 297 143Volume Left (vph) 77 0 138 0 109 0 54 0Volume Right (vph) 0 76 0 60 0 95 0 143Hadj (s) 0.53 -0.10 0.53 -0.08 0.20 -0.67 0.13 -0.67Departure Headway (s) 9.2 8.6 9.3 8.6 9.1 8.2 9.1 8.3Degree Utilization, x 0.20 0.98 0.36 0.90 0.82 0.22 0.75 0.33Capacity (veh/h) 380 409 383 404 392 429 389 428Control Delay (s) 13.3 66.8 16.1 51.4 41.4 12.3 33.2 14.1Approach Delay (s) 58.3 41.9 34.8 27.0Approach LOS F E D D

Intersection SummaryDelay 41.1HCM Level of Service EIntersection Capacity Utilization 71.5% ICU Level of Service CAnalysis Period (min) 15

Page 183: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 55 0 55 25 510 10 40 581 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 60 0 60 27 554 11 43 632 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 1112 1341 318 1028 1338 283 637 565vC1, stage 1 conf vol 721 721 614 614vC2, stage 2 conf vol 391 620 414 724vCu, unblocked vol 1112 1341 318 1028 1338 283 637 565tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 95 100 98 84 100 92 97 96cM capacity (veh/h) 315 316 677 363 317 714 943 1003

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 120 27 370 196 43 421 216Volume Left 16 60 27 0 0 43 0 0Volume Right 11 60 0 0 11 0 0 5cSH 401 481 943 1700 1700 1003 1700 1700Volume to Capacity 0.07 0.25 0.03 0.22 0.12 0.04 0.25 0.13Queue Length 95th (ft) 5 24 2 0 0 3 0 0Control Delay (s) 14.6 14.9 8.9 0.0 0.0 8.8 0.0 0.0Lane LOS B B A AApproach Delay (s) 14.6 14.9 0.4 0.6Approach LOS B B

Intersection SummaryAverage Delay 2.0Intersection Capacity Utilization 36.8% ICU Level of Service AAnalysis Period (min) 15

Page 184: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 5 5 0 5 5 274 46 32 395 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 5 5 0 5 5 298 50 35 429 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 841 860 432 841 838 323 435 348vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 841 860 432 841 838 323 435 348tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 98 100 99 98 100 99 100 97cM capacity (veh/h) 275 284 623 275 292 718 1125 1211

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 11 11 353 470Volume Left 5 5 5 35Volume Right 5 5 50 5cSH 382 398 1125 1211Volume to Capacity 0.03 0.03 0.00 0.03Queue Length 95th (ft) 2 2 0 2Control Delay (s) 14.7 14.3 0.2 0.9Lane LOS B B A AApproach Delay (s) 14.7 14.3 0.2 0.9Approach LOS B B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 49.6% ICU Level of Service AAnalysis Period (min) 15

Page 185: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 5 0 5 10 538 15 15 598 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 5 0 5 11 585 16 16 650 16PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 0.96 0.96 0.96 0.96 0.96 0.96vC, conflicting volume 1010 1314 333 983 1314 301 666 601vC1, stage 1 conf vol 691 691 615 615vC2, stage 2 conf vol 320 623 368 699vCu, unblocked vol 933 1248 333 905 1248 196 666 508tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 98 99 100 99 99 98cM capacity (veh/h) 368 350 663 411 349 782 919 1014

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 11 390 211 16 433 233Volume Left 16 5 11 0 0 16 0 0Volume Right 11 5 0 0 16 0 0 16cSH 448 539 919 1700 1700 1014 1700 1700Volume to Capacity 0.06 0.02 0.01 0.23 0.12 0.02 0.25 0.14Queue Length 95th (ft) 5 2 1 0 0 1 0 0Control Delay (s) 13.6 11.8 9.0 0.0 0.0 8.6 0.0 0.0Lane LOS B B A AApproach Delay (s) 13.6 11.8 0.2 0.2Approach LOS B B

Intersection SummaryAverage Delay 0.6Intersection Capacity Utilization 27.0% ICU Level of Service AAnalysis Period (min) 15

Page 186: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 68 375 388 73 79 84Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 74 408 422 79 86 91Pedestrians 43 43 43Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 4 5 4Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 544 1103 547vC1, stage 1 conf vol 504vC2, stage 2 conf vol 598vCu, unblocked vol 544 1103 547tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 93 79 82cM capacity (veh/h) 988 406 497

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 74 408 501 86 91Volume Left 74 0 0 86 0Volume Right 0 0 79 0 91cSH 988 1700 1700 406 497Volume to Capacity 0.07 0.24 0.29 0.21 0.18Queue Length 95th (ft) 6 0 0 20 17Control Delay (s) 8.9 0.0 0.0 16.2 13.9Lane LOS A C BApproach Delay (s) 1.4 0.0 15.0Approach LOS C

Intersection SummaryAverage Delay 2.9Intersection Capacity Utilization 50.4% ICU Level of Service AAnalysis Period (min) 15

Page 187: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 71 69 84 474 559 87Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 75 91 515 608 95Pedestrians 438Lane Width (ft) 12.0Walking Speed (ft/s) 4.0Percent Blockage 36Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 1533 789 1140vC1, stage 1 conf vol 1093vC2, stage 2 conf vol 440vCu, unblocked vol 1533 789 1140tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 54 65 76cM capacity (veh/h) 167 212 386

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 77 75 91 258 258 405 297Volume Left 77 0 91 0 0 0 0Volume Right 0 75 0 0 0 0 95cSH 167 212 386 1700 1700 1700 1700Volume to Capacity 0.46 0.35 0.24 0.15 0.15 0.24 0.17Queue Length 95th (ft) 54 38 23 0 0 0 0Control Delay (s) 43.8 31.0 17.2 0.0 0.0 0.0 0.0Lane LOS E D CApproach Delay (s) 37.5 2.6 0.0Approach LOS E

Intersection SummaryAverage Delay 5.0Intersection Capacity Utilization 36.8% ICU Level of Service AAnalysis Period (min) 15

Page 188: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 15 45 570 5 5 616Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 49 620 5 5 670PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 968 312 625vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 968 312 625tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 93 93 99cM capacity (veh/h) 250 683 952

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 65 413 212 5 335 335Volume Left 16 0 0 5 0 0Volume Right 49 0 5 0 0 0cSH 477 1700 1700 952 1700 1700Volume to Capacity 0.14 0.24 0.12 0.01 0.20 0.20Queue Length 95th (ft) 12 0 0 0 0 0Control Delay (s) 13.7 0.0 0.0 8.8 0.0 0.0Lane LOS B AApproach Delay (s) 13.7 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 27.3% ICU Level of Service AAnalysis Period (min) 15

Page 189: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 610 616 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 663 670 5Pedestrians 559Lane Width (ft) 16.0Walking Speed (ft/s) 4.0Percent Blockage 62Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 1574 896 1234vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1574 896 1234tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 85 95 97cM capacity (veh/h) 37 107 212

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 226 442 446 229Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 55 212 1700 1700 1700Volume to Capacity 0.20 0.03 0.26 0.26 0.13Queue Length 95th (ft) 16 2 0 0 0Control Delay (s) 85.5 1.2 0.0 0.0 0.0Lane LOS F AApproach Delay (s) 85.5 0.4 0.0Approach LOS F

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 190: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2016 PM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 30 15 0 25 5 259 5 5 332 25Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 33 16 0 27 5 282 5 5 361 27PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 708 683 374 713 694 284 388 287vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 708 683 374 713 694 284 388 287tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 95 95 100 96 100 100cM capacity (veh/h) 335 368 672 328 363 755 1170 1275

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 43 43 292 393Volume Left 11 16 5 5Volume Right 33 27 5 27cSH 537 507 1170 1275Volume to Capacity 0.08 0.09 0.00 0.00Queue Length 95th (ft) 7 7 0 0Control Delay (s) 12.3 12.8 0.2 0.2Lane LOS B B A AApproach Delay (s) 12.3 12.8 0.2 0.2Approach LOS B B

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 32.0% ICU Level of Service AAnalysis Period (min) 15

Page 191: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 889 83 92 602 74 125 148 32 51 82 20Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 420 1785 167 279 1883 839 477 616 522 415 641 543Proportion Arriving On Green 0.53 0.53 0.53 0.53 0.53 0.53 0.33 0.33 0.33 0.33 0.33 0.33Movement Delay, s/veh 14.9 12.8 12.8 21.9 10.9 9.3 23.5 20.7 18.6 23.2 19.3 18.3Movement LOS B B B C B A C C B C B BApproach Volume, veh/h 1133 835 332 166Approach Delay, s/veh 12.9 12.0 21.6 20.4Approach LOS B B C C

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 32.00 48.12 32.00 48.12Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.65 5.04 4.65 5.04Maximum Green Setting (Gmax), s 26.50 52.50 26.50 52.50Max. Queue Clearance Time (g_c+l1), s 11.15 17.17 9.87 28.79Green Extension Time (g_e), s 1.99 17.12 2.05 13.83Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.031 0.338 0.020 0.512

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1298.57 774.77 1217.31 553.13

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 3355.57 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1577.59 313.25 1640.69 1577.38

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 135.9 0.0 76.1 0.0 55.4 0.0 100.0Group Sat. Flow (s), veh/h/ln 0.0 1298.6 0.0 774.8 0.0 1217.3 0.0 553.1Queue Serve Time (g_s), s 0.0 6.6 0.0 5.0 0.0 2.8 0.0 11.6Cycle Queue Clear Time (g_c), s 0.0 9.2 0.0 13.5 0.0 7.9 0.0 26.8

Page 192: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1298.6 0.0 774.8 0.0 1217.3 0.0 553.1Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 26.5 0.0 42.6 0.0 26.5 0.0 42.6Perm LT Serve Time (g_u), s 0.0 23.9 0.0 34.1 0.0 21.4 0.0 27.5Perm LT Que Serve Time (g_ps), s 0.0 6.6 0.0 5.0 0.0 2.8 0.0 11.6Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 477.5 0.0 419.8 0.0 415.5 0.0 279.4Volume-to-Capacity Ratio (X) 0.000 0.285 0.000 0.181 0.000 0.133 0.000 0.358Available Capacity (c_a), veh/h 0.0 477.5 0.0 515.3 0.0 415.5 0.0 347.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 22.0 0.0 14.6 0.0 22.5 0.0 21.1Incremental Delay (d2), s/veh 0.0 1.5 0.0 0.2 0.0 0.7 0.0 0.8Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 23.5 0.0 14.9 0.0 23.2 0.0 21.9First-Term Queue (Q1), veh/ln 0.0 2.1 0.0 0.9 0.0 0.8 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.0 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.3 0.0 0.9 0.0 0.9 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.59 0.00 0.11 0.00 0.15 0.00 0.22Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 160.9 0.0 536.4 0.0 89.1 0.0 654.3Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 5.1 0.0 15.2 0.0 2.6 0.0 8.5Cycle Queue Clear Time (g_c), s 0.0 5.1 0.0 15.2 0.0 2.6 0.0 8.5Lane Group Capacity (c), veh/h 0.0 616.1 0.0 990.9 0.0 640.8 0.0 1882.7Volume-to-Capacity Ratio (X) 0.000 0.261 0.000 0.541 0.000 0.139 0.000 0.348Available Capacity (c_a), veh/h 0.0 616.1 0.0 1220.6 0.0 640.8 0.0 2319.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 19.6 0.0 12.3 0.0 18.8 0.0 10.8Incremental Delay (d2), s/veh 0.0 1.0 0.0 0.5 0.0 0.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 20.7 0.0 12.8 0.0 19.3 0.0 10.9First-Term Queue (Q1), veh/ln 0.0 2.1 0.0 5.2 0.0 1.1 0.0 2.8Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.3 0.0 5.3 0.0 1.2 0.0 2.8Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.16 0.00 0.03 0.00 0.05

Page 193: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 34.8 0.0 520.2 0.0 21.7 0.0 80.4Group Sat. Flow (s), veh/h/ln 0.0 1577.6 0.0 1806.1 0.0 1640.7 0.0 1577.4Queue Serve Time (g_s), s 0.0 1.2 0.0 15.2 0.0 0.7 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 15.2 0.0 0.7 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.173 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 521.8 0.0 960.7 0.0 542.7 0.0 839.1Volume-to-Capacity Ratio (X) 0.000 0.067 0.000 0.541 0.000 0.040 0.000 0.096Available Capacity (c_a), veh/h 0.0 521.8 0.0 1183.5 0.0 542.7 0.0 1033.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 18.3 0.0 12.3 0.0 18.2 0.0 9.2Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.5 0.0 0.1 0.0 0.0Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 18.6 0.0 12.8 0.0 18.3 0.0 9.3First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 5.0 0.0 0.3 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 5.1 0.0 0.3 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.12 0.00 0.15 0.00 0.05 0.00 0.09Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 14.3HCM Level of Service B

Page 194: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 25 5 40 15 5 5 20 405 5 5 142 10Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 5 43 16 5 5 22 440 5 5 154 11PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 665 660 160 703 662 443 165 446vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 665 660 160 703 662 443 165 446tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 92 99 95 95 99 99 98 100cM capacity (veh/h) 360 376 885 326 374 615 1413 1115

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 76 27 467 171Volume Left 27 16 22 5Volume Right 43 5 5 11cSH 547 370 1413 1115Volume to Capacity 0.14 0.07 0.02 0.00Queue Length 95th (ft) 12 6 1 0Control Delay (s) 12.6 15.5 0.5 0.3Lane LOS B C A AApproach Delay (s) 12.6 15.5 0.5 0.3Approach LOS B C

Intersection SummaryAverage Delay 2.3Intersection Capacity Utilization 41.2% ICU Level of Service AAnalysis Period (min) 15

Page 195: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 70 592 210 32 411 80 176 130 28 180 403 141Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 0.99 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 348 776 681 210 776 656 358 740 647 550 1051 364Proportion Arriving On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.40 0.40 0.40 0.40 0.40 0.40Movement Delay, s/veh 19.2 22.5 12.0 24.9 14.2 10.7 25.6 12.2 11.1 16.7 14.6 14.8Movement LOS B C B C B B C B B B B BApproach Volume, veh/h 948 568 363 787Approach Delay, s/veh 19.7 14.3 19.2 15.2Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 29.00 30.13 29.00 30.13Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.92 4.73 4.92 4.73Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 21.50 20.21 12.21 22.56Green Extension Time (g_e), s 1.21 3.45 4.75 2.07Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 1.000 0.960 0.489 1.000

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 854.25 975.14 1231.74 813.49

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 2644.79 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1628.02 1633.62 916.51 1573.83

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 191.3 0.0 76.1 0.0 195.7 0.0 34.8Group Sat. Flow (s), veh/h/ln 0.0 854.3 0.0 975.1 0.0 1231.7 0.0 813.5Queue Serve Time (g_s), s 0.0 12.3 0.0 3.8 0.0 7.3 0.0 2.4Cycle Queue Clear Time (g_c), s 0.0 19.5 0.0 14.7 0.0 10.2 0.0 20.6

Page 196: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 854.3 0.0 975.1 0.0 1231.7 0.0 813.5Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 24.6 0.0 23.5 0.0 24.6Perm LT Serve Time (g_u), s 0.0 16.3 0.0 13.7 0.0 20.6 0.0 6.4Perm LT Que Serve Time (g_ps), s 0.0 12.3 0.0 3.8 0.0 7.3 0.0 2.4Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 357.9 0.0 348.5 0.0 550.3 0.0 210.2Volume-to-Capacity Ratio (X) 0.000 0.535 0.000 0.218 0.000 0.356 0.000 0.165Available Capacity (c_a), veh/h 0.0 357.9 0.0 362.8 0.0 550.3 0.0 222.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 19.9 0.0 18.9 0.0 14.9 0.0 24.5Incremental Delay (d2), s/veh 0.0 5.6 0.0 0.3 0.0 1.8 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 25.6 0.0 19.2 0.0 16.7 0.0 24.9First-Term Queue (Q1), veh/ln 0.0 2.1 0.0 0.7 0.0 2.0 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.6 0.0 0.0 0.0 0.3 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.7 0.0 0.8 0.0 2.3 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.34 0.00 0.10 0.00 0.72 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 141.3 0.0 643.5 0.0 307.3 0.0 446.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.9 0.0 18.2 0.0 7.0 0.0 10.9Cycle Queue Clear Time (g_c), s 0.0 2.9 0.0 18.2 0.0 7.0 0.0 10.9Lane Group Capacity (c), veh/h 0.0 740.3 0.0 776.0 0.0 740.3 0.0 776.0Volume-to-Capacity Ratio (X) 0.000 0.191 0.000 0.829 0.000 0.415 0.000 0.576Available Capacity (c_a), veh/h 0.0 740.3 0.0 803.3 0.0 740.3 0.0 803.3Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.6 0.0 15.4 0.0 12.9 0.0 13.2Incremental Delay (d2), s/veh 0.0 0.6 0.0 7.1 0.0 1.7 0.0 1.0Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.2 0.0 22.5 0.0 14.6 0.0 14.2First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 5.9 0.0 2.4 0.0 3.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 1.5 0.0 0.4 0.0 0.2Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 7.4 0.0 2.8 0.0 3.7Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.14 0.00 0.38 0.00 0.07

Page 197: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 30.4 0.0 228.3 0.0 284.0 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 1628.0 0.0 1633.6 0.0 1698.6 0.0 1573.8Queue Serve Time (g_s), s 0.0 0.7 0.0 5.6 0.0 7.2 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 0.7 0.0 5.6 0.0 7.2 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 0.540 0.000 1.000Lane Group Capacity (c), veh/h 0.0 647.0 0.0 680.5 0.0 675.0 0.0 655.6Volume-to-Capacity Ratio (X) 0.000 0.047 0.000 0.335 0.000 0.421 0.000 0.133Available Capacity (c_a), veh/h 0.0 647.0 0.0 704.5 0.0 675.0 0.0 678.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.9 0.0 11.7 0.0 12.9 0.0 10.7Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.3 0.0 1.9 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.1 0.0 12.0 0.0 14.8 0.0 10.7First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 1.6 0.0 2.2 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.4 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.7 0.0 2.6 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.03 0.00 0.36 0.00 0.18Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 17.1HCM Level of Service B

Page 198: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 123 190 200 80 181 84 64 251 50 102 334 85Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.97 0.96 0.97 0.96 0.97 0.91 0.94 0.94Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 486 701 593 491 701 594 479 1460 595 516 1460 617Proportion Arriving On Green 0.38 0.38 0.38 0.38 0.38 0.38 0.41 0.41 0.41 0.41 0.41 0.41Movement Delay, s/veh 14.6 11.6 12.1 14.0 11.5 10.9 12.7 10.0 9.7 12.8 10.4 10.1Movement LOS B B B B B B B B A B B BApproach Volume, veh/h 558 375 397 566Approach Delay, s/veh 12.5 12.0 10.4 10.8Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 27.00 25.12 27.00 25.12Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.81 4.66 4.81 4.66Maximum Green Setting (Gmax), s 21.50 27.50 21.50 27.50Max. Queue Clearance Time (g_c+l1), s 8.09 10.63 8.52 8.95Green Extension Time (g_e), s 4.45 4.14 4.37 4.27Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.250 0.124 0.268 0.093

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 986.16 1147.50 1039.92 1182.19

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1441.32 1575.80 1495.06 1578.42

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 69.6 0.0 133.7 0.0 110.9 0.0 87.0Group Sat. Flow (s), veh/h/ln 0.0 986.2 0.0 1147.5 0.0 1039.9 0.0 1182.2Queue Serve Time (g_s), s 0.0 2.6 0.0 4.8 0.0 4.0 0.0 2.9Cycle Queue Clear Time (g_c), s 0.0 6.1 0.0 8.6 0.0 6.5 0.0 7.0

Page 199: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 986.2 0.0 1147.5 0.0 1039.9 0.0 1182.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 21.5 0.0 19.6 0.0 21.5 0.0 19.6Perm LT Serve Time (g_u), s 0.0 18.0 0.0 15.8 0.0 18.9 0.0 15.6Perm LT Que Serve Time (g_ps), s 0.0 2.6 0.0 4.8 0.0 4.0 0.0 2.9Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 478.7 0.0 485.6 0.0 516.1 0.0 491.2Volume-to-Capacity Ratio (X) 0.000 0.145 0.000 0.275 0.000 0.215 0.000 0.177Available Capacity (c_a), veh/h 0.0 478.7 0.0 659.1 0.0 516.1 0.0 670.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.0 0.0 14.3 0.0 11.8 0.0 13.8Incremental Delay (d2), s/veh 0.0 0.6 0.0 0.3 0.0 1.0 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.7 0.0 14.6 0.0 12.8 0.0 14.0First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 1.2 0.0 0.8 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 1.3 0.0 0.9 0.0 0.8Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.29 0.00 0.17 0.00 0.21Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 272.8 0.0 206.5 0.0 363.0 0.0 196.7Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.6 0.0 4.1 0.0 3.5 0.0 3.8Cycle Queue Clear Time (g_c), s 0.0 2.6 0.0 4.1 0.0 3.5 0.0 3.8Lane Group Capacity (c), veh/h 0.0 1460.0 0.0 701.2 0.0 1460.0 0.0 701.2Volume-to-Capacity Ratio (X) 0.000 0.187 0.000 0.295 0.000 0.249 0.000 0.281Available Capacity (c_a), veh/h 0.0 1460.0 0.0 982.9 0.0 1460.0 0.0 982.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.7 0.0 11.4 0.0 10.0 0.0 11.3Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.4 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.0 0.0 11.6 0.0 10.4 0.0 11.5First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 1.4 0.0 1.0 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.5 0.0 1.1 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.04 0.00 0.09 0.00 0.03

Page 200: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 54.3 0.0 217.4 0.0 92.4 0.0 91.3Group Sat. Flow (s), veh/h/ln 0.0 1441.3 0.0 1575.8 0.0 1495.1 0.0 1578.4Queue Serve Time (g_s), s 0.0 1.2 0.0 5.2 0.0 2.0 0.0 2.0Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 5.2 0.0 2.0 0.0 2.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 594.6 0.0 593.2 0.0 616.7 0.0 594.1Volume-to-Capacity Ratio (X) 0.000 0.091 0.000 0.366 0.000 0.150 0.000 0.154Available Capacity (c_a), veh/h 0.0 594.6 0.0 831.5 0.0 616.7 0.0 832.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.3 0.0 11.8 0.0 9.6 0.0 10.8Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.4 0.0 0.5 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.7 0.0 12.1 0.0 10.1 0.0 10.9First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 1.5 0.0 0.5 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 1.6 0.0 0.6 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.11 0.00 0.37 0.00 0.11 0.00 0.17Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.5HCM Level of Service B

Page 201: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 11

Intersection has too many lanes per leg.HCM All-Way analysis is limited to two lanes per leg.Channelized right turn lanes are not counted.

