hannans sweden iron portfolio

37
Sweden Iron Portfolio HANNANS REWARD LIMITED ASX: HNR ABN: 52 099 862 129 JULY 2012

Upload: mindy-ong

Post on 27-Mar-2016

216 views

Category:

Documents


1 download

DESCRIPTION

Emerging iron ore project in the Kiruna District of Northern Sweden with existing JORC resources of 473mt iron @ 40% Fe plus JORC exploration target of 203-273 @ 32-40% Fe.

TRANSCRIPT

Page 1: Hannans Sweden Iron Portfolio

Sweden IronPortfolio

HANNANS REWARD LIMITEDASX: HNRABN: 52 099 862 129

J U LY 2 0 1 2

Page 2: Hannans Sweden Iron Portfolio

Disclaimer

This Document and the information contained herein and any presentation (collectively referred to as “Information”) is proprietary to Hannans RewardLimited (“the Company”, “Hannans Reward” or “Hannans”).

This Document is intended to provide general background on the Company. It is not a disclosure document and is not intended as an offer, invitation,solicitation or recommendation with respect to any potential transaction.

Securities of micro cap exploration companies, typically involve a high degree of risk and as such, any investment in the Company must be considered aspurely speculative. The Information in this presentation does not purport to cover all relevant information about any potential investment in the Company.Accordingly potential investors are advised to seek appropriate independent advice, if necessary, to determine the suitability of this investment. Youshould not solely act in reliance on the material in this presentation. This presentation does not purport to be all inclusive or to contain all informationwhich its recipients require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation andperform your own analysis in order to satisfy yourself as to the accuracy or completeness of the information, statements, and opinions contained in thispresentation before deciding whether to make an investment into Hannans.

The Document contains reference to certain intentions, expectations and plans of the Company. Those intentions, expectations and plans may or may not be achieved. They are based on certain assumptions which may not be met or on which views may differ. The performance and operations of the Company may be influenced by a number of factors, many of which are outside the control of the Company. No representation or warranty, express or implied, is made by the Company or any of their respective directors, employees, agents, advisers and consultants that any intentions, expectations or plans will be achieved either totally or partially or within a prescribed timeframe or that any particular rate of return will be achieved.

The Information disclosed relates to the proposed business of the Company at the date of this Document. Material information may have changed sincethe date the Document was compiled. No responsibility is accepted to advise any person of any change or update any of the Information.

Neither the provision of this Document nor any information contained in this Document or subsequently communicated to any person in connection withthis Document is, or should be taken as, constituting the giving of investment advice to any person. By accepting this Document you acknowledge andagree to be bound by each of the foregoing statements.

The currency used throughout the presentation is Australian Dollars unless otherwise stated.

Page 3: Hannans Sweden Iron Portfolio

HANNANS

AUSTRALIANickel

Gold

SWEDENIron

Copper-Gold

NORWAYCopper-Gold

Organisational Structure

Page 4: Hannans Sweden Iron Portfolio

Board of Directors(Please note that Mr Olof Forslund and Mr Markus Bachmann will be appointed during July 2012)

Richard ScallanChairman, Hannans Reward Ltd

• Director of Hannans Reward Ltd (2004)

• Mining Engineer with 54 years experience in underground and open cut mining

• Previously employed by the Anglo American Corporation of South Africa Limited for 26 years and joined Renison Goldfields Limited in 1981 where he was employed for 21 years

Jonathan MurrayNon-Executive Director, Hannans Reward Ltd• Director of Hannans Reward Ltd (2010)

• Principal legal practice areas include equity capital markets, takeovers, project acquisitions and divestments, corporate governance, commercial law and strategy

Olof ForslundNon-Executive Director, Hannans Reward Ltd• Director of Hannans Reward Ltd (2012)• Founding director Scandinavian Resources Ltd

(2008) & Kiruna Iron AB• Geophysicist with extensive international experience

in the mineral exploration industry• Previously Regional Manager of SGU Mineral

Resources Information Office

William HicksNon-Executive Director, Hannans Reward Ltd

• Founding director of Hannans Reward Ltd (2002)• Director and secretary of Spargo’s Reward Gold

