hanna cv (2015)
TRANSCRIPT
1
Awad S. Hanna, Ph.D., PE.
Ph.D., Civil Engineering (Construction Engineering and Management), 1989, Pennsylvania State
University, State College, Pennsylvania.
M.S., Civil Engineering (Construction Engineering and Management), 1986, Pennsylvania State
University, State College, Pennsylvania.
B.Sc., Civil Engineering, Cairo University, Cairo, Egypt.
Registered Professional Engineer in the State of Wisconsin (Registration #30306)
Registered Professional Engineer in Canada (Registration #02600)
2006-present: Director, Construction and Materials Support Center (CMSC), The University of
Wisconsin-Madison.
2003-present: Professor and Chair, Construction Engineering & Management Program, Department
of Civil and Environmental Engineering, The University of Wisconsin-Madison.
2000-present: Professor, Department of Civil and Environmental Engineering, The University of
Wisconsin-Madison.
1996-2000: Associate Professor with tenure, The University of Wisconsin-Madison.
1992-1996: Assistant/Associate Professor with tenure, The University of Wisconsin-Madison.
Tenure granted 1995.
1992-1993: Associate Professor with tenure, Memorial University of Newfoundland, Canada.
Tenure granted 1992.
1989-1992: Assistant Professor, Memorial University of Newfoundland, Canada.
1984-1988: Research Assistant and Instructor, The Pennsylvania State University.
U N I V E R S I T Y O F W I S C O N S I N - M A D I S O N • 2 3 2 0 E N G I N E E R I N G H A L L • 1 4 1 5 E N G I N E E R I N G D R I V E
M A D I S O N , W I 5 3 7 0 6
P H O N E ( 6 0 8 ) 2 6 3 - 8 9 0 3 • F A X ( 6 0 8 ) 2 6 5 - 9 8 6 0 • E - M A I L H A N N A @ E N G R . W I S C . E D U
Related Work Experience
Licenses Received
Education
CURRICULUM VITAE
2
Winner of the 2010 Best Paper Award of the ASCE Journal of Construction Engineering and
Management for “Quantitative Methods for Design-Build Team Selection,” co-authored by Mounir
El Asmar, Wafik Lotfallah and Gary Whited.
Awarded the 2010 Construction Management Award, American Society of Civil Engineers
(ASCE).
Elected Fellow, American Society of Civil Engineers (ASCE), 2009.
Winner of Outstanding Researcher Award, Construction Industry Institute (CII), Austin, Texas,
2006.
Received the Builder Edge Award for the Best Construction Engineering and Management
Program, 2006.
2002 Best Peer Review Paper Award for “Guidelines for Warranty Contracting for Highway
Construction,” Journal of Management in Engineering American Society of Civil Engineers
(ASCE), co-authored by Benjamin P. Thompson, Stuart D. Anderson and Jeffrey S. Russell.
Winner of the Polygon Outstanding Instructor Award, University of Wisconsin-Madison, College
of Engineering in April 1997.
Winner of an international competition for the “Best Innovative Ideas in Construction” in 1990.
($5,000 prize was sponsored by the Canadian Construction Research Board). Selected by a jury of
internationally-recognized experts over 43 other entries, Preview 2000, 6th Canadian Construction
Congress.
Fellow, American Society of Civil Engineers (ASCE).
Member of the ASCE Construction Research Council (CRC).
Member of the ASCE Construction Institute (CI).
Past Member, American Concrete Institute (ACI).
Past Secretary of ACI 235 Committee (Knowledge-Based Systems and Mathematical Modeling for
Materials).
Past Voting Member of ACI 347 Committee (Concrete Formwork).
Past Member, Canadian Society for Civil Engineering. (1990-1995)
Member, American Association for Engineering Educators. (1995-2002)
Member, Tripartite Subcommittee on Overtime Impact, Construction User Roundtable (CURT).
Professional Societies and Committees
Professional Awards and Achievements
3
Papers in Refereed Journals:
1. Hanna, A.S., Yeutter, M., and Aoun, D. “State of Practice of Building Information Modeling
(BIM) in the Electrical Construction Industry.” ASCE Journal of Construction Engineering and
Management. Vol. 140, No. 12. December 2014.
2. Hanna, A.S., Swanson, J., and Aoun, D. “Proper Risk Allocation during Construction: Differing
Site Conditions.” ASCE Journal of Legal Affairs and Dispute Resolution in Engineering and
Construction. Vol. 6, No. 4. November 2014.
3. Hanna, A.S., Lotfallah, W., Aoun, D., and El Asmar, M. “Mathematical Formulation of the
Project Quarterback Rating: New Framework to Assess Construction Project Performance.”
ASCE Journal of Construction Engineering and Management. Vol. 140, No. 8. August 2014.
4. Al-Sabah, R., Menassa, C., and Hanna, A.S. “Evaluating Impact of Construction Risks in the
Arabian Gulf Region from Perspective of Multinational AEC Firms.” Construction Management
and Economics. Vol. 32, No. 4. April 2014.
5. Hanna, A.S., Menassa, C., and Boktor, J. “State of Practice of Building Information Modeling
(BIM) in the Mechanical Construction Industry.” ASCE Journal of Management in Engineering.
Vol. 30, No. 1, pp. 78-85. January 2014.
6. El Asmar, M., and Hanna, A.S. “Quantifying Performance for the Integrated Project Delivery
(IPD) System.” ASCE Journal of Construction Engineering and Management. Vol. 139, No. 11.
November 2013.
7. Boktor, J., Hanna, A.S., and Menassa, C. “The State of Practice of Building Information
Modeling (BIM) in the Mechanical Construction Industry.” ASCE Journal of Construction
Engineering and Management. Vol. 139, No. 10. October 2013.
8. Hanna, A.S., Boodai, F., and El Asmar, M. “The State of Practice of Building Information
Modeling (BIM) in the MEP Construction Industry.” ASCE Journal of Construction Engineering
and Management. Vol. 139, No. 10. October 2013.
9. Hanna, A.S., Swanson, J., and Thomas, G. “Construction Risk Identification and Allocation:
Cooperative Approach.” ASCE Journal of Construction Engineering and Management. Vol. 139,
No. 9. September 2013.
10. El Asmar, M., Lotfallah, W., Loh, W., and Hanna, A.S. (2013) “Reducing Bias and Uncertainty
in Multi-Evaluator Multi-Criterion Decision Making.” ASCE Journal of Computing in Civil
Engineering. Vol. 27, No. 2. March 2013.
11. Hanna, A.S., Shapira, A., El Asmar, M., and Taylor, C. “Impact of Crew Scheduling on Project
Performance.” ASCE Practice Periodical on Structural Design and Construction. Vol. 18, No. 1.
February 2013.
12. Hanna, A.S., Tadt, E.J., and Whited, G.C. “Request for Information: Benchmarks and Metrics
for Major Highway Projects.” ASCE Journal of Construction Engineering and Management.
Vol. 138, No. 12. December 2012.
Publications
4
13. Hanna, Awad S. “Using the Earned Value Management System to Improve Electrical Project
Control.” ASCE Journal of Construction Engineering and Management. Vol. 138, No. 3. March
2012.