Page 202: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 15 10 0 10 15 359 70 25 490 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 16 11 0 11 16 390 76 27 533 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 828 1089 269 798 1053 233 538 466vC1, stage 1 conf vol 590 590 461 461vC2, stage 2 conf vol 239 499 337 592vCu, unblocked vol 828 1089 269 798 1053 233 538 466tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 97 100 98 98 100 99 98 98cM capacity (veh/h) 415 388 729 455 395 769 1026 1091

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 22 16 260 206 27 355 183Volume Left 11 11 16 0 0 27 0 0Volume Right 16 11 0 0 76 0 0 5cSH 560 572 1026 1700 1700 1091 1700 1700Volume to Capacity 0.05 0.04 0.02 0.15 0.12 0.02 0.21 0.11Queue Length 95th (ft) 4 3 1 0 0 2 0 0Control Delay (s) 11.8 11.5 8.6 0.0 0.0 8.4 0.0 0.0Lane LOS B B A AApproach Delay (s) 11.8 11.5 0.3 0.4Approach LOS B B

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 30.4% ICU Level of Service AAnalysis Period (min) 15

Page 203: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 5 0 4 6 0 9 5 381 13 6 157 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 0 4 7 0 10 5 414 14 7 171 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 628 626 173 623 621 421 176 428vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 628 626 173 623 621 421 176 428tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 99 100 100 98 100 98 100 99cM capacity (veh/h) 386 397 870 394 399 632 1400 1131

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 10 16 434 183Volume Left 5 7 5 7Volume Right 4 10 14 5cSH 513 509 1400 1131Volume to Capacity 0.02 0.03 0.00 0.01Queue Length 95th (ft) 1 2 0 0Control Delay (s) 12.2 12.3 0.1 0.3Lane LOS B B A AApproach Delay (s) 12.2 12.3 0.1 0.3Approach LOS B B

Intersection SummaryAverage Delay 0.7Intersection Capacity Utilization 32.8% ICU Level of Service AAnalysis Period (min) 15

Page 204: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 30 0 10 5 393 60 25 481 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 33 0 11 5 427 65 27 523 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 1.00 1.00 1.00 1.00 1.00 1.00vC, conflicting volume 815 1083 264 797 1053 246 528 492vC1, stage 1 conf vol 580 580 471 471vC2, stage 2 conf vol 235 503 327 583vCu, unblocked vol 807 1076 264 789 1046 236 528 483tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 96 100 99 93 100 99 99 97cM capacity (veh/h) 423 393 734 465 404 763 1035 1072

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 43 5 285 208 27 349 180Volume Left 16 33 5 0 0 27 0 0Volume Right 11 11 0 0 65 0 0 5cSH 509 515 1035 1700 1700 1072 1700 1700Volume to Capacity 0.05 0.08 0.01 0.17 0.12 0.03 0.21 0.11Queue Length 95th (ft) 4 7 0 0 0 2 0 0Control Delay (s) 12.5 12.6 8.5 0.0 0.0 8.4 0.0 0.0Lane LOS B B A AApproach Delay (s) 12.5 12.6 0.1 0.4Approach LOS B B

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 30.1% ICU Level of Service AAnalysis Period (min) 15

Page 205: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 23 335 291 19 78 63Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 25 364 316 21 85 68Pedestrians 30 30 30Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 3 3 3Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 367 801 387vC1, stage 1 conf vol 357vC2, stage 2 conf vol 444vCu, unblocked vol 367 801 387tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 98 84 89cM capacity (veh/h) 1162 526 627

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 25 364 337 85 68Volume Left 25 0 0 85 0Volume Right 0 0 21 0 68cSH 1162 1700 1700 526 627Volume to Capacity 0.02 0.21 0.20 0.16 0.11Queue Length 95th (ft) 2 0 0 14 9Control Delay (s) 8.2 0.0 0.0 13.2 11.4Lane LOS A B BApproach Delay (s) 0.5 0.0 12.4Approach LOS B

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 35.8% ICU Level of Service AAnalysis Period (min) 15

Page 206: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 46 66 20 398 485 30Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 50 72 22 433 527 33PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 803 280 560vC1, stage 1 conf vol 543vC2, stage 2 conf vol 260vCu, unblocked vol 803 280 560tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 90 90 98cM capacity (veh/h) 497 717 1007

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 50 72 22 216 216 351 208Volume Left 50 0 22 0 0 0 0Volume Right 0 72 0 0 0 0 33cSH 497 717 1007 1700 1700 1700 1700Volume to Capacity 0.10 0.10 0.02 0.13 0.13 0.21 0.12Queue Length 95th (ft) 8 8 2 0 0 0 0Control Delay (s) 13.1 10.6 8.7 0.0 0.0 0.0 0.0Lane LOS B B AApproach Delay (s) 11.6 0.4 0.0Approach LOS B

Intersection SummaryAverage Delay 1.4Intersection Capacity Utilization 26.6% ICU Level of Service AAnalysis Period (min) 15

Page 207: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 40 10 309 55 5 475Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 43 11 336 60 5 516PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 635 198 396vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 635 198 396tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 89 99 100cM capacity (veh/h) 409 810 1159

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 54 224 172 5 258 258Volume Left 43 0 0 5 0 0Volume Right 11 0 60 0 0 0cSH 454 1700 1700 1159 1700 1700Volume to Capacity 0.12 0.13 0.10 0.00 0.15 0.15Queue Length 95th (ft) 10 0 0 0 0 0Control Delay (s) 14.0 0.0 0.0 8.1 0.0 0.0Lane LOS B AApproach Delay (s) 14.0 0.0 0.1Approach LOS B

Intersection SummaryAverage Delay 0.8Intersection Capacity Utilization 23.1% ICU Level of Service AAnalysis Period (min) 15

Page 208: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 319 475 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 347 516 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 703 261 522vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 703 261 522tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 99 99 99cM capacity (veh/h) 370 738 1041

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 121 231 344 178Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 493 1041 1700 1700 1700Volume to Capacity 0.02 0.01 0.14 0.20 0.10Queue Length 95th (ft) 2 0 0 0 0Control Delay (s) 12.5 0.4 0.0 0.0 0.0Lane LOS B AApproach Delay (s) 12.5 0.1 0.0Approach LOS B

Intersection SummaryAverage Delay 0.2Intersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15

Page 209: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2035 AM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 25 0 60 5 0 5 95 315 40 35 112 160Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 0 65 5 0 5 103 342 43 38 122 174PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblockedvC, conflicting volume 861 877 209 921 942 364 296 386vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 861 877 209 921 942 364 296 386tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 89 100 92 97 100 99 92 97cM capacity (veh/h) 250 255 832 212 234 681 1266 1173

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 92 11 489 334Volume Left 27 5 103 38Volume Right 65 5 43 174cSH 494 323 1266 1173Volume to Capacity 0.19 0.03 0.08 0.03Queue Length 95th (ft) 17 3 7 3Control Delay (s) 14.0 16.5 2.4 1.2Lane LOS B C A AApproach Delay (s) 14.0 16.5 2.4 1.2Approach LOS B C

Intersection SummaryAverage Delay 3.3Intersection Capacity Utilization 53.1% ICU Level of Service AAnalysis Period (min) 15

Page 210: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 80 854 186 44 893 198 257 155 82 142 282 190Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1937 1863 1863 1863 1863 1863 1863 1937 1937Lanes 1 2 0 1 2 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 208 1287 280 171 1537 688 441 824 701 550 857 725Proportion Arriving On Green 0.43 0.43 0.43 0.43 0.43 0.43 0.44 0.44 0.44 0.44 0.44 0.44Movement Delay, s/veh 33.3 23.8 24.1 34.3 20.5 16.8 33.3 15.8 15.1 20.5 17.6 16.9Movement LOS C C C C C B C B B C B BApproach Volume, veh/h 1217 1234 537 667Approach Delay, s/veh 24.6 20.4 24.8 18.1Approach LOS C C C B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 6.0 5.0 5.0Phase Duration (G+Y+Rc), s 45.00 44.27 45.00 44.27Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.67 4.99 4.67 4.99Maximum Green Setting (Gmax), s 39.50 39.50 39.50 39.50Max. Queue Clearance Time (g_c+l1), s 32.35 33.44 14.94 32.59Green Extension Time (g_e), s 3.41 5.34 6.28 6.02Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.743 0.979 0.093 0.962

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1066.23 576.77 1211.88 515.81

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 2963.44 1937.25 3539.22

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 644.76 1637.73 1583.33

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 279.3 0.0 87.0 0.0 154.3 0.0 47.8Group Sat. Flow (s), veh/h/ln 0.0 1066.2 0.0 576.8 0.0 1211.9 0.0 515.8Queue Serve Time (g_s), s 0.0 21.0 0.0 12.4 0.0 8.0 0.0 7.5Cycle Queue Clear Time (g_c), s 0.0 30.3 0.0 31.4 0.0 12.9 0.0 30.6

Page 211: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 2

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1066.2 0.0 576.8 0.0 1211.9 0.0 515.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 39.5 0.0 38.8 0.0 39.5 0.0 38.8Perm LT Serve Time (g_u), s 0.0 30.1 0.0 19.7 0.0 34.6 0.0 15.7Perm LT Que Serve Time (g_ps), s 0.0 21.0 0.0 12.4 0.0 8.0 0.0 7.5Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 440.7 0.0 207.9 0.0 549.7 0.0 171.4Volume-to-Capacity Ratio (X) 0.000 0.634 0.000 0.418 0.000 0.281 0.000 0.279Available Capacity (c_a), veh/h 0.0 440.7 0.0 212.6 0.0 549.7 0.0 175.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 26.5 0.0 31.9 0.0 19.2 0.0 33.4Incremental Delay (d2), s/veh 0.0 6.8 0.0 1.3 0.0 1.3 0.0 0.9Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 33.3 0.0 33.3 0.0 20.5 0.0 34.3First-Term Queue (Q1), veh/ln 0.0 5.1 0.0 1.6 0.0 2.2 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.8 0.0 0.1 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 6.0 0.0 1.7 0.0 2.4 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 1.51 0.00 0.21 0.00 0.40 0.00 0.15Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 2Group Volume (v), veh/h 0.0 168.5 0.0 583.1 0.0 306.5 0.0 970.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1937.3 0.0 1769.6Queue Serve Time (g_s), s 0.0 4.9 0.0 23.0 0.0 9.4 0.0 19.1Cycle Queue Clear Time (g_c), s 0.0 4.9 0.0 23.0 0.0 9.4 0.0 19.1Lane Group Capacity (c), veh/h 0.0 824.2 0.0 809.0 0.0 857.2 0.0 1537.1Volume-to-Capacity Ratio (X) 0.000 0.204 0.000 0.721 0.000 0.358 0.000 0.631Available Capacity (c_a), veh/h 0.0 824.2 0.0 824.2 0.0 857.2 0.0 1566.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 15.3 0.0 20.8 0.0 16.5 0.0 19.7Incremental Delay (d2), s/veh 0.0 0.6 0.0 3.0 0.0 1.2 0.0 0.8Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.8 0.0 23.8 0.0 17.6 0.0 20.5First-Term Queue (Q1), veh/ln 0.0 2.0 0.0 8.9 0.0 4.0 0.0 7.0Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.7 0.0 0.3 0.0 0.2Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.2 0.0 9.6 0.0 4.3 0.0 7.2Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.28 0.00 0.12 0.00 0.13

Page 212: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis3: 600 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 3

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R T+R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 89.1 0.0 547.3 0.0 206.5 0.0 215.2Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1745.5 0.0 1637.7 0.0 1583.3Queue Serve Time (g_s), s 0.0 3.0 0.0 23.1 0.0 7.2 0.0 7.9Cycle Queue Clear Time (g_c), s 0.0 3.0 0.0 23.1 0.0 7.2 0.0 7.9Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 0.369 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 700.6 0.0 758.1 0.0 724.6 0.0 687.7Volume-to-Capacity Ratio (X) 0.000 0.127 0.000 0.722 0.000 0.285 0.000 0.313Available Capacity (c_a), veh/h 0.0 700.6 0.0 772.3 0.0 724.6 0.0 700.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 14.7 0.0 20.8 0.0 15.9 0.0 16.5Incremental Delay (d2), s/veh 0.0 0.4 0.0 3.3 0.0 1.0 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.1 0.0 24.1 0.0 16.9 0.0 16.8First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 8.3 0.0 2.6 0.0 2.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.7 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 9.0 0.0 2.8 0.0 2.7Percentile Storage Ratio (RQ%) 0.00 0.28 0.00 0.27 0.00 0.47 0.00 0.42Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 22.0HCM Level of Service C

Page 213: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis5: 600 East & 1200 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 4

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 10 5 15 0 15 20 389 10 15 532 35Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 11 5 16 0 16 22 423 11 16 578 38PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 1118 1107 597 1112 1121 428 616 434vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1118 1107 597 1112 1121 428 616 434tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 94 95 99 90 100 97 98 99cM capacity (veh/h) 175 202 503 171 199 627 964 1126

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 27 33 455 633Volume Left 11 16 22 16Volume Right 5 16 11 38cSH 214 269 964 1126Volume to Capacity 0.13 0.12 0.02 0.01Queue Length 95th (ft) 11 10 2 1Control Delay (s) 24.2 20.2 0.7 0.4Lane LOS C C A AApproach Delay (s) 24.2 20.2 0.7 0.4Approach LOS C C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 45.2% ICU Level of Service AAnalysis Period (min) 15

Page 214: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 5

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 171 621 346 36 603 120 371 259 25 60 189 201Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 1.00 1.00 0.99 1.00 1.00 1.00 0.99Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1937 1863 1937 1937 1863 1863 1937 1863 1937 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 2 0Lane AssignmentCapacity, veh/h 216 859 758 202 859 722 401 776 684 422 776 655Proportion Arriving On Green 0.46 0.46 0.46 0.46 0.46 0.46 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 67.5 25.4 17.4 34.3 24.2 14.4 79.6 19.4 15.7 23.4 18.0 19.1Movement LOS E C B C C B F B B C B BApproach Volume, veh/h 1237 825 712 489Approach Delay, s/veh 29.3 23.2 53.3 19.2Approach LOS C C D B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 6.0 5.0Phase Duration (G+Y+Rc), s 43.00 47.00 43.00 47.00Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.93 4.75 4.93 4.75Maximum Green Setting (Gmax), s 37.50 41.50 37.50 41.50Max. Queue Clearance Time (g_c+l1), s 39.50 43.50 15.28 33.52Green Extension Time (g_e), s 0.00 0.00 6.94 6.02Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 1.000 1.000 0.168 0.891

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 995.65 805.52 1091.74 791.00

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1640.74 1644.52 1573.07 1566.16

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 403.3 0.0 185.9 0.0 65.2 0.0 39.1Group Sat. Flow (s), veh/h/ln 0.0 995.6 0.0 805.5 0.0 1091.7 0.0 791.0Queue Serve Time (g_s), s 0.0 29.0 0.0 15.2 0.0 3.9 0.0 4.0Cycle Queue Clear Time (g_c), s 0.0 37.5 0.0 41.5 0.0 13.3 0.0 31.5

Page 215: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 6

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 995.6 0.0 805.5 0.0 1091.7 0.0 791.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 37.5 0.0 41.5 0.0 37.5 0.0 41.5Perm LT Serve Time (g_u), s 0.0 29.0 0.0 15.2 0.0 28.2 0.0 13.9Perm LT Que Serve Time (g_ps), s 0.0 29.0 0.0 15.2 0.0 3.9 0.0 4.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 401.2 0.0 215.8 0.0 421.5 0.0 202.5Volume-to-Capacity Ratio (X) 0.000 1.005 0.000 0.861 0.000 0.155 0.000 0.193Available Capacity (c_a), veh/h 0.0 401.2 0.0 215.8 0.0 421.5 0.0 202.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 33.4 0.0 39.5 0.0 22.6 0.0 33.8Incremental Delay (d2), s/veh 0.0 46.2 0.0 28.0 0.0 0.8 0.0 0.5Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 79.6 0.0 67.5 0.0 23.4 0.0 34.3First-Term Queue (Q1), veh/ln 0.0 8.7 0.0 4.0 0.0 1.0 0.0 0.7Second-Term Queue (Q2), veh/ln 0.0 5.2 0.0 1.7 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 13.8 0.0 5.7 0.0 1.1 0.0 0.7Percentile Storage Ratio (RQ%) 0.00 1.76 0.00 0.72 0.00 0.33 0.00 0.14Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 281.5 0.0 675.0 0.0 205.4 0.0 655.4Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 9.3 0.0 27.6 0.0 6.5 0.0 26.3Cycle Queue Clear Time (g_c), s 0.0 9.3 0.0 27.6 0.0 6.5 0.0 26.3Lane Group Capacity (c), veh/h 0.0 776.1 0.0 858.9 0.0 776.1 0.0 858.9Volume-to-Capacity Ratio (X) 0.000 0.363 0.000 0.786 0.000 0.265 0.000 0.763Available Capacity (c_a), veh/h 0.0 776.1 0.0 858.9 0.0 776.1 0.0 858.9Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 18.0 0.0 20.5 0.0 17.2 0.0 20.2Incremental Delay (d2), s/veh 0.0 1.3 0.0 4.9 0.0 0.8 0.0 4.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 19.4 0.0 25.4 0.0 18.0 0.0 24.2First-Term Queue (Q1), veh/ln 0.0 3.7 0.0 10.5 0.0 2.6 0.0 10.0Second-Term Queue (Q2), veh/ln 0.0 0.3 0.0 1.2 0.0 0.2 0.0 1.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 4.0 0.0 11.6 0.0 2.8 0.0 11.0Percentile Storage Ratio (RQ%) 0.00 0.15 0.00 0.22 0.00 0.38 0.00 0.20

Page 216: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis6: 800 East & 1400 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 7

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R T+R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 27.2 0.0 376.1 0.0 218.5 0.0 130.4Group Sat. Flow (s), veh/h/ln 0.0 1640.7 0.0 1644.5 0.0 1573.1 0.0 1566.2Queue Serve Time (g_s), s 0.0 0.9 0.0 14.4 0.0 8.5 0.0 4.4Cycle Queue Clear Time (g_c), s 0.0 0.9 0.0 14.4 0.0 8.5 0.0 4.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 683.6 0.0 758.3 0.0 655.4 0.0 722.2Volume-to-Capacity Ratio (X) 0.000 0.040 0.000 0.496 0.000 0.333 0.000 0.181Available Capacity (c_a), veh/h 0.0 683.6 0.0 758.3 0.0 655.4 0.0 722.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 15.6 0.0 16.9 0.0 17.8 0.0 14.3Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.5 0.0 1.4 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.7 0.0 17.4 0.0 19.1 0.0 14.4First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 4.8 0.0 2.9 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 4.9 0.0 3.1 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.01 0.00 0.09 0.00 0.43 0.00 0.46Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 31.5HCM Level of Service C

Page 217: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 8

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 144 260 130 50 236 124 99 415 30 66 520 147Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.95 0.98 0.99 0.92 0.98 0.91 0.96 0.93Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1937 1937 1863 1937 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 2 1 1 2 1Lane AssignmentCapacity, veh/h 429 709 615 433 709 577 386 1493 609 433 1493 620Proportion Arriving On Green 0.38 0.38 0.38 0.38 0.38 0.38 0.42 0.42 0.42 0.42 0.42 0.42Movement Delay, s/veh 17.4 13.0 11.9 15.7 12.7 11.9 17.0 11.2 9.7 14.1 11.8 11.4Movement LOS B B B B B B B B A B B BApproach Volume, veh/h 580 446 591 797Approach Delay, s/veh 13.9 12.8 12.2 11.9Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 29.00 26.70 29.00 26.70Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.93 4.81 4.93 4.81Maximum Green Setting (Gmax), s 23.50 25.50 23.50 25.50Max. Queue Clearance Time (g_c+l1), s 13.88 14.41 9.90 10.24Green Extension Time (g_e), s 5.42 4.04 6.82 4.73Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.665 0.416 0.471 0.232

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 823.37 1064.73 899.05 1123.90

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 3539.22 1862.75 3539.22 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1442.61 1616.81 1468.88 1516.87

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 107.6 0.0 156.5 0.0 71.7 0.0 54.3Group Sat. Flow (s), veh/h/ln 0.0 823.4 0.0 1064.7 0.0 899.0 0.0 1123.9Queue Serve Time (g_s), s 0.0 5.8 0.0 6.9 0.0 3.2 0.0 2.1Cycle Queue Clear Time (g_c), s 0.0 11.9 0.0 12.4 0.0 7.9 0.0 8.2

Page 218: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 9

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 823.4 0.0 1064.7 0.0 899.0 0.0 1123.9Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 23.5 0.0 21.2 0.0 23.5 0.0 21.2Perm LT Serve Time (g_u), s 0.0 17.4 0.0 15.7 0.0 18.8 0.0 15.0Perm LT Que Serve Time (g_ps), s 0.0 5.8 0.0 6.9 0.0 3.2 0.0 2.1Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 386.2 0.0 429.2 0.0 432.7 0.0 432.5Volume-to-Capacity Ratio (X) 0.000 0.279 0.000 0.365 0.000 0.166 0.000 0.126Available Capacity (c_a), veh/h 0.0 386.2 0.0 511.4 0.0 432.7 0.0 519.3Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 15.2 0.0 16.8 0.0 13.3 0.0 15.6Incremental Delay (d2), s/veh 0.0 1.8 0.0 0.5 0.0 0.8 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 17.0 0.0 17.4 0.0 14.1 0.0 15.7First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 1.5 0.0 0.6 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.2 0.0 1.6 0.0 0.7 0.0 0.5Percentile Storage Ratio (RQ%) 0.00 0.19 0.00 0.36 0.00 0.12 0.00 0.15Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 2 0 1 0 2 0 1Group Volume (v), veh/h 0.0 451.1 0.0 282.6 0.0 565.2 0.0 256.5Group Sat. Flow (s), veh/h/ln 0.0 1769.6 0.0 1862.7 0.0 1769.6 0.0 1862.7Queue Serve Time (g_s), s 0.0 4.7 0.0 6.2 0.0 6.1 0.0 5.5Cycle Queue Clear Time (g_c), s 0.0 4.7 0.0 6.2 0.0 6.1 0.0 5.5Lane Group Capacity (c), veh/h 0.0 1493.3 0.0 708.9 0.0 1493.3 0.0 708.9Volume-to-Capacity Ratio (X) 0.000 0.302 0.000 0.399 0.000 0.379 0.000 0.362Available Capacity (c_a), veh/h 0.0 1493.3 0.0 852.8 0.0 1493.3 0.0 852.8Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.7 0.0 12.6 0.0 11.1 0.0 12.4Incremental Delay (d2), s/veh 0.0 0.5 0.0 0.4 0.0 0.7 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.2 0.0 13.0 0.0 11.8 0.0 12.7First-Term Queue (Q1), veh/ln 0.0 1.4 0.0 2.2 0.0 1.9 0.0 2.0Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.2 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.6 0.0 2.3 0.0 2.0 0.0 2.1Percentile Storage Ratio (RQ%) 0.00 0.13 0.00 0.06 0.00 0.16 0.00 0.04

Page 219: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis9: 800 East & 1000 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 10

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 32.6 0.0 141.3 0.0 159.8 0.0 134.8Group Sat. Flow (s), veh/h/ln 0.0 1442.6 0.0 1616.8 0.0 1468.9 0.0 1516.9Queue Serve Time (g_s), s 0.0 0.7 0.0 3.3 0.0 3.9 0.0 3.4Cycle Queue Clear Time (g_c), s 0.0 0.7 0.0 3.3 0.0 3.9 0.0 3.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 608.7 0.0 615.3 0.0 619.7 0.0 577.3Volume-to-Capacity Ratio (X) 0.000 0.054 0.000 0.230 0.000 0.258 0.000 0.233Available Capacity (c_a), veh/h 0.0 608.7 0.0 740.2 0.0 619.7 0.0 694.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.5 0.0 11.7 0.0 10.4 0.0 11.7Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.2 0.0 1.0 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.7 0.0 11.9 0.0 11.4 0.0 11.9First-Term Queue (Q1), veh/ln 0.0 0.2 0.0 1.0 0.0 1.0 0.0 1.0Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.2 0.0 1.1 0.0 1.2 0.0 1.0Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.25 0.00 0.21 0.00 0.29Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 12.6HCM Level of Service B

Page 220: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 11

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopVolume (vph) 91 336 100 167 340 65 130 299 117 60 303 162Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 99 365 109 182 370 71 141 325 127 65 329 176

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2Volume Total (vph) 99 474 182 440 466 127 395 176Volume Left (vph) 99 0 182 0 141 0 65 0Volume Right (vph) 0 109 0 71 0 127 0 176Hadj (s) 0.53 -0.13 0.53 -0.08 0.19 -0.67 0.12 -0.67Departure Headway (s) 10.1 9.5 10.1 9.5 9.8 9.0 9.7 8.9Degree Utilization, x 0.28 1.25 0.51 1.16 1.27 0.32 1.06 0.44Capacity (veh/h) 350 385 347 384 374 397 370 400Control Delay (s) 15.8 159.9 21.8 125.3 167.6 14.8 94.3 17.4Approach Delay (s) 135.0 95.1 134.8 70.6Approach LOS F F F F

Intersection SummaryDelay 108.9HCM Level of Service FIntersection Capacity Utilization 88.9% ICU Level of Service EAnalysis Period (min) 15

Page 221: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis14: 800 East & 1200 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 12

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 70 0 75 25 620 15 50 696 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 76 0 82 27 674 16 54 757 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL NoneMedian storage veh) 2Upstream signal (ft) 1122pX, platoon unblockedvC, conflicting volume 1341 1612 381 1234 1607 345 762 690vC1, stage 1 conf vol 868 868 736 736vC2, stage 2 conf vol 473 745 498 871vCu, unblocked vol 1341 1612 381 1234 1607 345 762 690tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 93 100 98 75 100 87 97 94cM capacity (veh/h) 247 257 617 300 261 651 846 900

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 158 27 449 241 54 504 258Volume Left 16 76 27 0 0 54 0 0Volume Right 11 82 0 0 16 0 0 5cSH 325 416 846 1700 1700 900 1700 1700Volume to Capacity 0.08 0.38 0.03 0.26 0.14 0.06 0.30 0.15Queue Length 95th (ft) 7 43 2 0 0 5 0 0Control Delay (s) 17.1 18.8 9.4 0.0 0.0 9.3 0.0 0.0Lane LOS C C A AApproach Delay (s) 17.1 18.8 0.4 0.6Approach LOS C C

Intersection SummaryAverage Delay 2.4Intersection Capacity Utilization 42.3% ICU Level of Service AAnalysis Period (min) 15

Page 222: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis17: 600 East & 1050/Independ 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 13

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 10 0 5 5 0 5 5 404 46 32 515 5Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 11 0 5 5 0 5 5 439 50 35 560 5PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft)pX, platoon unblockedvC, conflicting volume 1112 1132 562 1112 1110 464 565 489vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1112 1132 562 1112 1110 464 565 489tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 94 100 99 97 100 99 99 97cM capacity (veh/h) 179 195 526 179 202 598 1007 1074