Mines NL and was instrumental in the listing on the ASX of both Central Kalgoorlie Gold Mines NL and Maritana Gold NL

Damian HicksManaging Director, Hannans Reward Ltd

• Founding director of Hannans Reward Ltd (2002)• Founding director Scandinavian Resources Ltd

(2008) & Kiruna Iron AB• Admitted Barrister & Solicitor in Western Australia;

Bachelor of Commerce (Accounting & Finance)

Markus BachmannNon-Executive Director, Hannans Reward Ltd• Director of Hannans Reward Ltd (2012)• Founding director of Kiruna Iron AB• Corporate finance professional and founding partner

of Craton Capital • Craton Capital awarded Fund Manager of the Year

at the Mining Journal’s “Outstanding Achievement Awards” during December 2010

Page 5: Hannans Sweden Iron Portfolio

Hannans Technical Team

Amanda ScottExploration Manager

• Geologist with 8 years experience• Responsible for developing the Kiruna Iron Project

portfolio and the SCR gold and base metals portfolio since inception

• Previously Exploration Manager for Hannans Reward Ltd (2008 – 2010) and Scandinavian Resources Ltd (2010 – 2012)

Jorgen LindsköldSenior Geologist

• Geologist with more than 30 years experience in the Swedish mineral exploration industry

• Previously joined North Atlantic Natural Resources AB (NAN) now also known as Lundin Mining AB for 11 years and Bolidens mine in Renström mainly responsible in mine mapping and ore control

Christina LundmarkManaging Director (SRAB)

• Geologist with more than 15 years experience in the Swedish mineral exploration industry

• Previously Head of Division Mineral Information for the Geological Survey of Sweden (SGU)

• Responsible for SGU participation at PDAC, FEM and other international symposiums

Magnus ArnqvistManaging Director (KIAB)

• Ex-MD of Europe’s largest zinc mine

• Mining engineer with Rapallo (Australia) and Mine Manager of the Kristineberg, Storliden and Maurliden Mines (owned by Boliden)

• Bachelor of Mining from Bergsskolan Filipstad and Luleå University of Technology

Page 6: Hannans Sweden Iron Portfolio

Hannans Technical Team

Ana Braña BergshjorthGeophysicist

• Senior mining geophysicist with over 15 years experience working on international exploration in mineral commodities providing extensive geophysical expertise and capability

• Qualified Person according to the statutes of Fennoscandian Review Board and is a member of SveMin

Rune WilbergSenior Geologist

• Geologist with more than 30 years experience in Norwegian mineral exploration industry

• Worked as a geological consultant (1998-2011) for various mining and exploration companies for base metals and gold in Norway and Greenland

• Worked 12 years for NGU

Jan EhrenborgSenior Geologist

• Geologist with more than 40 years experience primarily for SGU and SGAB

• 15 years mapping Tertiary volcanic terrains in Nicaragua and Panama, gold exploration in Guinea (West Africa), logging drill cores for the Swedish Nuclear Fuel and Waste Management Co.

Lewis WildProject Geologist

• Geologist with 4 years experience working on projects in Australia and Sweden

• Two years working with Anglo American Metallurgical Coal in the major Moranbah South and Grosvenor exploration projects in Queensland and worked for Talisman Mining on base metal and gold exploration in Western Australia

Page 7: Hannans Sweden Iron Portfolio

Investment case and strategy

§ Emerging iron ore project in the Kiruna District of Northern Sweden

§ Experienced Sweden based management team with exploration, development and mining history in Sweden

§ Successful implementation of exploration & corporate strategy in Kiruna since 2008

§ Existing JORC resources1 of 473mt iron @ 40% Fe plus JORC exploration target of 203-273 @ 32-40% Fe

§ Favourable mining jurisdiction

§ Targeting production of premium quality (+68% Fe) concentrate

§ Excellent existing infrastructure in Nordic region1JORC resources are in the indicated and inferred category. See slide 8 for further detail © Hans Lindberg

Page 8: Hannans Sweden Iron Portfolio

Location

§ Established mining jurisdiction

§ Close to Kiruna and existing infrastructure

§ Next to Europe’s largest iron mine (Kiirunavaara owned by LKAB) and near Europe’s largest open pit (Aitik owned by Boliden)