14. El Asmar, M., Lotfallah, W., Loh, W., and Hanna, A.S. “Uncertainty Reduction in Multi-
Evaluator Decision Making.” ASCE Journal of Computing in Civil Engineering. Vol. 26, No. 1,
pp. 105–112. March 2012.
15. El Asmar, M., Hanna, A.S., and Whited, G. “A New Approach to Developing Conceptual Cost
Estimates for Major Highway Projects.” ASCE Journal of Construction Engineering and
Management. Vol. 137, No. 11, pp. 942-949. November 2011.
16. Allison, G., Whited, G.C., Hanna, A.S., and Nasief, H. G. “Evaluation of Probing Versus Coring
for Determination of Portland Cement Concrete Pavement Thickness.” Transportation Research
Record: Journal of the Transportation Research Board. Vol. 2, No. 2152, Accession No.:
01150939. 2010.
17. El Asmar, M., Lotfallah, W., Whited, G., and Hanna, A.S. “Quantitative Methods for Design-
Build Team Selection.” ASCE Journal of Construction Engineering and Management. Vol. 136,
No. 8, pp. 904-912. August 2010.
18. Menches, C.L., Hanna, A.S., Nordheim, E.V. and Russell, J.S. “Quantifying the impact of pre-
construction planning on project performance in the U.S. electrical construction industry.”
Construction Management and Economics. Vol. 26, No. 8, pp. 853-867. July 2010.
19. Hanna, A.S. and Skiffingtin, M. “The Effect of Pre-Construction Planning Effort on Sheet Metal
Project Performance.” ASCE Journal of Construction Engineering and Management. Vol. 135,
No. 2, pp. 235-241. February 2010.
20. El Asmar, Mounir, Hanna, Awad S. and Chang, Chul-Ki. “Monte Carlo Simulation Approach to
Support Alliance Team Selection.” ASCE Journal of Construction Engineering and
Management. Vol. 135, No. 10, pp. 1087-1095. October 2009.
21. Hanna, A.S., Lee, M., Schoenfelder, S. and Lee, C. “Temperature-density relationship of hot-mix
asphalt pavement after completed rolling.” Canadian Journal of Civil Engineering. Vol. 35, No.
12, pp. 1468-1475. December 2008.
22. Karlsson, M., Lakka, A., Sulankivi, K., Hanna, A.S., and Thompson, B. “Best Practices for
Integrating the Concurrent Engineering Environment into Multi-Partners Project Management.”
ASCE Journal of Construction Engineering and Management. Vol. 134, No. 4, pp. 289-299.
April 2008.
23. Chang, C.K., Hanna, A.S., Lackney, J.A., and Sullivan, K. “Impact of Shift Work on Labor
Productivity for Labor Intensive Contractors.” ASCE Journal of Construction Engineering and
Management. Vol. 134, No. 3, pp. 197-204. March 2008.
24. Russell, J.S., Hanna, A.S., Bank, L.C., and Shapira, A. “Education in Construction Engineering
and Management Built on Tradition: Blueprint for Tomorrow.” ASCE Journal of Construction
Engineering and Management. Vol. 133, No. 9, pp. 661-668. September 2007.
5
25. Chang, C.K., Hanna, A.S., Lackney, J.A., and Sullivan, K. “Quantifying the Impact of Schedule
Compression on Labor Productivity for Mechanical and Sheet Metal Contractors.” ASCE Journal
of Construction Engineering and Management. Vol. 133, No.4, pp. 287-296. April 2007.
26. Hanna, A.S. and Swanson, J. “Risk Allocation by Law-Cumulative Impact of Change Orders.”
ASCE Journal of Professional Issues in Engineering Education and Practice. Vol. 133, No. 1,
pp. 60-67. January 2007.
27. Hanna, Awad S. “Risk Allocation and Increased Claims in the Construction Industry.” ASCE
Journal of Professional Issues in Engineering Education and Practice. Vol. 133, No. 1,pp 43-44.
January 2007.
28. Hanna, A.S., Chang, C.K., Lackney, J.A., and Sullivan, K. “Impact of Overmanning on
Mechanical and Sheet Metal Labor Productivity.” ASCE Journal of Construction Engineering
and Management. Vol. 133, No. 1, pp. 22-28. January 2007.
29. Menches, C.L. and Hanna, A.S. “Quantitative Measurement of Successful Performance from the
Project Manager’s Perspective.” ASCE Journal of Construction Engineering and Management.
Vol. 132, No. 12, pp. 1284-1294. December 2006.
30. Hanna, A.S. and Menches, C.L. “Conceptual Planning Process for Electrical Construction.”
ASCE Journal of Construction Engineering and Management. Vol. 132, No. 12, pp. 1306-1314.
December 2006.
31. Hanna, Awad S. “Discussion of Cumulative Effects of Project Changes for Electrical and
Mechanical Construction.” ASCE Journal of Construction Engineering and Management. Vol.
132, No. 5,pp. 545-547. May 2006.
32. Hanna, A.S., Menches, C.L., Sullivan, K.T., and Sargent, J.R. “Factors Affecting Absenteeism in
Electrical Construction.” ASCE Journal of Construction Engineering and Management. Vol. 131,
No. 11, pp. 1212-1218. November 2005.
33. Gunduz, M. and Hanna, A.S. “Benchmarking Change Order Impacts on Productivity for
Electrical and Mechanical Projects.” Elsevier Journal of Building and Environment. Vol. 40, No.
8, pp. 1068-1075. August 2005.
34. Hanna, A.S. and Gunduz, M. “Early Warning Signs for Distressed Projects.” Canadian Journal
of Civil Engineering. Vol. 32, No. 5, pp. 796-802. National Research Council Canada. August
2005.
35. Hanna, A.S., Taylor, C., and Sullivan, K.T. “Impact of Extended Overtime on Construction
Labor Productivity.” ASCE Journal of Construction Engineering and Management. Vol. 131,
No. 6, pp. 734-739. June 2005.
36. Hanna, A.S. and Sullivan, K.T. “Bridging the Gap between Academics and Practice: A Capstone
Design Experience.” ASCE Journal of Professional Issues in Engineering Education and
Practice. Vol. 131, No. 1, pp. 59-62. January 2005.
37. Hanna, A.S., Camlic, R., Peterson, P., and Lee, M.J. “Cumulative Effect of Project Changes for
Electrical and Mechanical Construction.” ASCE Journal of Construction Engineering and
Management. Vol. 130, No. 6, pp. 762-772. November 2004.
6
38. Hanna, A.S. and Gunduz, M. “Impact of Change Orders on Small Labor-intensive Projects.”
ASCE Journal of Construction Engineering and Management. Vol. 130, No. 5, pp. 726-733.
October 2004.
39. Hanna, Awad S. “Closure: Quantitative Definition of Projects Impacted by Change Orders.”
ASCE Journal of Construction Engineering and Management. Vol. 130, No. 4, pp. 612-613.
August 2004.
40. Lee, M.J. and Hanna, A.S. “Decision Tree Approach to Classify and Quantify the Cumulative
Impact of Change Orders on Productivity.” ASCE Journal of Computing in Civil Engineering.
