    SPILLAGE HANDLING SOLUTIONS

    USING VACUUM TECHNOLOGY

    Karl T. Haugen

    Managing Director

    HAUGEN System AB, Sweden

    MIDDLE EAST EXPORT OFFICE

    DISAB Group

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    2/40

    Do you have problem like this?

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    3/40

    Do you have problem like this?

    Or this?

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    4/40

    Vacuum technology

    - a natural part of spillage handling

    in the cement manufacturing technology!

    Why?

    Better internal and external environment

    Increase of production efficiency

    Reduce maintenance costs

    Efficient recovery of valuable material

    Increase operational profit

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    5/40

    Spillage handling main areas of operation

    Cleaning Transport Recovery

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    6/40

    Going Green by Keeping it CleanThe introduction of professional cleaning can change the

    whole plant's outlook and help generate pride in the facility.

    Typical clinker transport system - Before and after spillage management

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    7/40

    Cleaning has many benefits for your plant

    A clean electric motor has longer life time

    Repair time is reduced if equipment is cleaned

    Access to point of repair is quicker with vacuum removal

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    8/40

    Human Benefit

    Less air pollution Less dust to free airLess hard manual

    work

    Safer working place

    Cleaner working

    place

    Machinery to quickly

    handle spillage

    Less health risks by

    handling material

    Cleaning is pure profit - Human and Economical

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    9/40

    Do you have problem like this?

    Spillage in your plant:

    -Increase maintenance cost

    -Decrease production efficiency

    -Gives internal and external environmental problems

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    10/40

    Transport by vacuum will reduce plant down time

    A vacuum loader can transport material more than 150 mtr

    Cement can be sucked and blown back to the process

    A vacuum loader can often pay for itself just by reducing plant downtime

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    11/40

    Recovery is pure economical profit

    Large volumes of valuable material spills under belts and mills

    Collected material spills can be returned to the

    process without contamination

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    12/40

    We can recover this material to your process.

    Value: SR 10 13 for 50 kg means SR 260.- / tonThere are hundreds of tons to be recovered.

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    13/40

    Enclosedtransportsystem

    Minimumof spillage

    at break down

    Collectedat confined

    spaces

    Can be depositedUnder control

    ISO 14000certification

    Transport and recovery

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    14/40

    Reducing number of people for manual cleaningis pure economical profit

    What is is needed for spillage management by

    vacuum instead of shovel and wheel barrel:

    Packing plant Stationary system 3 men

    Raw mill Stationary system 3 men

    Cement Mill

    Clinker silos

    Lime stacker

    Cellars

    Other areas Mobile unit 3 men

    Above is dependendent upon production capacity of plant and local conditions

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    15/40

    Vacuum solutions for spillage handling

    A fixed installation of a mid

    effect vacuum unit for dailycleaning

    Stationary vacuum systemMobile vacuum loaders

    A heavy mobile vacuum unit to

    handle emergency break downswith high volume of material

    spillages.

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    16/40

    Mobile vacuum loader

    Suck / Blow or Suction only

    Powered by the truck diesel motor Powered by separate diesel motor

    Emptied by a hi-lift system Mounted on a semi-trailor

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    17/40

    Vacuum loader Suction

    Principles of operation

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    18/40

    Vacuum loader Blowing

    Principles of operation

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    19/40

    MATERIAL WEIGHT

    CEMENT AND / OR

    CLINKER

    10 m3

    Cement haven a volume weight of ca 1,5 ton / m3.

    Clinker will have a volume weight of ca 2 ton / m3

    When we have cement will this weight be 15 ton.

    When we have clinker will tihs weight be 20 ton

    Almost all of this weight will be on the rear axles.

    The vacuum loader weight is totally 10 400 kg..

    The weight is when the container is empty.

    The weight distribution on front and rear axles

    are dependent upon the wheel base.

    Most of this weight will be on the rear axles.

    P 210/9-3210 require for Volvo FM 400

    Wheel base of 4 900 mm:

    Front axle 3,5 ton / Rear axles 6,9 ton

    The axles of the truck will have permissable maximum weight to

    ensure safety and long life time. Special axles can be supplied.

    The Volvo FM 400 has a total permissable weight of 40 or 41 ton.

    Front axle 8 ton or 9 ton. ( We require 9 ton )

    Rear axles 2 x 16 ton = 32 ton

    The truck itself has also a weight .The chassis weight of Volvo FM 400 is ca 8,1,ton.

    This chassis weight is divided:

    Front axle 4,7 ton / Rear axle 3,4 ton.

    WB-Wheel baseThe maximum weight on the axles are:

    Front axle: 3,5 + 4,7 = 8,2 ton

    Rear axle cement: 15 + 6,9 + 3,4 = 23,2 ton

    Rear axle clinker 20 + 6,9 + 3,4 = 30,3 ton

    The max on rear axle is 32 ton. We have safety margin.

    If we increase the container to 16 m3 it will be:

    Rear axle clinker: 32 + 6,9 +3,4 = 4 2,3 ton

    This is not acceptable for truck guarantees or safety.

    UNIT WEIGHT

    VACUUM LOADER

    TRUCKS OWN WEIGHT

    WEIGHT CALCULATION - AXLES

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    20/40

    Semi-mobile vacuum units Suction only

    Mounted on an industrial towbar trailor

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    21/40

    Filter separatorVacuum unit

    All material collectedto one point

    Easy handling

    Tailor made

    Stationary vacuum system

    Vacuum system

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    22/40

    Basic design of a stationary vacuum system

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    23/40

    Typical lay-out drawing

    Stationary vacuum systemPacking Plant

    Ground floor

    Material collected is wasteCollected in pre separator

    Above ground floor

    Material collected is recoveredCollected in filter separator

    Returned to production

    Recovered materialmust be sieved

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    24/40

    The contract was won on a single supplier justification basis.