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 16 11 495 600Volume Left 11 5 5 35Volume Right 5 5 50 5cSH 229 275 1007 1074Volume to Capacity 0.07 0.04 0.01 0.03Queue Length 95th (ft) 6 3 0 3Control Delay (s) 21.9 18.6 0.2 0.9Lane LOS C C A AApproach Delay (s) 21.9 18.6 0.2 0.9Approach LOS C C

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 57.4% ICU Level of Service BAnalysis Period (min) 15

Page 223: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis21: 800 East & Stadium 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 14

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 10 5 0 5 10 658 15 15 718 15Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 11 5 0 5 11 715 16 16 780 16PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 397pX, platoon unblocked 0.94 0.94 0.94 0.94 0.94 0.94vC, conflicting volume 1206 1574 398 1179 1574 366 797 732vC1, stage 1 conf vol 821 821 745 745vC2, stage 2 conf vol 385 753 434 829vCu, unblocked vol 1094 1485 398 1065 1485 201 797 590tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1tC, 2 stage (s) 6.5 5.5 6.5 5.5tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 95 100 98 98 100 99 99 98cM capacity (veh/h) 308 299 601 354 297 759 821 924

Direction, Lane # EB 1 WB 1 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3Volume Total 27 11 11 477 255 16 520 276Volume Left 16 5 11 0 0 16 0 0Volume Right 11 5 0 0 16 0 0 16cSH 383 483 821 1700 1700 924 1700 1700Volume to Capacity 0.07 0.02 0.01 0.28 0.15 0.02 0.31 0.16Queue Length 95th (ft) 6 2 1 0 0 1 0 0Control Delay (s) 15.1 12.6 9.4 0.0 0.0 9.0 0.0 0.0Lane LOS C B A AApproach Delay (s) 15.1 12.6 0.1 0.2Approach LOS C B

Intersection SummaryAverage Delay 0.5Intersection Capacity Utilization 30.3% ICU Level of Service AAnalysis Period (min) 15

Page 224: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis24: 1000 North & Independ 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 15

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsVolume (veh/h) 68 445 488 73 79 84Sign Control Free Free StopGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 74 484 530 79 86 91Pedestrians 43 43 43Lane Width (ft) 13.0 16.0 12.0Walking Speed (ft/s) 4.0 4.0 4.0Percent Blockage 4 5 4Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 1066pX, platoon unblockedvC, conflicting volume 653 1288 656vC1, stage 1 conf vol 613vC2, stage 2 conf vol 675vCu, unblocked vol 653 1288 656tC, single (s) 4.1 6.4 6.2tC, 2 stage (s) 5.4tF (s) 2.2 3.5 3.3p0 queue free % 92 76 79cM capacity (veh/h) 900 359 431

Direction, Lane # EB 1 EB 2 WB 1 SB 1 SB 2Volume Total 74 484 610 86 91Volume Left 74 0 0 86 0Volume Right 0 0 79 0 91cSH 900 1700 1700 359 431Volume to Capacity 0.08 0.28 0.36 0.24 0.21Queue Length 95th (ft) 7 0 0 23 20Control Delay (s) 9.4 0.0 0.0 18.1 15.6Lane LOS A C CApproach Delay (s) 1.2 0.0 16.8Approach LOS C

Intersection SummaryAverage Delay 2.7Intersection Capacity Utilization 55.5% ICU Level of Service BAnalysis Period (min) 15

Page 225: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis26: 800 East & Blue 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 16

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 71 69 84 594 679 87Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 77 75 91 646 738 95Pedestrians 438Lane Width (ft) 12.0Walking Speed (ft/s) 4.0Percent Blockage 36Right turn flare (veh)Median type TWLTL TWLTLMedian storage veh) 2 2Upstream signal (ft) 759pX, platoon unblockedvC, conflicting volume 1729 854 1271vC1, stage 1 conf vol 1223vC2, stage 2 conf vol 505vCu, unblocked vol 1729 854 1271tC, single (s) 6.8 6.9 4.1tC, 2 stage (s) 5.8tF (s) 3.5 3.3 2.2p0 queue free % 46 61 73cM capacity (veh/h) 142 192 345

Direction, Lane # EB 1 EB 2 NB 1 NB 2 NB 3 SB 1 SB 2Volume Total 77 75 91 323 323 492 341Volume Left 77 0 91 0 0 0 0Volume Right 0 75 0 0 0 0 95cSH 142 192 345 1700 1700 1700 1700Volume to Capacity 0.54 0.39 0.27 0.19 0.19 0.29 0.20Queue Length 95th (ft) 67 43 26 0 0 0 0Control Delay (s) 57.1 35.4 19.2 0.0 0.0 0.0 0.0Lane LOS F E CApproach Delay (s) 46.4 2.4 0.0Approach LOS E

Intersection SummaryAverage Delay 5.1Intersection Capacity Utilization 40.1% ICU Level of Service AAnalysis Period (min) 15

Page 226: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis30: 800 East & Public Safety 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 17

Movement WBL WBR NBT NBR SBL SBTLane ConfigurationsVolume (veh/h) 20 55 705 5 5 731Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 22 60 766 5 5 795PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 881pX, platoon unblockedvC, conflicting volume 1177 386 772vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1177 386 772tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 88 90 99cM capacity (veh/h) 183 612 839

Direction, Lane # WB 1 NB 1 NB 2 SB 1 SB 2 SB 3Volume Total 82 511 261 5 397 397Volume Left 22 0 0 5 0 0Volume Right 60 0 5 0 0 0cSH 376 1700 1700 839 1700 1700Volume to Capacity 0.22 0.30 0.15 0.01 0.23 0.23Queue Length 95th (ft) 20 0 0 0 0 0Control Delay (s) 17.2 0.0 0.0 9.3 0.0 0.0Lane LOS C AApproach Delay (s) 17.2 0.0 0.1Approach LOS C

Intersection SummaryAverage Delay 0.9Intersection Capacity Utilization 31.4% ICU Level of Service AAnalysis Period (min) 15

Page 227: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis31: 800 East & 1300 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 18

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsVolume (veh/h) 5 5 5 755 731 5Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 5 5 5 821 795 5Pedestrians 559Lane Width (ft) 16.0Walking Speed (ft/s) 4.0Percent Blockage 62Right turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 761pX, platoon unblockedvC, conflicting volume 1777 959 1359vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 1777 959 1359tC, single (s) 6.8 6.9 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 80 94 97cM capacity (veh/h) 27 97 190

Direction, Lane # EB 1 NB 1 NB 2 SB 1 SB 2Volume Total 11 279 547 530 270Volume Left 5 5 0 0 0Volume Right 5 0 0 0 5cSH 42 190 1700 1700 1700Volume to Capacity 0.26 0.03 0.32 0.31 0.16Queue Length 95th (ft) 21 2 0 0 0Control Delay (s) 116.9 1.3 0.0 0.0 0.0Lane LOS F AApproach Delay (s) 116.9 0.4 0.0Approach LOS F

Intersection SummaryAverage Delay 1.0Intersection Capacity Utilization 34.4% ICU Level of Service AAnalysis Period (min) 15

Page 228: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM Unsignalized Intersection Capacity Analysis33: 600 East & 1300 North 12/2/2011

2035 PM 11/17/2011 Development Synchro 8 ReportPage 19

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (veh/h) 15 0 35 15 0 25 5 389 5 5 477 40Sign Control Stop Stop Free FreeGrade 0% 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 0 38 16 0 27 5 423 5 5 518 43PedestriansLane Width (ft)Walking Speed (ft/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (ft) 712pX, platoon unblocked 0.92 0.92 0.92 0.92 0.92 0.92vC, conflicting volume 1015 990 540 1026 1009 426 562 428vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 971 944 454 983 965 426 478 428tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1tC, 2 stage (s)tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2p0 queue free % 92 100 93 92 100 96 99 100cM capacity (veh/h) 202 238 556 193 231 629 995 1131

Direction, Lane # EB 1 WB 1 NB 1 SB 1Volume Total 54 43 434 567Volume Left 16 16 5 5Volume Right 38 27 5 43cSH 365 341 995 1131Volume to Capacity 0.15 0.13 0.01 0.00Queue Length 95th (ft) 13 11 0 0Control Delay (s) 16.6 17.1 0.2 0.1Lane LOS C C A AApproach Delay (s) 16.6 17.1 0.2 0.1Approach LOS C C

Intersection SummaryAverage Delay 1.6Intersection Capacity Utilization 40.8% ICU Level of Service AAnalysis Period (min) 15

Page 229: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 11/21/2011

Existing PM Peak 11/17/2011 Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 65 239 74 104 230 39 100 178 74 39 230 130v/c Ratio 0.17 0.39 0.13 0.28 0.38 0.07 0.19 0.21 0.10 0.07 0.27 0.16Control Delay 9.7 10.9 3.6 11.0 10.7 4.1 9.8 9.3 3.4 8.7 9.6 3.0Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.7 10.9 3.6 11.0 10.7 4.1 9.8 9.3 3.4 8.7 9.6 3.0Queue Length 50th (ft) 7 27 0 11 25 0 11 19 0 4 26 0Queue Length 95th (ft) 29 80 17 42 77 12 41 61 17 20 77 23Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 926 1512 1252 911 1512 1260 920 1512 1299 963 1512 1309Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.16 0.06 0.11 0.15 0.03 0.11 0.12 0.06 0.04 0.15 0.10

Intersection Summary

Page 230: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

Existing PM Peak 11/17/2011 Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 60 220 68 96 212 36 92 164 68 36 212 120Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 503 644 540 495 644 545 481 611 520 522 611 520Proportion Arriving On Green 0.35 0.35 0.35 0.35 0.35 0.35 0.33 0.33 0.33 0.33 0.33 0.33Movement Delay, s/veh 10.1 8.6 7.7 10.7 8.6 7.5 11.1 8.7 8.1 9.7 9.1 8.5Movement LOS B A A B A A B A A A A AApproach Volume, veh/h 378 374 352 400Approach Delay, s/veh 8.7 9.0 9.2 9.0Approach LOS A A A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 16.57 17.17 16.57 17.17Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.75 4.88 4.75 4.88Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 7.68 6.64 5.24 7.83Green Extension Time (g_e), s 3.40 3.68 3.55 3.59Probability of Phase Call (p_c) 1.000 0.999 1.000 0.999Probability of Max Out (p_x) 0.079 0.076 0.047 0.096

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1145.39 1142.26 1201.14 1127.21

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1562.73 1583.33 1576.47

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 100.0 0.0 65.2 0.0 39.1 0.0 104.3Group Sat. Flow (s), veh/h/ln 0.0 1145.4 0.0 1142.3 0.0 1201.1 0.0 1127.2Queue Serve Time (g_s), s 0.0 2.5 0.0 1.5 0.0 0.8 0.0 2.6Cycle Queue Clear Time (g_c), s 0.0 5.7 0.0 4.6 0.0 3.2 0.0 5.8

Page 231: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

Existing PM Peak 11/17/2011 Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1145.4 0.0 1142.3 0.0 1201.1 0.0 1127.2Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 11.1 0.0 11.7 0.0 11.1 0.0 11.7Perm LT Serve Time (g_u), s 0.0 7.9 0.0 8.6 0.0 8.7 0.0 8.4Perm LT Que Serve Time (g_ps), s 0.0 2.5 0.0 1.5 0.0 0.8 0.0 2.6Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 480.6 0.0 502.9 0.0 522.1 0.0 494.6Volume-to-Capacity Ratio (X) 0.000 0.208 0.000 0.130 0.000 0.075 0.000 0.211Available Capacity (c_a), veh/h 0.0 936.3 0.0 937.2 0.0 1000.0 0.0 923.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.9 0.0 10.0 0.0 9.6 0.0 10.5Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.1 0.0 0.1 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.1 0.0 10.1 0.0 9.7 0.0 10.7First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 0.3 0.0 0.2 0.0 0.5Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 0.3 0.0 0.2 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.17 0.00 0.08 0.00 0.06 0.00 0.10Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 178.3 0.0 239.1 0.0 230.4 0.0 230.4Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.4 0.0 3.3 0.0 3.2 0.0 3.1Cycle Queue Clear Time (g_c), s 0.0 2.4 0.0 3.3 0.0 3.2 0.0 3.1Lane Group Capacity (c), veh/h 0.0 611.3 0.0 644.3 0.0 611.3 0.0 644.3Volume-to-Capacity Ratio (X) 0.000 0.292 0.000 0.371 0.000 0.377 0.000 0.358Available Capacity (c_a), veh/h 0.0 1352.4 0.0 1352.4 0.0 1352.4 0.0 1352.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.4 0.0 8.3 0.0 8.7 0.0 8.2Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.4 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.7 0.0 8.6 0.0 9.1 0.0 8.6First-Term Queue (Q1), veh/ln 0.0 0.7 0.0 0.9 0.0 0.9 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.7 0.0 1.0 0.0 1.0 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.04 0.00 0.02 0.00 0.12 0.00 0.06

Page 232: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

Existing PM Peak 11/17/2011 Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 73.9 0.0 73.9 0.0 130.4 0.0 39.1Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1562.7 0.0 1583.3 0.0 1576.5Queue Serve Time (g_s), s 0.0 1.1 0.0 1.1 0.0 2.0 0.0 0.6Cycle Queue Clear Time (g_c), s 0.0 1.1 0.0 1.1 0.0 2.0 0.0 0.6Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 519.6 0.0 540.5 0.0 519.6 0.0 545.2Volume-to-Capacity Ratio (X) 0.000 0.142 0.000 0.137 0.000 0.251 0.000 0.072Available Capacity (c_a), veh/h 0.0 1149.5 0.0 1134.6 0.0 1149.5 0.0 1144.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.0 0.0 7.6 0.0 8.3 0.0 7.4Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.1 0.0 7.7 0.0 8.5 0.0 7.5First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 0.3 0.0 0.5 0.0 0.1Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 0.3 0.0 0.5 0.0 0.1Percentile Storage Ratio (RQ%) 0.00 0.09 0.00 0.09 0.00 0.17 0.00 0.04Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 9.0HCM Level of Service A

Page 233: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 11/21/2011

2016 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 65 272 87 109 250 43 109 185 76 43 239 141v/c Ratio 0.17 0.42 0.15 0.29 0.39 0.08 0.21 0.22 0.10 0.08 0.28 0.18Control Delay 9.5 11.0 3.4 11.0 10.7 4.0 10.4 9.6 3.5 9.1 10.0 3.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 9.5 11.0 3.4 11.0 10.7 4.0 10.4 9.6 3.5 9.1 10.0 3.1Queue Length 50th (ft) 7 31 0 12 29 0 12 21 0 5 28 0Queue Length 95th (ft) 29 91 19 45 84 13 46 65 18 22 83 24Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 890 1479 1228 865 1479 1234 892 1479 1272 937 1479 1286Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.07 0.18 0.07 0.13 0.17 0.03 0.12 0.13 0.06 0.05 0.16 0.11

Intersection Summary

Page 234: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2016 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 60 250 80 100 230 40 100 170 70 40 220 130Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 494 673 565 476 673 570 467 620 527 510 620 527Proportion Arriving On Green 0.36 0.36 0.36 0.36 0.36 0.36 0.33 0.33 0.33 0.33 0.33 0.33Movement Delay, s/veh 10.5 9.0 7.9 11.4 8.8 7.6 11.9 9.2 8.5 10.3 9.6 9.1Movement LOS B A A B A A B A A B A AApproach Volume, veh/h 424 402 370 424Approach Delay, s/veh 9.0 9.4 9.8 9.5Approach LOS A A A A

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 17.49 18.50 17.49 18.50Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.75 4.90 4.75 4.90Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 8.45 7.20 5.65 8.89Green Extension Time (g_e), s 3.54 4.08 3.73 3.92Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.106 0.112 0.060 0.151

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1136.34 1122.27 1194.03 1095.01

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1563.61 1583.33 1576.76

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 65.2 0.0 43.5 0.0 108.7Group Sat. Flow (s), veh/h/ln 0.0 1136.3 0.0 1122.3 0.0 1194.0 0.0 1095.0Queue Serve Time (g_s), s 0.0 2.9 0.0 1.6 0.0 1.0 0.0 3.0Cycle Queue Clear Time (g_c), s 0.0 6.4 0.0 5.2 0.0 3.6 0.0 6.9

Page 235: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2016 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1136.3 0.0 1122.3 0.0 1194.0 0.0 1095.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 12.0 0.0 13.0 0.0 12.0 0.0 13.0Perm LT Serve Time (g_u), s 0.0 8.5 0.0 9.4 0.0 9.3 0.0 9.1Perm LT Que Serve Time (g_ps), s 0.0 2.9 0.0 1.6 0.0 1.0 0.0 3.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 466.9 0.0 494.4 0.0 510.1 0.0 476.2Volume-to-Capacity Ratio (X) 0.000 0.233 0.000 0.132 0.000 0.085 0.000 0.228Available Capacity (c_a), veh/h 0.0 862.1 0.0 853.0 0.0 925.3 0.0 826.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.6 0.0 10.4 0.0 10.2 0.0 11.2Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.1 0.0 0.1 0.0 0.2Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.9 0.0 10.5 0.0 10.3 0.0 11.4First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 0.3 0.0 0.2 0.0 0.6Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.7 0.0 0.3 0.0 0.2 0.0 0.6Percentile Storage Ratio (RQ%) 0.00 0.21 0.00 0.09 0.00 0.07 0.00 0.12Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 184.8 0.0 271.7 0.0 239.1 0.0 250.0Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 2.6 0.0 3.9 0.0 3.5 0.0 3.6Cycle Queue Clear Time (g_c), s 0.0 2.6 0.0 3.9 0.0 3.5 0.0 3.6Lane Group Capacity (c), veh/h 0.0 620.4 0.0 672.9 0.0 620.4 0.0 672.9Volume-to-Capacity Ratio (X) 0.000 0.298 0.000 0.404 0.000 0.385 0.000 0.372Available Capacity (c_a), veh/h 0.0 1268.1 0.0 1268.1 0.0 1268.1 0.0 1268.1Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.9 0.0 8.6 0.0 9.2 0.0 8.5Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.4 0.0 0.4 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.2 0.0 9.0 0.0 9.6 0.0 8.8First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 1.1 0.0 1.0 0.0 1.0Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 1.2 0.0 1.1 0.0 1.1Percentile Storage Ratio (RQ%) 0.00 0.05 0.00 0.03 0.00 0.14 0.00 0.07

Page 236: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2016 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 76.1 0.0 87.0 0.0 141.3 0.0 43.5Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1563.6 0.0 1583.3 0.0 1576.8Queue Serve Time (g_s), s 0.0 1.2 0.0 1.4 0.0 2.4 0.0 0.7Cycle Queue Clear Time (g_c), s 0.0 1.2 0.0 1.4 0.0 2.4 0.0 0.7Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 527.4 0.0 564.9 0.0 527.4 0.0 569.6Volume-to-Capacity Ratio (X) 0.000 0.144 0.000 0.154 0.000 0.268 0.000 0.076Available Capacity (c_a), veh/h 0.0 1077.9 0.0 1064.5 0.0 1077.9 0.0 1073.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 8.4 0.0 7.8 0.0 8.8 0.0 7.5Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 8.5 0.0 7.9 0.0 9.1 0.0 7.6First-Term Queue (Q1), veh/ln 0.0 0.3 0.0 0.3 0.0 0.6 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.3 0.0 0.3 0.0 0.6 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.10 0.00 0.11 0.00 0.20 0.00 0.05Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 9.4HCM Level of Service A

Page 237: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 11/21/2011

2035 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 87 304 109 152 304 54 141 293 109 54 326 174v/c Ratio 0.24 0.48 0.19 0.42 0.48 0.10 0.39 0.45 0.18 0.15 0.50 0.26Control Delay 11.9 13.4 3.7 14.8 13.4 4.2 13.9 12.7 3.5 10.5 13.4 3.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.9 13.4 3.7 14.8 13.4 4.2 13.9 12.7 3.5 10.5 13.4 3.4Queue Length 50th (ft) 11 44 0 21 44 0 19 41 0 7 47 0Queue Length 95th (ft) 45 127 24 76 127 17 69 119 23 30 134 29Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 748 1306 1102 743 1306 1097 728 1306 1142 751 1306 1162Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.12 0.23 0.10 0.20 0.23 0.05 0.19 0.22 0.10 0.07 0.25 0.15

Intersection Summary

Page 238: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2035 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 80 280 100 140 280 50 130 270 100 50 300 160Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 430 704 592 429 704 596 422 716 608 447 716 608Proportion Arriving On Green 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38Movement Delay, s/veh 14.2 11.1 9.8 15.4 11.1 9.3 15.4 10.8 9.6 13.1 11.1 10.1Movement LOS B B A B B A B B A B B BApproach Volume, veh/h 500 511 543 554Approach Delay, s/veh 11.4 12.2 11.7 11.0Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 23.29 23.00 23.29 23.00Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.83 4.91 4.83 4.91Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 13.42 10.67 9.12 13.36Green Extension Time (g_e), s 4.36 4.64 5.16 4.14Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.457 0.298 0.266 0.429

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1049.51 1068.41 1081.30 1064.03

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1564.49 1583.33 1577.05

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 141.3 0.0 87.0 0.0 54.3 0.0 152.2Group Sat. Flow (s), veh/h/ln 0.0 1049.5 0.0 1068.4 0.0 1081.3 0.0 1064.0Queue Serve Time (g_s), s 0.0 5.4 0.0 3.0 0.0 1.8 0.0 5.7Cycle Queue Clear Time (g_c), s 0.0 11.4 0.0 8.7 0.0 7.1 0.0 11.4

Page 239: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2035 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1049.5 0.0 1068.4 0.0 1081.3 0.0 1064.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 17.8 0.0 17.5 0.0 17.8 0.0 17.5Perm LT Serve Time (g_u), s 0.0 11.7 0.0 11.9 0.0 12.5 0.0 11.9Perm LT Que Serve Time (g_ps), s 0.0 5.4 0.0 3.0 0.0 1.8 0.0 5.7Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 421.7 0.0 429.7 0.0 446.5 0.0 428.6Volume-to-Capacity Ratio (X) 0.000 0.335 0.000 0.202 0.000 0.122 0.000 0.355Available Capacity (c_a), veh/h 0.0 573.9 0.0 591.3 0.0 603.4 0.0 589.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 14.9 0.0 13.9 0.0 13.0 0.0 14.9Incremental Delay (d2), s/veh 0.0 0.5 0.0 0.2 0.0 0.1 0.0 0.5Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 15.4 0.0 14.2 0.0 13.1 0.0 15.4First-Term Queue (Q1), veh/ln 0.0 1.2 0.0 0.7 0.0 0.4 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.3 0.0 0.7 0.0 0.4 0.0 1.4Percentile Storage Ratio (RQ%) 0.00 0.41 0.00 0.18 0.00 0.13 0.00 0.26Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 293.5 0.0 304.3 0.0 326.1 0.0 304.3Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 5.3 0.0 5.6 0.0 6.0 0.0 5.6Cycle Queue Clear Time (g_c), s 0.0 5.3 0.0 5.6 0.0 6.0 0.0 5.6Lane Group Capacity (c), veh/h 0.0 715.8 0.0 704.3 0.0 715.8 0.0 704.3Volume-to-Capacity Ratio (X) 0.000 0.410 0.000 0.432 0.000 0.456 0.000 0.432Available Capacity (c_a), veh/h 0.0 986.0 0.0 986.0 0.0 986.0 0.0 986.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.4 0.0 10.7 0.0 10.6 0.0 10.7Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.4 0.0 0.5 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.8 0.0 11.1 0.0 11.1 0.0 11.1First-Term Queue (Q1), veh/ln 0.0 1.8 0.0 1.9 0.0 2.0 0.0 1.9Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.8 0.0 1.9 0.0 2.1 0.0 1.9Percentile Storage Ratio (RQ%) 0.00 0.11 0.00 0.05 0.00 0.26 0.00 0.13

Page 240: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 11/21/2011

2035 PM Peak 11/17/2011 Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 108.7 0.0 173.9 0.0 54.3Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1564.5 0.0 1583.3 0.0 1577.1Queue Serve Time (g_s), s 0.0 2.1 0.0 2.1 0.0 3.5 0.0 1.0Cycle Queue Clear Time (g_c), s 0.0 2.1 0.0 2.1 0.0 3.5 0.0 1.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 608.4 0.0 591.5 0.0 608.4 0.0 596.3Volume-to-Capacity Ratio (X) 0.000 0.179 0.000 0.184 0.000 0.286 0.000 0.091Available Capacity (c_a), veh/h 0.0 838.1 0.0 828.1 0.0 838.1 0.0 834.7Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.4 0.0 9.6 0.0 9.9 0.0 9.3Incremental Delay (d2), s/veh 0.0 0.1 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.6 0.0 9.8 0.0 10.1 0.0 9.3First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 0.6 0.0 1.0 0.0 0.3Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.6 0.0 0.6 0.0 1.0 0.0 0.3Percentile Storage Ratio (RQ%) 0.00 0.19 0.00 0.20 0.00 0.33 0.00 0.09Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 11.6HCM Level of Service B