Vol. 18, No. 2, pp. 132-144. April 2004.
41. Lee, M.J., Hanna, A.S., and Loh, W.Y. “Decision Tree Approach to Classify and Quantify
Cumulative Impact of Change Orders On Productivity.” ASCE Journal of Computing in Civil
Engineering. Vol. 18, No. 2, pp. 132-144. April 2004.
42. Ammar, A., Hanna, A.S., Nordheim, E.V., and Russell, J.S. “Indicator Variables Model of the
Firm’s Size-Profitability Relationship of Electrical Contractors Using Financial and Economical
Data.” ASCE Journal of Construction Engineering and Management. Vol. 29, No. 2, pp. 192-
197. April 2003.
43. Hanna, A.S. and Sullivan, K.T. “Impact of Overtime on Construction Labor Productivity.”
AACE International Journal of Cost Estimation, Cost/Schedule Control and Project
Management. Vol. 46, No. 4, pp. 20-27. 2003.
44. Hanna, A.S., Lotfallah, W.B., and Lee, M.J. “Statistical-Fuzzy Approach to Quantify Cumulative
Impact of Change Orders”. ASCE Journal of Computing in Civil Engineering. Vol. 16, No. 4, pp.
252-258. October 2002.
45. Hanna, A.S. and Russell, J.S. “Discussion of the Impact of Change Orders on Labor Efficiency
for Electrical Construction.” ASCE Journal of Construction Engineering and Management. Vol.
128, No. 4, pp. 362-364. August 2002.
46. Hanna, A.S., Peterson, P.A., and Lee, M.J. “Benchmarking Productivity Indicators for
Electrical/Mechanical Projects.” ASCE Journal of Construction Engineering and Management.
Vol. 128, No. 4, pp. 331-337. July 2002.
47. Thompson, B.P, Anderson, Stuart, D., Russell, J.S., and Hanna, A.S. “Guidelines for Warranty
Contracting for Highway Construction.” ASCE Journal of Management in Engineering. Vol. 18,
No. 3, pp. 129-137. June 2002.
48. Hanna, A.S., Camlic, R., Peterson, P.A., and Nordheim, E.V. “Quantitative Definition of
Projects Impacted by Change Orders.” ASCE Journal of Construction Engineering and
Management. Vol. 128, No. 1, pp. 57-65. February 2002.
49. Schmitt, R.L., Hanna, A.S., Russell, J.S., and Nordheim, E.V. “Statistically Based Methods for
Verification Testing.” Journal of the Transportation Research Board. Vol. 1761, pp. 86-93. 2001.
50. Kumar, V.S., Hanna, A.S., and Adams, T. “Assessment of Working Capital Requirements by
Fuzzy Set Theory.” Engineering Construction and Architectural Management. Vol. 7, No. 1, pp.
93-103. March 2000.
7
51. Hanna, A.S., Vandenberg, P., and Russell, J.S. “The Impact of Change Orders on Mechanical
Construction Labor Efficiency.” Journal of Construction Management and Economics. Vol. 17,
No. 6, pp. 721-730. November 1999.
52. Hanna, A.S., Russell, J.S., Nordheim, E.V. and Bruggink, M.J. “Impact of Change Orders on
Labor Efficiency for Electrical Construction.” ASCE Journal of Construction Engineering and
Management. Vol. 125, No. 4, pp. 224-232. July 1999.
53. Hanna, A.S., Russell, J.S., Gotzion, T.W. and Nordheim, E.V. “Impact of Change Orders on
Labor Efficiency for Mechanical Construction.” ASCE Journal of Construction Engineering and
Management. Vol. 125, No. 3, pp. 176-184. June 1999.
54. Hanna, A.S. and Lotfallah, W.B. “A Fuzzy Logic Approach to the Selection of Cranes.”
Automation in Construction. Vol. 8, No. 5, pp. 597-608. June 1999.
55. Noyce, D. and Hanna, A.S. “Planned and Unplanned Schedule Compression: The Impact on
Labor.”Journal of Construction Management and Economics. Vol. 16, No. 1, pp. 79-90. January
1998.
56. Hanna, A.S. and Brusoe, J.K. “Performance Evaluation Criteria Development in the Electrical
Construction Industry.” ASCE Journal of Management in Engineering. Vol. 13, No. 6, pp. 66-74.
November 1997.
57. Noyce, D. and Hanna, A.S. “Planned Schedule Compression Concept File for Electrical
Contractors.” ASCE Journal of Construction Engineering and Management. Vol. 123, No. 2, pp.
189-197. June 1997.
58. Hanna, A.S. and Senouci, A. “Materials Cost Minimization of Concrete Wall Forms.” The
International Journal of Building Science and its Application. Vol. 32, No. 1, pp. 57-67. January
1997.
59. Abou-Zeid, A., Russell, J.S., Hanna, A.S. and Park, S.C. “Data Flow Model for Communications
between Project Participants in a Highway Bridge Project.” Canadian Journal of Civil
Engineering. Vol. 22, No. 6, pp. 1224-1234. National Research Council of Canada. December
1995.
60. Hanna, A.S. and Senouci, A. “NEUROSLAB-Neural Network System for Optimum Formwork
Selection for Concrete Slabs.” Canadian Journal of Civil Engineering. Vol. 22, No. 4, pp. 785-
792. National Research Council of Canada. August 1995.
61. Hanna, A.S. and Senouci, A. “Design Optimization for Concrete Slab Forms.” ASCE Journal of
Construction Engineering and Management. Vol. 121, No. 2, pp. 215-221. June 1995.
62. Senouci, A. and Hanna, A.S. “Scheduling of Non-Serial Linear Projects with Non-Overlapped
Loop Structures.” Journal of Civil Engineering Systems. Vol. 11, No. 4, pp. 1-17. January 1995.
63. Hanna, A.S. and Heale, D. “Factors Affecting Productivity in Construction Sites: Newfoundland
Versus the Rest of Canada.”Canadian Journal of Civil Engineering. Vol. 21, No. 4, pp. 663-673.
National Research Council of Canada. August 1994.
8
64. Smith, G.R. and Hanna, A.S. “Factors Influencing Formwork Productivity.”Canadian Journal of
Civil Engineering. Vol. 20, No. 1, pp. 144-153. National Research Council of Canada. February
1993.
65. Hanna, A.S., Willenbrock, J.H. and Sanvido, V.E. “Knowledge Acquisition and Development
for a Formwork Selection System.” Journal of Construction Engineering and Management. Vol.
118, No. 1, pp. 179-198. March 1992.
66. Hanna, A.S. and Sanvido, V.E. “Interactive Horizontal Formwork Selection System.”American
Concrete Institute, Concrete International. Vol. 13, No. 8, pp. 50-56. August 1991.
67. Hanna, A.S. and Sanvido, V.E. “Interactive Vertical Formwork Selection System.”American
Concrete Institute, Concrete International. Vol. 12, No. 4, pp. 26-32. April 1990.