    Our latest turn-key supply in the GCC area

    Stationary vacuum system Emirates Steel Industries

    Electric motor 110 kW

    Air volume 4 000 m3/hMax vacuum 700 mbar

    Main pipe diam 152 mm

    Total system length 2 640 mtr

    Commissioned in December 2009

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    25/40

    Our experience

    Our customers gain

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    26/40

    Volumes of spillage to be collected influence

    The air volume and max vacuum of the vacuum pump

    The size and type of the separator

    Air volume influence the filter size in the filter separator

    Suction capacity is influenced by

    Diameter of pipe and suction hoses used

    Distance material is conveyed

    Difference in height

    Free-flowing material or sticky material

    Size of particles to be collected

    Collection of material from heaps or spread-out

    Number of suction points in operation at the same time

    Basic evaluation for designing a vacuum system

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    27/40

    Vacuum or Airflow

    The vacuum unit create an air stream in a pipe

    Material is mixed in to the air stream

    The vacuum is to overcome pressure loss in theairflow system

    OUR TECHNOLOGY IS AIRFLOW TRANSPORT

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    28/40

    Important factors

    Vacuum pipe dimension Pipe dimension is too large>

    Air speed is too low to transport material >

    Material falls out of the air stream >

    Clogging

    Pipe dimension is too small>

    High pressure drop >

    High material speed >High wear

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    29/40

    Shall the installation be Mobile or Stationary?

    Shall the vacuum unit have Electrical motor or Diesel engine?

    Shall the collected material be returned to the process?

    Where shall collected material be disposed or returned?

    Plant lay-out information?

    Basic information needed for making a suitable proposal?

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    30/40

    SEND US DRAWINGS WITH

    BASIC INFORMATION ANDPICTURES

    WE WILL MAKE THE LAY - OUT

    DRAWING AND COMPONENTS

    BOQ

    YOU BUY THE COMPONENTS

    LOCALLY OR FROM US

    USE OUR SUPERVISOR TO

    ASSIST YOUR LOCAL

    ERECTION CREW

    Stationary vacuum system design free of charge

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    31/40

    Users of our vacuum technology

    Yamama Saudi Cement Co., KSA

    Saudi Cement, Hofof, KSA

    Jordan Cement, Amman. Jordan

    ADRA Cement, Syria

    Union Cement Co., Ras AlKhaimah, UAE

    ECC, Egypt

    Assiut Cement, Assiut Egypt

    Ciment Egyptienne, Cairo, Egypt

    National Cement, Cairo, EgyptTourah Cement, Cairo, Egypt

    Ciment National, Lebanon

    Irish Cement, Ireland

    Italcementi,

    CCB, Belgium

    Blue Circle Cement, England

    Kantvik, Finland

    Kerman Cement, Kerman, Iran

    Lafarge Karsdorfer Zement, Germany

    Lafarge Cement, Dunbar Works,

    Ciment Lafrage, France

    Cementa AB, Slite, Sweden

    A.P.C.M., England

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    32/40

    Mordov Cement, Russia

    Norcem A/S, Norway

    Partek OY, Pargas, Finland

    Podolsky Cement, Ukraine

    Pulau Dammar Laut,Singapore

    Sangyong Cement, Seoul,South Korea

    Vassiliko Cement, NicosiaCyprus

    Valenciana De Cementos,

    Spain Titan Cement, Kamari,

    Greece

    Siam Cement, Bangkok,Thailand

    Acimento, Mercin, Turkey

    Sukohlosk Cement, Russia

    Tebessa Cement, Algeria

    More users of our tecnology

    Other industries Saudi Arabia

    SABIC Hadeed. Jubail 3 unitsNational Steel Co.

    Al Tuwairqi Group, Dammam 1 unit

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    33/40

    How can I use the vacuum technology without

    making the investment? Use a vacuum contractor !

    Most cement plants in Europe use a vacuum contractor

    - They are called in when you need the service

    - Your employees focus on cement production

    - The cost is on operational budget and not on the investment budget

    - The service of a vacuum contractor is by day, month or year

    ARMTURE, Dammam now offer ISM Industrial Spillage Management.

    Vacuum contractor service with modern vacuum loaders all over KSA

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    34/40

    Industrial Spillage Management

    Integration of

    Outsourced Contract Vacuum Cleaning with

    Site Surveying and Reporting

    ISM, DammamA Division of Armture

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    35/40

    ISM, DammamA Division of Armture

    Inspect Report Clean & Fix

    Planning is Critical

    Setting the Standard

    SUCCESSFUL VACUUM CONTRACTING SERVICEUSED BY LAFARGE, UK

    Contracting service that demand more than sucking cement:

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    36/40

    ISM, DammamA Division of Armture

    A new cement industry contracting service in Saudi Arabia

    Armture for Industrial ProjectsP.O.Box 5348, Dammam 31422 ,

    Tel: + 966 3 80 60 979. Fax: + 966 3 80 60 [email protected]

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    37/40

    Other applications for vacuum technology

    Railvac excavator London Underground Ship docks - blast material

    Steel plants Heavy sludge Ports

    We have 3000 vacuum systems in operation in many different applications globally.

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    38/40

    www.haugensystem.com

    [email protected]

    SPILLAGE IS NOT A DEPARTMENT ISSUE -

    IT IS A PLANT ISSUE !

  • 7/27/2019 HAUGEN : SPILLAGE HANDLING SOLUTIONS

    39/40

    This machine I sold

    26 years ago to

    Jordan Cement.

    It is still in operation

    - and so am I.