§ Kiruna is an established population centre with more than 100 years of mining production

Page 9: Hannans Sweden Iron Portfolio

Iron Prospects

Page 10: Hannans Sweden Iron Portfolio

JORC JORC ResourcesConceptual Target Exploration Target Inferred Indicated Measured

Kiruna - South Hotnjos/Leavka Tjåorika (15-30/45-55) Ekströmsberg (41.6/52) Ekströmsberg (30.4/52.0)Luoppovare Tjårrojåkka (52.6/51.0)

Kajpak Pattok (62.4/44.2)Renhagen (26.3/32.1)Harrejuare (16.2/43.4)

Kiruna - Central Piedjastjåkka Laukkujärvi (4-8/30-35) Rakkurijoki (74.5/39.7)Gäddmyr Åkosjegge (10-15/22-30) Rakkurijärvi (69.6/28.5)

Holmajärvi Rakkurijärvi-Discovery (10.9/38.7)Staggotjåkka Rakkurijärvi- Tributary (4.9/28.6)

Eustillako Vieto (14.0/35.7)Eustiljåkk + Eustilvaara Puoltsa (19.1/30.2)

ÅrosjokkPirttivuopioKaranisvareSalvotjåkkaHolmajärvi

Kiruna - North Saivo Altavaara (55-60/26-29) Sautusvaara South (6.8/26.6) Sautusvaara South (32.0/37.4)

Rappakojärvi Sautusvaara North (1.0/44.8) Sautusvaara North (11.4/39.7)

HonkavareVillenjärvi

Lannavaara Lannavaara 7 Kevus (35-45/28-35)Lannavaara 8 Paljasjärvi (40-60/30-40)

Teltaja (39-47/40-48)Other Masugnsbyn 2 Leppäjoki (5-8/35-45)

LainiojärviTervakoski

RatekSalmijärvi

Kiruna Iron Deposits (Mt / Fe%)

Page 11: Hannans Sweden Iron Portfolio

Note: 1. Where the iron is predominantly present as magnetite, then the mass recovery will follow the % magnetite in the ore.2. The mass recovery and iron recovery are related by the iron feed grade. i.e. If the iron grade is 10% Fe and this is present as only magnetite (equivalent to14% magnetite in the feed) then a mass recovery of 14%, in a perfect separation, would achieve 100% iron recovery.3. If the iron grade is made up of 50:50 magnetite : hematite then a mass recovery of 7% would achieve 50% iron recovery. If the mass recovery was 14%, as a result of gangue included with the magnetic concentrate, the iron recovery would still be ~50%, if the gangue material did not contain iron.

Head Fe grade in feed

% magnetite in feed material

% of mass recoveredfrom DTR

% of iron from feed material

present in conc. after

DTR

DTR conc Fe grade

DTR conc SiO2 grade

DTR conc Al2O3 grade

DTR conc P grade

DTR conc S grade

Ekströmsberg(Kiruna South)

52.6 28.2 25.9 44.6 70.8 0.7 0.1 0.04 0.003

Rakkurijoki(Kiruna Central)

35.9 27.7 45.2 83.8 69.2 1 0.3 0.009 0.365

Rakkurijärvi (Kiruna Central)

22.3 Insufficient data 25.5 76.1 68.9 2.2 0.4 0.005 0.022

Puoltsa(Kiruna Central)

49.3 62.4 67.9 96.2 70.3 0.58 0.16 0.0017 0.005

Sautasvaara(Kiruna North)

47.7 No data 54.5 88.5 71.1 0.5 0.2 0.05 0.3

Vieto(Kiruna Central)

32.8 47.9 42.2 82.8 70 1.2 0.2 0.01 0.06

Rakkurijärvi Discovery Zone(Kiruna Central)

46.9 No data 60 89.6 70.8 1 0.2 0.003 0.035

Laukkujarvi(Kiruna South)

10.3 69.9 65.7 98.4 71 0.6 0.02 0.002 0.001

Gaddmyr(Kiruna Central)