Page 241: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 77 300 74 134 296 55 100 210 92 50 234 133v/c Ratio 0.22 0.49 0.14 0.39 0.48 0.10 0.30 0.37 0.17 0.15 0.41 0.23Control Delay 10.0 12.0 3.5 12.6 11.9 3.6 12.6 12.0 4.0 10.7 12.5 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.0 12.0 3.5 12.6 11.9 3.6 12.6 12.0 4.0 10.7 12.5 3.8Queue Length 50th (ft) 8 36 0 16 36 0 13 27 0 6 31 0Queue Length 95th (ft) 34 104 17 57 103 15 48 82 21 27 90 25Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 760 1327 1087 750 1327 1100 841 1422 1230 858 1422 1240Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.23 0.07 0.18 0.22 0.05 0.12 0.15 0.07 0.06 0.16 0.11

Intersection Summary

Page 242: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 71 276 68 123 272 51 92 193 85 46 215 122Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 0.98 0.99 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 486 730 607 481 730 613 443 597 507 462 597 507Proportion Arriving On Green 0.39 0.39 0.39 0.39 0.39 0.39 0.32 0.32 0.32 0.32 0.32 0.32Movement Delay, s/veh 10.9 8.8 7.5 11.8 8.8 7.4 12.9 10.3 9.5 11.8 10.5 9.9Movement LOS B A A B A A B B A B B AApproach Volume, veh/h 451 485 402 416Approach Delay, s/veh 8.9 9.4 10.8 10.5Approach LOS A A B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 17.74 20.48 17.74 20.48Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.75 4.94 4.75 4.94Maximum Green Setting (Gmax), s 24.50 24.50 24.50 24.50Max. Queue Clearance Time (g_c+l1), s 8.58 8.53 6.61 10.45Green Extension Time (g_e), s 3.66 4.63 3.81 4.37Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.118 0.196 0.081 0.260

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1141.99 1072.14 1167.16 1061.79

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1548.99 1583.33 1565.15

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 100.0 0.0 77.2 0.0 50.0 0.0 133.7Group Sat. Flow (s), veh/h/ln 0.0 1142.0 0.0 1072.1 0.0 1167.2 0.0 1061.8Queue Serve Time (g_s), s 0.0 2.9 0.0 2.1 0.0 1.3 0.0 4.0Cycle Queue Clear Time (g_c), s 0.0 6.6 0.0 6.5 0.0 4.6 0.0 8.5

Page 243: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1142.0 0.0 1072.1 0.0 1167.2 0.0 1061.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 12.2 0.0 15.0 0.0 12.2 0.0 15.0Perm LT Serve Time (g_u), s 0.0 8.5 0.0 10.6 0.0 8.9 0.0 10.5Perm LT Que Serve Time (g_ps), s 0.0 2.9 0.0 2.1 0.0 1.3 0.0 4.0Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 442.8 0.0 485.5 0.0 461.5 0.0 480.5Volume-to-Capacity Ratio (X) 0.000 0.226 0.000 0.159 0.000 0.108 0.000 0.278Available Capacity (c_a), veh/h 0.0 809.2 0.0 752.8 0.0 836.0 0.0 745.2Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.7 0.0 10.8 0.0 11.7 0.0 11.5Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.1 0.0 0.3Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 12.9 0.0 10.9 0.0 11.8 0.0 11.8First-Term Queue (Q1), veh/ln 0.0 0.6 0.0 0.4 0.0 0.3 0.0 0.8Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.7 0.0 0.4 0.0 0.3 0.0 0.9Percentile Storage Ratio (RQ%) 0.00 0.21 0.00 0.11 0.00 0.09 0.00 0.16Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 209.8 0.0 300.0 0.0 233.7 0.0 295.7Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.3 0.0 4.5 0.0 3.7 0.0 4.4Cycle Queue Clear Time (g_c), s 0.0 3.3 0.0 4.5 0.0 3.7 0.0 4.4Lane Group Capacity (c), veh/h 0.0 596.6 0.0 730.0 0.0 596.6 0.0 730.0Volume-to-Capacity Ratio (X) 0.000 0.352 0.000 0.411 0.000 0.392 0.000 0.405Available Capacity (c_a), veh/h 0.0 1194.3 0.0 1194.3 0.0 1194.3 0.0 1194.3Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.9 0.0 8.4 0.0 10.1 0.0 8.4Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.4 0.0 0.4 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.3 0.0 8.8 0.0 10.5 0.0 8.8First-Term Queue (Q1), veh/ln 0.0 1.0 0.0 1.3 0.0 1.2 0.0 1.3Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.1 0.0 1.4 0.0 1.2 0.0 1.3Percentile Storage Ratio (RQ%) 0.00 0.07 0.00 0.03 0.00 0.16 0.00 0.10

Page 244: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/2/2011

Existing PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 92.4 0.0 73.9 0.0 132.6 0.0 55.4Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1549.0 0.0 1583.3 0.0 1565.2Queue Serve Time (g_s), s 0.0 1.6 0.0 1.2 0.0 2.4 0.0 0.9Cycle Queue Clear Time (g_c), s 0.0 1.6 0.0 1.2 0.0 2.4 0.0 0.9Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 507.1 0.0 607.0 0.0 507.1 0.0 613.3Volume-to-Capacity Ratio (X) 0.000 0.182 0.000 0.122 0.000 0.262 0.000 0.090Available Capacity (c_a), veh/h 0.0 1015.1 0.0 993.1 0.0 1015.1 0.0 1003.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 9.4 0.0 7.4 0.0 9.6 0.0 7.3Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 9.5 0.0 7.5 0.0 9.9 0.0 7.4First-Term Queue (Q1), veh/ln 0.0 0.4 0.0 0.3 0.0 0.6 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.4 0.0 0.3 0.0 0.7 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.14 0.00 0.09 0.00 0.21 0.00 0.07Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 9.9HCM Level of Service A

Page 245: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 12/1/2011

2016 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 77 333 76 138 315 60 109 216 95 54 242 143v/c Ratio 0.22 0.52 0.14 0.40 0.50 0.11 0.33 0.38 0.17 0.16 0.43 0.25Control Delay 10.0 12.6 3.4 12.8 12.1 3.6 13.7 12.7 4.1 11.4 13.3 3.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 10.0 12.6 3.4 12.8 12.1 3.6 13.7 12.7 4.1 11.4 13.3 3.9Queue Length 50th (ft) 9 42 0 16 39 0 15 29 0 7 33 0Queue Length 95th (ft) 35 123 18 61 116 16 54 89 23 30 99 28Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 768 1364 1116 749 1364 1130 738 1258 1100 756 1258 1116Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.24 0.07 0.18 0.23 0.05 0.15 0.17 0.09 0.07 0.19 0.13

Intersection Summary

Page 246: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2016 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 71 306 70 127 290 55 100 199 87 50 223 132Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 0.99 0.98 0.99 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 481 761 633 466 761 640 426 598 508 446 598 508Proportion Arriving On Green 0.41 0.41 0.41 0.41 0.41 0.41 0.32 0.32 0.32 0.32 0.32 0.32Movement Delay, s/veh 11.3 9.1 7.6 12.5 8.9 7.5 14.0 11.0 10.1 12.7 11.2 10.6Movement LOS B A A B A A B B B B B BApproach Volume, veh/h 486 513 420 440Approach Delay, s/veh 9.2 9.7 11.6 11.2Approach LOS A A B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 18.54 22.10 18.54 22.10Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.75 4.97 4.75 4.97Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 9.50 9.18 7.16 11.75Green Extension Time (g_e), s 3.55 5.21 3.80 4.86Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.225 0.193 0.147 0.271

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1132.96 1053.72 1160.24 1032.01

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1550.38 1583.33 1565.89

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 108.7 0.0 77.2 0.0 54.3 0.0 138.0Group Sat. Flow (s), veh/h/ln 0.0 1133.0 0.0 1053.7 0.0 1160.2 0.0 1032.0Queue Serve Time (g_s), s 0.0 3.4 0.0 2.3 0.0 1.5 0.0 4.5Cycle Queue Clear Time (g_c), s 0.0 7.5 0.0 7.2 0.0 5.2 0.0 9.7

Page 247: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2016 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1133.0 0.0 1053.7 0.0 1160.2 0.0 1032.0Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 13.0 0.0 16.6 0.0 13.0 0.0 16.6Perm LT Serve Time (g_u), s 0.0 8.9 0.0 11.7 0.0 9.4 0.0 11.4Perm LT Que Serve Time (g_ps), s 0.0 3.4 0.0 2.3 0.0 1.5 0.0 4.5Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 425.6 0.0 480.6 0.0 445.9 0.0 466.0Volume-to-Capacity Ratio (X) 0.000 0.255 0.000 0.161 0.000 0.122 0.000 0.296Available Capacity (c_a), veh/h 0.0 689.3 0.0 737.2 0.0 716.0 0.0 717.3Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 13.7 0.0 11.1 0.0 12.6 0.0 12.2Incremental Delay (d2), s/veh 0.0 0.3 0.0 0.2 0.0 0.1 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 14.0 0.0 11.3 0.0 12.7 0.0 12.5First-Term Queue (Q1), veh/ln 0.0 0.8 0.0 0.5 0.0 0.3 0.0 0.9Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.8 0.0 0.5 0.0 0.4 0.0 1.0Percentile Storage Ratio (RQ%) 0.00 0.26 0.00 0.12 0.00 0.11 0.00 0.18Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 216.3 0.0 332.6 0.0 242.4 0.0 315.2Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 3.6 0.0 5.2 0.0 4.1 0.0 4.9Cycle Queue Clear Time (g_c), s 0.0 3.6 0.0 5.2 0.0 4.1 0.0 4.9Lane Group Capacity (c), veh/h 0.0 597.7 0.0 760.9 0.0 597.7 0.0 760.9Volume-to-Capacity Ratio (X) 0.000 0.362 0.000 0.437 0.000 0.406 0.000 0.414Available Capacity (c_a), veh/h 0.0 1031.2 0.0 1214.6 0.0 1031.2 0.0 1214.6Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.6 0.0 8.7 0.0 10.8 0.0 8.6Incremental Delay (d2), s/veh 0.0 0.4 0.0 0.4 0.0 0.4 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.0 0.0 9.1 0.0 11.2 0.0 8.9First-Term Queue (Q1), veh/ln 0.0 1.2 0.0 1.5 0.0 1.3 0.0 1.4Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.2 0.0 1.6 0.0 1.4 0.0 1.5Percentile Storage Ratio (RQ%) 0.00 0.08 0.00 0.04 0.00 0.18 0.00 0.11

Page 248: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2016 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 94.6 0.0 76.1 0.0 143.5 0.0 59.8Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1550.4 0.0 1583.3 0.0 1565.9Queue Serve Time (g_s), s 0.0 1.8 0.0 1.2 0.0 2.8 0.0 1.0Cycle Queue Clear Time (g_c), s 0.0 1.8 0.0 1.2 0.0 2.8 0.0 1.0Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 508.1 0.0 633.3 0.0 508.1 0.0 639.6Volume-to-Capacity Ratio (X) 0.000 0.186 0.000 0.120 0.000 0.282 0.000 0.093Available Capacity (c_a), veh/h 0.0 876.5 0.0 1010.9 0.0 876.5 0.0 1021.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 10.0 0.0 7.5 0.0 10.3 0.0 7.4Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 10.1 0.0 7.6 0.0 10.6 0.0 7.5First-Term Queue (Q1), veh/ln 0.0 0.5 0.0 0.3 0.0 0.8 0.0 0.2Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.5 0.0 0.3 0.0 0.8 0.0 0.2Percentile Storage Ratio (RQ%) 0.00 0.16 0.00 0.10 0.00 0.25 0.00 0.08Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 10.3HCM Level of Service B

Page 249: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queues13: 600 East & 1000 North 12/1/2011

2035 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane Group Flow (vph) 99 365 109 182 370 71 141 325 127 65 329 176v/c Ratio 0.30 0.56 0.18 0.54 0.56 0.12 0.43 0.53 0.21 0.20 0.53 0.27Control Delay 12.4 14.1 3.4 17.8 14.3 3.6 17.1 15.7 4.0 13.1 15.8 3.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 12.4 14.1 3.4 17.8 14.3 3.6 17.1 15.7 4.0 13.1 15.8 3.8Queue Length 50th (ft) 14 57 0 29 58 0 22 53 0 9 54 0Queue Length 95th (ft) 50 153 23 96 155 18 79 150 28 39 151 32Internal Link Dist (ft) 1000 347 371 200Turn Bay Length (ft) 100 80 140 80 80 80 80 80Base Capacity (vph) 618 1222 1017 620 1222 1022 586 1111 995 593 1111 1015Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.16 0.30 0.11 0.29 0.30 0.07 0.24 0.29 0.13 0.11 0.30 0.17

Intersection Summary

Page 250: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2035 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 2

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsVolume (vph) 91 336 100 167 340 65 130 299 117 60 303 162Movement Number 7 4 14 3 8 18 5 2 12 1 6 16Initial Queue, veh 0 0 0 0 0 0 0 0 0 0 0 0Ped-Bike Adj. Factor (A_pbT) 1.00 0.98 0.99 0.99 1.00 1.00 1.00 1.00Parking, Bus Adj. Factors 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Adj. Sat. Flow Rate, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863Lanes 1 1 1 1 1 1 1 1 1 1 1 1Lane AssignmentCapacity, veh/h 421 788 656 423 788 662 377 678 576 381 678 576Proportion Arriving On Green 0.42 0.42 0.42 0.42 0.42 0.42 0.36 0.36 0.36 0.36 0.36 0.36Movement Delay, s/veh 15.1 11.1 9.4 16.9 11.2 9.1 18.4 13.2 11.5 16.5 13.2 12.0Movement LOS B B A B B A B B B B B BApproach Volume, veh/h 573 622 593 571Approach Delay, s/veh 11.5 12.6 14.1 13.2Approach LOS B B B B

Timer: 1 2 3 4 5 6 7 8Assigned Phase 2 4 6 8Case No 5.0 5.0 5.0 5.0Phase Duration (G+Y+Rc), s 24.28 27.33 24.28 27.33Change Period (Y+Rc), s 5.50 5.50 5.50 5.50Max. Allowable Headway (MAH), s 4.83 4.97 4.83 4.97Maximum Green Setting (Gmax), s 22.50 26.50 22.50 26.50Max. Queue Clearance Time (g_c+l1), s 15.28 13.43 11.57 17.43Green Extension Time (g_e), s 3.51 5.51 4.60 4.39Probability of Phase Call (p_c) 1.000 1.000 1.000 1.000Probability of Max Out (p_x) 0.760 0.438 0.497 0.659

Left-Turn Movement DataAssigned Movement 5 7 1 3Mvmt. Sat Flow, veh/h 1046.38 1004.47 1050.55 1004.78

Through Movement DataAssigned Movement 2 4 6 8Mvmt. Sat Flow, veh/h 1862.75 1862.75 1862.75 1862.75

Right-Turn Movement DataAssigned Movement 12 14 16 18Mvmt. Sat Flow, veh/h 1583.33 1551.51 1583.33 1566.49

Left Lane Group DataAssigned Movement 0 5 0 7 0 1 0 3Lane Assignment L L L LLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 141.3 0.0 98.9 0.0 65.2 0.0 181.5Group Sat. Flow (s), veh/h/ln 0.0 1046.4 0.0 1004.5 0.0 1050.6 0.0 1004.8Queue Serve Time (g_s), s 0.0 6.2 0.0 4.1 0.0 2.6 0.0 8.2Cycle Queue Clear Time (g_c), s 0.0 13.3 0.0 11.4 0.0 9.6 0.0 15.4

Page 251: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2035 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 3

Perm LT Sat Flow Rate (s_l), veh/h/ln 0.0 1046.4 0.0 1004.5 0.0 1050.6 0.0 1004.8Shared LT Sat Flow (s_sh), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Perm LT Eff. Green (g_p), s 0.0 18.8 0.0 21.8 0.0 18.8 0.0 21.8Perm LT Serve Time (g_u), s 0.0 11.7 0.0 14.5 0.0 11.8 0.0 14.6Perm LT Que Serve Time (g_ps), s 0.0 6.2 0.0 4.1 0.0 2.6 0.0 8.2Time to First Blk (g_f), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Serve Time pre Blk (g_fs), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion LT Inside Lane (P_L) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 377.4 0.0 420.8 0.0 380.6 0.0 423.0Volume-to-Capacity Ratio (X) 0.000 0.374 0.000 0.235 0.000 0.171 0.000 0.429Available Capacity (c_a), veh/h 0.0 452.7 0.0 511.8 0.0 456.3 0.0 514.0Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 17.8 0.0 14.8 0.0 16.3 0.0 16.2Incremental Delay (d2), s/veh 0.0 0.6 0.0 0.3 0.0 0.2 0.0 0.7Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 18.4 0.0 15.1 0.0 16.5 0.0 16.9First-Term Queue (Q1), veh/ln 0.0 1.3 0.0 0.9 0.0 0.6 0.0 1.6Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 1.4 0.0 0.9 0.0 0.6 0.0 1.7Percentile Storage Ratio (RQ%) 0.00 0.45 0.00 0.24 0.00 0.20 0.00 0.31Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Middle Lane Group DataAssigned Movement 0 2 0 4 0 6 0 8Lane Assignment T T T TLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 325.0 0.0 365.2 0.0 329.3 0.0 369.6Group Sat. Flow (s), veh/h/ln 0.0 1862.7 0.0 1862.7 0.0 1862.7 0.0 1862.7Queue Serve Time (g_s), s 0.0 6.9 0.0 7.3 0.0 7.1 0.0 7.4Cycle Queue Clear Time (g_c), s 0.0 6.9 0.0 7.3 0.0 7.1 0.0 7.4Lane Group Capacity (c), veh/h 0.0 677.9 0.0 787.8 0.0 677.9 0.0 787.8Volume-to-Capacity Ratio (X) 0.000 0.479 0.000 0.464 0.000 0.486 0.000 0.469Available Capacity (c_a), veh/h 0.0 812.1 0.0 956.5 0.0 812.1 0.0 956.5Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 12.6 0.0 10.7 0.0 12.7 0.0 10.7Incremental Delay (d2), s/veh 0.0 0.5 0.0 0.4 0.0 0.5 0.0 0.4Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 13.2 0.0 11.1 0.0 13.2 0.0 11.2First-Term Queue (Q1), veh/ln 0.0 2.5 0.0 2.4 0.0 2.5 0.0 2.5Second-Term Queue (Q2), veh/ln 0.0 0.1 0.0 0.1 0.0 0.1 0.0 0.1Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 2.6 0.0 2.5 0.0 2.6 0.0 2.6Percentile Storage Ratio (RQ%) 0.00 0.16 0.00 0.06 0.00 0.34 0.00 0.19

Page 252: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

HCM 2010 Signalized Intersection Capacity Analysis13: 600 East & 1000 North 12/1/2011

2035 PM 11/17/2011 Development with Realigned Signal Synchro 8 ReportPage 4

Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Right Lane Group DataAssigned Movement 0 12 0 14 0 16 0 18Lane Assignment R R R RLanes in Group 0 1 0 1 0 1 0 1Group Volume (v), veh/h 0.0 127.2 0.0 108.7 0.0 176.1 0.0 70.7Group Sat. Flow (s), veh/h/ln 0.0 1583.3 0.0 1551.5 0.0 1583.3 0.0 1566.5Queue Serve Time (g_s), s 0.0 2.9 0.0 2.2 0.0 4.1 0.0 1.4Cycle Queue Clear Time (g_c), s 0.0 2.9 0.0 2.2 0.0 4.1 0.0 1.4Prot RT Sat Flow Rate (s_R), veh/h/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Prot RT Eff. Green (g_R), s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Proportion RT Outside Lane (P_R) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Lane Group Capacity (c), veh/h 0.0 576.2 0.0 656.2 0.0 576.2 0.0 662.5Volume-to-Capacity Ratio (X) 0.000 0.221 0.000 0.166 0.000 0.306 0.000 0.107Available Capacity (c_a), veh/h 0.0 690.3 0.0 796.7 0.0 690.3 0.0 804.4Upstream Filter Factor (I) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Uniform Delay (d1), s/veh 0.0 11.4 0.0 9.2 0.0 11.7 0.0 9.0Incremental Delay (d2), s/veh 0.0 0.2 0.0 0.1 0.0 0.3 0.0 0.1Initial Queue Delay (d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Control Delay (d), s/veh 0.0 11.5 0.0 9.4 0.0 12.0 0.0 9.1First-Term Queue (Q1), veh/ln 0.0 0.9 0.0 0.6 0.0 1.2 0.0 0.4Second-Term Queue (Q2), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Third-Term Queue (Q3), veh/ln 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Percentile bk-of-que factor (f_B%) 0.000 1.000 0.000 1.000 0.000 1.000 0.000 1.000Percentile Back of Queue (Q%), veh/ln 0.0 0.9 0.0 0.7 0.0 1.3 0.0 0.4Percentile Storage Ratio (RQ%) 0.00 0.28 0.00 0.21 0.00 0.41 0.00 0.13Initial Queue (Qb), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Final (Residual) Queue (Qe), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Delay (ds), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Queue (Qs), veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Saturated Capacity (cs), veh/h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Initial Queue Clear Time (tc), h 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Intersection SummaryHCM Average Control Delay 12.9HCM Level of Service B

Page 253: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryRealign 600 E Stop Control 11/23/2011

Existing PM Peak SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 4:45 4:45 4:45 4:45 4:45 4:45 4:45End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 894 898 892 898 881 988 906Vehs Exited 868 909 907 901 869 987 905Starting Vehs 80 122 114 112 101 112 99Ending Vehs 106 111 99 109 113 113 104Denied Entry Before 0 0 0 0 0 2 0Denied Entry After 0 1 0 0 1 2 0Travel Distance (mi) 599 633 628 630 606 683 630Travel Time (hr) 25.4 27.1 26.6 26.9 25.7 29.7 26.9Total Delay (hr) 7.1 7.9 7.8 8.0 7.4 9.2 7.9Total Stops 1146 1215 1172 1187 1162 1375 1209Fuel Used (gal) 23.1 24.8 24.3 24.6 23.6 27.1 24.6

Interval #0 Information SeedingStart Time 4:45End Time 5:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 5:00End Time 5:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 894 898 892 898 881 988 906Vehs Exited 868 909 907 901 869 987 905Starting Vehs 80 122 114 112 101 112 99Ending Vehs 106 111 99 109 113 113 104Denied Entry Before 0 0 0 0 0 2 0Denied Entry After 0 1 0 0 1 2 0Travel Distance (mi) 599 633 628 630 606 683 630Travel Time (hr) 25.4 27.1 26.6 26.9 25.7 29.7 26.9Total Delay (hr) 7.1 7.9 7.8 8.0 7.4 9.2 7.9Total Stops 1146 1215 1172 1187 1162 1375 1209Fuel Used (gal) 23.1 24.8 24.3 24.6 23.6 27.1 24.6

Page 254: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportRealign 600 E Stop Control 11/23/2011

Existing PM Peak SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.3 0.1 0.1 0.2 0.0 0.1 0.1 0.1 0.0 0.2 0.1Delay / Veh (s) 12.3 15.8 11.4 10.0 13.4 5.6 12.4 13.8 11.6 14.5 14.9 7.6Total Stops 16 60 19 26 54 10 22 38 18 10 54 36Travel Dist (mi) 3.3 11.9 3.3 1.9 4.2 0.8 1.7 2.9 1.3 0.5 2.7 1.6Travel Time (hr) 0.2 0.7 0.2 0.1 0.3 0.1 0.1 0.3 0.1 0.1 0.3 0.1Avg Speed (mph) 21 19 21 13 12 15 12 12 15 8 9 11Fuel Used (gal) 0.1 0.4 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.0 0.1 0.0HC Emissions (g) 0 2 1 0 1 0 1 1 0 0 1 0CO Emissions (g) 17 65 22 6 21 3 22 37 20 2 14 6NOx Emissions (g) 2 7 2 1 2 0 2 4 1 0 2 1Vehicles Entered 16 60 17 25 54 10 22 38 17 10 54 30Vehicles Exited 16 59 16 26 54 10 22 38 16 10 54 31Hourly Exit Rate 64 236 64 104 216 40 88 152 64 40 216 124Input Volume 60 220 68 96 212 36 92 164 68 36 212 120% of Volume 107 107 94 108 102 111 96 93 94 111 102 103Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 1.3Delay / Veh (s) 12.9Total Stops 363Travel Dist (mi) 36.1Travel Time (hr) 2.6Avg Speed (mph) 14Fuel Used (gal) 1.1HC Emissions (g) 7CO Emissions (g) 235NOx Emissions (g) 23Vehicles Entered 353Vehicles Exited 352Hourly Exit Rate 1408Input Volume 1384% of Volume 102Denied Entry Before 0Denied Entry After 0

Page 255: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportRealign 600 E Stop Control 11/23/2011

