harman - strategic national plan apt ver 1_6.pdf

Upload: eugenio-andres-garcia-ruiz

Post on 03-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    1/21

    11

    Development of aDevelopment of a

    Strategic National PlanStrategic National PlanWorking Group MeetingWorking Group Meeting

    Lanham, MarylandLanham, Maryland

    April 28, 2006April 28, 2006

    Thomas P. HarmanThomas P. HarmanPavement Materials & Construction Team LeaderPavement Materials & Construction Team Leader

    Federal Highway AdministrationFederal Highway Administration

    TurnerTurner--Fairbank Highway Research CenterFairbank Highway Research Centerhttp://www.fhwa.dot.gov/http://www.fhwa.dot.gov/

    ASPHALT INSTITUTE

    http://www.fhwa.dot.gov/http://www.fhwa.dot.gov/http://www.fhwa.dot.gov/
  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    2/21

    22

    StrategicStrategic

    RoadmapsRoadmaps

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    3/21

    33

    VisionVision MissionMission

    Create the best transportation system inCreate the best transportation system inthe worldthe world

    We continually improve the quality of ourWe continually improve the quality of ourNationNations highway system and its inters highway system and its inter--

    modal connectionsmodal connections

    http://www.fhwa.dot.gov/infrastructure/index.htm
  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    4/2144

    FHWA Strategic Pavement RoadmapFHWA Strategic Pavement Roadmap

    Focus AreasFocus Areas

    Optimize Pavement PerformanceOptimize Pavement Performance

    Advanced Quality SystemsAdvanced Quality Systems

    Surface CharacteristicsSurface Characteristics

    Technical Capacity BuildingTechnical Capacity Building

    Environmental StewardshipEnvironmental Stewardship

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    5/21

    55

    CP Road MapCP Road Map

    (A National Strategic Plan)(A National Strategic Plan)

    12 Research Tracks:12 Research Tracks: PerformancePerformance--Based Mix Design System (MD)Based Mix Design System (MD)

    PP--B Design Guide and Rehab (DG)B Design Guide and Rehab (DG)

    High Speed NDT and ICS (ND)High Speed NDT and ICS (ND)

    Opt Surface Characteristics (SC)Opt Surface Characteristics (SC)

    Equipment Automation and Advancements (EA)Equipment Automation and Advancements (EA)

    Innovative Joint Design (IJ)Innovative Joint Design (IJ)

    High Speed Construction (RC)High Speed Construction (RC)

    LongLong--Life Pavements (LL)Life Pavements (LL)

    Accelerated and LongAccelerated and Long--Term Data Collection (DC)Term Data Collection (DC)

    Pavement Performance (PP)Pavement Performance (PP)

    Business Systems and Economics (BE)Business Systems and Economics (BE)

    Advanced Pavement Materials (AM)Advanced Pavement Materials (AM)

    TDC

    Complimentary Stakeholder DrivenCPTP IPRF

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    6/21

    66

    Working Group MeetingWorking Group Meeting Dr. Jon Epps (CART chair, Granite)Dr. Jon Epps (CART chair, Granite)

    Dr. Dave Newcomb (NAPA)Dr. Dave Newcomb (NAPA)

    Jeff Greenwald (NSSGA)Jeff Greenwald (NSSGA)

    Adam Fisher (AASHTO)Adam Fisher (AASHTO) Tom Harman (FHWA)Tom Harman (FHWA)

    Mike Anderson (AI)Mike Anderson (AI) Support:Support: John DJohn DAngeloAngelo, Bob Horan,, Bob Horan,

    Dale DeckerDale Decker

    Guests: Cheryl Richter, MonteGuests: Cheryl Richter, Monte SymonSymonASPHALT INSTITUTE

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    7/21

    77

    Working GroupWorking Group

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    8/21

    88

    Road MappingRoad MappingPlay to Win by Larry Wilson/Play to Win by Larry Wilson/HerschHerschWilsonWilson

    The Rules of ResultsThe Rules of Results #1: You can#1: You cant control the results you gett control the results you getYou can influence the resultsYou can influence the results

    #2: The results you are getting are the#2: The results you are getting are theresults you should be gettingresults you should be getting

    #3: If you want to change the results you are#3: If you want to change the results you aregetting, you have to do something differentlygetting, you have to do something differently

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    9/21

    99

    Road MappingRoad MappingPlay to Win by Larry Wilson/Play to Win by Larry Wilson/HerschHerschWilsonWilson

    Mapping the TerritoryMapping the Territory

    Maps guide us from pointMaps guide us from pointAAto pointto pointBB

    There is always more than one pathThere is always more than one pathbetween two pointsbetween two points getting Results!getting Results!