64.6 No data 17.9 20.4 71.9 0.01 0.07 0.02 0.005

Preliminary Metallurgical Test Work

Page 12: Hannans Sweden Iron Portfolio

§ Most advanced deposits are Rakkurijoki and Ekströmsberg

§ Environmental and social impact studies are being prepared for the Rakkuri Area

§ Exploration drilling success may change ranking of projects significantly

§ Open pit mining proposal

§ A plant producing 2-5mtpa is estimated to cost around US$435m

Metallurgy1

• Est. 75 micron grind size• Concentrate spec >60% Fe, <5% SiO2, <0.05% P and <0.05% S

1High level CAPEX estimates were provided by METS inJuly 2011 and November 2011

Kiruna Hub

Page 13: Hannans Sweden Iron Portfolio

Rakkurijoki – Ideal Start

Rakkurijoki

§ Scoping Study in progress

§ Environmental impact assessment in progress incorporating Rakkurijarvi)

§ Social impact assessment in progress (over Rakkurijarvi)

§ JORC resource drilling commenced (conversion from inferred to indicated)

§ Excellent Location:

§ 6km from Kiruna

§ ~1km from the rail

§ 250m from the road

§ 10 minutes from the office

§ Open pit mining potential

§ Current Inferred resources of 74.5Mt @ 39.7% Fe

§ Mineralisation currently open at a depth of >400m

§ Area of national interest for mining

§ Upgrades to +68% Fe product

Page 14: Hannans Sweden Iron Portfolio

April to June 2012 drilling ~4,200m

Rig #1Rig #2

Rakkurijoki Project

Page 15: Hannans Sweden Iron Portfolio

Rakkurijoki Section C – C’

Page 16: Hannans Sweden Iron Portfolio

Lannavaara Hub§ Potentially more significant than Kiruna

Hub

§ Paljasjärvi is a 3km long magnetic anomaly

§ it has the 2nd highest magnetic intensity in the Kiruna District behind only LKAB’s Kiirunavaara mine

§ Historic drilling by SGU at Paljasjärvi intersected iron

§ 80km from Kiruna and close to Lannavaara

§ Joint venture agreement with Boliden at Lannavaara provides for Kiruna Iron AB to own 100% of the iron rights only

The JORC Exploration Targets have been subjected to diamond drill testing, ground geophysics and interpretation by the Geological Survey of Sweden reviewed by Mr Thomas Lindholm, of GeoVista AB. Mr Lindholm is a fellow of the Australasian Institute of Mining and Metallurgy (Member 230476). The potential quantity and grade of the exploration targets is conceptual in nature, there has been insufficient interpretation to define a JORC Mineral Resource and it is uncertain if further interpretation will result in the determination of a JORC Mineral Resource.

Page 17: Hannans Sweden Iron Portfolio

2012 - Q3 / Q4

§ Commence logistics studies

§ JORC resource update for Rakkurijoki

§ Begin drilling at Palisjärvi to test exploration target§ Begin drilling at Ekströmsberg to convert resource from

inferred to indicated

§ Complete scoping studies for Rakkurijoki

§ Complete social impact and environmental studies for Rakkuri

2013 - Q1 / Q2

§ JORC resource update for Rakkurijoki, Paljasjärvi, Altavaara

§ Feasibility studies for processing and logistics options

© Hans Lindberg

Expected milestones / news

Page 18: Hannans Sweden Iron Portfolio

1JORC resources are in the indicated and inferred category. See slide 8 for further detail

§ Emerging iron ore project in the Kiruna District of Northern Sweden

§ Experienced management team with exploration, development and mining history in Sweden

§ Successful implementation of exploration & corporate strategy in Kiruna since 2008

§ Existing JORC resources1 of 473mt iron @ 40% Fe plus JORC exploration target of 203-273 @ 32-40% Fe

§ Favourable mining jurisdiction

§ Targeting production of premium quality (68%+) concentrate

§ Nordic region has excellent existing infrastructure

© Hans Lindberg

Summary

Page 19: Hannans Sweden Iron Portfolio

Contacts

Hannans Reward Ltd, through its subsidiary companies, holds a portfolio of mineral assets in Sweden, Norway and Australia.Hannans has a dual strategy focused on creating a pathway to production for the Kiruna Iron Project in Sweden, supplemented withprecious and other base metals exploration in Sweden, Norway and Australia.