Existing PM Peak SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 59 118 72 77 114 66 110 46 153 95Average Queue (ft) 28 66 34 38 58 26 69 33 75 5495th Queue (ft) 61 122 76 82 123 68 123 61 137 105Link Distance (ft) 1038 367 411 206Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 13 0 6 0 8 0 11 0Queuing Penalty (veh) 17 1 8 0 5 0 14 0

Page 256: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation Summary600 East Realigned Stop Control 11/23/2011

2016 PM Peak SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 4:45 4:45 4:45 4:45 4:45 4:45 4:45End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1000 1019 1014 970 999 1049 1007Vehs Exited 1006 1022 1042 982 1007 1052 1018Starting Vehs 117 113 140 108 130 123 117Ending Vehs 111 110 112 96 122 120 99Denied Entry Before 1 1 0 3 2 0 0Denied Entry After 2 1 1 1 0 2 0Travel Distance (mi) 700 716 722 670 717 723 708Travel Time (hr) 30.1 31.0 32.3 29.1 31.1 31.4 30.8Total Delay (hr) 9.2 9.7 10.5 8.8 9.4 9.7 9.5Total Stops 1335 1354 1429 1304 1348 1422 1367Fuel Used (gal) 27.5 28.6 28.7 26.5 28.1 28.6 28.0

Interval #0 Information SeedingStart Time 4:45End Time 5:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 5:00End Time 5:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1000 1019 1014 970 999 1049 1007Vehs Exited 1006 1022 1042 982 1007 1052 1018Starting Vehs 117 113 140 108 130 123 117Ending Vehs 111 110 112 96 122 120 99Denied Entry Before 1 1 0 3 2 0 0Denied Entry After 2 1 1 1 0 2 0Travel Distance (mi) 700 716 722 670 717 723 708Travel Time (hr) 30.1 31.0 32.3 29.1 31.1 31.4 30.8Total Delay (hr) 9.2 9.7 10.5 8.8 9.4 9.7 9.5Total Stops 1335 1354 1429 1304 1348 1422 1367Fuel Used (gal) 27.5 28.6 28.7 26.5 28.1 28.6 28.0

Page 257: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance Report600 East Realigned Stop Control 11/23/2011

2016 PM Peak SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.4 0.1 0.1 0.2 0.0 0.1 0.2 0.1 0.0 0.3 0.1Delay / Veh (s) 14.7 23.0 16.3 11.3 13.1 5.6 16.4 16.2 12.7 12.3 16.1 7.8Total Stops 16 64 18 27 50 10 25 44 18 12 58 41Travel Dist (mi) 2.9 12.7 3.6 2.1 4.0 0.7 1.9 3.5 1.3 0.6 2.9 1.7Travel Time (hr) 0.2 0.8 0.2 0.2 0.3 0.0 0.2 0.3 0.1 0.1 0.4 0.2Avg Speed (mph) 20 15 16 13 12 15 10 11 14 9 8 11Fuel Used (gal) 0.1 0.4 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.0 0.1 0.1HC Emissions (g) 1 4 1 0 1 0 1 1 1 0 0 0CO Emissions (g) 23 95 29 8 20 8 26 40 23 2 15 8NOx Emissions (g) 2 10 3 1 2 1 2 3 2 0 2 1Vehicles Entered 15 64 18 27 52 9 24 44 16 12 58 34Vehicles Exited 15 65 18 27 51 9 25 45 17 12 58 33Hourly Exit Rate 60 260 72 108 204 36 100 180 68 48 232 132Input Volume 60 250 80 100 231 40 100 170 70 40 220 130% of Volume 100 104 90 108 88 90 100 106 97 120 105 102Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 1.6Delay / Veh (s) 15.3Total Stops 383Travel Dist (mi) 37.9Travel Time (hr) 3.0Avg Speed (mph) 13Fuel Used (gal) 1.3HC Emissions (g) 10CO Emissions (g) 297NOx Emissions (g) 30Vehicles Entered 373Vehicles Exited 375Hourly Exit Rate 1500Input Volume 1491% of Volume 101Denied Entry Before 0Denied Entry After 0

Page 258: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking Report600 East Realigned Stop Control 11/23/2011

2016 PM Peak SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB WB WB WB NB NB SB SBDirections Served L TR L T R LT R LT RMaximum Queue (ft) 94 167 70 88 59 138 68 156 90Average Queue (ft) 39 99 37 55 22 81 38 86 5595th Queue (ft) 104 213 66 97 57 145 75 149 103Link Distance (ft) 1038 367 410 206Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft) 120 140 70 70 70Storage Blk Time (%) 10 5 0 14 0 14 1Queuing Penalty (veh) 6 7 0 10 1 18 1

Page 259: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 260: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation Summary600 East Realigned Stop Control 11/23/2011

2035 PM Peak SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 4:45 4:45 4:45 4:45 4:45 4:45 4:45End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1369 1290 1263 1365 1299 1346 1322Vehs Exited 1299 1206 1200 1340 1308 1317 1277Starting Vehs 224 225 288 244 227 238 233Ending Vehs 294 309 351 269 218 267 275Denied Entry Before 7 5 1 3 11 2 2Denied Entry After 13 58 115 19 7 16 37Travel Distance (mi) 928 851 845 956 928 936 907Travel Time (hr) 75.0 71.2 89.6 67.8 60.2 61.4 70.9Total Delay (hr) 46.9 45.4 64.1 38.9 32.5 33.3 43.5Total Stops 2794 2716 3206 2880 2229 2526 2726Fuel Used (gal) 44.4 41.4 45.8 43.5 41.5 41.4 43.0

Interval #0 Information SeedingStart Time 4:45End Time 5:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 5:00End Time 5:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1369 1290 1263 1365 1299 1346 1322Vehs Exited 1299 1206 1200 1340 1308 1317 1277Starting Vehs 224 225 288 244 227 238 233Ending Vehs 294 309 351 269 218 267 275Denied Entry Before 7 5 1 3 11 2 2Denied Entry After 13 58 115 19 7 16 37Travel Distance (mi) 928 851 845 956 928 936 907Travel Time (hr) 75.0 71.2 89.6 67.8 60.2 61.4 70.9Total Delay (hr) 46.9 45.4 64.1 38.9 32.5 33.3 43.5Total Stops 2794 2716 3206 2880 2229 2526 2726Fuel Used (gal) 44.4 41.4 45.8 43.5 41.5 41.4 43.0

Page 261: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance Report600 East Realigned Stop Control 11/23/2011

2035 PM Peak SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.4 2.2 0.8 0.2 0.5 0.0 1.2 2.8 1.0 0.2 1.0 0.3Delay / Veh (s) 80.2 120.1 108.5 15.6 23.9 9.5 150.5 155.1 135.6 47.9 49.6 31.1Total Stops 29 79 29 37 68 16 24 54 35 14 76 56Travel Dist (mi) 3.3 13.4 5.0 2.7 5.3 0.9 2.2 5.1 2.1 0.7 3.6 1.9Travel Time (hr) 0.5 2.7 0.9 0.3 0.6 0.1 1.3 3.0 1.1 0.2 1.1 0.4Avg Speed (mph) 7 5 5 10 8 13 2 2 3 3 3 5Fuel Used (gal) 0.2 0.9 0.3 0.1 0.2 0.0 0.3 0.8 0.3 0.1 0.3 0.1HC Emissions (g) 1 4 1 1 1 0 2 4 2 0 1 1CO Emissions (g) 31 140 40 16 24 3 43 105 41 5 37 19NOx Emissions (g) 3 14 4 2 3 0 4 10 4 1 4 2Vehicles Entered 16 68 25 35 69 12 28 66 28 13 73 37Vehicles Exited 17 66 25 35 69 12 29 64 26 14 71 38Hourly Exit Rate 68 264 100 140 276 48 116 256 104 56 284 152Input Volume 80 280 100 140 281 50 130 270 100 50 305 160% of Volume 85 94 100 100 98 96 89 95 104 112 93 95Denied Entry Before 0 0 0 0 0 0 0 2 0 0 0 0Denied Entry After 0 0 0 0 0 0 2 2 1 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 10.5Delay / Veh (s) 81.0Total Stops 517Travel Dist (mi) 46.3Travel Time (hr) 12.2Avg Speed (mph) 4Fuel Used (gal) 3.6HC Emissions (g) 16CO Emissions (g) 503NOx Emissions (g) 52Vehicles Entered 470Vehicles Exited 466Hourly Exit Rate 1864Input Volume 1946% of Volume 96Denied Entry Before 2Denied Entry After 5

Page 262: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking Report600 East Realigned Stop Control 11/23/2011

2035 PM Peak SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB WB WB WB NB NB SB SBDirections Served L TR L T R LT R LT RMaximum Queue (ft) 134 527 118 153 92 449 95 223 95Average Queue (ft) 95 410 62 90 36 426 95 185 8795th Queue (ft) 197 827 124 168 94 475 95 287 121Link Distance (ft) 1038 367 410 206Upstream Blk Time (%) 64 33Queuing Penalty (veh) 0 170Storage Bay Dist (ft) 120 140 70 70 70Storage Blk Time (%) 0 72 0 24 0 96 3 72 8Queuing Penalty (veh) 0 57 0 45 0 96 12 115 27

Page 263: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 264: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment with Realign Stop Control 12/1/2011

Existing PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1Vehs Entered 1128 1069 1028 1067 1080 1068Vehs Exited 1151 1066 1020 1075 1069 1078Starting Vehs 138 125 113 122 121 118Ending Vehs 115 128 121 114 132 118Denied Entry Before 3 1 0 2 0 0Denied Entry After 0 0 2 2 3 0Travel Distance (mi) 747 696 672 702 706 705Travel Time (hr) 34.1 31.5 29.5 31.2 32.1 31.7Total Delay (hr) 11.1 10.2 9.0 9.6 10.4 10.1Total Stops 1553 1466 1376 1444 1511 1464Fuel Used (gal) 29.9 28.3 26.6 28.5 28.1 28.3

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1128 1069 1028 1067 1080 1068Vehs Exited 1151 1066 1020 1075 1069 1078Starting Vehs 138 125 113 122 121 118Ending Vehs 115 128 121 114 132 118Denied Entry Before 3 1 0 2 0 0Denied Entry After 0 0 2 2 3 0Travel Distance (mi) 747 696 672 702 706 705Travel Time (hr) 34.1 31.5 29.5 31.2 32.1 31.7Total Delay (hr) 11.1 10.2 9.0 9.6 10.4 10.1Total Stops 1553 1466 1376 1444 1511 1464Fuel Used (gal) 29.9 28.3 26.6 28.5 28.1 28.3

Page 265: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment with Realign Stop Control 12/1/2011

Existing PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.5 0.1 0.1 0.4 0.0 0.1 0.3 0.1 0.1 0.4 0.1Total Del/Veh (s) 17.8 24.2 17.2 13.7 19.7 8.5 22.9 21.6 15.9 18.0 23.9 10.4Speed Delay (hr) 0.1 0.5 0.1 0.1 0.4 0.0 0.1 0.3 0.1 0.1 0.4 0.1Speed Del/Veh (s) 13.4 22.9 12.7 13.7 19.7 8.5 22.0 20.7 11.5 18.0 23.9 10.4Total Stops 19 71 24 33 66 14 22 46 31 10 53 40Travel Dist (mi) 3.1 14.3 3.4 2.4 5.3 0.9 1.7 3.6 2.0 0.5 2.7 1.7Travel Time (hr) 0.2 1.0 0.2 0.2 0.6 0.1 0.2 0.4 0.2 0.1 0.5 0.2Avg Speed (mph) 18 15 17 11 9 13 8 9 12 7 6 9Fuel Used (gal) 0.1 0.5 0.1 0.1 0.2 0.0 0.1 0.2 0.1 0.0 0.1 0.1HC Emissions (g) 1 3 0 1 2 1 0 1 1 0 1 0CO Emissions (g) 23 98 19 25 54 12 18 46 36 4 23 8NOx Emissions (g) 2 10 2 3 6 2 2 4 3 1 2 1Vehicles Entered 16 72 17 31 67 12 21 46 25 10 53 33Vehicles Exited 15 72 17 31 67 12 21 45 26 11 54 33Hourly Exit Rate 60 288 68 124 268 48 84 180 104 44 216 132Input Volume 71 276 68 123 273 51 92 193 85 46 215 122% of Volume 85 104 100 101 98 94 91 93 122 96 100 108Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 2.2Total Del/Veh (s) 19.6Speed Delay (hr) 2.1Speed Del/Veh (s) 18.6Total Stops 429Travel Dist (mi) 41.5Travel Time (hr) 3.8Avg Speed (mph) 11Fuel Used (gal) 1.6HC Emissions (g) 11CO Emissions (g) 366NOx Emissions (g) 38Vehicles Entered 403Vehicles Exited 404Hourly Exit Rate 1616Input Volume 1615% of Volume 100Denied Entry Before 0Denied Entry After 0

Page 266: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realign Stop Control 12/1/2011

Existing PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 125 236 75 114 163 84 185 95 185 94Average Queue (ft) 50 105 45 58 90 36 100 60 106 6595th Queue (ft) 129 236 93 128 183 94 187 108 198 113Link Distance (ft) 1038 349 411 196Upstream Blk Time (%) 3Queuing Penalty (veh) 10Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 0 31 0 0 17 0 24 1 24 1Queuing Penalty (veh) 0 43 1 0 29 0 20 2 29 3

Page 267: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 268: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment with Realign Stop Control 12/1/2011

2016 PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1191 1190 1117 1145 1194 1230 1177Vehs Exited 1204 1205 1128 1148 1166 1222 1181Starting Vehs 141 150 140 152 124 153 137Ending Vehs 128 135 129 149 152 161 130Denied Entry Before 2 1 0 2 2 1 0Denied Entry After 2 0 0 1 0 2 0Travel Distance (mi) 781 815 748 772 784 825 787Travel Time (hr) 37.5 38.9 33.0 35.1 35.6 37.4 36.2Total Delay (hr) 13.6 14.2 10.2 11.6 12.0 12.4 12.3Total Stops 1662 1739 1520 1588 1602 1630 1614Fuel Used (gal) 32.0 33.1 29.9 31.0 31.5 33.0 31.8

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1191 1190 1117 1145 1194 1230 1177Vehs Exited 1204 1205 1128 1148 1166 1222 1181Starting Vehs 141 150 140 152 124 153 137Ending Vehs 128 135 129 149 152 161 130Denied Entry Before 2 1 0 2 2 1 0Denied Entry After 2 0 0 1 0 2 0Travel Distance (mi) 781 815 748 772 784 825 787Travel Time (hr) 37.5 38.9 33.0 35.1 35.6 37.4 36.2Total Delay (hr) 13.6 14.2 10.2 11.6 12.0 12.4 12.3Total Stops 1662 1739 1520 1588 1602 1630 1614Fuel Used (gal) 32.0 33.1 29.9 31.0 31.5 33.0 31.8

Page 269: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment with Realign Stop Control 12/1/2011

2016 PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.8 0.1 0.1 0.5 0.1 0.2 0.4 0.1 0.1 0.4 0.1Total Del/Veh (s) 22.0 37.8 22.5 16.3 25.6 13.9 30.1 27.8 17.9 22.5 24.5 13.6Speed Delay (hr) 0.1 0.8 0.1 0.1 0.5 0.1 0.2 0.4 0.1 0.1 0.4 0.1Speed Del/Veh (s) 17.8 36.6 18.4 16.3 25.6 13.9 29.2 27.1 13.7 22.5 24.5 13.6Total Stops 21 78 25 33 74 18 25 51 27 12 56 42Travel Dist (mi) 3.4 15.0 3.5 2.4 5.7 1.1 1.9 3.9 1.6 0.6 2.8 1.7Travel Time (hr) 0.2 1.3 0.2 0.2 0.7 0.1 0.3 0.5 0.2 0.1 0.5 0.2Avg Speed (mph) 16 11 15 10 8 10 7 7 11 6 6 8Fuel Used (gal) 0.1 0.6 0.1 0.1 0.3 0.0 0.1 0.2 0.1 0.0 0.1 0.1HC Emissions (g) 0 5 1 0 2 1 0 1 1 0 0 1CO Emissions (g) 22 121 26 19 55 15 19 48 31 4 18 16NOx Emissions (g) 2 13 3 2 6 2 2 4 3 0 2 2Vehicles Entered 17 76 18 30 72 14 24 50 20 11 56 32Vehicles Exited 17 74 18 30 72 14 24 51 20 12 55 33Hourly Exit Rate 68 296 72 120 288 56 96 204 80 48 220 132Input Volume 71 306 70 127 290 55 100 199 87 50 223 132% of Volume 96 97 103 94 99 102 96 103 92 96 99 100Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 3.1Total Del/Veh (s) 25.7Speed Delay (hr) 3.0Speed Del/Veh (s) 24.8Total Stops 462Travel Dist (mi) 43.6Travel Time (hr) 4.7Avg Speed (mph) 10Fuel Used (gal) 1.8HC Emissions (g) 12CO Emissions (g) 392NOx Emissions (g) 41Vehicles Entered 420Vehicles Exited 420Hourly Exit Rate 1680Input Volume 1710% of Volume 98Denied Entry Before 0Denied Entry After 0

Page 270: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realign Stop Control 12/1/2011

2016 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 113 271 75 112 179 82 214 94 160 95Average Queue (ft) 46 145 48 66 123 45 127 60 104 6895th Queue (ft) 121 348 95 151 264 108 251 112 189 115Link Distance (ft) 1038 349 411 196Upstream Blk Time (%) 1 3Queuing Penalty (veh) 6 13Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 47 1 27 0 36 1 28 2Queuing Penalty (veh) 66 2 49 1 31 2 37 7

Page 271: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 272: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment with Realign Stop Control 12/1/2011

2035 PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1422 1562 1486 1467 1388 1533 1477Vehs Exited 1357 1446 1397 1418 1347 1439 1403Starting Vehs 283 282 300 257 321 283 285Ending Vehs 348 398 389 306 362 377 354Denied Entry Before 6 33 36 19 22 14 21Denied Entry After 117 50 76 53 84 36 68Travel Distance (mi) 902 1013 943 950 901 995 951Travel Time (hr) 87.9 99.2 105.2 78.8 100.7 93.4 94.2Total Delay (hr) 60.6 68.8 76.6 50.0 73.3 63.4 65.5Total Stops 3075 3981 3716 3084 3583 3837 3543Fuel Used (gal) 47.0 53.3 52.6 46.5 50.3 51.3 50.2

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1422 1562 1486 1467 1388 1533 1477Vehs Exited 1357 1446 1397 1418 1347 1439 1403Starting Vehs 283 282 300 257 321 283 285Ending Vehs 348 398 389 306 362 377 354Denied Entry Before 6 33 36 19 22 14 21Denied Entry After 117 50 76 53 84 36 68Travel Distance (mi) 902 1013 943 950 901 995 951Travel Time (hr) 87.9 99.2 105.2 78.8 100.7 93.4 94.2Total Delay (hr) 60.6 68.8 76.6 50.0 73.3 63.4 65.5Total Stops 3075 3981 3716 3084 3583 3837 3543Fuel Used (gal) 47.0 53.3 52.6 46.5 50.3 51.3 50.2

Page 273: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment with Realign Stop Control 12/1/2011

2035 PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.4 1.9 0.5 0.4 1.2 0.2 2.4 5.5 2.1 0.2 1.2 0.4Total Del/Veh (s) 58.5 76.1 59.3 35.8 53.3 34.7 299.9 289.5 283.9 52.0 58.3 38.7Speed Delay (hr) 0.4 1.9 0.5 0.4 1.2 0.2 0.9 2.1 0.7 0.2 1.2 0.4Speed Del/Veh (s) 53.9 74.6 55.0 35.8 52.7 33.8 108.9 111.9 94.1 52.0 58.3 38.7Total Stops 42 106 50 65 84 28 16 39 28 13 73 53Travel Dist (mi) 4.4 16.2 5.6 3.3 6.1 1.2 1.9 4.7 1.8 0.6 3.4 1.7Travel Time (hr) 0.5 2.5 0.7 0.6 1.4 0.2 2.5 5.7 2.1 0.2 1.3 0.5Avg Speed (mph) 9 7 8 6 4 6 2 2 2 3 3 4Fuel Used (gal) 0.2 0.8 0.3 0.2 0.4 0.1 0.6 1.4 0.5 0.1 0.4 0.2HC Emissions (g) 1 7 2 2 2 0 2 4 1 0 2 1CO Emissions (g) 43 163 54 43 64 9 64 134 39 9 51 25NOx Emissions (g) 4 18 5 5 7 1 4 9 3 1 6 3Vehicles Entered 23 84 28 42 76 15 24 60 24 12 67 32Vehicles Exited 22 79 29 42 79 16 24 60 22 13 66 34Hourly Exit Rate 88 316 116 168 316 64 96 240 88 52 264 136Input Volume 91 336 100 167 341 65 130 299 117 60 303 162% of Volume 97 94 116 101 93 98 74 80 75 87 87 84Denied Entry Before 0 0 0 0 0 0 3 10 3 0 0 0Denied Entry After 0 0 0 0 0 0 7 18 5 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 16.4Total Del/Veh (s) 110.9Speed Delay (hr) 10.0Speed Del/Veh (s) 67.4Total Stops 597Travel Dist (mi) 50.9Travel Time (hr) 18.3Avg Speed (mph) 4Fuel Used (gal) 5.2HC Emissions (g) 24CO Emissions (g) 698NOx Emissions (g) 68Vehicles Entered 487Vehicles Exited 486Hourly Exit Rate 1944Input Volume 2171% of Volume 90Denied Entry Before 16Denied Entry After 30

Page 274: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realign Stop Control 12/1/2011

2035 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 144 564 75 165 323 95 443 95 224 95Average Queue (ft) 105 368 71 133 230 73 421 90 207 8895th Queue (ft) 196 822 95 216 406 132 477 124 276 123Link Distance (ft) 1038 349 411 196Upstream Blk Time (%) 0 5 78 51Queuing Penalty (veh) 0 29 0 270Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 0 80 4 3 69 1 98 1 87 6Queuing Penalty (veh) 0 153 16 10 159 3 115 5 141 21

Page 275: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 276: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryBaseline 12/2/2011

Existing AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 645 661 653 637 613 633 637Vehs Exited 665 673 657 664 591 631 645Starting Vehs 71 71 65 70 60 64 55Ending Vehs 51 59 61 43 82 66 49Denied Entry Before 1 0 1 1 1 2 0Denied Entry After 0 2 0 0 0 2 0Travel Distance (mi) 419 430 419 408 389 409 412Travel Time (hr) 17.0 17.6 16.9 16.3 15.7 16.3 16.6Total Delay (hr) 4.5 4.6 4.3 4.0 3.9 4.0 4.2Total Stops 782 779 736 729 698 709 735Fuel Used (gal) 16.3 17.1 16.0 16.0 15.2 15.7 16.0

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 645 661 653 637 613 633 637Vehs Exited 665 673 657 664 591 631 645Starting Vehs 71 71 65 70 60 64 55Ending Vehs 51 59 61 43 82 66 49Denied Entry Before 1 0 1 1 1 2 0Denied Entry After 0 2 0 0 0 2 0Travel Distance (mi) 419 430 419 408 389 409 412Travel Time (hr) 17.0 17.6 16.9 16.3 15.7 16.3 16.6Total Delay (hr) 4.5 4.6 4.3 4.0 3.9 4.0 4.2Total Stops 782 779 736 729 698 709 735Fuel Used (gal) 16.3 17.1 16.0 16.0 15.2 15.7 16.0

Page 277: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportBaseline 12/2/2011

Existing AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0Total Del/Veh (s) 10.8 10.0 8.1 6.2 8.1 3.8 8.4 10.0 9.5 5.5 7.6 4.4Speed Delay (hr) 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0Speed Del/Veh (s) 6.4 9.2 3.6 6.2 8.1 3.8 7.8 9.3 5.2 5.5 7.6 4.4Total Stops 14 45 9 10 32 3 13 38 13 1 14 8Travel Dist (mi) 2.8 9.0 1.7 0.7 2.3 0.2 1.0 2.9 0.9 0.1 0.7 0.4Travel Time (hr) 0.1 0.4 0.1 0.0 0.1 0.0 0.1 0.2 0.1 0.0 0.1 0.0Avg Speed (mph) 22 21 23 15 15 15 14 14 16 14 13 13Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0HC Emissions (g) 0 3 0 0 1 0 0 1 1 0 0 0CO Emissions (g) 18 60 12 7 20 1 14 35 20 0 2 1NOx Emissions (g) 1 7 1 1 2 0 1 3 2 0 0 0Vehicles Entered 14 45 8 10 32 3 13 38 12 1 14 7Vehicles Exited 14 45 9 10 32 3 13 38 12 1 14 8Hourly Exit Rate 56 180 36 40 128 12 52 152 48 4 56 32Input Volume 60 178 32 44 128 12 48 148 52 8 64 32% of Volume 93 101 112 91 100 100 108 103 92 50 88 100Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 0.5Total Del/Veh (s) 8.7Speed Delay (hr) 0.4Speed Del/Veh (s) 7.6Total Stops 200Travel Dist (mi) 22.8Travel Time (hr) 1.3Avg Speed (mph) 18Fuel Used (gal) 0.7HC Emissions (g) 6CO Emissions (g) 191NOx Emissions (g) 20Vehicles Entered 197Vehicles Exited 199Hourly Exit Rate 796Input Volume 806% of Volume 99Denied Entry Before 0Denied Entry After 0