Papers Accepted for Publication in Refereed Journals:
1. Hanna, A.S., Blasier, K., and Aoun, D. “Risk Misallocation on Highway Construction Projects.”
Accepted for publication by the ASCE Journal of Legal Affairs and Dispute Resolution in
Engineering and Construction.
2. Hanna, A.S. and Iwanski, M. “Performance of Integrated Project Delivery (IPD) for Mechanical
and Electrical Contractors.” Accepted for publication by the ASCE Journal of Construction
Engineering and Management.
3. Hanna, A.S. and Olson, A. “Evaluation of Integrated Project Delivery on Construction Project
Performance.” Accepted for publication by the ASCE Journal of Construction Engineering and
Management.
4. Hanna, A.S., and El Asmar, M. “Evaluating Integrated Project Delivery (IPD) Using the Project
Quarterback Rating (PQR).” Accepted for publication by the ASCE Journal of Construction
Engineering and Management.
Books:
1. Hanna, Awad S. Change Order Pricing Principles and Best Management Practices. 133 pages.
ISBN_13: 978-0-9829042-2-0. September 2013.
2. Hanna, Awad S. Construction Labor Productivity Management and Methods Improvement. Self-
published. ISBN_13: 978-0-9829042-0-6. 2011.
3. Hanna, Awad S. Electrical Pre-Construction Planning Process Implementation Manual. Electri
International. Index No. F2806. 2009.
4. Hanna, Awad S. Factors Affecting Labor Productivity for Electrical Contractors. Electri
International. Index No. F3000. 2004.
5. Hanna, Awad S. Preconstruction Planning Process for HVAC and Sheet Metal Contractors. New
Horizons Foundation. 2006.
9
6. Hanna, Awad S. Equitable Risk Allocation: Principles, Perspective, and Process. Construction
Industry Institute. 2006.
7. Hanna, Awad S. Contracting to Appropriately Allocate Risk: A Common Law Perspective.
Construction Industry Institute. Index No. 10-05. 2006.
8. Hanna, A.S. and Menches, C.L. Achieving Greater Project Success and Profitability through Pre-
Construction Planning. Electri International. 2006.
9. Hanna, Awad S. Using the Earned Value Management System to Improve Electrical Project
Control. 2006.
10. Hanna, Awad S. The Effects of Absenteeism & Turnover on Labor Productivity for Electrical
Contractors. Electri International, 2006.
11. Hanna, Awad S. Productivity: Quantifying the Impact of Adverse Working Condition Electrical
Construction. The National Electrical Contractors Association. 2004.
12. Hanna, A.S. and Menches, C.L. Productivity: Manpower Loading: The Rate of Manpower
Consumption. The National Electrical Contractors Association. Baltimore, MD. 2004.
13. Hanna, A.S. and Menches, C.L. Productivity: Project Peak Workforce. The National Electrical
Contractors Association. Baltimore, MD. 2004.
14. Hanna, A.S. and Menches, C.L. Productivity: Normal Project Duration. The National Electrical
Contractors Association. Baltimore, MD. 2004.
15. Hanna, Awad S. Productivity: The Effect of Multi-story Buildings on Productivity. The National
Electrical Contractors Association. Baltimore, MD. 2004.
16. Hanna, Awad S. Productivity: The Effect of Temperature on Productivity. The National Electrical
Contractors Association. Baltimore, MD. 2004.
17. Hanna, A.S. and Taylor, C.S. Productivity: Overtime and Productivity in Electrical Construction.
The National Electrical Contractors Association. Baltimore, MD. 2004.
18. Hanna, Awad S. Productivity: Factors Affecting Labor Productivity for Electrical Contractors.
The National Electrical Contractors Association. Baltimore, MD. 2004.
19. Hanna, Awad S. Concrete Formwork Systems. (Spanish Translation). Marcel Dekker Inc. New
York, NY. 2003.
20. Hanna, A.S., Russell, J.S., and Emerson, E.O. Stacking of Trades for Electrical Contractors.
Electri International. Bethesda, MD. 2002.
21. Hanna, Awad S. Quantifying the Cumulative Impact of Change Orders for Mechanical
Contractors. The Mechanical Contracting Foundation. December 2001.
22. Hanna, Awad S. Quantifying the Cumulative Impact of Change Orders for Electrical Contractors.
Electri International. 2001.
10
23. Hanna, A.S. and Brusoe, J.K. A Survey of Performance Evaluations in the Electrical
Construction Industry. Electri International. 1999.
24. Hanna, Awad S. Formwork Systems. Marcel Dekker Inc. New York, NY. 1998.
25. Hanna, A.S., Russell, J.S., and Bruggink, M.J. Impact of Change Orders on Labor Efficiency for
Electrical Construction. Electri International. 1998.
26. Thomas, H.R., Oloufa, A.A., Hanna, A.S., and Noyce, D.A. What-To-Do-Guide for Schedule
Acceleration and Compression. Electri International. 1995.
Monographs or Book Chapters:
1. Taha, M., Abou-Zeid, A., Hanna, A.S., and Russell, J.S. “Merging Genetic Algorithms with
Neural Networks: Owner-Contractor Prequalification Example.” The American Society of Civil
Engineers Second Monograph on Artificial Neural Networks, pp. 247-259. Published as
“Advanced Neural Networks for Civil Engineers: Advanced Features and Applications.” August
1998.
2. Hanna, A.S., Russell, Jeffrey S., Taha, M. and Park, S.C. “Application of Neural Networks to
Owner-Contractor Prequalification.”ASCE Artificial Neural Networks for Civil Engineers:
Fundamentals and Applications Monograph, pp. 124-136. New York, NY. 1997.
3. Hanna, A.S., and Sanvido, V.E. “Computers in Concrete Construction.” American Concrete
Institute Compilation 15, pp. 8-14. Detroit, MI. ACI. 1992.
4. Hanna, A.S., and Sanvido, V.E. “Elevated Slabs.” American Concrete Institute Compilation 21,
pp. 22-28. Detroit, MI. ACI. 1992.
Papers in Refereed Conference Proceedings (Refereed Abstracts):
1. El Asmar, M. and Hanna, A.S. “Schedule Performance Analysis for Integrated Project Delivery.”
The 7th International Structural Engineering and Construction Conference, Honolulu, Hawaii. June
2013.
2. El Asmar, M. and Hanna, A.S. “Comparative Analysis of Integrated Project Delivery (IPD) Cost
and Quality Performance.” The 29th International Conference on Applications of IT in the AEC
Industry, CIB W78, Beirut, Lebanon. October 2012.
3. El Asmar, M., Lotfallah, W., Loh, W., and Hanna, A.S. “RBU: A Model to Reduce Bias and
Uncertainty in Multi-Evaluator Multi-Criterion Decision Making.” ASCE International
Conference on Computing in Civil Engineering. Clearwater Beach, Florida. 2012.
4. Bradford, R. and Hanna, A.S. “Allocating Project Risk.” Power. Vol. 156, No. 7, pp. 53. July
2012.
11
5. El Asmar, M., Hanna, A.S., and Chang, C., and Russell J.S. “Alliance Team Selection for
Infrastructure Projects Using Monte Carlo Simulation.” Construction Research Congress (CRC).