Sweden & Norway

§ Flagship Kiruna Iron Project is 30km from the 2Bt Kiruna iron mine (owned by LKAB) – the world’s largest and most modernunderground iron mine

§ Pipeline of projects covering gold, copper-gold and lead-zinc prospects in Sweden and Norway

Australia

§ Forrestania – nickel & gold project 7km north of Western Area’s Flying Fox nickel mine

§ Lake Johnston – nickel & gold project located 25km south east of Norilsk’s Maggie Hays nickel mine and 100kms west ofNorseman, Western Australia.

§ Queen Victoria Rocks – nickel and gold project located 30km south-west of Coolgardie, Western Australia.

§ Jigalong – base metals project located 150km east of Newman, Western Australia

Contact details in relation to this presentation:

Damian HicksManaging DirectorHannans Tel: +61 8 9324 3388

Magnus ArnqvistManaging DirectorKiruna IronTel: +46 703 22 55 37

Christina LundmarkManaging DirectorScandinavian ResourcesTel: +46 703 22 15 18

Page 20: Hannans Sweden Iron Portfolio

Kiruna Iron ProjectAdditional Information

Page 21: Hannans Sweden Iron Portfolio

Rakkurijoki Drilling Schematics

Page 22: Hannans Sweden Iron Portfolio

Rakkurijoki Section A – A’

Page 23: Hannans Sweden Iron Portfolio

Rakkurijoki Section B – B’

Page 24: Hannans Sweden Iron Portfolio

Rakkurijoki Section C – C’

Page 25: Hannans Sweden Iron Portfolio

Rakkurijoki Section D – D’

Page 26: Hannans Sweden Iron Portfolio

ProjectNo. of Holes

Drilled by KIABYear

Drilled

Metres Drilled

Comments

Rakkurijärvi 6 2011 1488 Phase 1Rakkurijoki 8 2011 3083 Phase 1Rakkurijoki 2 2011 883 Phase 2 Infill Drilling

Rakkurijoki 10 2012 2699Phase 2 Infill Drilling

(13,000m)TOTAL

(To date)26

-8153 -

© Hans Lindberg

Rakkuri Drilling

© Hans Lindberg

Page 27: Hannans Sweden Iron Portfolio

JORC Compliant Indicated Mineral Resource TableProspect Mt Fe (%) P (%) S (%)Sautusvaara South 32.0 37.4 0.06 1.63Sautusvaara North 11.4 39.7 0.09 0.44Ekströmsberg 30.4 52.0 Unavailable UnavailableTOTAL 73.8 43.0 - -

JORC Compliant Inferred Mineral Resource TableProspect Mt Fe (%) P (%) S (%)Rakkurijärvi 69.6 28.5 0.07 0.93Rakkurijoki 74.5 39.7 0.28 0.89Discovery Zone 10.9 38.7 0.05 0.95Tributary Zone 4.9 28.6 0.05 1.08Sautusvaara South 6.8 26.6 0.09 1.82Sautusvaara North 1.0 44.8 0.05 0.46Vieto 14.0 35.7 0.14 1.46Puoltsa 19.1 30.2 0.025 0.01Renhagen 26.3 32.1 0.23 0.03Harrejaure 16.2 43.4 0.04 0.01Ekströmsberg 41.6 52.0 Unavailable UnavailableTjårrojåkka 52.6 51.0 Unavailable UnavailablePattok 62.4 44.2 1.96 UnavailableTOTAL 399.9 38.1 - -

TOTAL Mt Fe (%)Indicated & Inferred 473.7 40.5

Kiruna Hub – JORC Resources

Page 28: Hannans Sweden Iron Portfolio

Kiruna HubProspect Tonnage Range (Mt) Grade Range (Fe%)Åkosjegge 10-15 23-30Altavaara 55-60 26-29Laukkujärvi 4-8 30-35Leppäjoki 5-8 35-45Tjåorika 15-30 45-55Total Hub 1 89-121 31.8-38.8