Page 278: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportBaseline 12/2/2011

Existing AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB NB NB SB SBDirections Served L T R L T LT R LT RMaximum Queue (ft) 39 70 26 7 24 93 49 45 28Average Queue (ft) 21 39 9 1 6 51 24 29 1495th Queue (ft) 39 82 28 9 22 90 53 45 35Link Distance (ft) 1036 300 402 206Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 120 50 140 70 70Storage Blk Time (%) 2 0 3 0 0Queuing Penalty (veh) 2 0 1 0 0

Page 279: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 280: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryBaseline 12/2/2011

Existing PM Peak SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 4:45 4:45 4:45 4:45 4:45 4:45 4:45End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 896 919 874 870 894 956 902Vehs Exited 888 953 934 873 904 949 915Starting Vehs 103 141 147 111 105 114 112Ending Vehs 111 107 87 108 95 121 101Denied Entry Before 2 0 3 2 1 3 0Denied Entry After 1 0 1 1 0 1 0Travel Distance (mi) 600 633 621 600 609 671 622Travel Time (hr) 26.0 28.4 27.4 24.9 25.7 29.7 27.0Total Delay (hr) 7.8 9.3 8.5 6.9 7.2 9.6 8.2Total Stops 1189 1270 1160 1097 1126 1295 1189Fuel Used (gal) 23.7 25.4 24.7 23.6 23.7 26.5 24.6

Interval #0 Information SeedingStart Time 4:45End Time 5:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 5:00End Time 5:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 896 919 874 870 894 956 902Vehs Exited 888 953 934 873 904 949 915Starting Vehs 103 141 147 111 105 114 112Ending Vehs 111 107 87 108 95 121 101Denied Entry Before 2 0 3 2 1 3 0Denied Entry After 1 0 1 1 0 1 0Travel Distance (mi) 600 633 621 600 609 671 622Travel Time (hr) 26.0 28.4 27.4 24.9 25.7 29.7 27.0Total Delay (hr) 7.8 9.3 8.5 6.9 7.2 9.6 8.2Total Stops 1189 1270 1160 1097 1126 1295 1189Fuel Used (gal) 23.7 25.4 24.7 23.6 23.7 26.5 24.6

Page 281: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportBaseline 12/2/2011

Existing PM Peak SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.3 0.1 0.1 0.2 0.0 0.2 0.3 0.1 0.0 0.3 0.1Total Del/Veh (s) 14.2 19.0 11.5 13.6 15.2 5.0 26.9 29.8 16.8 18.9 22.8 12.2Speed Delay (hr) 0.0 0.3 0.0 0.1 0.2 0.0 0.2 0.3 0.1 0.0 0.3 0.1Speed Del/Veh (s) 10.3 18.2 7.0 13.6 15.2 5.0 26.4 29.0 12.5 18.9 22.8 12.2Total Stops 15 55 20 24 55 9 23 42 19 10 49 36Travel Dist (mi) 3.0 10.9 3.3 1.6 3.9 0.6 1.8 3.2 1.2 0.5 2.5 1.5Travel Time (hr) 0.2 0.7 0.2 0.2 0.4 0.0 0.2 0.5 0.1 0.1 0.4 0.2Avg Speed (mph) 20 17 21 10 11 15 7 7 11 7 6 8Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.1 0.2 0.1 0.0 0.1 0.1HC Emissions (g) 0 3 1 0 1 0 1 1 1 0 0 0CO Emissions (g) 17 73 21 7 19 7 32 43 24 3 14 9NOx Emissions (g) 1 8 2 1 2 1 3 4 2 0 2 1Vehicles Entered 15 54 17 24 56 9 24 42 16 10 49 28Vehicles Exited 14 56 16 24 55 8 23 43 16 9 50 29Hourly Exit Rate 56 224 64 96 220 32 92 172 64 36 200 116Input Volume 60 220 68 96 212 36 92 164 68 36 212 120% of Volume 93 102 94 100 104 89 100 105 94 100 94 97Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 1.8Total Del/Veh (s) 18.0Speed Delay (hr) 1.7Speed Del/Veh (s) 17.2Total Stops 357Travel Dist (mi) 34.1Travel Time (hr) 3.0Avg Speed (mph) 11Fuel Used (gal) 1.2HC Emissions (g) 8CO Emissions (g) 268NOx Emissions (g) 27Vehicles Entered 344Vehicles Exited 343Hourly Exit Rate 1372Input Volume 1384% of Volume 99Denied Entry Before 0Denied Entry After 0

Page 282: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportBaseline 12/2/2011

Existing PM Peak SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 32 114 72 46 72 3 223 86 164 95Average Queue (ft) 22 60 26 14 26 0 107 40 94 6195th Queue (ft) 41 112 70 44 68 0 255 94 179 112Link Distance (ft) 1036 300 402 206Upstream Blk Time (%) 0 2Queuing Penalty (veh) 0 7Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 14 0 2 24 1 21 1Queuing Penalty (veh) 18 0 2 16 2 25 3

Page 283: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 284: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 882 902 895 885 859 857 878Vehs Exited 911 896 910 882 843 901 890Starting Vehs 97 90 98 81 76 122 83Ending Vehs 68 96 83 84 92 78 74Denied Entry Before 2 0 1 0 0 3 0Denied Entry After 1 3 1 0 1 0 0Travel Distance (mi) 558 569 559 558 524 535 550Travel Time (hr) 23.0 23.5 23.5 23.8 21.9 22.5 23.0Total Delay (hr) 6.1 6.4 6.4 6.9 5.9 6.1 6.3Total Stops 1070 1065 1094 1131 1018 1060 1071Fuel Used (gal) 21.8 22.5 22.0 22.2 20.4 21.1 21.6

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 882 902 895 885 859 857 878Vehs Exited 911 896 910 882 843 901 890Starting Vehs 97 90 98 81 76 122 83Ending Vehs 68 96 83 84 92 78 74Denied Entry Before 2 0 1 0 0 3 0Denied Entry After 1 3 1 0 1 0 0Travel Distance (mi) 558 569 559 558 524 535 550Travel Time (hr) 23.0 23.5 23.5 23.8 21.9 22.5 23.0Total Delay (hr) 6.1 6.4 6.4 6.9 5.9 6.1 6.3Total Stops 1070 1065 1094 1131 1018 1060 1071Fuel Used (gal) 21.8 22.5 22.0 22.2 20.4 21.1 21.6

Page 285: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.2 0.0 0.0 0.2 0.0 0.1 0.2 0.0 0.0 0.0 0.0Total Del/Veh (s) 12.8 11.3 9.3 8.3 12.4 5.3 12.9 13.9 11.4 8.0 9.3 5.1Speed Delay (hr) 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0Speed Del/Veh (s) 8.8 10.5 5.1 8.3 12.4 5.3 12.7 13.3 7.1 8.0 9.3 5.1Total Stops 17 57 14 16 56 5 13 45 13 3 18 12Travel Dist (mi) 3.4 11.3 2.5 1.1 4.1 0.3 1.0 3.5 1.0 0.1 0.9 0.6Travel Time (hr) 0.2 0.6 0.1 0.1 0.3 0.0 0.1 0.3 0.1 0.0 0.1 0.0Avg Speed (mph) 21 21 22 13 12 14 11 12 14 11 12 13Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0HC Emissions (g) 1 2 1 0 1 0 0 1 1 0 0 0CO Emissions (g) 27 67 27 9 39 2 13 46 20 1 3 2NOx Emissions (g) 3 7 3 1 4 0 1 4 2 0 0 0Vehicles Entered 17 56 13 16 56 4 12 46 13 3 18 12Vehicles Exited 17 57 12 16 56 4 14 46 12 3 18 12Hourly Exit Rate 68 228 48 64 224 16 56 184 48 12 72 48Input Volume 73 241 40 67 200 17 60 179 66 11 74 42% of Volume 93 95 120 96 112 94 93 103 73 109 97 114Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 0.9Total Del/Veh (s) 11.4Speed Delay (hr) 0.8Speed Del/Veh (s) 10.4Total Stops 269Travel Dist (mi) 29.9Travel Time (hr) 1.9Avg Speed (mph) 16Fuel Used (gal) 1.0HC Emissions (g) 9CO Emissions (g) 256NOx Emissions (g) 27Vehicles Entered 266Vehicles Exited 267Hourly Exit Rate 1068Input Volume 1070% of Volume 100Denied Entry Before 0Denied Entry After 0

Page 286: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 42 78 54 20 62 16 114 64 49 45Average Queue (ft) 24 42 15 5 24 4 66 27 32 2195th Queue (ft) 48 74 46 21 70 37 123 64 54 48Link Distance (ft) 1036 282 402 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 4 0 1 0 9 0 0 0Queuing Penalty (veh) 4 1 1 0 6 1 0 0

Page 287: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 288: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1183 1219 1144 1174 1163 1275 1194Vehs Exited 1181 1166 1167 1164 1156 1239 1178Starting Vehs 158 134 175 145 128 147 137Ending Vehs 160 187 152 155 135 183 155Denied Entry Before 3 2 0 1 2 1 0Denied Entry After 0 3 19 1 0 2 4Travel Distance (mi) 801 802 766 784 805 853 802Travel Time (hr) 39.5 40.1 42.4 38.6 37.9 44.1 40.5Total Delay (hr) 15.2 15.8 19.2 14.6 13.7 18.3 16.1Total Stops 1709 1689 1617 1770 1674 1890 1725Fuel Used (gal) 32.9 33.3 32.5 32.5 32.8 35.6 33.3

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1183 1219 1144 1174 1163 1275 1194Vehs Exited 1181 1166 1167 1164 1156 1239 1178Starting Vehs 158 134 175 145 128 147 137Ending Vehs 160 187 152 155 135 183 155Denied Entry Before 3 2 0 1 2 1 0Denied Entry After 0 3 19 1 0 2 4Travel Distance (mi) 801 802 766 784 805 853 802Travel Time (hr) 39.5 40.1 42.4 38.6 37.9 44.1 40.5Total Delay (hr) 15.2 15.8 19.2 14.6 13.7 18.3 16.1Total Stops 1709 1689 1617 1770 1674 1890 1725Fuel Used (gal) 32.9 33.3 32.5 32.5 32.8 35.6 33.3

Page 289: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 1.2 0.2 0.2 0.7 0.1 0.6 1.3 0.4 0.2 0.9 0.3Total Del/Veh (s) 28.9 49.9 37.8 21.2 33.7 12.3 78.6 88.6 60.8 49.0 51.8 28.7Speed Delay (hr) 0.1 1.1 0.2 0.2 0.7 0.1 0.5 1.2 0.3 0.2 0.9 0.3Speed Del/Veh (s) 24.7 48.9 33.7 21.2 33.7 12.3 69.6 80.4 49.7 49.0 51.8 28.7Total Stops 23 80 29 30 69 19 25 45 33 14 58 48Travel Dist (mi) 3.2 15.6 3.3 2.0 5.0 1.1 1.9 3.7 1.6 0.7 2.9 1.6Travel Time (hr) 0.3 1.7 0.3 0.3 0.9 0.1 0.7 1.4 0.4 0.2 1.0 0.3Avg Speed (mph) 14 9 12 8 6 10 3 3 4 3 3 5Fuel Used (gal) 0.1 0.7 0.1 0.1 0.3 0.0 0.2 0.4 0.1 0.1 0.3 0.1HC Emissions (g) 0 4 2 1 2 1 1 2 1 0 1 1CO Emissions (g) 23 113 42 25 61 15 31 64 36 7 31 21NOx Emissions (g) 2 12 4 3 6 2 3 6 4 1 4 3Vehicles Entered 16 80 16 28 68 15 25 50 21 13 58 31Vehicles Exited 16 75 16 29 70 15 24 48 20 13 57 31Hourly Exit Rate 64 300 64 116 280 60 96 192 80 52 228 124Input Volume 71 306 70 127 290 55 100 199 87 50 223 132% of Volume 90 98 91 91 97 109 96 96 92 104 102 94Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 1 2 1 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 6.0Total Del/Veh (s) 48.3Speed Delay (hr) 5.7Speed Del/Veh (s) 45.7Total Stops 473Travel Dist (mi) 42.7Travel Time (hr) 7.6Avg Speed (mph) 6Fuel Used (gal) 2.5HC Emissions (g) 16CO Emissions (g) 470NOx Emissions (g) 50Vehicles Entered 421Vehicles Exited 414Hourly Exit Rate 1656Input Volume 1710% of Volume 97Denied Entry Before 0Denied Entry After 4

Page 290: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 144 317 75 127 190 63 346 95 222 95Average Queue (ft) 64 202 53 47 97 27 270 76 183 8795th Queue (ft) 164 370 105 142 235 97 472 132 264 122Link Distance (ft) 1036 282 402 196Upstream Blk Time (%) 1 15 30Queuing Penalty (veh) 4 0 121Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 69 0 0 24 0 76 1 75 3Queuing Penalty (veh) 98 1 0 43 0 66 3 100 8

Page 291: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 292: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryBaseline 12/2/2011

2035 AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1130 1122 1091 1104 1066 1131 1107Vehs Exited 1116 1119 1106 1098 1050 1135 1103Starting Vehs 113 128 136 123 103 119 109Ending Vehs 127 131 121 129 119 115 115Denied Entry Before 3 0 3 3 4 3 0Denied Entry After 0 1 1 0 1 1 0Travel Distance (mi) 733 709 688 683 682 724 703Travel Time (hr) 31.9 30.4 29.1 29.4 29.6 31.3 30.3Total Delay (hr) 10.1 9.3 9.0 9.1 9.4 9.8 9.4Total Stops 1369 1342 1288 1306 1224 1345 1310Fuel Used (gal) 29.0 27.9 27.2 27.1 26.8 28.9 27.8

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1130 1122 1091 1104 1066 1131 1107Vehs Exited 1116 1119 1106 1098 1050 1135 1103Starting Vehs 113 128 136 123 103 119 109Ending Vehs 127 131 121 129 119 115 115Denied Entry Before 3 0 3 3 4 3 0Denied Entry After 0 1 1 0 1 1 0Travel Distance (mi) 733 709 688 683 682 724 703Travel Time (hr) 31.9 30.4 29.1 29.4 29.6 31.3 30.3Total Delay (hr) 10.1 9.3 9.0 9.1 9.4 9.8 9.4Total Stops 1369 1342 1288 1306 1224 1345 1310Fuel Used (gal) 29.0 27.9 27.2 27.1 26.8 28.9 27.8

Page 293: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportBaseline 12/2/2011

2035 AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.2 0.0 0.0 0.2 0.0 0.1 0.4 0.1 0.0 0.1 0.0Total Del/Veh (s) 14.7 14.9 9.6 9.7 15.9 5.5 22.4 22.1 15.0 11.4 10.9 5.6Speed Delay (hr) 0.1 0.2 0.0 0.0 0.2 0.0 0.1 0.4 0.1 0.0 0.1 0.0Speed Del/Veh (s) 10.4 14.1 5.3 9.7 15.8 5.5 21.2 21.3 10.7 11.4 10.9 5.5Total Stops 20 57 13 16 47 4 18 70 27 2 22 12Travel Dist (mi) 4.1 11.4 2.2 1.1 3.4 0.3 1.4 5.4 1.6 0.1 1.1 0.6Travel Time (hr) 0.2 0.6 0.1 0.1 0.3 0.0 0.2 0.6 0.2 0.0 0.1 0.0Avg Speed (mph) 20 19 22 12 10 14 9 9 12 10 10 12Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.1 0.3 0.1 0.0 0.0 0.0HC Emissions (g) 1 3 1 0 1 0 0 2 1 0 0 0CO Emissions (g) 24 72 16 7 30 2 17 68 31 0 3 2NOx Emissions (g) 2 8 2 1 3 0 2 6 3 0 0 0Vehicles Entered 21 57 11 16 48 4 19 70 21 2 22 12Vehicles Exited 20 57 11 16 48 4 18 71 21 2 22 12Hourly Exit Rate 80 228 44 64 192 16 72 284 84 8 88 48Input Volume 80 240 50 70 191 20 70 280 80 10 100 50% of Volume 100 95 88 91 101 80 103 101 105 80 88 96Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 1.3Total Del/Veh (s) 15.4Speed Delay (hr) 1.2Speed Del/Veh (s) 14.3Total Stops 308Travel Dist (mi) 32.7Travel Time (hr) 2.5Avg Speed (mph) 13Fuel Used (gal) 1.1HC Emissions (g) 8CO Emissions (g) 273NOx Emissions (g) 27Vehicles Entered 303Vehicles Exited 302Hourly Exit Rate 1208Input Volume 1241% of Volume 97Denied Entry Before 0Denied Entry After 0

Page 294: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportBaseline 12/2/2011

2035 AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 46 99 58 48 70 15 192 95 68 52Average Queue (ft) 28 55 16 9 24 2 115 55 36 2395th Queue (ft) 49 102 51 51 77 25 197 114 65 53Link Distance (ft) 1036 300 402 206Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 9 0 3 0 33 1 1 0Queuing Penalty (veh) 12 0 3 0 26 2 1 0

Page 295: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 296: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryBaseline 12/2/2011

2035 PM Peak SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 4:45 4:45 4:45 4:45 4:45 4:45 4:45End Time 5:15 5:15 5:15 5:15 5:15 5:15 5:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1294 1343 1292 1305 1376 1382 1332Vehs Exited 1248 1295 1271 1237 1268 1300 1272Starting Vehs 258 213 225 208 215 231 216Ending Vehs 304 261 246 276 323 313 280Denied Entry Before 33 6 15 14 3 10 11Denied Entry After 77 45 39 52 15 48 45Travel Distance (mi) 907 935 876 878 906 937 907Travel Time (hr) 85.3 64.6 66.3 68.9 69.1 76.1 71.7Total Delay (hr) 58.1 36.6 39.8 42.5 42.1 48.0 44.5Total Stops 2932 2380 2425 2343 2784 2761 2601Fuel Used (gal) 46.0 42.3 41.0 41.6 42.4 45.0 43.1

Interval #0 Information SeedingStart Time 4:45End Time 5:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 5:00End Time 5:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1294 1343 1292 1305 1376 1382 1332Vehs Exited 1248 1295 1271 1237 1268 1300 1272Starting Vehs 258 213 225 208 215 231 216Ending Vehs 304 261 246 276 323 313 280Denied Entry Before 33 6 15 14 3 10 11Denied Entry After 77 45 39 52 15 48 45Travel Distance (mi) 907 935 876 878 906 937 907Travel Time (hr) 85.3 64.6 66.3 68.9 69.1 76.1 71.7Total Delay (hr) 58.1 36.6 39.8 42.5 42.1 48.0 44.5Total Stops 2932 2380 2425 2343 2784 2761 2601Fuel Used (gal) 46.0 42.3 41.0 41.6 42.4 45.0 43.1

Page 297: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportBaseline 12/2/2011

2035 PM Peak SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.6 2.5 1.1 0.3 1.2 0.1 2.7 5.3 1.7 0.2 1.3 0.4Total Del/Veh (s) 113.0 144.2 147.5 31.9 57.8 27.3 352.1 367.1 347.7 71.9 75.1 43.2Speed Delay (hr) 0.6 2.5 1.1 0.3 1.2 0.1 1.1 2.1 0.6 0.2 1.3 0.4Speed Del/Veh (s) 108.9 142.7 146.1 31.9 57.8 27.3 137.3 142.6 119.0 71.9 75.1 43.2Total Stops 47 88 41 45 76 16 15 32 24 10 64 60Travel Dist (mi) 3.9 12.4 5.5 2.4 5.2 0.7 2.1 4.1 1.4 0.5 3.0 1.8Travel Time (hr) 0.8 3.0 1.3 0.4 1.3 0.1 2.8 5.4 1.8 0.2 1.4 0.5Avg Speed (mph) 5 4 4 6 4 6 2 2 2 2 2 3Fuel Used (gal) 0.3 0.9 0.4 0.1 0.4 0.0 0.7 1.3 0.4 0.1 0.4 0.2HC Emissions (g) 1 6 3 1 3 0 1 4 2 0 1 1CO Emissions (g) 54 169 76 21 63 6 57 121 48 5 43 26NOx Emissions (g) 6 18 8 3 7 1 4 8 4 1 5 3Vehicles Entered 21 67 29 35 74 10 28 54 18 10 61 36Vehicles Exited 18 59 26 34 72 10 28 51 19 10 60 36Hourly Exit Rate 72 236 104 136 288 40 112 204 76 40 240 144Input Volume 80 280 100 140 281 50 130 270 100 50 305 160% of Volume 90 84 104 97 102 80 86 76 76 80 79 90Denied Entry Before 0 0 0 0 0 0 4 5 2 0 0 0Denied Entry After 0 1 0 0 0 0 11 21 8 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 17.5Total Del/Veh (s) 130.1Speed Delay (hr) 11.3Speed Del/Veh (s) 84.5Total Stops 518Travel Dist (mi) 43.1Travel Time (hr) 19.1Avg Speed (mph) 3Fuel Used (gal) 5.2HC Emissions (g) 23CO Emissions (g) 690NOx Emissions (g) 66Vehicles Entered 443Vehicles Exited 423Hourly Exit Rate 1692Input Volume 1946% of Volume 87Denied Entry Before 11Denied Entry After 41

Page 298: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportBaseline 12/2/2011

2035 PM Peak SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB WB WB WB NB NB SB SBDirections Served L TR L T R LT R LT RMaximum Queue (ft) 145 727 126 210 78 441 95 228 95Average Queue (ft) 122 496 83 150 33 415 86 217 9395th Queue (ft) 204 921 191 334 107 506 129 259 110Link Distance (ft) 1035 300 410 206Upstream Blk Time (%) 3 10 84 53Queuing Penalty (veh) 0 48 0 275Storage Bay Dist (ft) 120 140 70 70 70Storage Blk Time (%) 0 87 0 46 0 98 1 94 5Queuing Penalty (veh) 0 70 0 88 0 98 2 150 17

Page 299: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 300: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

Existing AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 721 739 738 735 758 769 740Vehs Exited 708 742 753 749 757 762 746Starting Vehs 61 71 86 81 73 68 65Ending Vehs 74 68 71 67 74 75 60Denied Entry Before 0 0 0 1 0 1 0Denied Entry After 1 1 0 0 0 0 0Travel Distance (mi) 454 462 466 469 478 476 468Travel Time (hr) 18.5 18.6 19.2 19.5 19.3 19.5 19.1Total Delay (hr) 4.8 4.5 5.0 5.1 4.8 5.0 4.9Total Stops 875 864 917 904 858 916 891Fuel Used (gal) 17.7 18.1 18.4 18.4 18.9 18.7 18.3

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 721 739 738 735 758 769 740Vehs Exited 708 742 753 749 757 762 746Starting Vehs 61 71 86 81 73 68 65Ending Vehs 74 68 71 67 74 75 60Denied Entry Before 0 0 0 1 0 1 0Denied Entry After 1 1 0 0 0 0 0Travel Distance (mi) 454 462 466 469 478 476 468Travel Time (hr) 18.5 18.6 19.2 19.5 19.3 19.5 19.1Total Delay (hr) 4.8 4.5 5.0 5.1 4.8 5.0 4.9Total Stops 875 864 917 904 858 916 891Fuel Used (gal) 17.7 18.1 18.4 18.4 18.9 18.7 18.3

Page 301: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

Existing AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0Total Del/Veh (s) 10.6 11.0 7.9 6.8 8.6 4.4 9.4 11.6 9.5 6.5 9.1 4.0Speed Delay (hr) 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0Speed Del/Veh (s) 6.5 10.3 3.5 6.8 8.6 4.4 8.8 10.9 5.1 6.5 9.1 4.0Total Stops 15 46 10 14 42 4 14 42 14 4 15 8Travel Dist (mi) 3.0 9.0 1.8 1.0 3.1 0.3 1.0 3.2 1.0 0.2 0.8 0.4Travel Time (hr) 0.2 0.4 0.1 0.1 0.2 0.0 0.1 0.2 0.1 0.0 0.1 0.0Avg Speed (mph) 22 21 23 14 14 14 14 13 16 13 12 13Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0HC Emissions (g) 0 3 1 0 1 0 0 0 0 0 0 0CO Emissions (g) 17 59 25 7 28 2 10 26 14 1 3 2NOx Emissions (g) 1 7 3 1 3 0 1 2 1 0 0 0Vehicles Entered 15 45 9 14 43 4 14 41 14 4 15 8Vehicles Exited 14 46 9 14 42 4 14 41 13 4 15 8Hourly Exit Rate 56 184 36 56 168 16 56 164 52 16 60 32Input Volume 63 199 32 61 178 19 48 157 58 9 68 34% of Volume 89 92 112 92 94 84 117 104 90 178 88 94Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 0.6Total Del/Veh (s) 9.5Speed Delay (hr) 0.5Speed Del/Veh (s) 8.4Total Stops 228Travel Dist (mi) 24.8Travel Time (hr) 1.5Avg Speed (mph) 17Fuel Used (gal) 0.8HC Emissions (g) 6CO Emissions (g) 194NOx Emissions (g) 21Vehicles Entered 226Vehicles Exited 224Hourly Exit Rate 896Input Volume 926% of Volume 97Denied Entry Before 0Denied Entry After 0