Seattle, Washington. April 5-7, 2009.
6. El Asmar, M., Lotfallah, W., Whited, G., and Hanna, A.S. “Quantitative Methods for Design-
Build Team Selection.” Transportation Research Board (TRB). Washington D.C. January 11-15,
2009.
7. Hanna, A.S. and Haddad, G. “Overtime and Productivity in Electrical Construction.” ASCE
Conference Proceedings. 339, 18. 2009.
8. Hanna, A.S., El Asmar, M., Chang, C.K., and Russell, J.S. “Alliance Team Selection for
Infrastructure Projects Using Monte Carlo Simulations.” ASCE Conference Proceedings. 339,
133. 2009.
11. Roth, G. and Hanna, A.S. “Market Share, Business Practices, and Union/Non-Union Differences
for Wisconsin Electrical Contractors.” Construction Research Council. No. 181. May 2007.
12. Swanson, J., Hanna, A.S., and Russell, J.S. “Contracting to Appropriately Allocate Risk.”
Construction Research Council. No. 181. May 2007.
13. Thompson, B.P., Anderson, S.D., Russell, J.S., and Hanna, A.S. “Guidelines for Warranty
Contracting for Highway Construction.” ASCE Alternative Project Delivery, Procurement, and
Contracting Methods for Highways, pp. 113-128. 2007.
14. Hanna, A.S., Chang, C.K., Lackney, J.A., and Sullivan, K.T. “Shift Work Impact on
Construction Labor Productivity.” ASCE Construction Research Congress, pp. 296-300. San
Diego, California. April 2005.
15. Hanna, A.S., Chang, C.K., Lackney, J.A., and Sullivan, K.T. “Overmanning Impact on
Construction Labor Productivity.” ASCE Construction Research Congress, pp. 381-385. San
Diego, California. April 2005.
16. Hanna, A.S., Chang, C.K., Lackney, J.A., and Sullivan, K.T. “Quantifying the Impact of
Schedule Compression on Construction Labor Productivity.” ASCE Construction Research
Congress, pp. 291-295. San Diego, California. April 2005.
17. Menches, C., Hanna, A.S., and Russell, J.S. “Benchmarking Effective Pre-Construction
Planning.” Proceedings of Building Future Council, pp. 1-10. March 2005.
18. Hanna, A.S. and Sullivan, K.T. “Impact of Overtime on Construction Labor Productivity.”
AACE Cost Engineering. Vol. 130, No. 4, pp. 20-27. April 2004.
19. Lee, M.J., Hanna, A.S., and Russell, J.S. “Benchmarking Productivity for Electrical Projects.”
2002 AACE International Transactions. Vol. CSC, No. 18, pp. 1-6. June 2002.
20. Hanna, Awad S. “Productivity Factors in Electrical Construction.” 2001 Annual Conference for
the Electrical Contracting Foundation. Aventura, Florida. January 24-26, 2001.
21. Schmitt, R.L., Hanna, A.S., Russell, J.S., and Nordheim, E.V. “Contractor Quality Control
Testing Levels for Highway Construction.” ASCE Construction Congress (Proceedings of the
Congress), pp. 353-362. February 2000.
12
22. Hanna, Awad S. “Safety Analysis for Post-Frame Construction.” CIB W-99. Safety Coordination
and Quality in Construction, pp. 245-252. Milan, Italy. 1999.
23. Taha, M., Abou-Zeid, A., Hanna, A.S., and Russell, J.S. “Merging Genetic Algorithms with
Neural Networks: Owner-Contractor Prequalification Example.” Advanced Neural Networks for
Civil Engineers: Advanced Features and Applications (Second Monograph on Artificial Neural
Networks), pp. 247-259. ASCE. August 1998.
24. Jaselskis, E.J., Hanna, A.S., and Coble, R. “Future Safety Trends in the Construction Industry in
the United States.” Health and Safety in Construction: Current and Future Challenges, pp. 260-
265. CIB W99. South Africa. 1997.
25. Noyce, D.A. and Hanna, A.S. “Planned and Unplanned Schedule Compression: The Impact on
Labor Productivity.” Proceedings of Construction Congress V. Minneapolis, Minnesota. 1997.
26. Hanna, A.S., Schmitt, B.L., and Stetzer, K.M. “The Use of Tabular Knowledge Base in
Construction Decision-Making.” Proceedings of Construction Congress V. Minneapolis,
Minnesota. 1997.
27. Schmitt, R.L., Hanna, A.S., and Russell, J.S. “Improving Asphalt Paving Productivity.” 76th
Annual Transportation Research Meeting, Transportation Research Record. No. 1575.
Construction: Flexible Pavements, Bridge, Quality and Management, pp. 25-33. National
Research Council. January 1997.
28. Hanna, A.S., Isidore, L., and Kammel, D. “Safety Evaluation for Frame Building Contractors.”
International Council for Building Research. Studies and Documentation. CIB W99 Working
Commission, pp. 145-155. September 1996.
29. Hanna, Awad S. “Innovative Formwork Schemes for Building Concrete.” XXIV IAHS World
Housing Congress. International Journal for Housing Sciences. Ankara, Turkey. 1996.
30. Hanna, Awad S. “The Use of Tabular Knowledge Base Format in Knowledge Acquisition and
Organization for Concrete Construction.” The American Concrete Institute Annual Convention.
Montreal, Quebec, Canada. November 1995.
31. Cheng, C. and Hanna, A.S. “Visual Simulation for Crane Operation Using Animation
Programs.” Canadian Society for Civil Engineering Annual Conference. Ottawa, Ontario,
Canada. June 19, 1995.
32. Hanna, Awad S. “Progress and Delay in Construction: A Case Study.” Canadian Society for Civil
Engineering Annual Conference. Ottawa, Ontario, Canada. June 19, 1995.
33. Hanna, Awad S. “Development of an Interactive Information Environment for Formwork
Activities.” Proceedings of the Institute of Civil Engineers. Vol. 108, No. 2. London, England.
May 1995.
34. Hanna, A.S. and Chao, L.C. “Quantification of Cost Uncertainty Using Neural Network
Technique.” Proceedings of the First ASCE Congress on Computing in Civil Engineering, pp. 41-
46. Washington, D.C. June 1994.
13
35. Hanna, Awad S. “SELECTCRANE: An Expert System for Optimum Crane Selection.”
Proceedings of the First ASCE Congress on Computing in Civil Engineering, pp. 958-963.
Washington, D.C. June 1994.
36. Hanna, Awad S. “Development of a Knowledge-Based System for Construction Formwork
Safety.” The American Concrete Institute Annual Convention. Minneapolis, Minnesota.
November 1993.
37. Hanna, A.S. and Senouci, A. “Neural Network Development for Selection of Horizontal
Formwork Systems.” The American Concrete Institute Annual Convention. Minneapolis,
Minnesota. November 1993.
38. Hanna, A.S. and Blair, A.N. “A Rational Method for Treatment Escalation in Construction
Costs.” International Council for Building Research. Vol. 3, pp. 1415-1425. Studies and
Documentation. CIB W65 Working Commission. September 1993.