Lannavaara HubProspect Tonnage Range (Mt) Grade Range (Fe%)Kevus 35-45 28-35Paljasjärvi 40-60 30-40Teltaja 39-47 40-48Total Hub 2 114-152 32-41

TOTAL Mt Fe (%)

Hub 1 & 2 203-273 32.1- 39.6

The JORC Exploration Targets have been subjected to diamond drill testing, ground geophysics and interpretation by the Geological Survey of Sweden reviewed by Mr Thomas Lindholm, of GeoVista AB. The potential quantity and grade of the exploration targets is conceptual in nature, there has been insufficient interpretation to define a JORC Mineral Resource and it is uncertain if further interpretation will result in the determination of a JORC Mineral Resource.

JORC Exploration Targets

Page 29: Hannans Sweden Iron Portfolio

Since April 2010

• Kiruna Iron Plc established with initial assets

• Completed Tasman Metals Ltd JV

• Acquires 100% of the Rakkuri Project from Anglo American

• Acquires portfolio of iron permits from Grängesberg Iron AB

• Environmental and social impact studies commenced

• Maiden JORC resource of 412mt @39% Fe published

• SRK Consulting independently values Kiruna Iron Project at US$125M in accordance with 2005 Valmin code1

• Signs co-operation agreement with Boliden to earn 100% interest in Lannavaara

• Conceptual study into iron slurry pipeline completed

• Appointed Managing Director

• Updated JORC resource to 473Mt @ 40% Fe

• Completed 18,000m of drilling at Kiruna Iron project

2012 and beyond• Drill

― Rakkurijoki – inferred to measured― Ekströmsberg – inferred to measured― Paljasjärvi – convert target to JORC resources― Greenfields targets to Exploration Targets

• Studies― Social impact― Environmental― Metallurgical― Logistics

• Exploitation licence application/s • Engage with

― Sami Villages― Government Agencies― Kiruna Residents

• Produce high grade concentrate

1Code for the technical assessment and valuation of mineral and petroleum assets and securities for independent expert reports

History and plan

Page 30: Hannans Sweden Iron Portfolio

§ Kiruna Kommun

§ Sami Villages§ Laevas

§ Girjas

§ Gabna

§ Talma

§ Land & Home Owners

§ Kiruna Residents

§ Government

§ Narvik Municipality

§ Lulea Kommun

§ Shareholders

§ Regulators

Port of Narvik, Norway (photo courtesy of Narvik Port)

Social, Economic & Environment

Page 31: Hannans Sweden Iron Portfolio

§ Sami organisations consider that the Swedish Mining Law contravenes the European Union Directive on Human Rights and therefore all exploration and mining activity in Sweden is a breach of these human rights. Sami organisations are therefore opposed to the activities of exploration and mining companies including Scandinavian Resources AB and Kiruna Iron AB. In general the Sami position is that mining operations may destroy both the future of the reindeer husbandry industry and the ability to practise, and pass on, the traditional Sami way of living.

§ Kiruna Iron AB is a member of SveMin, an employers and industry association for mines and mineral and metal producers in Sweden. The Ethical Rules of SveMin states that the task of the mining industry is to supply society with minerals and ore in a responsible manner and with long-term profitability. Minerals and metals are essential to a well-functioning and modern society. Metals are produced from ore and may be continuously recycled. SveMin members will promote sustainable development and efficient, balanced, long-term management of energy and natural resources while showing due consideration for people, the economy, the environment and the society in general.

§ SveMin has recently started a sub-committee for the relations between the reindeer husbandry and the mining industry. The chairman of the sub-committee is Christina Lundmark, Managing Director of Scandinavian Resources AB.

§ Kiruna Iron AB has carried out its activities at all times in an open and transparent manner with regard to the Sami interests through many face-to-face meetings, the provision of detailed written information and the carrying out of exploration activities at times where the interests of the reindeer herders are not impacted. Kiruna Iron’s legal team have confirmed that the Company has exceeded the requirements of the mining legislation with regard to communications with affected persons and the Company will continue to do so.