Page 302: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

Existing AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB NB NB SB SBDirections Served L T R L T LT R LT RMaximum Queue (ft) 32 74 36 20 44 102 41 45 32Average Queue (ft) 19 40 9 5 12 58 20 29 1795th Queue (ft) 37 84 31 25 42 112 47 52 38Link Distance (ft) 1036 282 402 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 120 50 140 70 70Storage Blk Time (%) 4 0 0 4 0 0Queuing Penalty (veh) 3 0 0 2 0 0

Page 303: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 304: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

Existing PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1157 1104 1075 1045 1038 1081 1081Vehs Exited 1129 1129 1070 1045 1030 1088 1081Starting Vehs 127 145 145 118 126 146 123Ending Vehs 155 120 150 118 134 139 130Denied Entry Before 2 1 0 1 0 1 0Denied Entry After 2 1 0 0 4 0 0Travel Distance (mi) 762 742 706 696 692 732 722Travel Time (hr) 37.4 32.7 37.2 32.3 31.7 34.9 34.4Total Delay (hr) 14.1 10.2 15.8 10.8 10.5 12.6 12.3Total Stops 1664 1487 1494 1441 1431 1506 1497Fuel Used (gal) 31.3 29.7 29.4 28.2 27.5 30.3 29.4

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1157 1104 1075 1045 1038 1081 1081Vehs Exited 1129 1129 1070 1045 1030 1088 1081Starting Vehs 127 145 145 118 126 146 123Ending Vehs 155 120 150 118 134 139 130Denied Entry Before 2 1 0 1 0 1 0Denied Entry After 2 1 0 0 4 0 0Travel Distance (mi) 762 742 706 696 692 732 722Travel Time (hr) 37.4 32.7 37.2 32.3 31.7 34.9 34.4Total Delay (hr) 14.1 10.2 15.8 10.8 10.5 12.6 12.3Total Stops 1664 1487 1494 1441 1431 1506 1497Fuel Used (gal) 31.3 29.7 29.4 28.2 27.5 30.3 29.4

Page 305: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

Existing PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.7 0.1 0.2 0.6 0.0 0.4 0.9 0.3 0.1 0.5 0.1Total Del/Veh (s) 24.1 33.7 20.5 20.2 31.9 11.1 66.7 63.0 45.7 31.5 35.6 15.5Speed Delay (hr) 0.1 0.7 0.1 0.2 0.6 0.0 0.4 0.8 0.3 0.1 0.5 0.1Speed Del/Veh (s) 19.8 32.6 16.5 20.2 31.9 11.1 64.3 60.1 40.0 31.5 35.6 15.5Total Stops 22 72 27 34 68 17 23 45 33 11 50 42Travel Dist (mi) 3.6 14.2 3.8 2.2 5.0 1.0 1.8 3.6 1.8 0.6 2.5 1.5Travel Time (hr) 0.3 1.2 0.3 0.3 0.8 0.1 0.5 1.0 0.4 0.1 0.6 0.2Avg Speed (mph) 16 12 16 8 6 11 4 4 5 4 4 7Fuel Used (gal) 0.1 0.5 0.1 0.1 0.3 0.0 0.2 0.3 0.1 0.0 0.2 0.1HC Emissions (g) 1 3 1 0 2 1 0 3 2 0 1 1CO Emissions (g) 30 90 27 19 63 13 21 70 43 3 23 15NOx Emissions (g) 3 10 3 2 7 2 2 7 4 0 3 2Vehicles Entered 19 71 19 31 68 14 22 47 24 11 49 30Vehicles Exited 18 70 19 32 68 14 23 47 24 11 49 30Hourly Exit Rate 72 280 76 128 272 56 92 188 96 44 196 120Input Volume 71 276 68 123 273 51 92 193 85 46 215 122% of Volume 101 101 112 104 100 110 100 97 113 96 91 98Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 4.2Total Del/Veh (s) 35.7Speed Delay (hr) 4.0Speed Del/Veh (s) 34.3Total Stops 444Travel Dist (mi) 41.6Travel Time (hr) 5.7Avg Speed (mph) 7Fuel Used (gal) 2.1HC Emissions (g) 14CO Emissions (g) 416NOx Emissions (g) 45Vehicles Entered 405Vehicles Exited 405Hourly Exit Rate 1620Input Volume 1615% of Volume 100Denied Entry Before 0Denied Entry After 0

Page 306: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

Existing PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 110 258 75 103 158 50 320 95 204 95Average Queue (ft) 43 121 40 40 86 23 228 71 117 7495th Queue (ft) 120 282 93 118 210 89 463 125 219 119Link Distance (ft) 1036 282 402 196Upstream Blk Time (%) 1 11 9Queuing Penalty (veh) 5 0 36Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 0 42 0 0 22 0 59 2 40 1Queuing Penalty (veh) 0 59 1 0 38 0 50 5 49 2

Page 307: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 308: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 882 902 895 885 859 857 878Vehs Exited 911 896 910 882 843 901 890Starting Vehs 97 90 98 81 76 122 83Ending Vehs 68 96 83 84 92 78 74Denied Entry Before 2 0 1 0 0 3 0Denied Entry After 1 3 1 0 1 0 0Travel Distance (mi) 558 569 559 558 524 535 550Travel Time (hr) 23.0 23.5 23.5 23.8 21.9 22.5 23.0Total Delay (hr) 6.1 6.4 6.4 6.9 5.9 6.1 6.3Total Stops 1070 1065 1094 1131 1018 1060 1071Fuel Used (gal) 21.8 22.5 22.0 22.2 20.4 21.1 21.6

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 882 902 895 885 859 857 878Vehs Exited 911 896 910 882 843 901 890Starting Vehs 97 90 98 81 76 122 83Ending Vehs 68 96 83 84 92 78 74Denied Entry Before 2 0 1 0 0 3 0Denied Entry After 1 3 1 0 1 0 0Travel Distance (mi) 558 569 559 558 524 535 550Travel Time (hr) 23.0 23.5 23.5 23.8 21.9 22.5 23.0Total Delay (hr) 6.1 6.4 6.4 6.9 5.9 6.1 6.3Total Stops 1070 1065 1094 1131 1018 1060 1071Fuel Used (gal) 21.8 22.5 22.0 22.2 20.4 21.1 21.6

Page 309: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.2 0.0 0.0 0.2 0.0 0.1 0.2 0.0 0.0 0.0 0.0Total Del/Veh (s) 12.8 11.3 9.3 8.3 12.4 5.3 12.9 13.9 11.4 8.0 9.3 5.1Speed Delay (hr) 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0Speed Del/Veh (s) 8.8 10.5 5.1 8.3 12.4 5.3 12.7 13.3 7.1 8.0 9.3 5.1Total Stops 17 57 14 16 56 5 13 45 13 3 18 12Travel Dist (mi) 3.4 11.3 2.5 1.1 4.1 0.3 1.0 3.5 1.0 0.1 0.9 0.6Travel Time (hr) 0.2 0.6 0.1 0.1 0.3 0.0 0.1 0.3 0.1 0.0 0.1 0.0Avg Speed (mph) 21 21 22 13 12 14 11 12 14 11 12 13Fuel Used (gal) 0.1 0.3 0.1 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0HC Emissions (g) 1 2 1 0 1 0 0 1 1 0 0 0CO Emissions (g) 27 67 27 9 39 2 13 46 20 1 3 2NOx Emissions (g) 3 7 3 1 4 0 1 4 2 0 0 0Vehicles Entered 17 56 13 16 56 4 12 46 13 3 18 12Vehicles Exited 17 57 12 16 56 4 14 46 12 3 18 12Hourly Exit Rate 68 228 48 64 224 16 56 184 48 12 72 48Input Volume 73 241 40 67 200 17 60 179 66 11 74 42% of Volume 93 95 120 96 112 94 93 103 73 109 97 114Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 0 0 0 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 0.9Total Del/Veh (s) 11.4Speed Delay (hr) 0.8Speed Del/Veh (s) 10.4Total Stops 269Travel Dist (mi) 29.9Travel Time (hr) 1.9Avg Speed (mph) 16Fuel Used (gal) 1.0HC Emissions (g) 9CO Emissions (g) 256NOx Emissions (g) 27Vehicles Entered 266Vehicles Exited 267Hourly Exit Rate 1068Input Volume 1070% of Volume 100Denied Entry Before 0Denied Entry After 0

Page 310: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2016 AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 42 78 54 20 62 16 114 64 49 45Average Queue (ft) 24 42 15 5 24 4 66 27 32 2195th Queue (ft) 48 74 46 21 70 37 123 64 54 48Link Distance (ft) 1036 282 402 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 4 0 1 0 9 0 0 0Queuing Penalty (veh) 4 1 1 0 6 1 0 0

Page 311: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 312: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1183 1219 1144 1174 1163 1275 1194Vehs Exited 1181 1166 1167 1164 1156 1239 1178Starting Vehs 158 134 175 145 128 147 137Ending Vehs 160 187 152 155 135 183 155Denied Entry Before 3 2 0 1 2 1 0Denied Entry After 0 3 19 1 0 2 4Travel Distance (mi) 801 802 766 784 805 853 802Travel Time (hr) 39.5 40.1 42.4 38.6 37.9 44.1 40.5Total Delay (hr) 15.2 15.8 19.2 14.6 13.7 18.3 16.1Total Stops 1709 1689 1617 1770 1674 1890 1725Fuel Used (gal) 32.9 33.3 32.5 32.5 32.8 35.6 33.3

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1183 1219 1144 1174 1163 1275 1194Vehs Exited 1181 1166 1167 1164 1156 1239 1178Starting Vehs 158 134 175 145 128 147 137Ending Vehs 160 187 152 155 135 183 155Denied Entry Before 3 2 0 1 2 1 0Denied Entry After 0 3 19 1 0 2 4Travel Distance (mi) 801 802 766 784 805 853 802Travel Time (hr) 39.5 40.1 42.4 38.6 37.9 44.1 40.5Total Delay (hr) 15.2 15.8 19.2 14.6 13.7 18.3 16.1Total Stops 1709 1689 1617 1770 1674 1890 1725Fuel Used (gal) 32.9 33.3 32.5 32.5 32.8 35.6 33.3

Page 313: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 1.2 0.2 0.2 0.7 0.1 0.6 1.3 0.4 0.2 0.9 0.3Total Del/Veh (s) 28.9 49.9 37.8 21.2 33.7 12.3 78.6 88.6 60.8 49.0 51.8 28.7Speed Delay (hr) 0.1 1.1 0.2 0.2 0.7 0.1 0.5 1.2 0.3 0.2 0.9 0.3Speed Del/Veh (s) 24.7 48.9 33.7 21.2 33.7 12.3 69.6 80.4 49.7 49.0 51.8 28.7Total Stops 23 80 29 30 69 19 25 45 33 14 58 48Travel Dist (mi) 3.2 15.6 3.3 2.0 5.0 1.1 1.9 3.7 1.6 0.7 2.9 1.6Travel Time (hr) 0.3 1.7 0.3 0.3 0.9 0.1 0.7 1.4 0.4 0.2 1.0 0.3Avg Speed (mph) 14 9 12 8 6 10 3 3 4 3 3 5Fuel Used (gal) 0.1 0.7 0.1 0.1 0.3 0.0 0.2 0.4 0.1 0.1 0.3 0.1HC Emissions (g) 0 4 2 1 2 1 1 2 1 0 1 1CO Emissions (g) 23 113 42 25 61 15 31 64 36 7 31 21NOx Emissions (g) 2 12 4 3 6 2 3 6 4 1 4 3Vehicles Entered 16 80 16 28 68 15 25 50 21 13 58 31Vehicles Exited 16 75 16 29 70 15 24 48 20 13 57 31Hourly Exit Rate 64 300 64 116 280 60 96 192 80 52 228 124Input Volume 71 306 70 127 290 55 100 199 87 50 223 132% of Volume 90 98 91 91 97 109 96 96 92 104 102 94Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 1 2 1 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 6.0Total Del/Veh (s) 48.3Speed Delay (hr) 5.7Speed Del/Veh (s) 45.7Total Stops 473Travel Dist (mi) 42.7Travel Time (hr) 7.6Avg Speed (mph) 6Fuel Used (gal) 2.5HC Emissions (g) 16CO Emissions (g) 470NOx Emissions (g) 50Vehicles Entered 421Vehicles Exited 414Hourly Exit Rate 1656Input Volume 1710% of Volume 97Denied Entry Before 0Denied Entry After 4

Page 314: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2016 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 144 317 75 127 190 63 346 95 222 95Average Queue (ft) 64 202 53 47 97 27 270 76 183 8795th Queue (ft) 164 370 105 142 235 97 472 132 264 122Link Distance (ft) 1036 282 402 196Upstream Blk Time (%) 1 15 30Queuing Penalty (veh) 4 0 121Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 69 0 0 24 0 76 1 75 3Queuing Penalty (veh) 98 1 0 43 0 66 3 100 8

Page 315: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 316: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2035 AM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1198 1191 1263 1200 1191 1157 1204Vehs Exited 1201 1208 1294 1219 1184 1145 1208Starting Vehs 147 150 159 128 131 124 131Ending Vehs 144 133 128 109 138 136 130Denied Entry Before 3 0 4 1 1 1 0Denied Entry After 12 0 7 1 1 2 4Travel Distance (mi) 776 761 792 761 765 735 765Travel Time (hr) 40.4 34.4 39.4 33.8 33.6 32.6 35.7Total Delay (hr) 17.2 11.6 15.6 10.9 10.7 10.8 12.8Total Stops 1535 1465 1606 1470 1542 1473 1520Fuel Used (gal) 32.2 30.5 32.4 30.2 30.2 29.2 30.8

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1198 1191 1263 1200 1191 1157 1204Vehs Exited 1201 1208 1294 1219 1184 1145 1208Starting Vehs 147 150 159 128 131 124 131Ending Vehs 144 133 128 109 138 136 130Denied Entry Before 3 0 4 1 1 1 0Denied Entry After 12 0 7 1 1 2 4Travel Distance (mi) 776 761 792 761 765 735 765Travel Time (hr) 40.4 34.4 39.4 33.8 33.6 32.6 35.7Total Delay (hr) 17.2 11.6 15.6 10.9 10.7 10.8 12.8Total Stops 1535 1465 1606 1470 1542 1473 1520Fuel Used (gal) 32.2 30.5 32.4 30.2 30.2 29.2 30.8

Page 317: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2035 AM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 0.1 0.4 0.0 0.1 0.3 0.0 0.4 1.4 0.3 0.0 0.1 0.0Total Del/Veh (s) 17.1 20.2 11.2 13.4 18.1 6.1 76.0 67.7 56.4 10.6 12.3 6.3Speed Delay (hr) 0.1 0.4 0.0 0.1 0.3 0.0 0.3 1.1 0.2 0.0 0.1 0.0Speed Del/Veh (s) 13.1 19.1 7.1 13.4 18.1 6.0 58.8 53.3 40.0 10.6 12.3 6.3Total Stops 23 67 18 22 63 9 15 61 27 2 27 15Travel Dist (mi) 4.4 13.3 2.7 1.6 4.7 0.6 1.3 5.3 1.5 0.1 1.4 0.7Travel Time (hr) 0.3 0.8 0.1 0.2 0.5 0.0 0.4 1.6 0.4 0.0 0.1 0.1Avg Speed (mph) 18 16 20 10 9 13 4 4 5 9 10 12Fuel Used (gal) 0.1 0.4 0.1 0.1 0.2 0.0 0.1 0.5 0.1 0.0 0.0 0.0HC Emissions (g) 1 4 2 0 2 1 0 2 1 0 0 0CO Emissions (g) 30 97 38 13 45 13 19 71 25 0 6 3NOx Emissions (g) 3 11 5 1 5 2 2 7 3 0 1 0Vehicles Entered 22 67 13 22 64 8 18 68 20 2 27 14Vehicles Exited 23 68 13 22 64 8 17 71 19 2 28 14Hourly Exit Rate 92 272 52 88 256 32 68 284 76 8 112 56Input Volume 83 261 50 87 241 27 70 289 86 11 104 52% of Volume 111 104 104 101 106 119 97 98 88 73 108 108Denied Entry Before 0 0 0 0 0 0 0 0 0 0 0 0Denied Entry After 0 0 0 0 0 0 1 2 1 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 3.2Total Del/Veh (s) 32.0Speed Delay (hr) 2.7Speed Del/Veh (s) 26.6Total Stops 349Travel Dist (mi) 37.6Travel Time (hr) 4.6Avg Speed (mph) 9Fuel Used (gal) 1.7HC Emissions (g) 12CO Emissions (g) 360NOx Emissions (g) 39Vehicles Entered 345Vehicles Exited 349Hourly Exit Rate 1396Input Volume 1361% of Volume 103Denied Entry Before 0Denied Entry After 4

Page 318: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2035 AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 93 135 66 58 90 34 312 94 72 53Average Queue (ft) 40 74 26 14 41 5 227 60 41 2695th Queue (ft) 100 139 74 58 105 38 467 123 66 49Link Distance (ft) 1036 282 402 196Upstream Blk Time (%) 19Queuing Penalty (veh) 0Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 22 0 5 0 61 1 2 0Queuing Penalty (veh) 29 1 6 0 53 2 1 0

Page 319: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 320: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Simulation SummaryDevelopment 12/2/2011

2035 PM SimTraffic ReportPage 1

Summary of All Intervals

Run Number 1 2 3 4 5 AvgStart Time 6:45 6:45 6:45 6:45 6:45 6:45 6:45End Time 7:15 7:15 7:15 7:15 7:15 7:15 7:15Total Time (min) 30 30 30 30 30 30 30Time Recorded (min) 15 15 15 15 15 15 15# of Intervals 2 2 2 2 2 2 2# of Recorded mScheduledIntervals 1 1 1 1 1 1 1Vehs Entered 1483 1448 1468 1497 1423 1450 1457Vehs Exited 1338 1292 1416 1331 1311 1407 1349Starting Vehs 271 225 329 232 363 320 286Ending Vehs 416 381 381 398 475 363 395Denied Entry Before 20 34 6 23 34 30 22Denied Entry After 113 66 72 76 177 80 97Travel Distance (mi) 957 919 975 963 917 955 948Travel Time (hr) 104.2 85.1 102.8 94.1 125.5 101.9 102.3Total Delay (hr) 75.3 57.2 73.4 65.2 97.8 73.2 73.7Total Stops 3922 2924 3878 3412 4469 3794 3733Fuel Used (gal) 52.7 46.9 53.4 50.5 56.9 52.3 52.1

Interval #0 Information SeedingStart Time 6:45End Time 7:00Total Time (min) 15Volumes adjusted by Growth Factors.No data recorded this interval.

Interval #1 Information RecordingStart Time 7:00End Time 7:15Total Time (min) 15Volumes adjusted by Growth Factors.

Run Number 1 2 3 4 5 AvgVehs Entered 1483 1448 1468 1497 1423 1450 1457Vehs Exited 1338 1292 1416 1331 1311 1407 1349Starting Vehs 271 225 329 232 363 320 286Ending Vehs 416 381 381 398 475 363 395Denied Entry Before 20 34 6 23 34 30 22Denied Entry After 113 66 72 76 177 80 97Travel Distance (mi) 957 919 975 963 917 955 948Travel Time (hr) 104.2 85.1 102.8 94.1 125.5 101.9 102.3Total Delay (hr) 75.3 57.2 73.4 65.2 97.8 73.2 73.7Total Stops 3922 2924 3878 3412 4469 3794 3733Fuel Used (gal) 52.7 46.9 53.4 50.5 56.9 52.3 52.1

Page 321: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

SimTraffic Performance ReportDevelopment 12/2/2011

2035 PM SimTraffic ReportPage 2

13: 600 East & 1000 North Performance by movement

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRTotal Delay (hr) 1.2 4.8 1.1 0.5 1.5 0.1 3.7 8.6 3.0 0.3 1.3 0.4Total Del/Veh (s) 164.6 179.6 152.4 44.0 61.2 27.6 457.1 562.6 533.5 76.3 78.0 45.5Speed Delay (hr) 1.1 4.5 1.0 0.5 1.5 0.1 1.1 2.1 0.6 0.3 1.3 0.4Speed Del/Veh (s) 147.1 168.3 138.7 44.0 61.1 27.6 138.9 138.9 117.0 76.3 78.0 45.5Total Stops 53 135 51 60 86 28 10 20 19 15 56 46Travel Dist (mi) 4.1 15.5 4.5 3.0 5.9 1.3 1.8 3.5 1.4 0.7 2.7 1.4Travel Time (hr) 1.3 5.3 1.3 0.7 1.7 0.2 3.8 8.7 3.0 0.3 1.3 0.4Avg Speed (mph) 3 3 4 4 4 6 2 2 2 2 2 3Fuel Used (gal) 0.4 1.5 0.4 0.2 0.5 0.1 0.9 2.1 0.7 0.1 0.4 0.1HC Emissions (g) 3 7 2 1 2 0 2 4 5 0 2 1CO Emissions (g) 71 214 64 29 74 10 73 161 93 8 51 28NOx Emissions (g) 7 22 7 4 9 1 4 8 5 1 6 4Vehicles Entered 23 84 24 42 80 16 22 46 18 14 53 27Vehicles Exited 19 74 21 41 80 17 24 45 17 14 52 26Hourly Exit Rate 76 296 84 164 320 68 96 180 68 56 208 104Input Volume 91 336 100 167 341 65 130 299 117 60 303 162% of Volume 84 88 84 98 94 105 74 60 58 93 69 64Denied Entry Before 0 0 0 0 0 0 5 12 4 0 0 0Denied Entry After 2 4 2 0 0 0 11 40 14 0 0 0

13: 600 East & 1000 North Performance by movement

Movement AllTotal Delay (hr) 26.4Total Del/Veh (s) 190.0Speed Delay (hr) 14.6Speed Del/Veh (s) 104.6Total Stops 579Travel Dist (mi) 45.7Travel Time (hr) 28.1Avg Speed (mph) 3Fuel Used (gal) 7.5HC Emissions (g) 29CO Emissions (g) 877NOx Emissions (g) 78Vehicles Entered 449Vehicles Exited 430Hourly Exit Rate 1720Input Volume 2171% of Volume 79Denied Entry Before 21Denied Entry After 73

Page 322: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment 12/2/2011

2035 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB SB SBDirections Served L T R L T R LT R LT RMaximum Queue (ft) 144 964 75 155 245 95 445 95 226 95Average Queue (ft) 129 754 64 120 193 50 422 86 220 8995th Queue (ft) 198 1209 105 215 369 127 438 132 231 126Link Distance (ft) 1036 282 402 196Upstream Blk Time (%) 23 15 93 67Queuing Penalty (veh) 0 85 0 350Storage Bay Dist (ft) 120 50 140 70 70 70Storage Blk Time (%) 0 96 2 5 62 0 99 1 98 3Queuing Penalty (veh) 1 183 10 20 144 1 115 4 158 12

Page 323: HCM 2010 Signalized Intersection Capacity Analysis 3: 600
Page 324: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing AM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 23 152 125 29 79 86 20 48 50 30 28 25Average Queue (ft) 8 95 86 15 37 50 14 32 22 12 14 1495th Queue (ft) 26 154 149 36 75 98 25 46 53 36 34 33Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 21Average Queue (ft) 895th Queue (ft) 24Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 5: 600 East & 1200 North

Movement EB WBDirections Served LTR LTRMaximum Queue (ft) 30 31Average Queue (ft) 29 2395th Queue (ft) 31 42Link Distance (ft) 569 1374Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 325: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing AM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 30 205 100 26 65 17 65 22 12 31 72 72Average Queue (ft) 17 114 58 14 42 6 40 15 2 30 48 5595th Queue (ft) 40 194 110 33 77 17 65 28 10 32 74 82Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 1 0 0Queuing Penalty (veh) 0 0 0