39. Hanna, A.S. and Heale, D.G. “Factors Affecting Productivity at Canadian Construction Sites.”
Proceedings of the Canadian Society for Civil Engineering Annual Conference, pp. 165-174.
Fredericton, New Brunswick, Canada. June 1993.
40. Hanna, A.S. and Heale, D.G. “Modeling Masonry Construction Productivity.” Proceedings of
the Canadian Society for Civil Engineering Annual Conference, pp. 185-192. Fredericton, New
Brunswick, Canada. June 1993.
41. Hanna, A.S. and Blair, A.N. “Computerized Approach for Forecasting the Rate of Cost
Escalation.” Fifth International Conference in Computing in Civil and Building Engineering (V-
ICCCBE), pp. 401-408. Anaheim, California. June 1993.
42. Moloney, C., Hanna, A.S. and Cheng, A. “Graphical Simulation of Crane Configurations.”
Proceedings of the 10th National Conference on Microcomputers in Civil Engineering, pp. 109-
113. Orlando, Florida. November 1992.
43. Hanna, A.S. and Allis, K. “Analysis of Construction Safety Data for Newfoundland.”
Proceedings of the Canadian Society for Civil Engineering Annual Conference, pp. 457-464.
Quebec City, Quebec, Canada. May 1992.
44. Hanna, Awad S. “The Use of IDEF Technique to Model Concrete Structures.” Proceedings of the
1st Atlantic Congress on Advanced Manufacturing and Engineering, pp. 131-142. Halifax, Nova
Scotia, Canada. September 1991.
45. Hanna, A.S. and Amoah, A.S. “Expert System for Bid No-Bid in Construction.” Proceedings of
the 1st Atlantic Conference on Advanced Manufacturing and Engineering, pp. 275-284. Halifax,
Nova Scotia, Canada. September 1991.
46. Smith, G.R. and Hanna, A.S. “Factors Influencing Formwork Productivity.” Proceedings of the
Canadian Society for Civil Engineering Annual Conference, pp. 395-404. Vancouver, British
Columbia, Canada. May 1991.
47. Hanna, A.S., Willenbrock, J.H., and Smith, G.R. “Time Extension for Accelerated Schedule
Using Continuous Milestones Charts Formulas (Supplementary Vol., Part II).” Proceedings of the
14
Canadian Society for Civil Engineering Annual Conference, pp. 119-130. Vancouver, British
Columbia, Canada. May 1991.
48. Hanna, Awad S. “A Knowledge-Based Expert System for the Selection of Formwork Systems for
Reinforced Concrete Slabs.” Sixth Canadian Construction Congress. Preview 2000, pp. 309-322.
December 1990.
49. Hanna, A.S. and Sanvido, V.E. “Vertical Formwork Systems: A Comparative Analysis IV.”
Proceedings of the Canadian Society for Civil Engineering Annual Conference, pp. 233-249.
Hamilton, Ontario, Canada. May 1990.
50. Smith, G.R., Hanna, A.S., and Bullock, R.J. “An Expert System Tutorial Approach for
Evaluating Notice Requirements Disputes.” Proceedings of the Canadian Society for Civil
Engineering Annual Conference, pp. 125-139. Hamilton, Ontario, Canada. May 1990.
51. Hanna, A.S. and Smith, G.R. “Expert System Development on Microcomputers for Construction
Formwork Safety.” Proceedings of the Seventh National Conference on Microcomputers in Civil
Engineering, pp. 206-213. Orlando, Florida. November 1989.
Non-Refereed Publications:
1. Hanna, A.S. and Swanson, J. “Contracting to Appropriately Allocate Risk.” The Sixth
International Structural Engineering and Construction Conference. Zurich, Switzerland. June
2011.
2. Hanna, A.S. and Swanson, J. “Two-Party Risk Assessment and Allocation Model.” Crete,
Greece. May 2010.
3. Hanna, A.S. and Wodalski, M. “Integrated Lean Delivery for Public Work.” IGLC 18. Haifa,
Israel. July 2010.
4. El Asmar, M., Hanna, A.S., and Whited, G. “A New Approach to Developing Conceptual Cost
Estimates for Major Highway Projects.” Transportation Research Board Annual Meeting.
Washington, D.C. January 2010.
5. Pashouwer, J., Hanna, A.S., Whited, G., and Alsamadani, R. “A New Methodology for
Developing Cost Indexes for Highway Construction.” Transportation Research Board Annual
Meeting. Washington, D.C. January 2010.
6. Wodalski, M., Whited, G., and Hanna, A.S. “Applying Lean Techniques in the Delivery of
Transportation Infrastructure Projects.” Transportation Research Board Annual Meeting.
Washington, D.C. January 2010.
7. Hanna, A.S., El Asmar, M., Lotfalla, W., and Whited, G. “Infrastructure Project Delivery,
Construction Management and Quality Assurance: Quantitative Methods for Design-Build Team
Selection.” Transportation Research Board Annual Meeting. Washington, D.C. January 2009.
8. Hanna, Awad S. “Improve Project Tracking Using Earned Value Approach.” New Horizons
Foundation. Las Vegas, Nevada. October 2007.
15
9. Whited, G. and Hanna, A.S. “Improving Communication on Transportation Construction
Projects.” Mid-Continent Symposium. August 2007.
10. Hanna, Awad S. “Learning the Measured-Mile Approach to Lost Compensation.” The Wire. Vol.
8, No. 1. 2006.
11. Hanna, Awad S. “The Stacking of Trades: Too Many People on the Site at Once can be Chaotic
and Costly.” The Electrical Contracting Magazine. pp. 118-120. August 2004.
12. Hanna, Awad S. “Recouping Your Losses Dealing with Loss of Productivity Claims.” Electrical
Contractor Magazine, pp. 174-176. Bethesda, Maryland. September 2003.
13. Hanna, Awad S. “Research Proves the Cumulative Effect of Change Orders.” Electrical
Contractor Magazine, pp. 35. Vol. 67, No. 2. Bethesda, Maryland. February 2002.
14. Hanna, Awad S. “End of Our Love of Skyscrapers?” Reuters International. September 2001.
15. Russell, J.S., Hanna, A.S., Anderson, S.D., Wiseley, P.W., and Smith, R.J. “The Warranty
Alternative.” Civil Engineering, pp. 60-63. May 1999.
16. Hanna, Awad S. “How to Convince Contractors to Write.” American Concrete Institute, Concrete
International, pp. 53. May 1998.
17. Hanna, A.S. and Maples, M. “More Manpower?” American Concrete Institute, Concrete
International, pp. 73. Vol. 19, No. 10. October 1997.
18. Hanna, A.S. and Maples, M. “Add a Second Shift.” American Concrete Institute, Concrete
International, pp. 57. Vol. 19, No. 10. October 1997.
19. Hanna, A.S. and Maples, M. “Place the Crew on Overtime.” American Concrete Institute,
Concrete International, pp. 71. Vol. 19, No. 9. September 1997.
20. Hanna, A.S. and Hoerr, M. “Use a Set-Up Crew.”American Concrete Institute, Concrete
International, pp. 82. Vol. 18, No. 10. October 1996.