Sami Interests

Page 32: Hannans Sweden Iron Portfolio

§ Multiple infrastructure options

§ Existing open access government owned heavy gauge rail infrastructure

§ Capacity constrained but expanding

§ Increased flexibility and options on the Kiruna-Lulea rail

§ Northland Resources expect to gain access on Kiruna-Narvik rail

§ Annual allocation and access by social and economic assessment criteria

§ Two existing port options

§ Lulea ‘ready to go’ +/-2mtpa with room for expansion

§ Narvik a gateway to the USA, Middle & Far East

§ Slurry pipeline (5 or 10mtpa) potentially provides independent wholly owned infrastructure option

Infrastructure

Page 33: Hannans Sweden Iron Portfolio

Increased capacity according to national plan 2015

§ Estimated increase in iron ore shipments Luleå – Riksgränsen by 80% from 2010 to 2020, most before 2015

§ Current capacity on Kiruna to Narvik line is fully utilised

§ Capacity is slightly better from Kiruna to Luleå, where short trains are easier to adapt to the infrastructure

“New Money”

§ Will allow Trafikverket to extend passing stations earlier than planned so that the capacity better meets the demand

§ Capacity study, Governmental Commission

§ Time frame, 2012 – 2021

§ In the longer perspective, 2050

Getting on the Track

§ Permits required from Swedish Transport Agency

§ Application for capacity to Swedish Transport Administration (STA)

§ Capacity allocated on an annual basis on same terms as others users

§ Where there are conflicts due to congestion, the STA must consider the socioeconomic benefits of allocating the capacity among different users

Source: Trafikverket Presentation. Date: 8 September 2011

Transport by Rail

Page 34: Hannans Sweden Iron Portfolio

Rail at Port of Lulea

LKAB Assets

Rail to Luleå and Port of Luleå Option

§ Utilise existing open access gauge rail from Kiruna to Luleå (340km)

§ Port of Luleå

§ Currently 2mtpa capacity with expansion potential

§ Sweden’s largest port for dry bulk handling

§ Top 5 amongst Swedish ports for tonnage handled

§ DWT 55,000 tonnes (11,8m)

§ Annual goods turnover c. 9mt

§ Called by c. 700 vessels/yr

§ Secured all-year access

§ Regular destinations mainly within Baltic region

§ LKAB export c. 6mtpa ex Luleå

LKAB owned infrastructure at Lulea

Infrastructure – Luleå

Page 35: Hannans Sweden Iron Portfolio

§ Preliminary study completed by Raw Materials Group in October 2011

§ 5mtpa and 10mtpa options

§ CAPEX est. for 5mt is US$185m and 10mt is US$231m

§ (1SEK=0.154 US$)

§ OPEX est. for 5mt is US$0.69/tonne and 10mt is US$0.62/tonne

Transport by pipeline Port of Narvik

§ Utilise existing open access heavy gauge rail from Kiruna to Narvik (180km)

§ Narvik Port handles shipping for LKAB, and a 10mtpa terminal for Northland Resources is being built

§ Can handle Capesize vessels

§ Ice-free

§ Expansion planned on rail and port

Source: Port of Narvik Presentation. Date: 15 September 2011

Infrastructure - Narvik

Company Today 2015 2020

LKAB 18mt 28mt 34mt

Northland 0mt 5mt 7mt

Hannans 0mt 0mt 5mt

Other 0mt 0mt 4mt

Total 18mt 33mt 50mt

Page 36: Hannans Sweden Iron Portfolio

§ LKAB 2010 key statistics:

§ Operating profit SEK12,281M

§ 26Mt of iron products (21Mt pellets)

§ 4,100 employees

§ The Kiruna ore deposit mined by LKAB is the world’s largest known continuous body of iron ore. About 26Mt of crude oreis mined each year. It is a single, continuous, rich magnetite orebody that is more than 4km long and has an average width ofabout 80m. LKAB knows that it extends to a depth of at least 1,500m, and there are indications that it continues to a depthof up to 2km. The present main level, from which the ore is gathered, is at a depth of 1,045m (measured from the zeropoint at the original peak of Mt. Kiirunavaara). LKAB is now building a new main level at 1,365m.