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    10/21

    1010

    Road MappingRoad MappingPlay to Win by Larry Wilson/Play to Win by Larry Wilson/HerschHerschWilsonWilson

    Road Mapping involvesRoad Mapping involves PartnershipPartnership

    Shared VisionShared Vision

    Understanding Culture/BarriersUnderstanding Culture/Barriers

    Commitment and RiskCommitment and Risk

    Hard to doHard to solve Hard to doEasy to solve

    Easy to do

    Dont remembersolving

    Easy to do

    Hard to solve

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    11/21

    1111

    VisionVisionDevelop and deliver improvedDevelop and deliver improved

    asphalt pavement technologiesasphalt pavement technologies

    that provide the public withthat provide the public with

    safe, longsafe, long--lasting, smoothlasting, smoothpavements. These innovations willpavements. These innovations will

    advance the nationadvance the nations mobility ands mobility and

    economic security whileeconomic security while

    minimizing user inconvenience andminimizing user inconvenience and

    environmental impacts.environmental impacts.

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    12/21

    1212

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    ThemesThemes

    Program AreasProgram Areas

    Key ProjectsKey Projects

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    13/21

    1313

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    ThemesThemes Production/PlacementProduction/Placement

    Environmental StewardshipEnvironmental Stewardship

    Pavement PerformancePavement Performance

    Contracting Practices/OptionsContracting Practices/Options

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    14/21

    1414

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    Production/PlacementProduction/Placement RealReal--time Process Controltime Process Control

    Intelligent Construction SystemsIntelligent Construction Systems

    Improved Construction EquipmentImproved Construction Equipment

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    15/21

    1515

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    Environmental StewardshipEnvironmental Stewardship Warm MixWarm Mix

    Recycling TechnologiesRecycling Technologies

    Energy EfficiencyEnergy Efficiency

    Water/Air/Noise QualityWater/Air/Noise Quality

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    16/21

    1616

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    Pavement PerformancePavement Performance Perpetual pavementsPerpetual pavements

    Safety/Improved Surface CharacteristicsSafety/Improved Surface Characteristics

    Performance ModelingPerformance Modeling Materials CharacteristicsMaterials Characteristics

    LongLong--term Performanceterm Performance

    Mix Selection/DesignMix Selection/Design Type Selection/DesignType Selection/Design

    Pavement Thickness DesignPavement Thickness Design

    Accelerated Pavement TestingAccelerated Pavement Testing Lab/FieldLab/Field

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    17/21

    1717

    Strategic National PlanStrategic National Plan

    for Asphalt Pavement Technologyfor Asphalt Pavement Technology

    Contracting Practices/OptionsContracting Practices/Options Risk AssessmentRisk Assessment

    Innovative ContractingInnovative Contracting LifeLife--Cycle CostsCycle Costs

    User CostsUser Costs Rapid ConstructionRapid Construction(Congestion Mitigation)(Congestion Mitigation)

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    18/21

    1818

    Strategic National PlanStrategic National Plan

    Timeline 2006Timeline 2006 -- 20072007

    1.1. Establish Working Group March 1Establish Working Group March 1stst

    2.2. Identify and compile source materialIdentify and compile source material

    3.3. Develop a Straw man on April 28Develop a Straw man on April 28thth

    4.4. Vet Vision to Asphalt ETGVet Vision to Asphalt ETGss

    5.5. Develop a draftDevelop a draft--plan by July 1plan by July 1stst6.6. Support group meet June 7Support group meet June 7thth

    7.7. Working group meet, June 27Working group meet, June 27thth

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    19/21

    1919

    Strategic National PlanStrategic National Plan

    Timeline 2006Timeline 2006 -- 20072007

    8.8. Working group meet, June 27Working group meet, June 27thth

    9.9. Vet the draft toVet the draft to UserUser--Producer Groups, CART (7/15)Producer Groups, CART (7/15)

    committee, AI, NSSGA, AASHTO andcommittee, AI, NSSGA, AASHTO andothers identifiedothers identified

    10.10.Compile feedback and adjustCompile feedback and adjust

    11.11.Working group meet in SeptemberWorking group meet in Septemberto finalize planto finalize plan12.12.Provide final text to NAPA forProvide final text to NAPA for

    publication in time for TRBpublication in time for TRB

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    20/21

    2020

    What do you see?What do you see?Develop and deliver improvedDevelop and deliver improved

    asphalt pavement technologiesasphalt pavement technologies

    that provide the public withthat provide the public with

    safe, longsafe, long--lasting, smoothlasting, smoothpavements. These innovations willpavements. These innovations will

    advance the nationadvance the nations mobility ands mobility and

    economic security whileeconomic security while

    minimizing user inconvenience andminimizing user inconvenience and

    environmental impacts.environmental impacts.

  • 7/29/2019 Harman - Strategic National Plan APT ver 1_6.pdf

    21/21

    2121

    Thank You!Thank You!

    Questions?Questions?