21. Hanna, A.S. and Engelman, A.E. “Avoid Interrupting Crews During Peak Productivity Times.”
American Concrete Institute, Concrete International, pp. 58. Vol. 18, No. 7. July 1996.
22. Hanna, A.S. and Inman, B.D. “Provide Employees with Incentive.” American Concrete Institute,
Concrete International, pp. 72. Vol. 18, No. 6. June 1996.
Technical Reports:
1. Vonderohe, A., Hintz, C., and Hanna, A.S. “3D Design Terrain Models for Construction Plans
and GPS Control of Highway Construction Equipment.” Report 02-05. CFIRE. March 2010.
2. Hanna, Awad S. “Contracting to Appropriately Allocate Risk.” Report 210-11. The Construction
Industry Institute. December 2007.
16
3. Hanna, Awad S. “Equitable Risk Allocation: Risk Assessment Worksheets Tutorial.” Report 210-
12. The Construction Industry Institute. December 2007.
4. Hanna, Awad S. “Equitable Risk Allocation: A Legal Perspective.” Report 210-13. The
Construction Industry Institute. December 2007.
5. Hanna, Awad S., et al. “Extended Overtime on Construction Projects.” Overtime Subcommittee
of the Construction User Round Table. May 2004.
6. Hanna, A.S. and Luedke, M. “Project Management in the Concurrent Engineering
Environment.” VTT-Technical Research Center of Finland. April 2003.
7. Hanna, A.S., Bahia, H., and Russell, J.S. “Determining a Temperature Density Relationship
After Rolling for Hot-Mix Asphalt.” Wisconsin Highway Research Program. November 2001.
8. Hanna, Awad S. “Quantifying the Cumulative Impact of Change Orders for Electrical and
Mechanical Contractors.” Construction Industry Institute. Report 158-11, pp. 178. February 2001.
9. Hanna, Awad S., et al. “Cumulative Impact of Change Orders on Labor.” The Construction
Industry Institute. Source Document 158, pp. 198. August 2000.
10. Hanna, Awad S. “Improved Contracting Methods for Highway Construction Projects.” The
National Cooperative Highway Research Program’s Transportation Research Board (National
Research Council), pp. 250. 1998.
11. Hanna, Awad S. “Implementation Guidelines for Warranty, Multi-Parameter, and Best Value
Contracting.” The National Cooperative Highway Research Program’s Transportation Research
Board (National Research Council), pp. 125.1998.
12. Hanna, A.S. and Dedolph, C. “A Forecasting Model for Construction and Demolition Waste
Quantities in Dane County Wisconsin.” The University of Wisconsin-Madison, pp. 78. December
1996.
13. Hanna, A.S. and Noyce, D. “The Impact of Planned and Unplanned Schedule Compression or
Acceleration on the Labor Productivity of Contractors.” The Electrical Contracting Foundation,
Inc., pp. 359. June 1995.
14. Isidore, L. and Hanna, A.S. “Forecasting Models in Construction.” University of Wisconsin-
Madison Department of Civil and Environmental Engineering, pp. 60. August 1994.
15. Hussey, G. and Hanna, A.S. “Productivity on Canadian Construction Sites.” The Canadian
Construction Research Board, pp. 99. St. John's, Newfoundland, Canada. August 1992.
16. Hanna, A.S. and Rimmer, D. “Construction Waste.” The National Research Council (Canada),
pp. 84. St. John's, Newfoundland, Canada. August 1991.
17. Hanna, Awad S. “The Integration of a Microcomputer Based Scheduling Program into the
Continuous Milestone Chart Procedure.” The Pennsylvania State University Department of Civil
Engineering, pp. 149. May 1986.
17
Average teaching evaluation score for contractors and professionals is approximately 4.6/5.0 (based
on around 10,000 attendees, averaged over 20 years).
Average teaching evaluation score for EPD (Effective Cost Estimating Design Build) seminars is
4.5/5.0.
Average teaching evaluation score for EPD “Construction Week” in Madison is 4.4/5.0 (based on
five days of teaching with an average of 50 attendees over six hours, averaged over 15 years).
COURSES WITHIN THE CONSTRUCTION ENGINEERING & MANGEMENT PROGRAM
Courses taught:
Construction Project Management (CEE 498 – 3 credits)
Civil Engineering Design (Senior Capstone Design, CEE 576 – 3 credits)
Construction Labor Productivity Management (CEE 592 – 3 credits)
Integrated Estimating and Scheduling (CEE 492 – 3 credits)
Building Systems (CEE 290 – 3 credits)
Construction Safety (CEE 698 – 3 credits)
Courses developed, supervised, participated in teaching:
Building Information Modeling (CEE 392 – 2 credits)
Lean Construction (CEE 698 – 3 credits)
Legal Aspects of Engineering (CEE 491 – 3 credits; course coordinator)
Electric Systems for Construction (CEE 496 – 3 credits)
Mechanical Systems for Construction (CEE 497 – 3 credits)
Leadership Development in Construction (CEE 698 – 3 credits)
Civil Field Engineering Workshops (CEE 698 – 3 credits)
Teaching and Training Effectiveness
18
RESEARCH FUNDING (WITHIN LAST 10 YEARS)
UW ID Work Order Name Work Order
Total Begin Date End Date
PI
Status
PRJ55MJ CMSC Program Management Support Services
(Wisconsin Department of Transportation, WisDOT) $400,000.00 12/31/13 12/31/16 PI
PRJ55MJ CMSC Program Management Support Services
(Wisconsin Department of Transportation, WisDOT) $400,000.00 1/1/12 12/31/13 PI
PRJ56PP Backbone & 3R Cost Estimating Process and Tool (WisDOT) $45,160.00 2/1/12 12/31/12 PI
PRJ57DB DTSD Scoping, Estimating, Program Management & Project
Management Assistance for Mega and Major Projects (WisDOT) $99,145.00 2/15/12 7/1/13 PI
PRJ61HW Safety Edge 2012 Pilot Project Evaluation $23,015.00 5/15/12 4/1/13 PI
PRJ66ZM Quantitative Measure of PM Competencies (The Construction
Industry Institute) $241,456.00 9/15/12 12/31/14 PI
PRJ66FC Highway Construction Production Rates (WisDOT) $93,300.00 11/15/12 9/1/14 PI
PRJ521L Update of Warranty Cost and Performance Evaluation (WisDOT) $15,320.00 10/22/12 11/12/12 PI
None Timely Decision Making on WisDOT Construction Projects
(WisDOT) $9,500.00 11/26/12 6/30/13 PI
PRJ31JW Applying Lean Techniques in Delivery of Transportation
Infrastructure Projects. $79,655.00 1/1/10 3/31/11 PI
PRJ33ZA Best Practices on Mega-Projects and ARRA Projects $94,860.00 3/1/10 12/31/11 PI
PRJ41JD Evaluation of Local Program Management Consultant (MC)
Program $67,290.00 7/15/10 12/1/11 PI
PRJ45BM Majors Program Cost Estimating Procedure Manual $38,865.00 3/1/11 12/31/11 PI
PRJ52CD Changing project delivery and the Effect on Public Agency
Contractors $45,000.00 9/1/11 8/30/12 PI
PRJ34GI HMA Longitudinal Joint Deterioration Investigation $35,490.00 1/1/10 6/1/11 PI
PRJ32ZQ WisDOT Transparency Evaluation $43,410.00 1/1/10 4/1/11 PI
144-QD29 Implementing Innovative Transportation Project Delivery Systems $49,948.00 4/1/07 7/1/08 PI
144-QC37 Strategies for Appropriately Allocating Risk on Transportation
Projects $92,539.00 4/1/07 7/1/08 PI
133-GH48 Contracting to Appropriate Allocate Risk $112,780.00 1/1/05 8/1/07 PI
133-GC55 Achieving Greater Project Success and Profitability through Pre-
Construction Planning $98,080.00 8/1/04 8/1/07 PI
133-GC56 Using the Earned Value Management System to Improve Electrical
Project Control $98,080.00 8/1/04 8/1/07 PI
A-19-1500 Quantifying the Cumulative Impact of Change Orders on Sheet
Metal Contractors $112,000.00 11/1/01 4/1/04 PI
133-EE61 Productivity Factors for Mechanical Contractors
$46,000.00 11/1/01 12/1/03 PI
133-EB78 Cost Effectiveness of Innovative Crew Scheduling $87,000.00 10/1/00 9/1/03 PI
19
EXTENSION/ENGINEERING PROFESSIONAL DEVELOPMENT
For the last 15 years, I have been teaching courses on project management, scheduling, and cost
estimating for the University of Wisconsin Engineering Professional Development.