§ The Malmberget mine consists of about 20 orebodies, of which ten are currently mined. Most of the deposit consists ofmagnetite ore, but non-magnetic hematite also occurs. The present main level of the Malmberget mine is at a depth of1,000 meters. About 14 Mt of crude ore is extracted from the orebodies each year

§ Kiruna population: c. 18,000

Kiruna, LKAB’s Kiruna orebody overlaid on image

Source: LKAB web site & Annual Report 2010

Kiruna – A City in Transformation

Page 37: Hannans Sweden Iron Portfolio

Competent Persons Statements

The information in this document that relates to exploration results is based on information compiled by Ms Amanda Scott, Exploration Manager, Scandinavian Resources Ltd, who is a Member of the Australian Institute of Mining and Metallurgy. Scandinavian Resources is a subsidiary of Hannans Reward Ltd and Ms Scott is a full-time employee of Scandinavian Resources Ltd. Ms Scott has sufficient experience, which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which has been undertaken to qualify as a Competent Person as defined by the 2004 edition of the “Australian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms Scott consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.Competent Persons Statement-Rakkurijärvi, Rakkurijoki, Discovery, Tributary Zone, and Puoltsa Mineral ResourcesThe mineral resource estimate for Rakkurijärvi, Rakkurijoki, Discovery, Tributary Zone and Puoltsa is effective from 13 January 2012 and has been prepared by Mr Thomas Lindholm, MSc of GeoVista AB, Luleå, Sweden acting as an independent “Competent Person”. Mr Lindholm is a member of the Australasian Institute of Mining and Metallurgy (Member 230476). Mineral resources of the Rakkuri iron deposits have been prepared and categorised for reporting purposes by Mr Lindholm, following the guidelines of the JORC Code. Mr Lindholm is qualified to be a Competent Person as defined by the JORC Code on the basis of training and experience in the exploration, mining and estimation of mineral resources of gold, base metal and iron deposits.

Competent Persons Statement-Ekströmsberg, Tjårrojåkka and Pattok Mineral ResourcesThe mineral resource estimate for Ekströmsberg, Tjårrojåkka, and Pattok is effective from 22 July 2011 and has been prepared by Dr Christopher Wheatley of Behre Dolbear International Ltd, UK, acting as an independent “Competent Person”. Dr Wheatley is a member of the Institute of Materials Minerals and Mining (Member 450553). Mineral resources of the Ekströmsberg, Tjårrojåkka, and Pattok have been prepared and categorised for reporting purposes by Dr Wheatley, following the guidelines of the JORC Code. Dr Wheatley is qualified to be a Competent Person as defined by the JORC Code on the basis of training and experience in the exploration, mining and estimation of mineral resources of gold, base metal and iron deposits. Dr Wheatley consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

Competent Persons Statement-Vieto, Sautusvaara, Renhagen and Harrejaure Mineral ResourcesThe mineral resource estimate for Vieto and Sautusvaara is effective from 26 July 2011 and the mineral resource estimate for Renhagen and Harrejaure is effective from 13 January 2012 and has been prepared by Mr Geoffrey Reed of Minarco-MineConsult acting as an independent “Competent Person”. Mr Geoffrey Reed is a member of the Australasian Institute of Mining and Metallurgy (CP)(Member 205422). Mineral resources of Vieto, Sautusvaara, Renhagen and Harrejaure have been prepared and categorised for reporting purposes by Mr Reed, following the guidelines of the JORC Code. Mr Reed is qualified to be a Competent Person as defined by the JORC Code on the basis of training and experience in the exploration, mining and estimation of mineral resources of gold, base metal and iron deposits. Mr Reed consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

Competent Persons Statement-Exploration TargetsThe information in this document that relates to JORC Exploration Targets is based on information reviewed by Mr Thomas Lindholm of GeoVista AB, Luleå, Sweden acting as an independent “Competent Person”. Mr Lindholm is a member of the Australasian Institute of Mining and Metallurgy (Member 230476). Mr Lindholm is qualified to be a Competent Person as defined by the JORC Code on the basis of training and experience in the exploration, mining and estimation of mineral resources of gold, base metal and iron deposits. Mr Lindholm consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.