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB SB SBDirections Served L T R L T R L T T R L TMaximum Queue (ft) 84 44 44 45 45 19 44 44 22 19 66 154Average Queue (ft) 44 31 24 28 35 15 23 14 12 14 31 9495th Queue (ft) 85 47 40 55 53 27 46 43 29 25 68 176Link Distance (ft) 972 1183 294 294 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 2Queuing Penalty (veh) 1

Intersection: 9: 800 East & 1000 North

Movement SBDirections Served RMaximum Queue (ft) 23Average Queue (ft) 1695th Queue (ft) 30Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%)Queuing Penalty (veh)

Page 326: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SBDirections Served L T R L T R L T R T RMaximum Queue (ft) 46 85 41 48 64 22 30 72 31 65 24Average Queue (ft) 20 54 15 43 44 4 18 37 29 37 1495th Queue (ft) 46 95 40 56 73 18 41 76 33 65 34Link Distance (ft) 1032 343 410 410 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 100 80 140 80 80 80Storage Blk Time (%) 2 0 0 0Queuing Penalty (veh) 2 0 0 0

Intersection: 14: 800 East & 1200 North

Movement EB WBDirections Served LR LRMaximum Queue (ft) 28 29Average Queue (ft) 11 695th Queue (ft) 33 25Link Distance (ft) 1374 366Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WBDirections Served LR LRMaximum Queue (ft) 28 28Average Queue (ft) 6 695th Queue (ft) 24 24Link Distance (ft) 433 267Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 327: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing AM SimTraffic ReportPage 4

Intersection: 21: 800 East & Stadium

Movement EB WB SBDirections Served LR LR LMaximum Queue (ft) 31 31 28Average Queue (ft) 25 12 1195th Queue (ft) 45 37 33Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 180Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 24: 1000 North & Independ

Movement EB SB SBDirections Served L L RMaximum Queue (ft) 29 48 51Average Queue (ft) 6 32 2695th Queue (ft) 25 45 52Link Distance (ft) 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 26: 800 East & Independence

Movement EB EBDirections Served L RMaximum Queue (ft) 54 52Average Queue (ft) 30 2995th Queue (ft) 58 56Link Distance (ft) 380 380Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 328: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing AM SimTraffic ReportPage 5

Intersection: 30: 800 East & Public Safety

Movement WB SBDirections Served LR TMaximum Queue (ft) 50 30Average Queue (ft) 28 695th Queue (ft) 55 26Link Distance (ft) 307 67Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 31: 800 East & 1300 North

Movement EBDirections Served LRMaximum Queue (ft) 26Average Queue (ft) 595th Queue (ft) 23Link Distance (ft) 420Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 30 23 30 31Average Queue (ft) 17 5 12 1295th Queue (ft) 41 20 37 37Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 4

Page 329: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing PM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 76 171 155 40 129 134 51 109 76 52 73 92Average Queue (ft) 31 122 96 20 84 95 24 76 40 19 37 5295th Queue (ft) 84 188 165 46 127 139 48 117 80 53 75 96Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%) 0 0 0 3 0 0Queuing Penalty (veh) 0 0 0 4 0 0

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 43Average Queue (ft) 2595th Queue (ft) 50Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 5: 600 East & 1200 North

Movement EB WB NB SBDirections Served LTR LTR LTR LTRMaximum Queue (ft) 31 30 15 23Average Queue (ft) 14 18 2 395th Queue (ft) 39 41 15 23Link Distance (ft) 569 1374 948 765Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 330: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing PM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 130 210 89 35 211 80 173 99 15 52 67 83Average Queue (ft) 69 127 56 13 129 27 101 57 3 23 30 4795th Queue (ft) 129 230 103 38 234 76 188 105 16 54 70 76Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 1 16 0 1 0 1Queuing Penalty (veh) 1 16 0 3 0 0

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB SB SBDirections Served L T R L T R L T T R L TMaximum Queue (ft) 73 117 65 44 76 54 104 121 51 27 69 191Average Queue (ft) 46 64 26 16 43 24 54 64 24 6 29 11495th Queue (ft) 76 120 62 41 83 58 118 132 55 20 59 182Link Distance (ft) 972 1183 294 294 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 0 0 1 0 0 4 0 3Queuing Penalty (veh) 1 0 1 1 0 6 0 1

Intersection: 9: 800 East & 1000 North

Movement SB SBDirections Served T RMaximum Queue (ft) 60 78Average Queue (ft) 13 3695th Queue (ft) 77 79Link Distance (ft) 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%) 0 0Queuing Penalty (veh) 0 0

Page 331: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T RMaximum Queue (ft) 52 160 47 115 193 83 66 101 72 62 128 83Average Queue (ft) 34 76 21 61 91 23 42 57 34 27 77 4595th Queue (ft) 56 155 52 120 182 70 76 111 73 64 129 92Link Distance (ft) 1032 343 410 196Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft) 100 80 140 80 80 80 80 80Storage Blk Time (%) 4 2 6 0 0 2 0 4 0Queuing Penalty (veh) 6 6 10 0 0 4 1 7 0

Intersection: 14: 800 East & 1200 North

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 34 64 24 34Average Queue (ft) 19 40 8 1495th Queue (ft) 44 69 28 39Link Distance (ft) 1374 366Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 260 240Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 28 32 12 42Average Queue (ft) 11 5 2 895th Queue (ft) 33 25 20 44Link Distance (ft) 433 267 196 948Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 332: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing PM SimTraffic ReportPage 4

Intersection: 21: 800 East & Stadium

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 34 30 15 28Average Queue (ft) 15 8 3 695th Queue (ft) 41 30 16 25Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80 180Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 24: 1000 North & Independ

Movement EB WB SB SBDirections Served L TR L RMaximum Queue (ft) 48 9 76 57Average Queue (ft) 21 1 37 3295th Queue (ft) 53 15 67 55Link Distance (ft) 972 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%) 0Queuing Penalty (veh) 0

Intersection: 26: 800 East & Independence

Movement EB EB NB SBDirections Served L R L TRMaximum Queue (ft) 71 50 62 3Average Queue (ft) 41 29 28 095th Queue (ft) 84 57 60 5Link Distance (ft) 380 380 297Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%) 0Queuing Penalty (veh) 1

Page 333: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

Existing PM SimTraffic ReportPage 5

Intersection: 30: 800 East & Public Safety

Movement WB SBDirections Served LR LMaximum Queue (ft) 44 5Average Queue (ft) 28 195th Queue (ft) 48 8Link Distance (ft) 307Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 31: 800 East & 1300 North

Movement EBDirections Served LRMaximum Queue (ft) 20Average Queue (ft) 395th Queue (ft) 18Link Distance (ft) 420Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 30 31 5 10Average Queue (ft) 13 17 1 195th Queue (ft) 36 39 12 12Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 72

Page 334: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 AM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 58 162 118 83 72 106 30 85 79 37 37 39Average Queue (ft) 28 110 71 36 45 64 15 43 43 11 15 1695th Queue (ft) 63 172 121 79 80 107 31 89 85 38 41 44Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%) 0 1 0Queuing Penalty (veh) 0 1 0

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 14Average Queue (ft) 795th Queue (ft) 23Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 5: 600 East & 1200 North

Movement EB WB NB SBDirections Served LTR LTR LTR LTRMaximum Queue (ft) 38 30 9 5Average Queue (ft) 23 16 1 195th Queue (ft) 47 40 14 8Link Distance (ft) 569 1374 948 765Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 335: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 AM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 84 269 71 34 94 28 104 60 15 77 76 106Average Queue (ft) 34 134 37 12 56 9 53 36 5 44 47 5795th Queue (ft) 89 269 71 35 101 27 98 69 16 81 79 103Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 2 2 2 1Queuing Penalty (veh) 1 1 2 1

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB SB SBDirections Served L T R L T R L T T R L TMaximum Queue (ft) 82 91 78 53 66 37 44 68 51 27 65 133Average Queue (ft) 40 40 34 30 34 16 23 30 26 9 33 7995th Queue (ft) 83 90 69 56 70 38 51 67 56 28 72 141Link Distance (ft) 972 1183 294 294 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 0 0 0 0 1Queuing Penalty (veh) 0 1 0 0 1

Intersection: 9: 800 East & 1000 North

Movement SB SBDirections Served T RMaximum Queue (ft) 18 43Average Queue (ft) 3 2195th Queue (ft) 29 45Link Distance (ft) 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%)Queuing Penalty (veh)

Page 336: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 AM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T RMaximum Queue (ft) 75 103 43 52 93 18 46 115 78 28 45 45Average Queue (ft) 35 57 15 35 56 6 25 63 33 8 20 1795th Queue (ft) 77 104 48 59 96 21 52 113 74 28 48 47Link Distance (ft) 1032 343 410 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 100 80 140 80 80 80 80 80Storage Blk Time (%) 1 0 1 0 3 0 0 0Queuing Penalty (veh) 2 0 1 0 4 0 0 0

Intersection: 14: 800 East & 1200 North

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 30 18 15 27Average Queue (ft) 16 4 5 695th Queue (ft) 40 21 22 27Link Distance (ft) 1374 366Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 260 240Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 17 30 4 14Average Queue (ft) 4 9 1 295th Queue (ft) 18 31 7 14Link Distance (ft) 433 267 196 948Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 337: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 AM SimTraffic ReportPage 4

Intersection: 21: 800 East & Stadium

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 45 35 5 24Average Queue (ft) 21 23 1 595th Queue (ft) 53 47 8 23Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80 180Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 24: 1000 North & Independ

Movement EB SB SBDirections Served L L RMaximum Queue (ft) 34 55 47Average Queue (ft) 8 32 2995th Queue (ft) 32 59 50Link Distance (ft) 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 26: 800 East & Independence

Movement EB EB NBDirections Served L R LMaximum Queue (ft) 46 39 29Average Queue (ft) 28 27 595th Queue (ft) 53 47 24Link Distance (ft) 380 380Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Page 338: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 AM SimTraffic ReportPage 5

Intersection: 30: 800 East & Public Safety

Movement WB NB SB SBDirections Served LR TR T TMaximum Queue (ft) 52 4 4 6Average Queue (ft) 28 1 1 195th Queue (ft) 58 6 7 11Link Distance (ft) 307 609 67 67Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 31: 800 East & 1300 North

Movement EB NBDirections Served LR LTMaximum Queue (ft) 31 15Average Queue (ft) 13 395th Queue (ft) 37 17Link Distance (ft) 420 67Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 43 27 52 31Average Queue (ft) 29 8 14 995th Queue (ft) 46 28 50 36Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 14

Page 339: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 PM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 90 156 190 53 150 172 71 120 145 58 88 122Average Queue (ft) 43 109 101 23 99 116 26 82 54 21 46 6195th Queue (ft) 109 173 187 56 164 174 73 137 144 63 85 121Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%) 0 1 1 0 9 1 0Queuing Penalty (veh) 0 0 1 0 13 1 0

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 58Average Queue (ft) 3095th Queue (ft) 59Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 5: 600 East & 1200 North

Movement EB WB NB SBDirections Served LTR LR LTR LTRMaximum Queue (ft) 31 34 20 19Average Queue (ft) 15 17 4 395th Queue (ft) 40 42 20 18Link Distance (ft) 569 1374 948 765Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 340: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 PM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 126 186 90 50 237 71 187 137 26 60 56 95Average Queue (ft) 70 122 51 18 132 23 113 62 6 25 33 5095th Queue (ft) 138 198 91 52 235 63 193 151 25 60 65 96Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 1 0 15 0 2 0 0Queuing Penalty (veh) 3 0 17 0 3 0 0

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB SB SBDirections Served L T R L T R L T T R L TMaximum Queue (ft) 92 140 62 50 100 58 108 103 76 20 78 214Average Queue (ft) 54 65 26 22 45 24 58 58 38 7 31 12995th Queue (ft) 97 155 64 53 100 59 118 103 77 21 80 216Link Distance (ft) 972 1183 294 294 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 2 1 1 0 0 4Queuing Penalty (veh) 5 2 2 0 0 2

Intersection: 9: 800 East & 1000 North

Movement SB SBDirections Served T RMaximum Queue (ft) 51 72Average Queue (ft) 7 3195th Queue (ft) 54 74Link Distance (ft) 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%) 0Queuing Penalty (veh) 0

Page 341: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T RMaximum Queue (ft) 104 145 42 105 135 67 90 131 66 71 157 88Average Queue (ft) 45 84 16 61 78 21 46 68 33 32 79 4695th Queue (ft) 98 153 47 109 148 60 89 139 77 77 148 93Link Distance (ft) 1032 343 410 196Upstream Blk Time (%) 0Queuing Penalty (veh) 2Storage Bay Dist (ft) 100 80 140 80 80 80 80 80Storage Blk Time (%) 0 6 1 5 1 5 0 0 5 1Queuing Penalty (veh) 0 8 2 9 4 10 0 1 9 2

Intersection: 14: 800 East & 1200 North

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 34 82 28 28Average Queue (ft) 15 45 10 1195th Queue (ft) 39 85 33 35Link Distance (ft) 1374 366Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 260 240Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 31 20 16 30Average Queue (ft) 8 7 3 895th Queue (ft) 31 27 28 36Link Distance (ft) 433 267 196 948Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 342: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 PM SimTraffic ReportPage 4

Intersection: 21: 800 East & Stadium

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 31 26 10 24Average Queue (ft) 15 6 2 695th Queue (ft) 40 26 15 25Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80 180Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 24: 1000 North & Independ

Movement EB WB SB SBDirections Served L TR L RMaximum Queue (ft) 52 7 67 50Average Queue (ft) 24 2 38 3495th Queue (ft) 55 11 69 57Link Distance (ft) 972 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%) 0Queuing Penalty (veh) 0

Intersection: 26: 800 East & Independence

Movement EB EB NB SBDirections Served L R L TRMaximum Queue (ft) 68 42 53 8Average Queue (ft) 41 28 28 195th Queue (ft) 70 48 59 14Link Distance (ft) 380 380 297Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%) 0Queuing Penalty (veh) 1

Page 343: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2016 PM SimTraffic ReportPage 5

Intersection: 30: 800 East & Public Safety

Movement WB SB SB SBDirections Served LR L T TMaximum Queue (ft) 41 10 7 8Average Queue (ft) 26 1 1 195th Queue (ft) 48 12 11 13Link Distance (ft) 307 67 67Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 31: 800 East & 1300 North

Movement EB NB NBDirections Served LR LT TMaximum Queue (ft) 30 17 5Average Queue (ft) 6 2 195th Queue (ft) 25 22 8Link Distance (ft) 420 67 67Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 38 40 5 10Average Queue (ft) 25 18 1 195th Queue (ft) 49 45 8 12Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 100

Page 344: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 73 228 201 119 103 132 29 107 193 76 72 80Average Queue (ft) 32 139 108 70 61 87 12 66 90 18 36 3595th Queue (ft) 76 243 198 131 109 137 34 119 188 70 75 72Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%) 1 0 0 4 5 0Queuing Penalty (veh) 1 1 0 8 7 0

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 21Average Queue (ft) 995th Queue (ft) 25Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 5: 600 East & 1200 North

Movement EB WB NB SBDirections Served LTR LTR LTR LTRMaximum Queue (ft) 53 30 35 34Average Queue (ft) 33 17 7 295th Queue (ft) 58 41 34 15Link Distance (ft) 569 1374 948 765Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 345: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 200 415 158 83 205 71 157 64 30 104 159 142Average Queue (ft) 66 277 68 26 117 24 91 29 9 75 91 9195th Queue (ft) 166 526 176 81 202 66 164 65 32 124 173 156Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%) 2 0Queuing Penalty (veh) 0 0Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 15 12 0 1 12 8Queuing Penalty (veh) 10 14 0 1 25 14

Intersection: 6: 800 East & 1400 North

Movement B27Directions Served TMaximum Queue (ft) 30Average Queue (ft) 695th Queue (ft) 53Link Distance (ft) 1027Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 346: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 3

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB SB SBDirections Served L T R L T R L T T R L TMaximum Queue (ft) 82 99 68 74 94 55 68 83 65 40 124 207Average Queue (ft) 48 53 38 38 51 26 41 40 37 18 55 11495th Queue (ft) 91 125 72 78 95 57 78 85 70 44 124 212Link Distance (ft) 972 1183 294 294 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 0 1 1 2 0 0 0 4Queuing Penalty (veh) 1 5 1 3 0 0 0 4

Intersection: 9: 800 East & 1000 North

Movement SB SBDirections Served T RMaximum Queue (ft) 2 51Average Queue (ft) 0 2595th Queue (ft) 4 52Link Distance (ft) 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T RMaximum Queue (ft) 78 160 58 78 121 23 75 154 89 28 58 39Average Queue (ft) 46 93 22 44 72 10 41 92 40 7 31 1695th Queue (ft) 97 166 62 78 130 29 87 162 92 27 65 41Link Distance (ft) 1032 343 410 196Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 100 80 140 80 80 80 80 80Storage Blk Time (%) 1 7 0 5 0 8 0 0Queuing Penalty (veh) 4 9 0 6 0 12 0 0

Page 347: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 4

Intersection: 14: 800 East & 1200 North

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 37 30 23 28Average Queue (ft) 17 12 6 795th Queue (ft) 44 36 26 28Link Distance (ft) 1374 366Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 260 240Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 23 28 15 18Average Queue (ft) 11 10 2 295th Queue (ft) 32 34 25 18Link Distance (ft) 433 267 196 948Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 21: 800 East & Stadium

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 31 49 5 24Average Queue (ft) 21 27 1 795th Queue (ft) 44 56 8 26Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80 180Storage Blk Time (%)Queuing Penalty (veh)

Page 348: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 5

Intersection: 24: 1000 North & Independ

Movement EB SB SBDirections Served L L RMaximum Queue (ft) 29 54 47Average Queue (ft) 8 35 2795th Queue (ft) 33 64 49Link Distance (ft) 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 26: 800 East & Independence

Movement EB EB NBDirections Served L R LMaximum Queue (ft) 54 42 29Average Queue (ft) 32 29 1095th Queue (ft) 61 49 33Link Distance (ft) 380 380Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 30: 800 East & Public Safety

Movement WB SBDirections Served LR LMaximum Queue (ft) 37 15Average Queue (ft) 28 295th Queue (ft) 48 15Link Distance (ft) 307Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Page 349: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 AM SimTraffic ReportPage 6

Intersection: 31: 800 East & 1300 North

Movement EB NBDirections Served LR LTMaximum Queue (ft) 31 10Average Queue (ft) 13 195th Queue (ft) 38 11Link Distance (ft) 420 67Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 63 27 84 37Average Queue (ft) 33 8 31 1295th Queue (ft) 62 28 85 38Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 126

Page 350: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 PM SimTraffic ReportPage 1

Intersection: 3: 600 East & 1400 North

Movement EB EB EB WB WB WB WB NB NB NB SB SBDirections Served L T TR L T T R L T R L TMaximum Queue (ft) 173 477 439 84 189 212 142 125 547 99 136 228Average Queue (ft) 66 304 269 34 132 148 66 120 380 48 80 12195th Queue (ft) 162 639 595 84 204 223 176 138 664 106 143 236Link Distance (ft) 864 864 1349 1349 631 925Upstream Blk Time (%) 4 1 1Queuing Penalty (veh) 0 0 4Storage Bay Dist (ft) 200 160 160 100 100 150Storage Blk Time (%) 0 24 3 5 0 58 9 1 3Queuing Penalty (veh) 0 19 1 10 0 138 29 3 11

Intersection: 3: 600 East & 1400 North

Movement SBDirections Served RMaximum Queue (ft) 136Average Queue (ft) 6795th Queue (ft) 151Link Distance (ft)Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 150Storage Blk Time (%) 0Queuing Penalty (veh) 0

Intersection: 5: 600 East & 1200 North

Movement EB WB NB SBDirections Served LTR LR LTR LTRMaximum Queue (ft) 35 39 63 46Average Queue (ft) 16 18 18 795th Queue (ft) 44 46 63 41Link Distance (ft) 569 1374 948 765Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 351: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 PM SimTraffic ReportPage 2

Intersection: 6: 800 East & 1400 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T TRMaximum Queue (ft) 224 1189 948 108 518 96 224 626 509 87 93 138Average Queue (ft) 208 882 568 39 334 38 211 563 215 39 52 8295th Queue (ft) 254 1606 1356 120 569 98 262 942 682 84 95 145Link Distance (ft) 1349 1349 1418 674 674 185 185Upstream Blk Time (%) 14 1 33 1 0Queuing Penalty (veh) 73 7 126 3 0Storage Bay Dist (ft) 200 140 80 200 80Storage Blk Time (%) 47 24 35 1 54 4 1 3Queuing Penalty (veh) 293 41 55 4 139 14 1 2

Intersection: 9: 800 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB NB B11 SBDirections Served L T R L T R L T T R T LMaximum Queue (ft) 128 268 106 57 116 91 152 207 100 36 49 91Average Queue (ft) 77 114 47 34 68 42 92 115 56 11 10 4695th Queue (ft) 135 270 114 65 124 100 182 260 153 38 87 122Link Distance (ft) 972 1183 294 294 286Upstream Blk Time (%) 4 1Queuing Penalty (veh) 0 0Storage Bay Dist (ft) 110 110 90 90 160 80 140Storage Blk Time (%) 7 4 0 3 0 11 0 1 0Queuing Penalty (veh) 26 12 0 5 1 23 0 0 0

Intersection: 9: 800 East & 1000 North

Movement SB SB SBDirections Served T T RMaximum Queue (ft) 230 52 60Average Queue (ft) 143 11 3395th Queue (ft) 237 80 62Link Distance (ft) 321 321Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 140Storage Blk Time (%) 6Queuing Penalty (veh) 4

Page 352: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 PM SimTraffic ReportPage 3

Intersection: 13: 600 East & 1000 North

Movement EB EB EB WB WB WB NB NB NB SB SB SBDirections Served L T R L T R L T R L T RMaximum Queue (ft) 92 199 103 143 192 84 96 314 93 100 202 105Average Queue (ft) 46 111 35 89 118 30 71 164 56 38 137 5395th Queue (ft) 97 217 93 150 208 89 119 350 110 89 236 110Link Distance (ft) 1032 343 410 196Upstream Blk Time (%) 0 1 4Queuing Penalty (veh) 0 0 19Storage Bay Dist (ft) 100 80 140 80 80 80 80 80Storage Blk Time (%) 0 11 0 4 11 0 13 14 1 2 15 1Queuing Penalty (veh) 0 20 0 17 25 0 53 35 5 8 33 4

Intersection: 14: 800 East & 1200 North

Movement EB WB NB NB SBDirections Served LR LR L T LMaximum Queue (ft) 37 91 37 9 38Average Queue (ft) 18 51 10 2 1895th Queue (ft) 44 92 35 17 44Link Distance (ft) 1374 366 297Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 260 240Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 17: 600 East & Holden/Independ

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 28 30 10 68Average Queue (ft) 12 9 1 1995th Queue (ft) 34 32 11 65Link Distance (ft) 433 267 196 948Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 353: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 PM SimTraffic ReportPage 4

Intersection: 21: 800 East & Stadium

Movement EB WB NB SBDirections Served LR LR L LMaximum Queue (ft) 38 30 25 24Average Queue (ft) 19 8 8 495th Queue (ft) 46 29 29 21Link Distance (ft) 343 316Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80 180Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 24: 1000 North & Independ

Movement EB EB WB SB SBDirections Served L T TR L RMaximum Queue (ft) 56 20 3 64 51Average Queue (ft) 27 3 0 44 3295th Queue (ft) 61 33 6 74 50Link Distance (ft) 343 972 192 192Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 80Storage Blk Time (%) 0Queuing Penalty (veh) 2

Intersection: 26: 800 East & Independence

Movement EB EB NB SBDirections Served L R L TRMaximum Queue (ft) 73 42 44 11Average Queue (ft) 44 29 26 295th Queue (ft) 75 47 52 12Link Distance (ft) 380 380 297Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 60Storage Blk Time (%) 0Queuing Penalty (veh) 1

Page 354: HCM 2010 Signalized Intersection Capacity Analysis 3: 600

Queuing and Blocking ReportDevelopment with Realigned Signal 12/2/2011

2035 PM SimTraffic ReportPage 5

Intersection: 30: 800 East & Public Safety

Movement WB NB NB SBDirections Served LR T TR LMaximum Queue (ft) 166 310 152 20Average Queue (ft) 98 163 47 395th Queue (ft) 252 438 274 17Link Distance (ft) 307 609 609Upstream Blk Time (%) 5 1 0Queuing Penalty (veh) 0 3 1Storage Bay Dist (ft) 60Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 31: 800 East & 1300 North

Movement EB NB NBDirections Served LR LT TMaximum Queue (ft) 38 68 5Average Queue (ft) 12 51 195th Queue (ft) 40 110 8Link Distance (ft) 420 67 67Upstream Blk Time (%) 31Queuing Penalty (veh) 117Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 33: 600 East & 1300 North

Movement EB WB NB SBDirections Served LR LR LTR LTRMaximum Queue (ft) 59 51 22 19Average Queue (ft) 30 25 5 395th Queue (ft) 67 53 26 20Link Distance (ft) 371 363 765 631Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Network SummaryNetwork wide Queuing Penalty: 1393