I taught five courses for the National Electrical Contractors Association, titled:
o Project Tracking to Improve Labor Productivity: An Earned Value Approach (2010)
o Change Orders in Electrical Construction (2002-present)
o Cumulative Impact of Change Orders (2002-present)
o Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical
Contractors (2002-present)
I taught two courses for the Wisconsin Department of Transportation, titled:
o Basic Practices of Highway Construction Scheduling (2003-2004)
o Advanced Highway Construction Scheduling and Delay Analysis (2003-2004)
In 2001, I taught a course, titled Cumulative Impact of Change Orders, at the Sacramento Bar
Association in Sacramento, California. I also taught this course in San Francisco, California;
Milwaukee, Wisconsin; New York, New York; Toronto, Ontario, Canada; Portland, Oregon;
Mountainside, New Jersey; Albuquerque, New Mexico; Boston, Massachusetts; and Miami,
Florida.
In 2001, I taught a course, titled Best Practices of Project Scheduling, in Los Angeles, California
and Denver, Colorado.
In 2001, I taught a five-day course, titled Construction Week in Madison (Estimating, Scheduling
and Project Management) in Madison, Wisconsin.
In 1991, I co-directed and taught a one-day seminar, titled Productivity on Canadian Construction
Sites. The seminar was a nationwide tour of 10 Canadian provinces sponsored by the Construction
Technology Center Atlantic (CTCA).
In 1990, I taught a three-day seminar, titled Concrete Formwork, in St. John's, Newfoundland,
Canada with 14 contact hours.
REVIEWER
1. I have reviewed papers as guest editor for the Journal of Professional Issues in Engineering
Education and Practice (Legal Affairs Section: Disputes and Claims in Construction).
2. I have reviewed an average of two to three papers per year for the last 20 years for the ASCE
Journal of Construction Engineering and Management.
3. I have reviewed an average of two to three papers per year for the last 20 years for the ASCE
Journal of Management in Engineering.
20
4. From 1991 to 2002, I reviewed an average of one paper per year for the American Concrete
Institute, Structure Journal, and Concrete International.
5. In 1997, I served as a member on the panel that selects the recipient of the Journal of Computing in
Civil Engineering Best Journal Paper award. I have also reviewed an average of two or three papers
per year for the Journal of Computing in Civil Engineering for the last 20 years.
6. I reviewed and edited two chapters of the ACI-347 publication, Concrete Formwork.
7. I have reviewed several papers for the UK publication Journal of Construction Management and
Economics.
8. I have served on review panels of the National Science Foundation.
9. In 2001, I reviewed research proposals for funding for the National Research Council of Hong
Kong.
10. From 1996 to present, I have reviewed research proposals for funding for the Hong Kong Research
Grant Council.
11. I am a frequent reviewer of promotion and tenure cases, such as the reviewer of someone to the
status of full professor.
12. I have reviewed papers for Automation in Construction from 1995 to present.
13. I reviewed papers for Artificial Intelligence for Engineering Design, Analysis and Manufacturing
from 1994 to 2002.
14. I reviewed papers for the Engineering Journal of the University of Qatar in 1996 and 1998.
15. In 1997, I reviewed the ACI Committee E-703 document “Concrete Construction Practices.”
16. In 1997, I reviewed a proposal for funding for the Center for Integrated Facility Engineering (CIFE)
at Stanford University.
17. I reviewed several papers for The International Journal of Building Science and its Application in
1995.
18. I reviewed two papers for the Building Research Journal in July and October of 1994.
19. I reviewed one paper for the Washington Editorial Review Board in July of 1994.
20. I reviewed two research proposals for funding for the Natural Science and Engineering Research
Council of Canada from 1991 to 1992.
21. I have reviewed papers for the Canadian Journal of Civil Engineering from 1989 to present.
21
Joint research effort with VTT Building Technology in Finland
Participant in a nationwide tour of Canada to teach a seminar, titled Productivity on Canadian
Construction Sites, for the National Research Council of Canada
Member of the steering committee and track coordinator for the International Council for Building
Research, Studies and Documentation (CIB), Working Commission W99, and Construction Safety
in Honolulu, Hawaii (1999)
Speaker invited to the University of Tokyo to participate in the Artificial Intelligence Application in
Civil and Building Engineering Workshop (1992)
1. I am the founder of the St. Mary and St. Rewais Coptic Orthodox Church in Madison, Wisconsin.
2. I am the founder and faculty advisor of the UW Construction Club. I annually supervise the
Construction Club banquet, to which over 300 construction professionals are invited.
3. I was the head coach of 1st through 5th grade soccer players at the Madison Country Day School in
1998.
4. I served as a member of the Board of Directors at St. Mary & St. Antonio’s Coptic Christian
Orthodox Church in Milwaukee, Wisconsin from 1995 to 1999.
5. In 1999, I was interviewed by three radio stations and local newspapers after the collapse of the
pharmacy building slab at the University of Wisconsin-Madison.
6. I provided expert opinion for ABC News and Reuters on the collapse of residential buildings in
Israel and the collapse of the World Trade Center buildings after the 9/11 terrorist attacks,
respectively.
7. I actively participated in fundraising activities, including helping to raise $1,100,000 from M.A.
Mortenson, $100,000 from the J.F. Ahern Company, $20,000 from Betchel Power, $2,500 from the
Wisconsin Chapter of NECA, and $10,000 in 2007 from Betchel National.
8. In the last 17 years, I have raised over $3,000,000 in donations for community organizations and
causes.
Community Service
International Activities and Recognition